This document provides information about a federal contract opportunity for maintenance dredging services. The U.S. Army Corps of Engineers, Engineering District San Francisco, will conduct a full and open competition procurement under NAICS code 237990 to acquire dredging of the Moss Landing Harbor in Monterey, California to a depth of -15 feet MLLW with 1 foot of allowable overdepth. The work includes transporting dredged material to the government-furnished ocean disposal site SF-12. The solicitation is expected to be available on July 20, 2020, with all bids due by August 19, 2020 at 12:00 PM PDT. The estimated value of the contract is between $1 million to $5 million. Interested parties must register with the System for Award Management at www.sam.gov and with Beta.SAM.gov to view and download solicitation documents. Questions should be directed to the named contracting specialist.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

J 1 146

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P720B0009

X 9B. DATED (SEE ITEM 11)

12-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Moss Landing Harbor Maintenance Dredging Project, Monterey County, California

ENCL) Standard Form (SF) 1442 Pages 1 and 2, Section 00 10 00 Pricing Schedule, Section 00 21 00, Section 00 72 00, Wage Determination, Drawing Sheet. See attached Summary of Changes for Amendment 0001.

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

1- Sept - 2020

CODE

USACE, SAN FRANCISCO DISTRICT

450 GOLDEN GATE

SAN FRANCISCO CA 94102

W912P7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P720B0009

Continuation page 2(A) of SF 30 – Summary of changes for Amendment 0001

This amendment makes changes to the solicitation; these changes represent one of three types, either adding new information, deleting information, or revising existing information. Changes made by this amendment replace the previously issued sections of the advertisement, as referenced in the below summary of changes:

ADVERTISEMENT FRONT-END (DIVISION 00):

(1) Revised Pricing Schedule

a. Revised Total (line items 0001 – 0003)

(2) Revised Section 00 21 00

a. Paragraph 1.1 General revised.

b. Paragraph 1.6 Bid Format (a) Cover Letter

c. Paragraph 1.7 Special Instructions Pertaining to Hand-Delivered Bids revised.

d. Paragraph 1.8 Other Bid Delivery Methods revised.

(3) Revised Section 00 72 00

a. Added FAR Clauses 52.204-25 and 52.204-26.

(4) Wage Determination

a. Revised Wager Determination CA20200018 dated 08/21/2020

(5) Drawing

a. Revised Drawing Sheet G-01

REQUESTS FOR INFORMATION (RFI) - QUESTIONS AND ANSWERS.

Be advised the bid opening for this project is September 11, 2020 at 1200 PST – see SF1442.

All offerors are required to acknowledge this amendment and provide a signed copy of this amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.

MOSS LANDING HARBOR MAINTENANCE DREDGING PROJECT, MONTEREY COUNTY, CALIFORNIA

PROJECT DESCRIPTION: The work includes maintenance dredging of the Moss Landing Harbor to -15-ft (MLLW) with 1-ft of allow able paid over-depth. The Material dredged from the Moss Landing Harbor Reach 1 Channel shall be placed at the aquatic disposal site (SF-12) or at a permitted Contractor furnished upland site at Contractor's expense. The Material dredged from the Moss Landing Harbor Reach 2 Channel shall be placed at the aquatic disposal site (SF-12) only.

This requirement is for full and open competition. It will be issued as an Invitation for Bid (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract.

The North American Industry Classif ication System (NAICS) Code applicable to this acquisition is 237990.

ESTIMATED COST RANGE IS BETWEEN $1,000,000 AND $5,000,000.

See FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

BIDDER QUESTIONS

Questions relating to this solicitation and technical inquiries will be submitted via email to the assigned contract specialist. Inquiries must be received no later than 14 calendar days prior to the date set for bid opening.

