Attachment 2_PWS_CVD Sewage Services Contract 2026.pdf

PDF 643 KB Posted

Attached to
Coyote Valley Dam and Lake Mendocino Sewage and Septic Services
Solicitation number
W912P727QA006
Issued by

About this file

This is a Performance Work Statement (PWS) for a non-personal services contract to provide sewage pumping and disposal, drain clearing, portable toilet rental, and portable/vault toilet stall cleaning/treatment services at Coyote Valley Dam and Lake Mendocino near Ukiah, California. The contract is a Firm Fixed Price award with a base year of 12 months (22 December 2026 – 21 December 2027) and three optional 12-month extension years, plus an optional 6-month extension. The U.S. Army Corps of Engineers (USACE) is the contracting agency, with the Contracting Officer listed as Nairi Freeman and the Contracting Officer Representative as Sadie Parker.

The Contractor must furnish all personnel, equipment, supplies, materials, and labor to perform services across 18 work site locations, including lift stations, holding tanks, vault toilets, sewer/drain lines, and portable toilet rental and maintenance. Key deliverables include sewage tank pumping quoted on a per-gallon basis, vault toilet pumping and treatment (per gallon), sewer and drain line clearing (annual job estimate of 20 services including three with video camera and hydro-jetting), portable toilet pumping and cleaning (per service trip), and biweekly portable toilet rentals in both regular and ADA-compliant sizes (per two-week period). The Contractor must maintain four ADA-compliant and four regular portable toilets available simultaneously, deliver portables within 48 hours of request, maintain a Quality Control Program, comply with EM 385-1-1 safety requirements, and submit an Accident Prevention Plan prior to work commencement. Services are provided on a call-out basis with scheduling agreed between the Contractor and COR. The contract requires monthly invoicing, E-Verify pre-screening of all employees within three business days of award, initial security training within 30 days, and compliance with FPCON, HPCON, and RAM security measures. Performance standards require greater than 95% of services performed timely without rework required, with Government surveillance conducted through periodic and random sampling inspections documented on inspection checklists.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CVD SEWAGE AND SEPTIC SERVICES

PERFORMANCE WORK STATEMENT

COYOTE VALLEY DAM & LAKE MENDOCINO

PART 1

GENERAL INFORMATION

1.0 GENERAL: This is a non-personal services contract to provide sewage pumping and proper disposal, drain clearing, portable toilet rental, and portable/vault toilet stall cleaning/treatment services at Coyote Valley Dam (CVD) Lake Mendocino. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the sewage pumping and proper disposal, drain clearing, portable toilet rental, and portable/vault toilet stall cleaning/treatment services as defined in this

Performance Work Statement (PWS) except for those items specified in Part 3 as Government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2 Background: Coyote Valley Dam (CVD) and Lake Mendocino form a reservoir near Ukiah, California that serves flood risk management, water supply, recreation, and environmental stewardship missions. Its recreation areas are managed by the U.S. Army Corps of Engineers

(USACE) and offer the public a wide variety of recreational activities such as boating, camping, picnicking, swimming, hiking, and more. Some specialized maintenance items, such as sewage and septic services, are contracted to and performed by the private sector.

1.3 Objective: To find a Contractor qualified to carry out the specifications of this PWS to provide for the safe and sanitary recreation experience of the visiting public at Lake Mendocino.

1.4 Scope: The Contractor shall provide all personnel, labor, equipment, materials, supplies, transportation, fuel, tools, supervision, and other items and non-personal services necessary to provide sewage pumping and proper disposal, drain clearing, portable toilet rental, and portable/vault toilet stall cleaning/treatment services at CVD Lake Mendocino as described herein the PWS and elsewhere within the solicitation. The Contractor shall perform to the standards set forth in Part 5 Specific Tasks, as well as provide all safety, security, and invoicing requirements as outlined in Attachment 3 Deliverables, or elsewhere within the PWS or solicitation.

1.5 Place of Performance: The work to be performed under this contract will be performed at

Coyote Valley Dam & Lake Mendocino located in Ukiah, California. It is recommended to visit the work site prior to providing a quote in order to review site conditions.

1.6 Period of Performance:

1.6.1 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and three (3) 12-month option years, with an optional 6-month extension under FAR

52.217-8. The Period of Performance reads as follows:

Base Year 22 December 2026 – 21 December 2027

Option Year I 22 December 2027 – 21 December 2028

Option Year II 22 December 2028 – 21 December 2029

Option Year III 22 December 2029 – 21 December 2030

Optional Extension 22 December 2030 – 21 June 2031

1.6.2 Hours of Operation: The Contractor is responsible for conducting business between the hours of 8:00am – 4:00pm Pacific Time, Monday thru Friday except federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.6.3 Federal Holidays: Services that would normally take place on the day of the week that a federal holiday falls on shall be performed either one day before or one day after the federal holiday, EXCEPT for the following three (3) holidays that occur during the peak recreation season: Memorial Day, Independence Day, and Labor Day.

