Pre-Proposal Conference Presentation for Environmental and Planning IDIQ Contract

This document is a pre-proposal conference presentation for the U.S. Army Corps of Engineers, San Francisco District, regarding solicitation W912P726RA029 for environmental and planning Architect-Engineer (A-E) services. The Government seeks to award one Single Award Task Order Contract (SATOC) Indefinite Delivery, Indefinite Quantity (IDIQ) contract with a total capacity of $20,000,000 over a 5-year period (3-year base plus one 2-year option). The contract is set aside for small businesses under NAICS Code 541330 Engineering Services with a $25.5 million size standard (five-year average). A-E firms must be small businesses, or joint ventures where each partner is small, or operate under an SBA-Approved Mentor Protégé Program.

Services required include environmental planning and related activities primarily in support of the Civil Works mission, with potential work for Military and Interagency/International Support missions. Work will be performed primarily within the San Francisco District boundaries but may extend across the South Pacific Division (Sacramento, Los Angeles, and Albuquerque Districts) covering California, Nevada, Utah, Arizona, and portions of Oregon, Idaho, Colorado, and Wyoming. Example tasks include dredge material sediment suitability analysis, environmental resource inventories, NHPA Section 106 compliance, nature-based solutions design, community engagement planning, economic technical reports, and GIS/CADD support for water resource studies. Pre-solicitation was issued July 27, 2026, with a questions deadline of August 12, 2026, 3:00 PM PDT, and pre-solicitation response deadline of August 26, 2026, 3:00 PM PDT. Interested firms must submit one copy each of SF330 Part I and Part II via PIEE. Selection criteria emphasize specialized experience and technical competence, professional qualifications, past performance, capacity to manage two simultaneous $250,000 task orders, and knowledge of locality, with secondary consideration given to small business participation and DoD contract volume.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

As of 29-Mar-11

U.S. Army Corps of Engineers San Francisco District

BUILDING STRONG® 2

U.S. Army Corps of Engineers

BUILDING STRONG®

San Francisco District

Pre-Proposal Conference for Environmental and Planning IDC/IDIQ in the San Francisco District

W912P726RA029

Presenter:

Nairi Freeman

U.S. Army Corps of Engineers Date: August 10, 2026 Time: 02:30 PM PDT Virtually Conducted

BUILDING STRONG®1

BUILDING STRONG®

This presentation is being provided for informational purposes only, without the intention of amending or changing the meaning of the language in the SYNOPSIS.

BUILDING STRONG®2

Introductions Purpose Project Overview Upcoming Projects Acquisition Structure Small Business Synopsis Selection Criteria Submission Notifications & Debriefings Timeline SAM Registration Resources Questions

BUILDING STRONG®3

AGENDA

► Environmental

• Julie Beagle

• Jessie Burton-Evans

► Contracting Personnel

• Nairi Freeman

• Logan Champlin

► Small Business Representatives

• Stephanie Parra

BUILDING STRONG®4

INTRODUCTIONS

U.S. Army Corps of Engineers, San Francisco District Personnel

PURPOSE

BUILDING STRONG®5

The purpose of this Pre-Proposal conference is:

(1) Highlight issuance of PRE-SOLICITATION NOTICE for A-E

Service for Environmental Planning at www.sam.gov

(2) Provide overview of Government’s Requirement

PURPOSE

BUILDING STRONG®6

Pre-solicitation Issued: Jul 27, 2026

Due Date for Questions: August 12, 2026 3:00 PM PDT

Due Date for Pre-solicitation Response: Aug 26, 2026 03:00 pm PDT

Solicitation No: W912P726RA029

Set Aside Type: Small Business

Government seeks to award one (1) Single Award Task Order Contract (SATOC) Indefinite Delivery, Indefinite Quantity (IDIQ)

Interested AE firms must submit 1 copy of the SF330 Part I and SF330 Part II

QUESTIONS

BUILDING STRONG®7

Questions will not be addressed during this briefing – an opportunity will be provided during the Synopsis.

SYNOPSIS Question Deadline - August 12, 2026 3:00 PM PDT

Email Question(s) to:

Logan Champlin(Contract Specialist)

Logan.Champlin@usace.army.mil

Nairi Freeman (Contracting Officer)

Nairi.freeman@usace.army.mil

PROJECT OVERVIEW

BUILDING STRONG®8

AE services are required to provide environmental planning services primarily in support of the Civil Works mission area. Similar services may be required to support the Military and Interagency and International Support (IIS) missions. The contractor will be required to perform service primarily within the San Francisco District boundaries. The contracts may also be used by other Districts within South Pacific Division (Sacramento, Los Angeles and Albuquerque Districts) to encompass the entire South Pacific Division geographical area of responsibility which can include CA, NV, UT and AZ and portions of OR, ID, CO and WY.