X

JAMES E GARROR

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

12-Aug-2020

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

415-503-6988

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______5 calendar days and complete it w ithin ________67 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________11 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

450 GOLDEN GATE AVE, 4TH FLOOR, SUITE 0134

SAN FRANCISCO CA 94102-3406

W912P7

PAGE OF PAGES

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

12:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912P720B0009 1 OF 408

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

SECTION 00 10 00 Page 1 of 1

SECTION 00 10 00

PRICING SCHEDULE

MOSS LANDING HARBOR FY20 MAINTENANCE DREDGING

Contract Line Item No.(CLIN)

Description of Supplies and Services *Estimated

Quantity

Unit Unit Price Amount

0001 Mobilization and Demobilization 1 Job

0002 Dredging Reach 1 to -15-ft MLLW including 1-foot of paid Over-depth with Disposal at SF-12 or Contractor furnished upland site

22,000 CY

0003 Dredging Reach 2 to -15-ft MLLW including 1-foot of paid Over-depth with Disposal at SF-12 52,000 CY

Total (Item 0001 through 0002) 74,000 CY + 1 Job

* - ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL

CONDITION) OF THE CONTRACT.

Notes:

1 . To be considered responsive, prices must be submitted on all individual items within Pricing Schedule. Failure to do so may be cause for rejection of bids.

2 . Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

3 . The term "Job", which appears on the Pricing Schedule (Section 00 10 00) under “Unit” for Bid Item No. 0001 shall be considered as a Lump Sum. The Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to Bid Item No. 0001.

4 . BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214- 19 Contract Award – Sealed Bidding – Construction.

5 . The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.

6 . The Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.

SECTION 00 10 00 Page 2 of 1

7 . Dredge Section material 01 11 00 placement

SUMMARY

shall meet

OF WORK.

W912P720B0009 the requirements in specification

End of Document

SECTION 00 21 00 - PAGE 1

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/

OFFERORS AND EVALUATION CRITERIA FOR AWARD

1 .1 GENERAL

The scope of this is an Unrestricted Invitation for Bid (IFB) for Moss Landing Harbor Channel Maintenance Dredging Project, Monterey County, California. The work includes maintenance dredging of the Moss Landing Harbor to -15-ft (MLLW) with 1-ft of allow able paid over-depth. The Material dredged from the Moss Landing Harbor Reach 1 Channel shall be placed at the aquatic disposal site (SF-12) or at a permitted Contractor furnished upland site at Contractor's expense. The Material dredged from the Moss Landing Harbor Reach 2 Channel shall be placed at the aquatic disposal site (SF-12) only. The work to be performed by the contractor and all subcontractors and suppliers qualifies for an exemption from the requirements of California Executive Order N-33-20, dated March 19, 2020, requiring individuals to stay at home to reduce the transmission of COVID-19. The work is exempt because it is needed to maintain continuity of operations of the Governments [waterways or facilities] critical infrastructure sector. The work of suppliers for the contract may also be needed to maintain continuity of operations of the Defense Industrial Base critical infrastructure sector. A description of these sectors can be found at https://www.cisa.gov/critical-infrastructure-sectors. The work is also exempt from the various California County shelter-in-place orders because it is necessary to the operations and maintenance of Essential Infrastructure, which under those orders includes public works construction.

1.2 BID EXPENSES AND PRE-CONTRACT COSTS

This Invitation for Bid (IFB) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a bid.

1.3 ACCURACY IN BIDS

Bids must set forth full, accurate, and complete information as required by this IFB (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.4 BIDDER QUESTIONS

Questions relating to this solicitation and technical inquiries will be submitted via email to the assigned contract specialist, James E. Garror, via email at james.e.garror@usace.army.mil.

Please include the solicitation number, the project title, the location of the project together with the company name, email address, and telephone number in your correspondence. Inquiries must be received no later than 14 calendar days prior to the date set for bid opening.

Answers to pertinent questions will be posted on the Beta System for Award Management (beta.SAM.gov) website (www.beta.SAM.gov); however, changes to the solicitation will be made by amendment only. Solicitation Amendments will be posted to beta.SAM.gov separately.

1.5 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Beta System for Award Management (beta.SAM.gov) website https://www.beta.SAM.gov/.

