THIS IS FOR CLARIFICATION OF PREVIOUS AMENDMENTS FOR W912P8-09-R-0046
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P8-09-R-0046.0005.pdf | ||
| ANSWERS-AMEND.pdf | ||
| AMEND 0046 -2.pdf | ||
| sf30.pdf | ||
| PA_Dwgs.pdf | ||
| W912P8-09-R-0046.pdf | ||
| PA_TaskOrder_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for 100% Service-Disabled Veteran (SDV) Set-Aside, Operations and Maintenance, General & Mississippi River and Tributaries Various Projects, Multiple Aw ard Task Order Contract (MATOC) for Various Parishes in New Orleans District, is hereby amended to clarify Amendment 0001, 0002 and 0003 and to answ er questions in this Amendement number 0004.
Proposal Receipt Date:
Proposal receipt date and time of 27 May 2009, 2:00 PM local time in New Orleans remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-May-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-09-R-0046
X 9B. DATED (SEE ITEM 11)
24-Apr-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-May-2009
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
Amendment Number 0001 Clarifications
1. Add “0001” to block 2 of the SF-30 dated April 28, 2009.
2. Remove “0001” from the number in block 9A.
3. Block 11 Put an X in the beginning of the sentence & another X in “is not extended”, put a “1” in the blank space.
Amendment Number 0002 Clarifications
1. Add “0002” to block 2 of the SF-30 dated May 4, 2009.
2. Remove “0002” from the number in 9A.
3. Block 11 Put an X in the beginnig of the sentence & another X in “ is not
Amendment Number 0003 Clarifications
1. Add “0003” to block 2 of the SF-30 dated May 4, 2009.
2. Block 11 Put an X in the beginnig of the sentence & another X in “is not
Amendment Number 0004
QUESTIONS AND ANSWERS
1.(a) 1) The first paragraph states "After the lock is completely dewatered by the Government, the Contractor's equipment will be placed into the lock chamber by the Government. No scaffolding is allowed. The contractor shall use the manlift to reach the high repair areas".
1)a. Will the Government have resources available to remove the Contractors equipment at the end of the contract?
The Government plans to remove all equipment that they placed into the lock chamber; including contractor equipment. Anything the contractor places on his own has to be removed on his own.
1)a,i. Will the resources be available in the event of a premature, Mother Nature dictated re-watering?
As long as we have enough notice, all equipment will be removed from the lock chamber in advance of a storm. Neither contractor equipment nor Government equipment has a priority over the other; each piece will be removed as it is ready to be removed. Note, however, that Section 01 50 00 includes a paragraph entitled "Hurricane Condition of Readiness". The Contractor has the responsibility to ensure that his equipment is ready to be removed from the lock chamber in advance of a storm; that's part of "securing" the equipment. The Government takes no responsibility for equipment not secured.
1)b. Will the Contractor be permitted to erect access scaffolding (stair tower) in between exp. joints on North and South walls of the lock chamber? [to address daily access and egress, safety issues and in the event of an evacuation] The Government plans to erect stair towers at various places in the lock chamber for personnel access. We do not anticipate the need for additional, contractor-furnished stair towers. If the contractor elects to erect his own stair tower for his own convenience, it has to comply with all OSHA requirements, and will be assembled, placed, and removed without Government assistance. See (1)(a) above. However, just as the Government-furnished stair towers are available for contractor use, any contractor-furnished tower has to be available for Government use.
1)b,i. Are mobile scaffolds allowed in the Tainer(sp) Valve tunnels to reach expansion joints above 6 ft. and on the ceiling of the valve tunnel?
Mobile scaffolds ARE allowed in the valve tunnels, provided they can be gotten into the valve tunnels in the first place; i.e. there are size limitations.
2) SF 1442, Item 13a indicates an original and 5 copies are required; and paragraph 4, the last sentence of the Instructions For Proposal Preparation indicate an original and 4 copies. 2)a Which is correct?
SEE BELOW
3) Are TWIC cards required for this contract?
TWIC are not required. Contractor personnel are not transportation workers; at worst, in the unlikely event that the US Coast Guard raises the issue, contractor personnel only have to be accompanied by a TWIC-holder according to TSA regulations, and there should be some Government personnel on-site with valid TWIC.
4) Contract Clause 52.211-18 has provisions for a credit or increase of contract price in the event of a more than 15% variation, the concern lies with the quantity of material that needs to be ordered and the abbreviated construction schedule that won't accommodate the lead time of ordering correct quantities. 4)a. Will Contractor be reimbursed for material that the manufacturer will not accept, after granting the USACE an appropriate credit on the unit price?
Contract Clause 52.211-18 has provisions for a credit or increase of contract price in the event of a more than 15% variation, the concern lies with the quantity of material that needs to be ordered and the abbreviated construction schedule that won't accommodate the lead time of ordering correct quantities. The Government will handle variations on a case by case basis. The Contractor is responsible for all costs and time should variances fall between 85% and 115% of the Bid Schedule Quantities. Should there be variances in quantities beyond 15%, the Government will pursue a fair and reasonable settlement with the Contractor for the variances.
5) During discussions with Port Allen Lock personnel, it was suggested by the Lock employees that “completely dewatered” would be a muck/silt, and fish free condition.
Question: Is this the case, or would the Contractor be required to provide labor, material and equipment to produce this condition?
The contractor should not have to remove muck/silt/dead fish from the lock chamber. He may have to provide one or more sump pumps to deal with water leaking through the joints he is repairing. That said, cleaning out the valve tunnels may be problematical, and we can't guarantee that we'll get out ALL of the muck/silt from the tunnels. Some pressure-washing to remove residue may be necessary.
