W912P725BA0001_Amendment 1.pdf

PDF 5 MB Posted

Attached to
FY25 SUISUN BAY CHANNEL NY SLOUGH MAINTENANCE DREDGING PROJECT
Solicitation number
W912P725BA001
Issued by

About this file

This document is an Amendment 1 to Solicitation W912P725BA001 for the FY25 Suisun Bay & NY Slough Channel Maintenance Dredging Project located in Contra Costa and Solano Counties, California. The solicitation is a small business set-aside for a firm fixed-price contract with an estimated value between $1-5 million, involving annual maintenance dredging of multiple channel reaches to specified depths (-35 to -37 feet MLLW) with one foot of paid over-depth, and transporting dredged material to disposal site SF-16.

Key changes in Amendment 1 include modifying the bid due time from 12:00 PM to 1:00 PM, bid opening time changed to 2:00 PM on June 13, 2025, updating wage determinations, and removing/adding specific contract clauses. The project requires electronic bid submission through the Procurement Integrated Enterprise Environment (PIEE) website, with a public bid opening via Microsoft Teams. Bidders must be registered in the System for Award Management (SAM) and PIEE, and are advised that the project may be delayed, cancelled, or revised at any time during the solicitation process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): The purpose of this amendment is to remove and add clauses that were missed in the initial solicitation, change the bid due time and opening time, provide updated bid schedule, and updated plans.

The bid due time is changed to 1 pm. The bid opening time is changed to 2 pm. Wage Determination's CA20250007 and CA20250018 have been updated to the newest versions.

Clauses removed:

52.219-9 52.236-1 52.222-54 52.219-7003 52.222-22 Clauses Added:

52.236-27 52.219-28 (Alternate I) 52.219-28 (Added as Full Text)

Updated Plans under the attachment section of PIEE and SAM. Updated Wage Determination and Bid Schedule and attached to Amendment 1.

Section 00 00 00 - Procurement and Contracting Requirements The following changes have been made:

INFORMATION FROM TO

Response Due Time 12:00 PM 01:00 PM

Section 00 20 00 - Instructions for Procurements

The following clauses were added:

FAR Clauses Incorporated by Full Text

W912P725BA001-0001

Contract Line Item No.(CLIN)

Description of Supplies and Services

*Quantity Unit Unit

Price($) Amount($)

Mobilization and Demobilization 1 Job

0002 Dredging Reach 2 to -37-ft MLLW plus 1 foot of paid Over-depth with disposal at SF-16

7,614

CY

0003 Dredging Reach 3A to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at SF-16 5,199 CY

0004 Dredging Reach 3B to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at SF-16 18,246 CY

0005 Dredging Reach 3C to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at SF-16 15,689 CY

0006 Dredging Reaches 3D and 3E to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at SF-16 24,852 CY

0007 Dredging Reaches 4A and 4B to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at SF-16 5,551 CY

Total (Item 0001 through 0007)

SUISUN BAY & NY SLOUGH CHANNEL FY25 MAINTENANCE DREDGING

77,151 CY + 1 Job

SECTION 00 10 00

PRICING SCHEDULE

17,265

7,713

18,109

17,858

23,729

5,944

90,618 CY + 1 Job

W912P725BA001-0001

l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out

1 .

2 .

3 .

4 .

5 .

6 .

7 .

End of Document

The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.

The Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.

Dredge material placement shall meet the requirements in specification Section 01

11 00 SUMMARY OF WORK.

* - ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL CONDITION)

OF THE CONTRACT.

IMPORTANT NOTES:

To be considered responsive, prices must be submitted on all individual items within Pricing Schedule. Failure to do so may be cause for rejection of bids.

Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive.

The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

The term "Job", which appears on the Pricing Schedule (Section 00 01 00) under “Unit” for Bid Item No. 0001 shall be considered as a Lump Sum. The Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to Bid Item No. 0001.

BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19 Contract Award – Sealed Bidding – Construction.