1.7 Type of Contract: The Government will award a Firm Fixed Price Contract.

1.8 Government Personnel:

1.8.1 Contracting Officer (KO) and Contracting Specialist (CS): TBD

1.8.2 Contracting Officer Representative (COR): The COR will be identified by separate designation letter. The COR is authorized to perform the following functions: assure that the

Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the

Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property; and coordinate site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract. The COR is subject to change.

Forecasted COR: Sadie Parker | (707) 467-4224 | Sadie.K.Parker@usace.army.mil

1.9 Contractor Personnel:

1.9.1 Key Personnel: The following personnel are considered key personnel: a Contract Manager

(i.e. a supervisor and/or foreman) and an Alternate Contract Manager. The Contract Manager and

Alternate Contract Manager shall be responsible for the performance of the work, and as such, mailto:Sadie.K.Parker@usace.army.mil shall serve as the points of contact (POCs) for matters involving quality, performance, and nonperformance of the services described herein. The Alternate Contract Manager shall act for the Contractor when the Contract Manager is absent or unavailable, but both shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager and Alternate Contract Manager shall be designated in writing and their names and contact information provided to the KO and COR.

Contact information shall include telephone numbers that are attended to during normal business hours of 8:00am – 4:00pm PT, Monday thru Friday, to which calls concerning performance or other contractual matters can be placed. For the purpose of time and date, a message will be deemed delivered to the Contractor at such time as it is delivered to the number provided by the

Contractor.

1.9.2 Identification and Decorum: All Contractor personnel are required to identify themselves as such through marked apparel and vehicles when performing contracted services on

Government installations.

Additionally, Contractor personnel shall present a neat appearance and be fully clothed at all times, as well as utilize tact, diplomacy, and courtesy during contact with the public and with

Government personnel. The COR reserves the right to disapprove any individual whom he/she considers to be incompetent to perform the work required. Such disapproval will be given to the

Contractor by written notice. Any such decision is final. Any illegal or criminal activity on the part of the Contractor or staff, employees, or other personnel may result in termination of the contract. The Government reserves the right to discuss matters with any Contractor employee on site and currently employed by the Contractor.

Furthermore, the Contractor must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.9.3 Minimum Manpower Requirements: The Contractor and employees/staff shall personally perform, or provide superintendence of the performance of, duties under this contract. The

Contractor shall maintain a sufficient number of staff/employees to perform the required services. In the event the Contractor is unable to perform contract duties, the Government reserves the right to terminate the contract.

1.10 Security Requirements:

1.10.1 General Requirements and Guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the COR. Contract personnel are critical to the overall security and safety of USACE installations, facilities and activities, and security awareness training contributes to those efforts. The Department of War (DoW) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the COR. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the COR.

Contractor personnel and vehicles are subject to search when entering federal installations.

Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health

Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable Requiring Activity (RA) plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

1.10.2 Physical Security and Access Control Requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoW installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the

National Crime Information Center-Interstate Identification Index (commonly referred to as

“NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the specific Government site.

1.10.2.1 On-Site Physical Security: The Contractor shall be responsible for safeguarding all

Government equipment, information, and property provided for Contractor use. All gates should be closed behind the Contractor when accessing restricted areas. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.10.2.2 Key Control: Government-furnished keys, locks, and/or lock combinations may be provided to the Contractor. The Contractor shall establish and implement methods of making sure all keys, locks, and lock combinations issued are not lost, misplaced, or duplicated, nor used by or revealed to unauthorized persons. Furthermore, the Contractor shall prohibit the use of

Government issued keys and lock combinations by any persons other than the Contractor’s employees and shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR or KO. The Contractor shall immediately report to any occurrences of loss, duplication, or unauthorized use of keys to the

COR.

In the event keys, other than master keys, are lost or duplicated, the Contractor may be required upon written direction of the KO, to re-key or replace the affected lock or locks without cost to the Government. Alternatively, the Government may replace the affected keys or locks and deduct the total cost of doing so from payment due to the Contractor.

The Contractor shall develop procedures covering key and lock control that shall be included in the Quality Control Program (addressed in section 1.15). Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. All keys shall be returned to the Government upon request and/or completion of the contract. Failure to return keys can result in withholding of payment.

