Southwest Louisiana Urban Flood Control Project Harahan Pump to the River – Pump Station
Jefferson Parish, Louisiana
Solicitation No. W912P8-11-B-0049
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W912P8-11-B-0049
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 1 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
Chris Nuccio Contract Specialist
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
A. HIRED LABOR
A. OFFEROR
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount)
6. NUMBER OF AMENDMENTS ISSUED
0006 C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED
7A.
ITEM
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
UNIT
PRICE
E. ESTIMATED
AMOUNT
D.
D. UNIT
ITEM
MOBILIZATION &
DEMOBILIZATION 1 LS
$392,683.00 $400,000.00 $797,850.00 $2,810,984.18
TEMPORARY RESTRAINING
STRUCTURES 1 LS
$1,141,973.00 $4,000,000.00 $1,614,085.00 $1,400,000.00
0003 SILT FENCES 1,300 LF
$5.00 $6,500.00 $2.00 $2,600.00 $36.56 $47,528.00 $3.00 $3,900.00
0004 TRUCK WASH-DOWN RACK 1 LS
$32,848.00 $25,000.00 $23,448.00 $25,000.00
DEMOLITION/SITE
PREPARATION 1 LS
$39,109.00 $90,000.00 $153,403.00 $20,000.00
CAST-IN-PLACE CONCRETE
PUMP STATION STRUCTURE 1 LS
$2,713,100.00 $3,736,000.00 $3,172,415.00 $2,500,000.00
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 2 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
ITEM
CAST-IN-PLACE CONCRETE
DISCHARGE PIPE DRAIN AND
COUPLING STRUCTURE
1 LS
$83,000.00 $300,000.00 $136,956.00 $150,000.00
CAST-IN-PLACE CONCRETE
FUEL OIL BULK STORAGE
AREA
1 LS
$78,500.00 $70,000.00 $117,962.00 $100,000.00
0009 12-INCH SD-RCP PIPING 165 LF
$120.00 $19,800.00 $55.00 $9,075.00 $37.44 $6,177.60 $75.00 $12,375.00
00010 15-INCH SD-RCP PIPING 275 LF
$130.00 $35,750.00 $50.00 $13,750.00 $76.09 $20,924.75 $87.00 $23,925.00
00011 18-INCH SD-RCP PIPING 145 LF $150.00
$21,750.00 $55.00 $7,975.00 $259.52 $37,630.40 $94.00 $13,630.00
00012 24-INCH SD-RCP PIPING 30 LF
$275.00 $8,250.00 $90.00 $2,700.00 $103.50 $3,105.00 $212.00 $6,360.00
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 3 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers received in response to this solicitation.
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
ITEM
00013
PRECAST DRAINAGE
MANHOLES 2 EA
$6,807.00 $13,614.00 $10,000.00 $20,00.00 $2,858.50 $5,717.00 $5,000.00 $10,000.00
00014
PRECAST STORM DRAIN
INLETS 5 EA
$4,000.00 $20,000.00 $1,800.00 $9,000.00 $1,711.80 $8,559.00 $2,200.00 $11,000.00
00015
PRECAST CONCRETE
BUILDING PANELS 1 LS
$335,532.00 $600,000.00 $594,194.00 $628,000.00
00016 MASONRY 1 LS
$13,605.00 $10,000.00 $10,734.00 $8,500.00
00017 STRUCTURAL STEEL 1 LS
$682,559.00 $510,000.00 $474,465.00 $450,00.00
00018 STEEL DECKS 1 LS
$651,451.00 $50,000.00 $31,775.00 $25,000.00
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 4 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
ITEM
00019
MISCELLANEOUS
METALWORK 1 LS
$564,887.00 $350,000.00 $823,112.00 $275,000.00
00020 ROOFING 1 LS
$78,612.00 $275,000.00 $182,170.00 $150,000.00
00021 STEEL DOORS AND FRAMES 15 EA
$1,192.00 $17,880.00 $4,000.00 $60,000.00 $2,689.87 $40,348.05 $1,200.00 $18,000.00
00022 WINDOWS 3 EA
$823.00 $2,469.00 $2,000.00 $6,000.00 $546.67 $1,640.01 $600.00 $1,800.00
00023 OVERHEAD COILING DOORS 1 EA $38,543.00
$38,543.00 $12,000.00 $12,000.00 $15,955.00 $15,955.00 $10,000.00 $10,000.00
00024
SAFE ROOM FINISHES AND
FURNISHINGS 1 LS
$25,095.00 $40,000.00 $70,324.00 $50,000.00
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 5 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers received in response to this solicitation.