Note: Information accumulated for purposes of determining the responsibility of a prospective contractor shall not be released or disclosed outside the Government, FAR 9.105-3. No award shall be made unless the contracting officer makes an affirmative determination of responsibility. To be determined responsible, the

Bidder must meet the general standards of responsibility, FAR 9.104–1. A prospective contractor that is or recently has been seriously deficient in contract performance will be deemed non-responsible, unless the contracting officer determines that the circumstances were properly beyond the contractor's control or that the contractor has taken appropriate corrective action.

1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID:

To submit a bid, each bidder must Offers MUST BE submitted electronically through the PIEE website. In the event assistance is needed, contact Logan Champlin (logan.champlin@usace.army.mil). The Government is not responsible for any loss of internet connectivity or for an offeror’s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. All submissions may be up to 6 calendar days prior to Bid Opening. Early and late submissions outside of this window will not be accepted.

The public bid opening will be held via Microsoft Teams at 100 pm 200 pm PST on June 13, 2025, which will allow participants to hear a live reading of the bids. Prior to the bid opening, participants must request meeting ID from contract specialist, Logan Champlin (logan.champlin@usace.army.mil). Government will review the bids received electronically and post the abstracts of bids on sam.gov and PIEE as soon as practicable after bid closing.

It is the responsibility of all bidders to ensure their bid submissions are complete, inclusive of the price schedule, acknowledge of amendments, bid guarantee, and all additional information requested through this advertisement.

In order to facilitate electronic submission of bonds, the Government may contact the surety that issues the offeror's submitted bid guarantee in order to validate the bond, as permitted by FAR 28.101-3(e).

1.8 OTHER BID DELIVERY METHODS

Telegraphic, Facsimile, emailed, HAND DELIVERED, MAILED, or comparable delivery methods of the

Bid Package are not acceptable.

Bids may only be modified or withdrawn by electronic means through a signed letter request uploaded to

PIEE. A notice to modify or withdraw a bid sent via PIEE must be received in PIEE no later than the exact date and time set for Bid Opening.

1.9 PERFORMANCE AND PAYMENT BONDS

The offeror will, furnish performance and payment bonds within the time established in the contract in accordance with FAR 52.228-15 DEV located in Section 00 70 00. The offeror will provide the bonds to the Government electronically via PIEE.

2.0 INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS

An offeror utilizing individual sureties in support of a bid bond shall include a Standard Form (SF) 28

(Affidavit of Individual Surety), accompanied by a pledge of acceptable assets from each person acting as an individual surety, and include these with the SF 24 (Bid Bond), and the proposal itself (see clause titled "Pledges of

Assets," FAR 52.228-11 DEVIATION 2020-O0016).

Pledges of acceptable assets shall be in the form of (1) evidence of an escrow account and/or (2) a recorded lien on real estate.

Section 00 21 00

SO

LI

C

IT

AT

IO

N

W912P725BA001-0001

mailto:logan.champlin@usace.army.mil l3ct9lc9 Cross-Out

(Feb 1995)

Section 00 21 00 - Instructions

The following clauses were added:

FAR Clauses Incorporated by Full Text

52.236-27 Site Visit (Construction).

Site Visit (Construction) (Feb 1995)

The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions(a) Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

Site visits may be arranged during normal duty hours by contacting:(b)

Name: Tawny Tran

Address: 450 Golden Gate Ave San Francisco, CA

Telephone: _(415) 503-6741___

(End of Provision)

Section 00 70 00 - Conditions of the Contract

Additional Information/Notes

The following clauses were added:

FAR Clauses Incorporated by Reference

Alternate/Variation

W912P725BA0001-0001

Number Title Effective DateDeviation Effective Date

FAR Clauses Incorporated by Full Text

52.219-28 Postaward Small Business Program Rerepresentation. (Jan 2025)

Postaward Small Business Program Rerepresentation (Jan 2025)

(a) . As used in this clause-Definitions

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern-

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.