1.10.3 Suspicious Activity Reporting Training: All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

1.10.4 Pre-Screen Employees using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR

Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with

FAR 22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility

Verification, and submit it to the KO to become part of the official contract file.

1.11 Safety Requirements:

1.11.1 General: If the Contractor fails or refuses to promptly comply with safety requirements as specified herein, any USACE employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the

Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.

The Contractor shall comply with all pertinent safety provisions of federal, state, and local regulations. Additionally, all equipment, materials, and services performed shall be in accordance with applicable safety requirements set forth in the USACE EM 385-1-1, "Safety &

Occupational Health Requirements Manual" (copies available in CVD & Lake Mendocino

Project office or can be downloaded from the following website:

https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ ).

https://www.e-verify.gov/ https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/

1.11.2 Accident Prevention Plan (APP): In compliance with the EM 385-1-1, the Contractor shall prepare an accident prevention plan (APP) that must be accepted by the KO prior to commencement of any work. The Contractor shall submit the APP to the KO or COR within one week of initial contract award. Within the APP, Contractors shall identify and address other areas of the EM 385-1-1 relevant to the scope of work and develop all associated documentation, if applicable.

The APP template can be provided by the COR, or downloaded from the following site:

https://www.publications.usace.army.mil/USACE-Publications/Engineer-Forms/

1.11.3 Environmental Controls: The Contractor shall be knowledgeable of, and shall comply with all applicable federal, state, and local laws, environmental requirements, and instructions. The Contractor shall ensure policies and procedures are established that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

If the Contractor or employee(s) of the Contractor spills or releases any substance into the environment, the Contractor shall immediately report the incident in accordance with local procedures and shall also notify the COR and KO. The Contractor shall be liable for containment and environmental cleanup of the spill or release of such substance.

1.12 Post Award Conference Meetings: The Contractor agrees to attend any post award conferences convened by the KO in accordance with Federal Acquisition Regulation (FAR)

Subpart 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review their performance. At these meetings the KO will apprise the Contractor of how the government views the contractor's performance and the

Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.13 Documents and Correspondence: After award, all documents and related correspondence can be routed through the COR located at the Coyote Valley Dam & Lake Mendocino Project

Office in Ukiah, California.

1.14 Invoicing and Payment: The Contractor shall submit monthly detailed billing statements or invoices that include all services completed during the monthly billing period. Invoices should include Contractor company name, address, contract number, invoice date, services performed outlined by contract line item, and total dollar amount. Invoices shall not include any tax.

Payment will be made monthly based on the actual work done by the Contractor, submission of the detailed billing statement or invoice, and the Government’s acceptance of said invoices, all in accordance with the Prompt Payment Act. Under the terms of this contract, invoices shall be submitted to the COR (subject to change):

Sadie Parker

1160 Lake Mendocino Dr.

Ukiah, CA 95482 https://www.publications.usace.army.mil/USACE-Publications/Engineer-Forms/

Email: Sadie.K.Parker@usace.army.mil

1.15 Quality Control (QC) and Quality Assurance (QA):

1.15.1 Quality Control: The Contractor shall develop and maintain a Quality Control Program

(QCP) to ensure services are performed in accordance with the terms of this PWS. The

Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. Details regarding the safeguarding of government furnished property (e.g. keys and locks) shall be included in the QCP as well.

The Contractor shall provide the QCP within 30 days after contract award to the KO and COR, and within five (5) working days when changes are made thereafter. After initial acceptance of the QCP, the contractor shall receive the KO’s acceptance in writing of any proposed change to the QCP. Complete records of all inspection work and operational testing reports performed by the Contractor under the QCP must be maintained and made available to the Government if requested.

1.15.2 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). It is attached as Attachment 4 Quality Assurance Surveillance Plan.

PART 2

DEFINITIONS & ACRONYMS

2.0 DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1 Accident Prevention Plan (APP): An APP is a written site-specific Safety & Occupational

Health plan that documents project, contract, and job-specific potential hazards in the workplace, and the company policies, controls, and work practices that will be used to minimize those hazards.

2.1.2 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.3 Contracting Officer (KO): A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government.

Note: The only individual who can legally bind the government.

2.1.4 Contracting Officers Representative (COR): A technical point of contact, usually on-site, appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does

NOT have authority to change the terms and conditions of the contract.

2.1.5 Contracting Specialist (CS): A contracting office point of contact involved in the logistics of writing, negotiating, awarding, and managing contracts.

2.1.6 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.7 Deliverable: Anything that can be physically delivered. May include non-manufactured things such as meeting minutes or reports.

2.1.8 Firm Fixed Price Contract: A type of contract that provides for a price that is not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract.