Not asked, but possibly important, and related to some of the questions above: There are no installed lights in the valve tunnels; the Contractor has to furnish his own work lights.
Due to ventilation issues, generators will NOT be allowed inside the valve tunnels; they must be placed in the lock chamber or on top of the lock wall. Any generators must be diesel-powered; gasoline generators are not allowed, for safety reasons.
6) In MATOC 09-R-0046, in the specifications for the Expansion Joint Repair Task Order 001, immediately after section 03 15 13-6 and just before the Bid Bond page there is a section "Instructions for Bidders".
SEE BELOW
7) According to our suppliers the material specified for the expansion joint repairs will not perform and is not suited for the intended repairs. Is the corps sure about using this product?
Yes, we're sure.
8) Is electrical power available? If so, will we be able to utilize it? Where is it & what rating?
Electrical power is not available inside the lock chamber or valve tunnels. Contractor should provide a generator to cover his electrical requirements. Diesel only, no gasoline-powered, for safety reasons. If the generator needs to be set on the floor of the lock chamber, Government personnel will lower it by crane. Trailer-mount is best so it can be moved along the floor of the chamber on its own wheels. Generators are not allowed inside the tunnels due to ventilation issues. Electrical cables from the generator can be fed into the tunnels through the valve openings in the lock wall.
9) Are we to repair joints on catwalk?
Joints between lock chamber monoliths only, but those joints are to be repaired top to bottom, to prevent the flow of water through the joint. Joints not subject to leakage of water into or out of the lock need not be repaired.
10) Are we to repair joints inside the two each 14’ diameter conduits?
The "14-foot diameter conduits" are the valve tunnels. Yes, they have to be repaired.
11) If we are to repair joints inside conduits, what is access into them? How many points of access into conduits or tunnels? What is size of access points & distance between?
Access into the valve tunnels is by vertical shafts from the top of the lock wall at the tainter valves; Government cranes will lower materials, equipment, etc. into the tunnels through these shafts. Personnel access to the tunnels the same way (ladders in the walls of these shafts do NOT go all the way to the bottom, and cannot be used for personnel access), but access to tunnels from lock chamber is also available by crawling through the valve openings in the lock wall.
12) Do joints in conduits or tunnels line up with lock joints?
Tunnel joints do line up with chamber joints.
13) Is joints size and configuration inside conduits the same as lock joints?
Size and configuration of tunnel joints is the same as in the lock chamber.
14) The joint width shown on plans is ¾” to 1 ½” wide. How wide are the existing joints?
Existing joints are the same width as shown on the drawings; except where the concrete has been damaged.
15) Will rolling scaffold for access to joint repairs inside conduit be permitted? If so, will the floor of the conduit accommodate rolling scaffold.
Mobile scaffolds are allowed inside the valve tunnels, as long as they are of a size that allows them to be lowered through the vertical shafts mentioned above.
16) What is ventilation into conduits or tunnels?
Ventilation is only whatever natural airflow may exist through the openings. If additional ventilation is required the Contractor will have to provide his own blowers and ductwork.
17) Is there lighting in conduits? If so, is it adequate to perform work & will facility maintain lighting during entire project?
No lighting in the tunnels. The contractor will have to provide his own work lights.
18) Who will perform demucking and debris removal inside locks and inside conduits?
Government will remove most muck/debris/dead fish from lock chamber and valve tunnels, but cannot expect to get 100% of the material. The contractor may have to pressure-wash the joints to be repaired. He may also have to provide his own pumps to deal with water leaking in through the joints to be repaired.
19) Who will perform continuous dewatering inside locks and conduit?
What is availability of potable water? How close, volume & psi?
Potable water is available from hose bibbs at the lock control houses. Flow rate and pressure unknown, but it's from municipal water lines, not from fire protection force mains.
20) Where will secure storage on site be?
No "secure" storage. We do not guarantee the security of contractor equipment or materials. Entire work area is inside a fenced reservation; if he needs additional security he had better provide his own lockable containers or trailers.
21) Who will provide daily placement and removal of material, equipment, and debris inside lock?
Government doesn't provide "daily" placement of contractor materials and equipment.
Whatever has to be placed into lock chamber or valve tunnels by crane will be moved as needed, and left in the tunnels and/or chamber during contractor off-duty hours. Lateral movement of equipment and/or materials inside the tunnels or chamber is the contractor's responsibility.
22) Will they accept cementitious repair mortar in lieu of epoxy mortar?
No cementitious grout. Elastomeric only. Joints are between adjacent monoliths, and differential movement of monoliths will crack a non-elastomeric joint sealant, rendering the repair useless.
23) Page 03 15 13-4, Part 3 EXECUTION of the documents states “After the lock chamber is completely dewatered by the Government, the Contractor’s equipments shall be placed into the lock chambers by the government. No scaffolding is allowed. The contractor will use the man lift to reach the high repair areas.
Government-owned and government-operated cranes will be used to transfer materials into and out of the lock chamber. However, for liability reasons, contractor personnel have to rig the lifts.
24) How will the contractor’s equipment be placed in the lock? Will the contractor’s time start as soon as dewatering begins, after lock is dewatered, or after equipment is set in lock? Will staging be allowed on sidewalls of locks? Will scaffold be allowed inside conduits? – If not, how are we to access joints inside conduits?
Government activities will be concentrated on east end of lock but not limited to the east end; Lock walls at west end are available for a contractor staging area, upon request after award, as is the ground surface on the south side of the lock.
SF-1442
Block 13.A. “5 copies” to now read “4 copies”.
Task Order 0001 Solicitation Package
Remove the section titled “INSTRUCTIONS FOR PROPOSAL PREPARATION”.
This section only applies to the basic portion of this solicitation.