Bid Results

Indefinite Delivery, Indefinite Quantity (Task Order) Atchafalaya Basin, Gulf Intracoastal Waterway (GIWW) Miscellaneous Projects Cutterhead Dredge Rental LOTS 1, 2, 3, 4, 5, 6.

Manson Construction Company (APP LOW) Lot 2 (L) $13,667,600.00 Mike Hooks, Incorporation Lot 4 (L) $13,853,450.00 Weeks Marine Lot 6 (L) $14,894,500.00 Great Lakes Dredge & Dock Company, LLC Lot 4 $15,588,770.00

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER

W912P8-14-B-0047

2. DATE ISSUED

22 Apr 2015

3. DATE OPENED

20 Aug 2015

PAGE

0F 4

PAGES 13

4. ISSUING OFFICE

U.S. ARMY OF ENGINEERS, DISTRICT NOD

P.O. BOX 60627

NEW ORLEANS, LA 70160-0267

UNRESTRICTED

I CERTIFY that I have opened, read, and recorded on this abstract all

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

offers received in response to this solicitation.

SIGNATURE DATE SIGNED

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(Check A, B or C and complete D, E, NO. 1 NO. 2 NO. 3

Indefinite Delivery, Indefinite Quantity (Task Order) Atchafalaya Basin, Gulf Intracoastal Waterway (GIWW) A. HIRED LABOR

A. OFFEROR

Mason Construction Company 5985 Richard Street, Suite 1 Jacksonville, FL 32216

B.OFFEROR

B. OFFEROR

Miscellaneous Projects Cutterhead Dredge Rental LOT TWO 24 IN. Inside Diameter (ID) Pump Discharge without Submerged Pump

B. REASONABLE

CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount)

B.BID SECURITY (Type and amount)

6. NUMBER OF AMENDMENTS ISSUED

03 C. REASONABLE

CONTRACT

C. AMENDMENTS ACKNOWLEDGED

C.AMENDMENTS ACKNOWLEDGED

7A.

ITEM

NO.

BID LOT TWO

7B. DESCRIPTION OF

OFFERED ITEM

7C. EST.

QUANTI

TY

D.

UNIT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 Initial Mobilization and Initial Demobilization 1 JOB --- 545,000.00 545,000.00 --- ---

OPTION

Additional Mobilization and Demobilization 2 EACH

TO BE NEGOTIATED

PER NON-

CONSECUTIVE TASK

ORDER

0003 DREDGING: Rental of one fully operated cutterhead dredge with 24-inch ID pump discharge, attendant plant and discharge pipeline as specified.

6109 HOUR 2,025.00 12,370,725.00

0004 Dredge Towing Service 420 MILE 950.00 399,000.00

0005 Picket Boat 7025 HOUR 25.00 175,625.00 --- ---

OPTION

Port Allen Lock Forebay Dredging: box cut on the north side of floating guidewall.

1 JOB 90,000.00 90,000.00

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1

2. DATE ISSUED

22 Apr 2015

3. DATE OPENED

20 Aug 2015

PAGE

0F 5

PAGES 13

4. ISSUING OFFICE

U.S. ARMY OF ENGINEERS, DISTRICT NOD

P.O. BOX 60627

NEW ORLEANS, LA 70160-0267

UNRESTRICTED

I CERTIFY that I have opened, read, Indefinite Delivery, Indefinite Quantity (Task Order) Atchafalaya Basin, Gulf Intracoastal Waterway (GIWW) A. HIRED LABOR

A. OFFEROR

LOT TWO, 24 IN. Inside Diameter Pump Discharge without Submerged Pump

B. REASONABLE

CONTRACT

NO.

7B. DESCRIPTION OF

OFFERED ITEM

7C. EST.

QUANTI

TY

D.

UNIT

F. ESTIMATED

OPTION

Additional Pumping Capability for Dredging Payment Item 0003:

Additional 8,000 ft of floating or submerged pipeline with additional pumping plant capacity as describe herein.

339 HOUR --- 250.00 84,750.00 --- ---

OPTION

Mobilization and Demobilization of additional pumping capability equipment for payment Item 0007

1 JOB 2,500.00 2,500.00

TOTAL LOT TWO --- 13,667,600.00 --- ---

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

2. DATE ISSUED

22 Apr 2015

3. DATE OPENED

20 Aug 2015

PAGE

0F 8

PAGES 13

4. ISSUING OFFICE

U.S. ARMY OF ENGINEERS, DISTRICT NOD

P.O. BOX 60627

NEW ORLEANS, LA 70160-0267

UNRESTRICTED

I CERTIFY that I have opened, read, Indefinite Delivery, Indefinite Quantity (Task Order)

Mike Hooks, Inc.

409 Mike Hooks Road Westlake, LA 70669

LOT FOUR 27 IN. Inside Diameter (ID) Pump Discharge without Submerged Pump

B. REASONABLE

CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount)

CONTRACT

C. AMENDMENTS

ACKNOWLEDGED

NO.

BID LOT

FOUR

7B. DESCRIPTION OF

OFFERED ITEM

7C. EST.