2.1.9 Government Furnished Property: Property owned by the Government that is provided to the

Contractor for the performance of a contract.

2.1.10 Industry Standard: A set of criteria within an industry relating to the standard functioning and carrying out of operations in their respective fields; how work is customarily done by contractors in the community.

2.1.11 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.12 Non-Peak Season: 01 October – 30 April. Also known as Off Season.

2.1.13 Non-Personal Service Contract: A contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

2.1.14 Peak Season: 01 May – 30 September. Also known as Recreation Season.

2.1.15 Proper Disposal: Proper disposal refers to disposing of materials off USACE property and in accordance will all applicable federal, state, and local laws and regulations.

2.1.16 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.17 Quality Control Program (QCP): An organized written document specifying measures to be taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.18 Refuse: Trash, garbage, solid waste.

2.1.19 Workmanship: The manner in which work is carried out, encompassing the skills, knowledge, and quality expected of a skilled professional in a particular trade or occupation.

2.1.20 Work Site: In this contract the work site refers to any location on USACE property at

Coyote Valley Dam and Lake Mendocino.

2.2. ACRONYMS:

ADA America with Disabilities Act

AFARS Army Federal Acquisition Regulation Supplement

AHA Activity Hazard Analysis

APP Accident Prevention Plan

AR Army Regulation

CFR Code of Federal Regulations

CONUS Continental United States (excludes Alaska and Hawaii)

COR Contracting Officer Representative

COTS Commercial-Off-the-Shelf

CS Contracting Specialist

CVD Coyote Valley Dam

DA Department of the Army

DFARS Defense Federal Acquisition Regulation Supplement

DOD Department of Defense (interchangeable with Department of War herein)

DOW Department of War (previously known as Department of Defense)

EM Engineering Manual

ENG Engineering (as in Engineering Form)

FAR Federal Acquisition Regulation

FPCON Force Protection Condition

HPCON Health Protection Condition

KO Contracting Officer

NCIC-III National Crime Information Center Interstate Identification Index

NTE Not to exceed

OCONUS Outside Continental United States (includes Alaska and Hawaii)

OPSEC Operations Security

POC Point of Contact

PPE Personal Protective Equipment

PRS Performance Requirements Summary

PT Pacific Time (Pacific Standard Time or Pacific Daylight Time)

PWS Performance Work Statement

QA Quality Assurance

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Program

RAM Random Antiterrorism Measure

SOV Schedule of Values

SSHO Site Safety and Health Officer

TSDB Terrorist Screening Database

UFC USACE Finance Center

USACE U.S. Army Corp of Engineers

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3.0 GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1 General: The Government shall furnish all keys, lock/keypad combinations, and/or the personnel necessary to allow access to the locations as outlined in Attachment 1 Work Site Area

& Sewage Locations. All keys and shall be returned to the Government upon request and/or completion of the contract.

The Government shall furnish water for cleaning and tank recharging purposes. However, Government water sources are subject to availability. Therefore, the Contractor will be required to furnish all equipment necessary to load, contain, and transport large amounts of water to areas where water is not available.

The Government shall also furnish copies of the Safety Manual EM 385-1-1 and any forms listed in the EM 385-1-1 upon request. All copies of the EM 385-1-1 shall be returned to the

Government upon request and/or completion of the contract.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4.0 CONTRACTOR FURNISHED ITEMS AND SERVICES:

4.1 General: The Contractor shall furnish all equipment, supplies, items, labor, materials, services, etc. to accomplish the services specified in this PWS. All sewage pumped shall be properly disposed of in accordance with all federal, state, and local regulations.

4.2 Vehicles: The Contractor shall furnish industry standard sewage pumping vacuum trucks, suitably equipped to pump sewage efficiently from any of the locations in Attachment 1 Work

Site Area & Sewage Locations. The Contractor shall thoroughly clean equipment to keep it free of residue and odor and to present a clean appearance. All equipment must be approved by the

KO or the COR prior to initial use. In accordance with EM 385-1-1 Chapter 18: Vehicles, Machinery, and Mechanized Equipment, the trucks used shall be in good working condition and operated by qualified drivers. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. The Contractor shall assure that they have, or can obtain on short notice, sufficient backup vehicles and equipment to continue the services as specified without interruption in the event of mechanical failure of their primary equipment.

4.3 Equipment: The Contractor shall furnish all equipment necessary for removal and disposal of all solid and liquid waste (including refuse) from sewage tanks, including but not limited to the vehicles mentioned above, hoses, trash bags, and long trash grabbers. The Contractor shall also furnish all equipment necessary for the clearing and removal of clogs within sewer drain lines, including but not limited to video cameras, snakes, rooters, hydro-jetters, and hoses. The

Contractor shall furthermore furnish all equipment necessary to load and transport large amounts of water for tank recharging purposes, including but not limited to mobile tanks, buckets, and hoses.