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project ff i i i
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C.
EST.
QUAN
D.
D.
D.
00025 PAINTING 1 LS
$114,491.00 $100,000.00 $96,663.00 $200,000.00
00026 PLUMBING 1 LS
$81,162.00 $50,000.00 $58,615.00 $50,000.00
00027
DRAINAGE PUMPING
SYSTEMS 3 EA
$5,117,349.00 $15,352,047.00 $2,800,000.00 $8,400,000.00 $3,024,216.67 $9,072,650.01 $3,400,000.00 $10,200,000.00
00028
SUMP PUMP AND ASSOCIATED
PIPING 1 LS
$20,751.00 $15,000.00 $18,204.00 $30,000.00
00029 COMPRESSED AIR SYSTEM 1 LS
$240,987.00 $100,000.00 $156,644.00 $300,000.00
00030 HVAC 1 LS
$1,357,617.00 $120,000.00 $275,671.00 $600,000.00
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 6 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
ITEM
00031 ELECTRICAL SYSTEMS 1 LS
$1,348,211.00 $900,000.00 $1,208,000.00 $1,000,000.00
00032
BACK-UP POWER
GENERATION SYSTEMS 1 LS
$842,901.00 $600,000.00 $644,853.00 $750,000.00
00033
UNINTERRUPTIBLE POWER
SUPPLY 1 LS
$13,706.00 $10,000.00 $8,581.00 $15,000.00
00034
CLOSED CIRCUIT
TELEVISION SYSTEM 1 LS
$148,022.00 $108,000.00 $34,160.00 $130,000.00
00035 FIRE PROTECTION 1 LS
$30,153.00 $30,000.00 $8,344.00 $40,000.00
00036 EARTHWORK 1 LS
$334,482.00 $500,000.00 $487,335.00 $350,000.00
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 7 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
ITEM
00037 DEWATERING 1 LS
$183,711.00 $600,000.00 $769,612.00 $400,000.00
00038
PILING, CONCRETE PRECAST,
PRESTRESSED (14 INCH X 14
INCH)
9,276 LF
$64.00 $593,664.00 $60.00 $556,560.00 $66.27 $623,996.52 $31.52 $292,379.52
00039
PILING, CONCRETE PRECAST,
PRESTRESSED (24 INCH X 24
INCH)
3,184 LF
$107.00 $340,688.00 $130.00 $413,920.00 $172.71 $549,908.64 $94.65 $301,365.60
00040
COMPRESSION PILE LOAD
TESTS, PRECAST
PRESTRESSED CONCRETE
PILE
1 EA
$20,857.00 $20,857.00 $75,000.00 $75,000.00 $10,845.00 $10,845.00 $38,500.00 $38,500.00
00041
COMPRESSION PILE LOAD
TESTS,TREATED TIMBER
PILES
3 EA $20,857.00
$62,571.00 $30,000.00 $90,000.00 $10,569.67 $31,709.01 $17,680.00 $53,040.00
00042 TREATED TIMBER PILE 35,795 LF
$26.40 $944,988.00 $20.00 $715,900.00 $24.55 $878,767.25 $15.46 $553,390.70
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 8 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
ITEM
00043
CONCRETE PAVEMENT,
ACCESS DRIVE/PARKING
AREA
1 LS
$151,560.00 $50,000.00 $59,387.00 $60,000.00
00044
REPLACEMENT CONCRETE
ROADWAY 120 SY
$150.