PROJECT OVERVIEW (AREA)

BUILDING STRONG®9

Example Task Order Projects

BUILDING STRONG®10

• Existing conditions inventory report for a planning feasibility study area.

• Cultural resource investigations (records search, pedestrian survey, evaluation for National Registry of Historic Places eligibility) for water resource studies/projects.

• Fish surveys and entrainment monitoring for federal operation and maintenance (O&M) dredging projects.

• Dredge material sampling and analysis plans, sampling and analysis reports, and support to obtain sediment suitability determinations for federal dredging projects.

Example Task Order Projects

BUILDING STRONG®11

• Phase I or II environmental site assessment for hazardous material contamination in water resource study/project areas.

• Identification and design of appropriate natural and nature based measures and approaches to support studies and projects involving beneficial use of dredge material, flood risk management, coastal storm risk management, navigation, aquatic ecosystem restoration, etc.

• Community/public engagement plan development and execution, including public meetings, facilitation services, and development of accessible materials.

• Land use inventory and analysis of without and with project flood damages to support economic analyses

ACQUISITION STRUCTURE

• Comply with Brooks Act

• Small Business Set-Aside

• SATOC pool: Government seeks to award 1 Indefinite Delivery Contract

• Total capacity: $20,000,000

• Contract duration of 5 years (base for 3 years and one option for 2 years)

BUILDING STRONG®12

SMALL BUSINESS

• Prime considered small under NAICS Code 541330 Engineering Services with a size standard of $25.5M (five-year average) in SAM profile.

• JV of two or more A-E’s; each required to be small under NAICS (13 CFR 125.8(a))

• JV under an SBA-Approved Mentor Protégé Program (13 CFR 125.8(b)(2)).

BUILDING STRONG®13

SYNOPSIS FORMAT = (A,B,C,D)

A

.C on tr ac t In fo rm at io n • Basic terms and conditions, who may submit

• Basic terms and conditions, who may submit

B .P ro je ct I nf or m at io n •Types of services to be contracted •Types of services to be contracted

C .S el e ct io n C rit er ia

D

S u bm is si o n R eq ui re m en ts •What, where, when, and how •What, where, when, and howPrimary Factors

•Specialized experience &

BUILDING STRONG®14

technical competence

•Professional qualifications •Past performance •Capacity •Knowledge of locality

Secondary Factors

•SB & SSDB participation

•Geographic Proximity

•Volume of DOD contracts

SYNOPSIS TIPS

READ

EVERYTHING

VERY

CAREFULLY!

RESPOND

TO EVERYTHING

VERY

COMPLETELY!

1 2

BUILDING STRONG®15

BUILDING STRONG®16

AE Submissions shall be handled by the Government IAW with FAR

15.207 (Handling) and 15.208 (Submission, Revision, and Withdrawal)

Boards will only evaluate SF-330 Parts I and II and any required supplemental information

Firms will not be considered if their SF-330 Part I is not signed, unless the SF-330 Part I is accompanied with a signed cover letter

If a firm does not submit a SF-330 Part II with it’s Part I, it will not be considered, unless that firm’s SF-330 Part II is on file with the agency

Firms are encouraged to update their SF-330 Part II, older ones will be considered by the board (up to 3 years)

BUILDING STRONG®17

Boards will not assume qualifications which are not clearly stated

Firms will not be contacted to clarify or supplement their submission, except during interviews with the most highly qualified firms

Boards will not consider any cost factors

Small Business Firms must certify their status in the SF-330 Part II

Interviews will be held with the MOST HIGHLY QUALIFIED firms. All firms will be interviewed by the same method.

SELECTION CRITERIA

Federal Agencies use the SF330 to obtain information from AE firms about their professional qualification. Federal Agencies select firms for AE contracts on the basis of professional qualifications as required by 40 U.S.C chapter 11, Selection of Architect Engineers, and Part 36 of the Federal Acquisition Regulations (FAR)

BUILDING STRONG®18

BUILDING STRONG®19

PRIMARY Selection Criteria (A-E) Criteria A and B being considered most important and are of equal importance.

criteria C, D, and E are of lesser importance and listed in descending order of importance.