The Contractor shall assure that they have, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of their primary equipment.

4.4 Supplies & Materials: The Contractor shall furnish all required detergents, non-restricted bacterial agents, cleaning rags, cleaning solution enzymes, disinfectant/deodorizer, signs, and all other supplies and materials to be consumed or incorporated in the work. Contractor shall be responsible for maintaining an adequate supply of materials on each service vehicle necessary for performing the required services.

4.5 Portable Toilets: The Contractor shall furnish industry standard portable toilets in both ADA-compliant and regular stalls. The Contractor shall be able to furnish four (4) ADA and four (4) regular stalls at any one time. Stalls must be maintained in good working conditions, subject to the approval of the COR. Good working conditions include being free of significant odors, damage, and vandalism. Stalls must also have adequate ventilation, be uniformly painted, constructed such that walls provide adequate privacy, and doors must have a working lock mechanism. The Contractor's name/logo and any legitimate warning/safety decals may be displayed on the stalls, but no advertising will be allowed.

The Government will not be responsible for the security or damage to any of the Contractor's equipment. If the portables become damaged, dirty, or unsafe, the COR may direct that the unit be replaced, or the problem corrected within 48 hours or immediately if a significant safety or health risk is evident. The Contractor should anticipate that portables need to be periodically cleaned or repaired and should incorporate those costs into the unit price for the portables rental line item. If the Contractor fails to keep the portables in good working condition or respond to the COR's directive to clean or repair a stall, the Government may have the work performed by others and deduct the cost from monies owed the Contractor.

4.6 Manpower: The Contractor shall furnish all competent and qualified manpower necessary to accomplish the required work with a degree of workmanship in line with industry standard.

PART 5

SPECIFIC TASKS

5.0 SPECIFIC TASKS:

5.1 Basic Services: Sewage pumping and drain clearing is directly related to public health and sanitation and is essential to CVD/ Lake Mendocino’s recreation mission. The Contractor shall furnish all equipment, supplies, items, labor, materials, and services necessary to for sewage pumping and proper disposal, drain clearing, portable toilet rental, and portable/vault toilet stall cleaning/treatment in accordance with all federal, state, and local regulations.

5.2 Service Descriptions:

5.2.1 Lift Stations & Holding Tanks: The Contractor shall pump/remove all solid and liquid material from each tank (including all litter and refuse such as bottles, trash bags, clothing, etc.), and hose down the area around the tank ensuring any spilled material is removed and the area is left clean, sanitary, and safe. The removed waste shall be transported from CVD/ Lake

Mendocino and disposed of in accordance with all federal, state, and local laws and regulations.

The Contractor shall bear all cost in connection with this work.

Tank capacities throughout the park vary from 1,000 – 10,000 gallons. Tank locations are outlined in Attachment 1 Work Site Area & Sewage Locations.

5.2.2 Vault Toilets: The Contractor shall pump/remove all solid and liquid material from each tank/vault. This includes all litter and refuse (bottles, cans, trash bags, clothing, etc.), which can be a common occurrence in the public vault toilets at Lake Mendocino. The Contractor shall also recharge the tank/vault with approximately one foot of water after pumping, apply an enzyme treatment if needed, and hose down the area around the tank ensuring any spilled material is removed and the area is left clean, sanitary, and safe. An enzyme treatment may be needed to control odor and maintain cleanliness of the stall. The removed waste shall be transported from

CVD/ Lake Mendocino and disposed of in accordance with all federal, state, and local laws and regulations. The Contractor shall bear all cost in connection with this work.

Vault toilets have a capacity of 1,000 gallons per stall. Vault toilet locations are outlined in

Attachment 1.

5.2.3 Sewer and Drain Line Clearing: The Contractor shall provide any combination of video camera services, snaking, rooting, hydro-jetting, and/or chemical treatment necessary to identify and remedy drain line clogs such that the lines can flow freely. Lines that do not continue to flow freely for one week (7 days) will require re-work at no additional cost to the Government.

5.2.4 Portable Toilets:

5.2.4.1 Amount, Type, and Condition: Locations subject to portable toilet placement include recreation areas outlined in Attachment 1. This will primarily be in areas with flush restrooms that occasionally experience system failures. The Contractor shall have enough inventory available to be able to provide up to four (4) sets of portable toilets at one time. A set includes one regular size portable toilet and one ADA-compliant size portable toilet. Portable toilets shall be for outdoor-use and anchorable.