$18,000.00 $35.00 $4,200.00 $61.32 $7,358.40 $50.00 $6,000.00
00045
REPLACEMENT CONCRETE
CURB 100 LF
$22.0
$2,200.00 $100.00 $10,000.00 $13.52 $1,352.00 $12.50 $1,250.00
00046 FENCING AND GATES 1 LS
$30,427.00 $15,000.00 $24,826.00 $30,000.00
00047 FERTILIZING AND SEEDING 1.2 AC $3,43
0.00
$4,116.00 $2,000.00 $2,400.00 $12,043.33 $14,452.00 $3,000.00 $3,600.00
00048 1 ½ -INCH W-PVC PIPING 1 LS
$7,151.00 $1,000.00 $1,214.00 $25,000.00
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 9 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
ITEM
00049
12-INCH/24-INCH W-PVC
PIPING 1 LS
$72,669.00 $90,000.00 $57,091.00 $110,000.00
00050
PACKAGED SUBMERSIBLE
DRAINAGE PUMP STATION 1 LS
$167,210.00 $50,000.00 $53,826.00 $50,000.00
00051
SEWER GRINDER PUMP
SYSTEM AND ASSOCIATED
PIPING
1 LS
$36,706.00 $20,000.00 $43,386.00 $45,000.00
00052 FUEL STORAGE/FEED SYSTEM 1 LS
$1,520,084.00 $540,000.00 $1,256,724.00 $1,200,000.00
00053
84-INCH (ID) STEEL
DISCHARGE PIPE 630 LF $1,44
4.00 $909,720.00 $2,500.00 $1,575,000.00 $3,801.85 $2,395,165.50 $3,500.00 $2,205,000.00
00054
MEASUREMENT AND
CONTROL
INSTRUMENTATION
1 LS
$904,577.00 $300,000.00 $249,113.00 $551,000.00
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 10 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
ITEM
00055
OVERHEAD ELECTRIC
CRANE 1 LS
$549,382.00 $350,000.00 $259,511.00 $300,000.00
00056
MECHANICALLY CLEANED
CLIMBER SCREENS 1 LS
$3,582,393.00 $2,400,000.00 $2,300,000.00 $4,200,000.00
TOTAL BASE
$37,400,714.00 $29,391,080.00 $30,048,273.14 $32,794,000.00
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 11 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
OPTIONAL WORK
00057
TEMPORARY RETAINING
STRUCTURES – CONCRETE
BOX CULVERT
1 LS
$1,277,111.00 $300,000.00 $795,659.00 $350,000.00
00058 CAST-IN-PLACE BOX CULVERT 1 LS
$231,955.00 $192,000.00 $165,997.00 $336,000.00
00059 DELETED
00060
EARTHWORK – CONCRETE
BOX CULVERT 1 LS
$177,777.00 $30,000.00 $57,803.00 $90,000.00
00061
DEWATERING – CONCRETE
BOX CULVERT 1 LS
$92,765.00 $30,000.00 $184,808.00 $100,000.00
2. DATE ISSUED
15-Aug-2011
3. DATE OPENED
16-Sep-2011 PAGE 12 0F12 PAGES
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
PO BOX 60267
NEW ORLEANS, LA 70160-0267
UNRESTRICTED
I CERTIFY that I have opened. read, and recorded on this abstract all offers
SIGNATURE DATE SIGNED
16-September-2011
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
Southwest Louisiana Urban Flood Control Project
M.R. Pittman Group, LLC 505 Commerce Point Harahan, Louisiana 70123
B. OFFEROR
Harry Pepper & Associates 9000 Regency Square Blvd., Suite 100 Jacksonville, Florida 32211
B. OFFEROR
FHP Tectonics Corp.
8725 W. Higgins Road, Suite 200 Chicago, Illinois 60631
B. REASONABLE CONTRACT
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
D.
D.
00062
SELF-CONTAINED VERTICAL
LIFT GATE 1 LS
$151,771.00 $50,000.00 $80,838.00 $65,000.00
00063 DELETED
TOTAL OPTIONAL WORK $1,931,379.00 $602,000.00 $1,285,105.00 $941,000.00
TOTAL BASE ALTERNATE1 + OPTIONAL WORK $38,936,093.00 $29,993,080.00 $31,333,378.14 $33,735,000.00
| 2011-09-20T08:55:32-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
| 2011-09-20T08:55:59-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
| 2011-09-20T08:56:16-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
| 2011-09-20T08:56:32-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
| 2011-09-20T08:56:48-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
| 2011-09-20T08:57:06-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
| 2011-09-20T08:57:27-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
| 2011-09-20T08:57:50-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
| 2011-09-20T08:58:15-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
| 2011-09-20T08:58:37-0500 | |
| NUCCIO.CHRISTOPHER.MICHAEL.1296631457 |
File details come from the government source that posted it. Updated .