W912P722B0002 Request for Information Responses.pdf

PDF 86 KB Posted

Attached to
DRY CREEK ECOSYSTEM RESTORATION PROJECT - PHASE I
Solicitation number
W912P722B0002
Issued by

About this file

This document contains a request for information responses and details of a related federal contract opportunity for ecosystem restoration work. The opportunity involves restoring stream and floodplain habitat along approximately one mile of Dry Creek in Sonoma County, California. Habitat restoration features will include constructing side channels, riffles, backwaters and alcoves using natural materials to slow water flow and provide refuge for young fish. Bank stabilization will prevent erosion and provide vegetation cover. Most work will occur on privately owned vineyard land. Interested parties must attend an organized site visit on April 20th with a limit of two personnel per contractor. Responses are requested to clarify the engineer's estimate and provide password access to related drawings. Attendance at the site visit is encouraged but not mandatory. The agency is the Department of the Army Corps of Engineers Engineering District San Francisco.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRY CREEK ECOSYSTEM RESTORATION PROJECT – PHASE I

AS OF: 15 April 2022

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P722B0002

The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.

Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment (SF30) to the solicitation changes the solicitation.

Changes to any previous responses in this document will be struck-through and new, updated responses will be provided as appropriate

RFI # Spec Section RFI (Question) Responses

1 SF1442

Do you know what the Engineers Estimate is?

All i see is a 'Magnitude between $5M - $10M'

The Engineer’s Estimate will not be disclosed. Please refer to Standard Form 1442 on page 3 of “W912P722B0002 Dry Creek_IFB and Specifications” for the magnitude of the requirement.

2 Amendment

We can’t get the Dry Creek Phase 1 drawings to cooperate with our estimating software. It needs a password to open. Can you tell me what the password is please?

Please refer to “W912P722B0002 Dry Creek_Amendment 0001”.

Amendment

Section 00 21 00

Is the site visit mandatory for all bidders?

Please refer to FAR 52.236-27 in Section 00 21 00 of “W912P722B0002 Dry Creek_Amendment 0002”. Attendance at the site visit is not mandatory, but is still highly encouraged.