The Contractor shall maintain portables that are clean and in good repair, free of significant odors, damage, and vandalism. Stalls must have adequate ventilation, be uniformly painted, constructed such that walls provide adequate privacy, and have doors with a working lock mechanism. Portables should be delivered and placed on flat, level ground surfaces as directed by the COR. In the event portables are vandalized, damaged, and/or moved by the public, the

Contractor bears the responsibility of retrieving, repairing and/or replacing them. At the discretion of the COR, the Contractor shall remove and replace damaged portables with ones in good condition.

There are also two (2) USACE-owned portable toilets that are subject to service. The Contractor is not responsible for the good working condition of these portables but is required to follow the same service description outlined below in Section 5.2.4.3 for the same unit price as the

Contractor-owned portables.

5.2.4.2 Rental Period: The Contractor shall deliver portable toilets in good working conditions within 48 hours of request by the COR. Portable toilets will be rented per type per two-week (15-day) period.

5.2.4.3 Service: The Contractor shall pump/remove all solid and liquid material from each portable, transport the waste from CVD/ Lake Mendocino, and dispose of it in accordance with all federal, state, and local laws and regulations. Additionally, each portable should be recharged with an industry standard deodorant/cleaner, restocked with reasonably enough toilet paper to last until the next service, and thoroughly cleaned. Cleaning includes scrubbing, wiping, rinsing, removing with appropriate soaps, disinfectants, and cleaning solutions to ensure stall floors, walls, ceilings, door, toilet lids, and toilet risers are free from waste, refuse, residues, spider webs, and significant odors. The area should be hosed down around the portables if needed to ensure any spilled material is removed and the area is left clean, sanitary, and safe.

5.3 Frequency: The Contractor shall provide services on a call-out basis. Scheduling for services will be agreed upon between the Contractor and the COR prior to the delivery of services. The allotted quantities for each service per this contract are based on field experiences from the past five (5) years and best estimates for future needs. An example schedule can be found in

Attachment 2 Sample Service Schedule.

5.4 Line Items:

1) Lift Station/Holding Tank Pumping | Unit: Gallon

a. Offerors should provide a quote per gallon of sewage pump, incorporating any additional costs (litter removal, sewage disposal) into the per gallon quote.

2) Vault Toilet Pumping & Treatment | Unit: Gallon

a. Offerors should provide a quote per gallon of sewage pump, incorporating any additional costs (litter removal, recharging/treatment services, sewage disposal) into the per gallon quote.

3) Sewer and Drain Line Clear Out | Unit: Job

a. Offerors should provide a quote for a total annual dollar amount that estimates seventeen (17) line clears that involve snaking/rooting/chemical treatment only, and three (3) line clears that require video camera and hydro-jetting services.

4) Portables Pumping & Cleaning | Unit: Each

a. Offerors should provide a quote per each pumping/cleaning service trip.

5) Biweekly Rental Regular Portable | Unit: Each

a. Offerors should provide a quote per two-week rental period for a regularly sized portable toilet, incorporating any costs necessary for maintaining the stall in good working condition.

6) Biweekly Rental ADA Portable | Unit: Each

a. Offerors should provide a quote per two-week rental period for a ADA-compliant sized portable toilet, incorporating any costs necessary for maintaining the stall in good working condition.

PART 6

APPLICABLE PUBLICATIONS

6.0 APPLICABLE PUBLICATIONS:

6.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures. Including, but not limited to:

EM 385-1-1

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7.0 ATTACHMENT/TECHNICAL EXHIBIT LIST:

7.1 Attachment 1 – Work Site Area & Sewage Locations

7.2 Attachment 2 – Sample Service Schedule

7.3 Attachment 3 – Deliverables Schedule

7.4 Attachment 4 – Quality Assurance Surveillance Plan

ATTACHMENT 1

WORK SITE AREA & SEWAGE LOCATIONS

Coyote Valley Dam & Lake Mendocino is located in Ukiah, CA. Project headquarters is located at 1160 Lake Mendocino Dr. There are 18 areas subject to sewage pumping, drain clearing, and portable toilet placement services. Vault toilet locations are outlined.

