This document contains a request for information amendment and related federal contract opportunity. The request for information amendment provides answers to questions about maintenance dredging locations and water decanting capabilities for reaches 7 through 9 of the Sacramento River Deep Water Ship Channel. The related federal contract opportunity is a pre-solicitation notice for annual maintenance dredging of the Sacramento River Deep Water Ship Channel to a depth of 30 feet plus one foot of overdepth. Interested offerors must register in the System for Award Management to access solicitation documents on Beta.SAM.gov. The solicitation is expected to be issued on or around May 12, 2021 as an invitation for bid with firm fixed price contract and bids will be due on or around June 11, 2021. The estimated cost range for this opportunity is between $5 million and $10 million.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information

Amendment 1- Questions and Answers 25 May 2021

Question: Where are the Landing points for reach 8 & 9?

• The table on page 321 (PDF counter) in the Attachments to Section 01 57 19 to the Technical

Specifications indicate the station landing as “Variable” and “Landing Point Will Move Along Site” for S-

31 class I.

• Attachment 8-c included at the end of the Technical Specifications indicate the Landing Site area between approximate mile marker 33.5 through 40.5 for S-31.

• The provided plans do not indicate a landing point for reach 8 or 9.

Answer: There are numerous cells along the S-31 site. The contractor may utilize any of the cells provided that there is sufficient capacity and the berms are in good shape. The preference is that the cells closest to the dredging location are utilized first.

Question: Can water be decanted by gravity for reach 7, 8 & 9?

Answer: Yes. Water can be decanted by gravity for cells on S-31