(2) , as used in this definition, means business concerns, one of whom directly or indirectlyAffiliates controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) If the Contractor represented its status as any of the small business concerns identified at 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, for the NAICS code assigned to an order (except that paragraphs (c)(1) through (3) of this clause do not apply to an order issued under a Federal Supply Schedule contract at subpart 8.4)-

(1) Set aside exclusively for a small business concern identified at 19.000(a)(3) that is issued under an unrestricted multiple-award contract, unless the order is issued under the reserved portion of an unrestricted multiple-award contract ( e.g., an order set aside for a woman-owned small business under a multiple-award contract that is not set-aside, unless the order is issued under the reserved portion of the multiple-award contract);

(2) Issued under a multiple-award contract set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying multiple-award contract ( e.g., an order set aside for a HUBZone small business concern under a multiple-award contract that is set aside for small businesses);

(3) Issued under the part of the multiple-award contract that is set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying set-aside part of the multiple-award contract ( e.g., an order set aside for a WOSB concern under the part of the multiple-award contract that is partially set aside for small businesses); and

(4) When the Contracting Officer explicitly requires it for an order issued under a multiple-award contract, including for an order issued under a Federal Supply Schedule contract (see 8.405-5(b) and 19.301-2(b)(2)).

(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.

(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by of this clause by validating or updating all its representations in theparagraphs (b) and (c) Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting writing within the timeframes specified in paragraph (b) of this clause, orofficer in with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.

(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it is, is not a small business concern under NAICS Code X assigned to contract number.____

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of .] The Contractor represents that it is, is not, a small disadvantaged business concern asthis clause defined in .13 CFR 124.1001

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of ] The Contractor represents that it is, is not a women-owned small business concern.this clause.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity identifier of each ____ party to the joint venture: __.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity identifier of each party to the____ joint venture: __ .]

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of ] The Contractor represents that it is, is not a veteran-owned small business concern.this clause.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in ] The Contractor represents that it is, is not a service-disabledparagraph (h)(6) of this clause.

veteran-owned small business concern.

(8) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB . The Contractor represents that it is, is not an SDVOSB joint venture eligible under theProgram

SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The Contractor shall____ enter the name and unique entity identifier of each party to the joint venture: __.]

(9) [ Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) ] The Contractor represents that-of this clause.

(i) It is, is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It is, is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [ The Contractor shall enter the names of each____ of the HUBZone small business concerns participating in the HUBZone joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[ Contractor to sign and date and insert authorized signer's name and title.] ____

(End of clause)

52.219-28 Post-Award Small Business Program Rerepresentation.

(Alternate I)

(Feb 2024)Alternate I(Mar 2020)

Alternate I . As prescribed in (c)(2), substitute the following paragraph (h)(1) for (Mar 2020) 19.309 paragraph (h)(1) of the basic clause:

(h)(1) The Contractor represents its small business size status for each one of the NAICS codes assigned to this contract.

NAICS Code Small business concern (yes/no)

[ ]Contracting Officer to insert NAICS codes.

W912P725B0010001 Page 7 of 8W912P725BA001-0001

(End of clause)

The following clauses were deleted:

FAR Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

52.219-9 Small Business Subcontracting Plan. Jan 2025 52.222-22 Previous Contracts and Compliance Reports. Feb 1999 52.222-54 Employment Eligibility Verification. Jan 2025 FAR Clauses Incorporated by Full Text 52.236-1 Performance of Work by the Contractor. (Apr 1984)

Performance of Work by the Contractor (Apr 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 80 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

DFARS Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

252.219-7003Small Business Subcontracting Plan (DoD Contracts). Dec 2019

"General Decision Number: CA20250018 05/23/2025

Superseded General Decision Number: CA20240018

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.

BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed|

| | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 01/10/2025 2 02/07/2025 3 02/21/2025 4 02/28/2025 5 03/07/2025 6 03/21/2025 7 05/23/2025

ASBE0016-004 05/01/2024

AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,

MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &

TOULMNE COUNTIES

AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)

Area 1......................$ 34.56 11.40 Area 2......................$ 36.53 9.27

ASBE0016-008 01/01/2024

AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN

FRANCISCO, SAN MATEO, SANTA CLARA, & SANTA CRUZ

AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,

MERCED, SAN JOAQUIN, STANISLAUS, & TUOLUMNE

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 84.76 25.07 Area 2......................$ 64.56 25.07

BOIL0549-001 01/01/2021

AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES

AREA 2: REMAINING COUNTIES

Rates Fringes

BOILERMAKER

Area 1......................$ 49.62 41.27 Area 2......................$ 45.60 38.99

BRCA0003-001 08/01/2024

Rates Fringes

MARBLE FINISHER..................$ 42.06 19.80

BRCA0003-003 08/01/2024

Rates Fringes

MARBLE MASON.....................$ 61.72 30.31

BRCA0003-005 05/01/2024

Rates Fringes

BRICKLAYER

( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 51.17 25.80 ( 7) San Francisco, San Mateo.......................$ 57.02 28.50 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 56.94 26.28 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 52.76 25.01

(16) Monterey, Santa Cruz...$ 54.18 27.82

BRCA0003-008 07/01/2024

Rates Fringes

TERRAZZO FINISHER................$ 44.93 20.98

TERRAZZO WORKER/SETTER...........$ 60.58 29.79

BRCA0003-011 04/01/2024

AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz

AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne

AREA 3: Fresno, Kings, Madera, Mariposa, Merced

Rates Fringes

TILE FINISHER

Area 1......................$ 37.75 19.28 Area 2......................$ 34.76 19.22 Area 3......................$ 32.68 18.32 Tile Layer Area 1......................$ 59.92 22.62 Area 2......................$ 55.17 22.52 Area 3......................$ 50.28 22.05

CARP0022-001 07/01/2023

San Francisco County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 60.54 33.52 Journeyman Carpenter........$ 60.39 33.52 Millwright..................$ 60.49 35.11

CARP0034-001 07/01/2021

Rates Fringes

Diver Assistant Tender, ROV Tender/Technician...........$ 54.10 34.69 Diver standby...............$ 60.51 34.69 Diver Tender................$ 59.51 34.69 Diver wet...................$ 103.62 34.69 Manifold Operator (mixed gas)........................$ 64.51 34.69 Manifold Operator (Standby).$ 59.51 34.69

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2021

Rates Fringes

Piledriver.......................$ 54.10 34.69

CARP0035-007 07/01/2020

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties

Rates Fringes

Modular Furniture Installer Area 1 Installer..................$ 28.76 22.53 Lead Installer.............$ 32.21 23.03 Master Installer...........$ 36.43 23.03 Area 2 Installer..................$ 26.11 22.53 Lead Installer.............$ 29.08 23.03 Master Installer...........$ 32.71 23.03 Area 3 Installer..................$ 25.16 22.53 Lead Installer.............$ 27.96 23.03 Master Installer...........$ 31.38 23.03

CARP0035-008 08/01/2020

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: San Joaquin

AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties

Drywall Installers/Lathers:

Area 1......................$ 52.65 31.26 Area 2......................$ 46.77 31.26 Area 3......................$ 47.27 31.26 Area 4......................$ 45.92 31.26 Drywall Stocker/Scrapper Area 1......................$ 26.33 18.22 Area 2......................$ 23.39 18.22 Area 3......................$ 23.64 18.22 Area 4......................$ 22.97 18.22

CARP0152-001 07/01/2020

Contra Costa County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41

CARP0152-002 07/01/2020

San Joaquin County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.92 30.82 Journeyman Carpenter........$ 46.77 30.82 Millwright..................$ 49.27 32.41

CARP0152-004 07/01/2020

Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41

CARP0217-001 07/01/2023

San Mateo County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 60.54 33.52 Journeyman Carpenter........$ 60.39 33.52 Millwright..................$ 60.49 35.11

CARP0405-001 07/01/2021

Santa Clara County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP0405-002 07/01/2021

San Benito County

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

CARP0505-001 07/01/2021

Santa Cruz County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

CARP0605-001 07/01/2021

Monterey County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

CARP0701-001 07/01/2021

Fresno and Madera Counties

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 47.77 31.49 Journeyman Carpenter........$ 47.62 31.49 Millwright..................$ 50.12 33.08