1. Project Headquarters

2. Joe Riley Day-Use Area (2 vault toilets)

3. Overlook Day-Use Area

4. South Boat Ramp

5. Coyote Valley Dam #1

6. Coyote Valley Dam #2 (1 vault)

7. Chekaka Day-Use Area (4 vaults)

8. Pomo A Day-Use Area

9. Pomo B Day-Use Area

10. Pomo C Day-Use Area

11. Wastewater Treatment Plant

12. Kyen Campground

13. North Boat Ramp

14. Oak Grove Day-Use Area (2 vaults)

15. Mesa Day-Use Area

16. Bushay Campground (6 vaults)

17. Coyote Valley Fish Facility

18. Control Tower

2 3

17 18

Sample Service Schedule

January February March April May June July August September October November December TOTAL ANNUAL

ALLOTMENT

Locations Unit

0001 Lift Station/Holding Tank Pumping Gallons

Coyote Valley Dam

Chekaka Day Use Area 1000

Kyen Campground - Lift 4000 4000 4000 4000

Kyen Campground - Dump 2000 2000 2000

North Boat Ramp 4000

Bushay Campground - Lift

Bushay Campground - Dump 2000 2000 2000 33000

0002 Vault Toilet Pumping & Treatment Gallons

Joe Riley Day Use Area 2000 2000

Coyote Valley Dam 1000 1000

Chekaka Day Use Area 4000 4000

Oak Grove Day Use Area 2000 2000

Bushay Campground - Deer 2000 2000

Bushay Campground - Tata 2000

Bushay Campground - Little Bear 2000 2000 28000

0003 Sewer and Drain Line Clear Out Job

(Variable)

Coyote Valley Dam 1 (Camera and jetting) 1 (Rooting only) 1 (Rooting only)

Pomo A Day Use Area 1 (Rooting only) 5 (Rooting only) 1 (Camera and jetting) 5 (Rooting only) 1 (Rooting only) 1 (Rooting)

Pomo B Day Use Area 1 (Rooting only) 1 (Rooting only) 1 (Camera and jetting)

0004 Portable Pumping & Cleaning Each

(Variable)

HQ 2 2 2 2 2 2 2 2 2 2 2 2

Coyote Valley Dam 18 18

Pomo A Day Use Area 18 18 18

Pomo B Day Use Area 18 18 18

Pomo C Day Use Area 18 18 18

North Boat Ramp 18 18 18 18 18 312

0005 Regular Size Portable Biweekly Rental Each

(Variable)

Coyote Valley Dam 2 2

Pomo A Day Use Area 2 2 2

Pomo B Day Use Area 2 2 2

Pomo C Day Use Area 2 2 2

North Boat Ramp 2 2 2 2 2 32

0006 ADA-Compliant Size Portable Biweekly RentalEach

(Variable)

Coyote Valley Dam 2 2

Pomo A Day Use Area 2 2 2

Pomo B Day Use Area 2 2 2

Pomo C Day Use Area 2 2 2

North Boat Ramp 2 2 2 2 2 32

Qty

20 services (3 with camera/jetting)

0006 ADA-Compliant Size Portable Biweekly Rental

ATTACHMENT 2

SAMPLE SERVICE SCHEDULE

ATTACHMENT 3

DELIVERABLES SCHEDULE

Deliverable Frequency Submit To

List of verified/eligible employees pre-screened by E-verify

(Section 1.10.4)

Initial list no later than 3 days after contract award.

Updates as requested.

COR

APP on ENG Form

6293 w/ all associated plans, AHAs, etc.

(Section 1.11.2)

Prior to commencement of work, and within one week of contract award.

COR & KO

Invoices (Section 1.14) Monthly.

COR

QCP (Section 1.15.1) Within 30 days of contract award.

Updates delivered within 5 working days thereafter.

COR & KO

Inspections and operational testing reports from QCP

(Section 1.15.1)

Upon request. COR (or KO, CS)

ATTACHMENT 4

QUALITY ASSURANCE SURVEILLANCE PLAN

Purpose. The Quality Assurance Surveillance Plan (QASP) provides systematic method to evaluate performance for the stated contract. It explains who will conduct monitoring, what will be monitored, and how monitoring will take place. The results will be documented.

The QASP does not detail how the contractor accomplishes the work. The Contractor is responsible for managing quality control to meet the terms of the PWS. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

The QASP is a “living document” and the Government may review and revise it on a regular basis. However, all updates will be provided to the Contractor and will ensure the QASP remains a valid, useful, and enforceable document.

The following FAR clause applies to this contract:

52.246-4 Inspection of Services – Fixed-Price

Government Roles and Responsibilities. The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (KO): The KO is responsible for ensuring performance of all necessary actions for effective contracting, ensuring compliance with the contract terms, and safeguarding the interests of the United States in the contractual relationship. They shall make certain that the Contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

KO: Nairi Freeman, Contracting Officer Phone: (415) 503-6574 | Email: Nairi.Freeman@usace.army.mil

b. Contracting Officer’s Representative (COR): The COR is responsible for the technical administration of the contract and is responsible for assuring proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

COR: Sadie Parker, Administrative Officer

Phone: (707) 467-4224 | Email: Sadie.K.Parker@usace.army.mil

c. Field Representatives: The COR’s field representative(s) may assist in conducting inspections.

