W912P722B0008-Napa River Maintenance Dredging - RFIs - 070822.pdf

PDF 76 KB Posted

Attached to
NAPA RIVER MAINTENANCE DREDGING PROJECT
Solicitation number
W912P722B0008
Issued by

About this file

This document includes a request for information and federal contract opportunity notice for maintenance dredging of the Napa River in California. The U.S. Army Corps of Engineers seeks bids to dredge the river to a depth of nine feet below mean lower low water plus one foot of overdepth, transporting dredged materials to the government-furnished Coombs disposal site. The small business set-aside contract has an estimated value between $1-5 million. Bids are due by July 11, 2022 and will be publicly opened via WebEx on July 11 at 1:30 PM Pacific Time. The solicitation and amendments will be posted on SAM.gov, and it is the contractor's responsibility to frequently check for changes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAPA RIVER MAINTENANCE DREDGING PROJECT

AS OF: 8 July 2022

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P722B0008

The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.

Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment (SF30) to the solicitation changes the solicitation.

Changes to any previous responses in this document will be struck-through and new, updated responses will be provided as appropriate

RFI # Spec Section RFI (Question) Responses

Is it possible for USACE to provide access to the South Coombs disposal site for a site visit? This would be helpful to developing pricing for the offloading and handling of dredge sediment at this site.

Yes. See FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

01 11 00 and Plans Sheet ID C-03

Is there any know submerged utility or pipeline crossings between STA 00+00 and 169+00 on the Napa River? If so please identify them.

Confirmed. As shown on Plans Sheet ID C-03, there is one shown at approximately station 67+00 and one at approximately 68+00

For the bid reference above, will it be acceptable for a newly formed JV company to each submit its own Financial Statement to satisfy the requirement of Item D?

Yes, newly formed JVs are allowed to submit separate financial statements.

4 Are the utilities listed in the drawings for the Coombs disposal site clearly marked on site?

The Sponsor’s Contractor will USA the utilities during their efforts for disposal site prep.

5 How deep is the utility line near the Coombs disposal site? Depth is shown on the drawings.

6 Confirming the Contractor is not responsible for hauling material out of disposal site.

Confirmed. The Sponsor will have a separate Contractor hauling the material out of the disposal site.

7 Who is responsible for prepping the Coombs disposal site?

The Sponsor will have their Contractor do the initial prep and grading, the Government’s Contractor is required to maintain it during dredging operations.

8 Are there any issues with staging equipment near the embankment of the Coombs disposal site? No issues as long as the embankment is not disturbed.