CARP0713-001 07/01/2021

Alameda County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP1109-001 07/01/2021

Kings County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 47.77 31.49 Journeyman Carpenter........$ 47.62 31.49 Millwright..................$ 50.12 33.08

ELEC0006-004 12/01/2024

SAN FRANCISCO COUNTY

Rates Fringes

Sound & Communications Installer...................$ 57.18 3%+27.15 Technician..................$ 65.76 3%+27.15

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0006-007 06/01/2024

SAN FRANCISCO COUNTY

Rates Fringes

ELECTRICIAN......................$ 91.25 3%+45.315

ELEC0100-002 03/01/2025

FRESNO, KINGS, AND MADERA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 49.00 29.62

ELEC0100-005 12/01/2024

FRESNO, KINGS, MADERA

Communications System Installer...................$ 45.28 28.01 Technician..................$ 52.07 28.21

SCOPE OF WORK

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO

THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems

WORK EXCLUDED Raceway systems are not covered (excluding

Ladder-Rack for the purpose of the above listed systems).

Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

ELEC0234-001 12/23/2024

MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES

Rates Fringes

ELECTRICIAN

Zone A......................$ 68.16 31.29 Zone B......................$ 74.98 31.50

Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line

Zone B: Any area outside of Zone A

ELEC0234-003 12/01/2021

MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES

Rates Fringes

Sound & Communications Installer...................$ 47.93 24.09 Technician..................$ 55.12 24.30

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0302-001 03/01/2025

CONTRA COSTA COUNTY

Rates Fringes

CABLE SPLICER....................$ 74.54 36.09

ELECTRICIAN......................$ 66.26 35.84

ELEC0302-003 12/01/2023

CONTRA COSTA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 48.44 27.60 Technician..................$ 55.71 27.82

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0332-001 06/01/2024

SANTA CLARA COUNTY

Rates Fringes

CABLE SPLICER....................$ 100.25 46.72

ELECTRICIAN......................$ 87.17 46.33

FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.

Work on structures of 60 ft. or over (as described above):

to be paid twice the straight-time rate of pay.

ELEC0332-003 12/01/2024

SANTA CLARA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 56.68 28.35 Technician..................$ 65.18 28.61

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0595-001 06/01/2024

ALAMEDA COUNTY

Rates Fringes

CABLE SPLICER....................$ 84.18 3%+44.68

ELECTRICIAN......................$ 73.20 3%+44.68

ELEC0595-002 06/01/2024

CALAVERAS AND SAN JOAQUIN COUNTIES

Rates Fringes

CABLE SPLICER....................$ 59.34 3%+30.48

ELECTRICIAN

(1) Tunnel work.............$ 51.92 3%+30.48

(2) All other work.........$ 49.45 3%+30.48

ELEC0595-006 12/01/2024

ALAMEDA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 56.68 3%+26.65 Technician..................$ 65.18 3%+26.65

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0595-008 12/01/2024

CALAVERAS AND SAN JOAQUIN COUNTIES

Rates Fringes

Communications System Installer...................$ 45.28 3%+26.65 Technician..................$ 52.07 3%+26.65

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0617-001 06/01/2024

SAN MATEO COUNTY

ELECTRICIAN......................$ 82.00 48.05

ELEC0617-003 12/01/2023

SAN MATEO COUNTY

Rates Fringes

Sound & Communications Installer...................$ 53.18 27.75 Technician..................$ 61.16 27.98

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0684-001 12/01/2024

MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 48.50 30.09

CABLE SPLICER = 110% of Journeyman Electrician

ELEC0684-004 12/01/2024

MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES

Communications System Installer...................$ 45.28 28.01 Technician..................$ 52.07 28.21

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC1245-001 01/01/2025

Rates Fringes

LINE CONSTRUCTION

(1) Lineman; Cable splicer..$ 70.16 24.71

(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment).............$ 53.30 22.26

(3) Groundman...............$ 40.76 21.76

(4) Powderman...............$ 51.87 18.79

HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day

ELEV0008-001 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 84.05 38.435+a+b

FOOTNOTE:

a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor…