This document contains responses to questions from interested parties regarding solicitation number W912P723B0001 for repair of the Moss Landing north and south jetties in Monterey County, California. The scope of work includes replacing damaged armor stones on both jetties, replacing two danger signs, two project signs, two aids to navigation, and removing timber piles. The document provides responses to clarify that there is no established material offloading facility on the north jetty, estimates of required access stone quantities are included in the specification, a revised armor stone gradation is specified in an amendment, a utility pipe shown on the plans crosses the north jetty at station 40+50, and armor stone quantities are broken down by type and location in the specification. Bids for the firm fixed price contract are due on November 30, 2022 and will be publicly opened via WebEx. The solicitation and amendments are available on SAM.gov and plans and specifications will not be provided in hard copy or CD format.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOSS LANDING JETTY REPAIR PROJECT

MONTEREY COUNTY, CALIFORNIA

AS OF: 12 December 22

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P723B0001

The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.

Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment (SF30) to the solicitation changes the solicitation.

Changes to any previous responses in this document will be struck-through and new, updated responses will be provided as appropriate

RFI # RFI (Question) Government’s Response

There does not appear to be an established MOF (Material Offloading Facility for barging) on the North Jetty to land equipment and material. 01 50 00 2.2.1 states the North Jetty road must not be used to transport armor stones of heavy equipment. How does the government anticipate stone and equipment being delivered and offloaded at the North Jetty?

There is no established MOF (Material Offloading Facility for barging). The Government anticipates that the stone and equipment will be delivered by barges.

Has the government quantified an estimated quantity of access stone needed for the jetty top access/travel ways? There is potentially a very large quantity and without being quantified within CLIN items 0003 and 0005 we must assume the worst case scenario for maximum quantities and cost accordingly.

See Amendment 0004 Specification Section 35 31 26 Paragraph 3.5

Armor Stone Gradation‐ The current A‐18 gradation is very tight with only 1 to 3 tons variation on the entire upper end. As a result, stone procurement cost will be extremely high because the usable yield for this range after a quarry blast may be under 10%. In the past, we've suggested a more open gradation range yielding a much higher usable quantity resulting in a much more reasonable cost to the government. For example, if the A‐18 stone gradation were as (or close to) follows, procurement cost could potentially be half of the currently spec'd gradation. (weights assumed reflecting a 182 PCF)

See Amendment 0004 Specification Section 35 31 26 Paragraph 2.1.7.5

MOSS LANDING JETTY REPAIR PROJECT

MONTEREY COUNTY, CALIFORNIA

AS OF: 12 December 22

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P723B0001

Weight of Stone Percent Smaller (by weight) 16 90 ‐ 100 13 50 ‐ 80 10 30 ‐ 60 8 5 ‐ 30 6 0 ‐ 10

Plan page C‐002 shows the unknown utility pipe leading towards station 40+50. It appears it may terminate prior to jetty or stub into sand, can the government confirm this?

The utility pipe crosses the North Jetty at station 40+50.

See Amendment 0004 Plans ‐ Sheet C‐002

Can the government provide quantity breakdowns for armor stones? For example, How many tons of A‐18 armor is quantified in the head and head approach of the north jetty, how many tons A‐15 stone approaching head on north jetty, how many tons A‐4 stone through center band north jetty, breakdown for south jetty, etc...

See Amendment 0004 Specification Section 35 31 26 Paragraph 3.4.7