A) Specialized Experience & Technical Competence (Section F, G)

A) Provide examples of up to 10 projects (within the last 5 yrs) Example projects should be completed (start, end, size, scope) Experience of PRIME will be weighted more heavily IDIQ contracts aren’t accepted BUT Task orders are good examples

i. Examples of completed dredge material sediment suitability process including Sampling and Analysis Plans.

ii. Examples of environmental resource inventories, effect analyses.

iii. Examples of National Historic Preservation Act (NHPA) Section 106.

iv. Examples of projects where the firm has designed nature-based solutions or “Engineering with Nature” (v) Examples of community outreach, involvement, and engagement plans.

v. Examples of economic technical reports, mapping, dataset development

vi. Examples of spatial data, GIS products, CADD drawings completed to support water resource studies or projects such as maps, Aerial Photography, Topographic/ Bathymetric Surveying and Mapping, database development, preparation of contract drawings.

BUILDING STRONG®20

B. Professional Qualifications (Section D, E, G)

• Evaluation will consider the qualifications of key personnel (Prime & Subs)

• Key Personnel = Org Chart (Management Plan) + Resumes Key Personnel listed in SYNOPSIS

• Key Personnel have appropriate licenses/certs AND required experience

• Include resumes of Key Management and Technical personnel Resumes not counted against 70 page limit

C. Past Performance

• CPARS and PPQ (non-Government clients)

• PPQ provided by PRIME are more favorable

• PPQ not counted against 70 page limit

• Awards, Letters of commendation, certifications are not evaluated Awards, Letters of commendation will count against 70 page limit

BUILDING STRONG®21

E. Knowledge of Locality

Demonstrate familiarity with SPD area Exhibited in Sections F and G

D. Capacity

Demonstrate the capacity to accomplish at least two (2) $250,000 individual task orders simultaneously

BUILDING STRONG®22

SECONDARY Selection Criteria – only considered in the event of a tie-breaker for technically equally ranked firms based on primary selection criteria

F. Small Business and Small Disadvantaged Participation

• Amount of SB concerns utilized IAW with SYNPOSIS

G. Volume of DoD Contract Awards

• Last 12 months DoD AE contracts awarded

SUBMISSION

Announcement ID: W912P726RA029

Pre-solicitation/synopsis issued date:

Jul 27, 2026

Submission Due Date and Time:

Aug 26, 2026 03:00 pm PDT

Submission Requirement: Interested Firms must submit 1 copy of each (SF330 Part I and II).

Submission Method: via PIEE

BUILDING STRONG®23

NOTIFICATION &

DEBRIEFINGS

BUILDING STRONG®24

8/10/2026

Notifications:

► All firms are notified by e-mail after selection process

► Firms will be identified into 3 categories:

(i) Highest Rated

(ii) Among the Most Highly Qualified firms but not the highest rated

(iii) Not among the Most Highly Qualified firms

► Debriefing information will be provided in notification

BUILDING STRONG®25

NOTIFICATIONS

BUILDING STRONG®26

Debriefing Purpose:

(1) create confidence in the debriefed firm that the selection was conducted fairly and objectively IAW with selection criteria

(2) provide the firm specific information to improve its qualifications and better compete for future work

BUILDING STRONG®27

► A request for a debriefing must be received within 10 calendar days after the date on which the firm received the notification

► Debriefing should occur within 10 calendar days after receipt of the request

► Debriefing will be conducted by the Selection Board Chairperson or appointed designee

► Debriefing will summarize significant weaknesses or deficiencies in a firm’s qualifications (FAR 15.506(d)(1)). A firm’s qualifications will not be compared point by point to other firms

Base &30 days30 days30 days45 days30 days OptionsNegotiate

Doc Prep Legal Review

Analyze

PNO

Ctr ProposalSelectionSynopsis

BUILDING STRONG®28

ACQUISITION TIMELINE

Anticipated acquisition of Environmental Planning Indefinite Delivery Contract

SAM REGISTRATION

To be eligible for contract award, a firm including Joint-Ventures (J/V) MUST registered in the System for Award Management (SAM).

BUILDING STRONG®29

SAM

► https://sam.gov/

FAR (Federal Acquisition Regulations) ► acquisition.gov

EP-715-1-7 Architect-Engineer Contracting in USACE, dated FEB 29, 2012 This pamphlet describes AE contracting process in USACE and how firms may obtain considerations for contracts.

BUILDING STRONG®30

RESOURCES

QUESTIONS

BUILDING STRONG®31

Questions will not be addressed during this briefing – an opportunity will be provided during the Synopsis.

SYNOPSIS Question Deadline - August 12, 2026 3:00 PM PDT

Email Question(s) to:

Logan Champlin(Contract Specialist)

Logan.Champlin@usace.army.mil

Nairi Freeman (Contracting Officer)

Nairi.freeman@usace.army.mil

File details come from the government source that posted it. Updated .