Field Rep(s): TBD

Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. The table below describes the performance standards that will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

Performance Objective Standard Performance

Threshold

Method &

Frequency of

Surveillance

The Contractor shall pump/remove and properly dispose of all solid and liquid material from each tank

(including all litter and refuse), and hose down the area around the tank ensuring any spilled material is removed and the area is left clean, sanitary, and safe (Section 5.2.1)

The Contractor provides removal and proper disposal of sewage and refuse from lift stations/holding tanks according to the service description.

>95% of sewage services performed timely and without rework required

Periodic

Inspection (aka

Planned

Sampling), Per Occurrence

The Contractor shall pump/remove and properly dispose of all solid and liquid material from each tank/vault

(including all litter and refuse), recharge the tank/vault with approximately one foot of water after pumping, apply an enzyme treatment if needed, and hose down the area around the tank ensuring any spilled material is removed and the area is left clean, sanitary, and safe (Sections 5.2.2)

The Contractor provides removal and proper disposal of sewage and refuse, and treatment for vault toilets according to the service description.

>95% of sewage services performed timely and without rework required

Periodic

Inspection, Per Occurrence

The Contractor shall provide any combination of video camera services, snaking, rooting, hydro-jetting, and/or chemical treatment necessary to identify and remedy drain line clogs such that the lines can flow freely (Sections 5.2.3)

The Contractor removes clogs in sewer and drain lines such that lines flow freely according to the service description.

>95% of sewage services performed timely and without rework required

Periodic

Inspection, Per Occurrence

The Contractor shall pump/remove and properly dispose of all solid and liquid material from each portable, recharge with an industry standard deodorant/cleaner, restock with toilet paper, and clean thoroughly

(Sections 5.2.4.3)

The Contractor provides removal and proper disposal of sewage and refuse, and recharging/cleaning service for portable toilets according to the service description.

>95% of sewage services performed timely and without rework required

Random

Sampling, Monthly

The Contractor shall deliver portable toilets in good working conditions within 48 hours of request by the COR (Section 5.2.4.1

& 5.2.4.2)

The Contractor provides delivery of portable toilets in a timely fashion and maintains their good working conditions according to the PWS description.

>95% of portable rental services performed timely

Periodic

Inspection, Per Occurrence

The Contractor shall provide all other deliverables according to the deliverables schedule (Attachment

3)

The Contractor provides all deliverables according to the deliverables schedule (including monthly invoices).

>95% of deliverables delivered on schedule

100%

Inspection, Per Occurrence

Inspection Deficiencies. The Government shall document all performance using the attached

Inspection Checklist. Inspections may become supporting documentation for any contract actions. The COR reserves the right to request that the Contractor return to the work site to address any items that do not meet the performance standard and threshold. Consistent and continual deficiencies will prompt the completion of a formal Contract Deficiency Report (CDR) to be provided to the KO and attached to the contract file. After a CDR is issued, the Contractor shall meet with the COR or KO if requested, and a mutual effort will be made to resolve all issues identified. Written meeting minutes shall be prepared and signed by all parties present upon completion of the meeting.

Sewage Pumping and Drain Clearing Services

Inspection Checklist

Date: _____________________________ Time: ______________________________

Inspector: _________________________ Signature: __________________________

Lift Station/ Holding Tank Location: Location:

All solid and liquid waste removed

Area left clean and free from spillage

Satisfactory Condition, Yes or No?

Additional Remarks

Vault Toilet Location: Location:

All solid and liquid waste removed

Tank recharged with water and enzyme (if applicable)

Area left clean and free from spillage

Satisfactory Condition, Yes or No?

Additional Remarks

Portable Toilet Location: Location:

All solid and liquid waste removed

Tank recharged with deodorant/cleaner

Toilet paper restocked

Clean floor, walls, ceiling, and door

Clean toilet lid and riser

Area left clean and free from spillage

Stalls free of significant odors, damage, & vandalism

Stalls have uniform paint

Stalls provide adequate privacy

Stalls have working lock mechanism

Satisfactory Condition, Yes or No?

Additional Remarks

Sewer and Drain Lines Location: Location:

Lines cleared of obstruction and flow freely

Area left clean and free from spillage

Satisfactory Condition, Yes or No?

Additional Remarks

PWS_CVD Sewage Services Contract 2026.pdf
Sample Service Schedule_Sewage Services 2026.pdf
PWS_CVD Sewage Services Contract 2026

File details come from the government source that posted it. Updated .