QUANTI

TY

D.

UNIT

G. ESTIMATED

0001 Initial Mobilization and Initial Demobilization 1 JOB 905,000.00 905,000.00 400,000.00 400,000.00 ---

OPTION

Additional Mobilization and (Demobilization 2 EACH TO BE NEGOTIATED

PER NON-

DREDGING: Rental of one fully operated cutterhead dredge with 27-inch ID pump discharge, attendant plant and discharge pipeline as specified.

4829 HOUR 2,851.00 13,767,479.00 2,400.00 11,589,600.00

0004 Dredge Towing Service 420 MILE 249.00 104,580.00 600.00 252,000.00

0005 Picket Boat 5553 HOUR 370.00 2,054,610.00 250.00 1,388,250.00 ---

OPTION

Port Allen Lock Forebay Dredging: box cut on the north side of floating guidewall.

1 JOB 30,000.00 30,000.00 70,000.00 70,000.00

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

2. DATE ISSUED

22 Apr 2015

3. DATE OPENED

20 Aug 2015

PAGE

0F 9

PAGES 13

4. ISSUING OFFICE

U.S. ARMY OF ENGINEERS, DISTRICT NOD

P.O. BOX 60627

NEW ORLEANS, LA 70160-0267

UNRESTRICTED

I CERTIFY that I have opened, read, Indefinite Delivery, Indefinite Quantity (Task Order)

LOT FOUR, 27 IN. Inside Diameter (ID) Pump Discharge without Submerged Pump

B. REASONABLE

CONTRACT

NO.

7B. DESCRIPTION OF

OFFERED ITEM

7C. EST.

QUANTI

TY

D.

UNIT

H. ESTIMATED

OPTION

Additional Pumping Capability for Dredging Payment Item 0003:

Additional 8,000 ft of floating or submerged pipeline with additional pumping plant capacity as describe herein.

268 HOUR 475.00 127,300.00 200.00 53,600.00 ---

OPTION

Mobilization and Demobilization of additional pumping capability equipment for

1 JOB 340,000.00 340,000.00 100,000.00 100,000.00

TOTAL LOT FOUR 17,328,969.00 13,853,450.00 ---

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

2. DATE ISSUED

22 Apr 2015

3. DATE OPENED

20 Aug 2015

PAGE

0F 12

PAGES 13

4. ISSUING OFFICE

U.S. ARMY OF ENGINEERS, DISTRICT NOD

P.O. BOX 60627

NEW ORLEANS, LA 70160-0267

UNRESTRICTED

I CERTIFY that I have opened, read, Indefinite Delivery, Indefinite Quantity (Task Order)

Weeks Marine 304 Gaille Drive, Innwoods Business Pk Covington, LA 70433

Miscellaneous Projects Cutterhead Dredge Rental LOT SIX 30 IN. Inside Diameter (ID) Pump Discharge with Submerged Pump

B. REASONABLE

CONTRACT

NO.

BID LOT SIX

7B. DESCRIPTION OF

OFFERED ITEM

7C. EST.

QUANTI

TY

D.

UNIT

I. ESTIMATED

0001 Initial Mobilization and Initial Demobilization 1 JOB --- --- --- 1,325,000.00 1,325,000.00

OPTION

Additional Mobilization and Demobilization 2 EACH TO BE NEGOTIATED

PER NON-

ORDER

DREDGING: Rental of one fully operated cutterhead dredge with 30-inch ID pump discharge, submerged pump, attendant plant, and discharge pipeline as specified.

2948 HOUR 4,300.00 12,676,400.00

0004 Dredge Towing Service 420 MILE 500.00 210,000.00

0005 Picket Boat 3390 HOUR --- --- 150.00 508,500.00

OPTION

Port Allen Lock Forebay Dredging: box cut on the north side of floating guidewall.

1 JOB 100,000.00 100,000.00

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

2. DATE ISSUED

22 Apr 2015

3. DATE OPENED

20 Aug 2015

PAGE

0F 13

PAGES 13

4. ISSUING OFFICE

U.S. ARMY OF ENGINEERS, DISTRICT NOD

P.O. BOX 60627

NEW ORLEANS, LA 70160-0267

UNRESTRICTED

I CERTIFY that I have opened, read, Indefinite Delivery, Indefinite Quantity (Task Order)

LOT SIX, 30 IN. Inside Diameter (ID) Pump Discharge with Submerged Pump

B. REASONABLE

CONTRACT

NO.

7B. DESCRIPTION OF

OFFERED ITEM

7C. EST.

QUANTI

TY

D.

UNIT

J. ESTIMATED

OPTION

Additional Pumping Capability for Dredging Payment Item 0003:

Additional 8,000 ft of floating or submerged pipeline with additional pumping plant capacity as describe herein.

164 HOUR --- --- --- 150.00 24,600.00

OPTION

Mobilization and Demobilization of additional pumping capability equipment for

1 JOB 50,000.00 50,000.00

TOTAL LOT SIX --- --- --- 14,894,500.00