All amendments will be posted to the beta.SAM.gov website. It shall be the contractor's responsibility to check the websites for any amendments. The Bidder shall submit in the bid all requested information specified in this section of the Invitation for Bid (IFB) solicitation.

https://www.cisa.gov/critical-infrastructure-sectors https://www.cisa.gov/critical-infrastructure-sectors mailto:james.e.garror@usace.army.mil https://www.beta.sam.gov/

SECTION 00 21 00 - PAGE 2

1.6 BID FORMAT AND SUBMITTAL REQUIREMENTS

BID FORMAT

Offerors shall submit the Pricing Schedule from Section 00 10 00. Bid prices must be entered for all items of the Pricing Schedule. Award will be made to one (1) contractor.

SUBMITTAL REQUIREMENTS

The following information must be submitted to the San Francisco District US Army Corps of Engineers point of contact and labeled Solicitation No. W912P720B0009.

(a) COVER LETTER (Envelope 1):

1) Solicitation number and Project Title: Oakland Inner and Outer Harbor Channel Maintenance Dredging Project, Alameda County, California Moss Landing Harbor Channel Maintenance Dredging Project, Monterey County, California.

2) Bidder name, DUNS number, tax identification number (TIN), address, email, telephone, and fax numbers.

3) Names, title, and email of authorized signer.

4) Name, title, and signature of the person authorized to sign the bid.

5) A statement specifying agreement with all terms, conditions, and provisions included in the IFB.

(b) SCHEDULE (Envelope 1):

1) The SF-1442 duly executed with an original signature by authorized official.

2) Include the Offeror's DUNS number in block 14.

3) Acknowledgement of all amendments.

4) Pricing Schedule (SECTION 00 10 00).

5) Bid Bond (SF-24), See FAR Clause 52.228-1, SECTION 00 21 00.

(c) REPRESENTATIONS AND CERTIFICATIONS:

1) The completed SECTION 00 45 00 of the IFB (Representations and Certifications)

2) Printed System for Award Management (SAM) Record (www.sam.gov)

(d) SUBMISSIONS FOR DETERMINATION OF CONTRACTOR RESPONSIBILITY (FAR 9.104-1 and 9.104-2) (Envelope 2):

Bidders shall submit the following:

1) A bank certification of financial capability or a financial statement not more than 60 days old. If more than 60 days old, a certificate stating that the financial condition is substantially the same or outlining the changes that have taken place.

2) Names of commercial and financial reporting agencies from which credit reports may be obtained.

Note: Information accumulated for purposes of determining the responsibility of a prospective contractor shall not be released or disclosed outside the Government, FAR 9.105-3. No award shall be made unless the contracting officer makes an affirmative determination of responsibility. To be determined responsible, the Bidder must meet the general standards of responsibility, FAR 9.104–1. A prospective contractor that is or recently has been seriously deficient in contract performance will be deemed non-responsible, unless the contracting officer determines that the circumstances were properly beyond the contractor's control or that the contractor has taken appropriate corrective action.

http://www.sam.gov/

SECTION 00 21 00 - PAGE 3

1.7 SPECIAL INSTRUCTIONS PERTAINING TO HAND-DELIVERED BIDS

All bidders are required to submit their bids electronically via the DoD Secure Access File Exchange (DoD SAFE) (https://safe.apps.mil/). No hand-delivered bids will be accepted.

To submit a bid, each bidder must contact James Garror to obtain a unique DoD SAFE request code.

James Garror can be reached at James.E.Garror@usace.army.mil or (415) 503-6988. In the event James Garror cannot be reached, please call the main Contracting Division telephone number, (415) 503-6990, to request assistance. Once a bidder has a unique request code, they may upload their bid submission to DoD SAFE. All submissions must be no earlier than 24 hours before and no later than the Bid Opening. This allows a submission window from 12:00 PM on September 10, 2020 until 12:00 PM on September 11, 2020.

Early and late submissions outside of this window will not be accepted.

The public bid opening will be held via WebEx on September 11, 2020 at 12:45 PM, which will allow participants to hear a live reading of the bids. Prior to the bid opening, participants must follow this link:

https://meetingsamer6.webex.com/meet/james.e.garror. The link will provide each participant to register and obtain a security code to be used to access the bid opening Webex Meeting. Government will review the bids received electronically and post the abstracts of bids on Beta.SAM.gov as soon as practicable after bid closing.

It is the responsibility of all bidders to ensure their bid submissions are complete, inclusive of the price schedule, acknowledge of amendments, bid guarantee, and all additional information requested through this advertisement.

In order to facilitate electronic submission of bonds, the Government may contact the surety that issues the offeror's submitted bid guarantee in order to validate the bond, as permitted by FAR 28.101-3(e).

1.8 OTHER BID DELIVERY METHODS

Telegraphic, Facsimile, Email, Hand Delivered, Mailed or comparable delivery methods of the Bid Package are not acceptable.

Bids may only be modified or withdrawn by electronic means through a signed letter request uploaded to DoD SAFE using the same request code as the original bid. A notice to modify or withdraw a bid sent via DoD SAFE must be received in DoD SAFE no later than the exact date and time set for Bid Opening.

The offeror shall ensure that the IFB Number is clearly displayed on the delivery envelope. The offeror is responsible to ensure that the delivery official obtains the following information:

(1) The date and time of receipt

(2) The name of the recipient

(3) The signature of the recipient

1.9 PERFORMANCE AND PAYMENT BONDS

The offeror will, furnish performance and payment bonds within the time established in the contract in accordance with FAR 52.228-15 located in Section 00 72 00. The offeror will provide the bonds to the Government electronically via the DoD SAFE. The offeror will also mail original, hard copies of bid bonds and performance bonds to the U.S. Army Corps of Engineers, San Francisco District, Contracting Division, 450 Golden Gate Avenue, Fourth Floor, San Francisco, CA 94102.

https://safe.apps.mil/ mailto:James.E.Garror@usace.army.mil https://meetingsamer6.webex.com/meet/james.e.garror

SECTION 00 21 00 - PAGE 4

2.0 INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS

An offeror utilizing individual sureties in support of a bid bond shall include a Standard Form (SF) 28 (Affidavit of Individual Surety), accompanied by a pledge of acceptable assets from each person acting as an individual surety, and include these with the SF 24 (Bid Bond), and the proposal itself (see clause titled "Pledges of Assets," FAR 52.228-11).

Pledges of acceptable assets shall be in the form of (1) evidence of an escrow account and/or (2) a recorded lien on real estate.

Failure to provide required documentation described herein may cause the offeror to be deemed

"unacceptable".

2.1 BID GUARANTEE FORM AND AMOUNT

The offeror shall furnish a separate bid guarantee in accordance with the solicitation provision titled "Bid Guarantee", FAR 52.228-1. In accordance with FAR 28.101-2 (b) the bid guarantee amount shall be at least 20 percent of the “proposed price" but shall not exceed $3 million. When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated. The term "proposed price" is hereby defined as the total price of either the Alternative 1 bid or the Alternative 2 bid, whichever is lower.

In accordance with FAR 28.106-1 states that a Standard Form (SF) 24 shall be used for the bid bond.

In accordance with FAR 28.202(a) (1), corporate sureties utilized must appear on the list contained in the Department of Treasury Circular 570 titled, “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies."

2.2 ACCEPTANCE OF OFFERS

A written award or acceptance of an offer mailed or otherwise furnished to the offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

2.3 CONTRACTOR RESPONSIBILITY, PRE-AWARD SURVEY

To determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Attachment 2, Pre-award Survey).

The Government will request this information from the eligible contractor after receipt of offer if they have not had a contract with the San Francisco District within the last twelve months and the Government will set a due date for its submission.

1. The Pre-award Survey is attached to the solicitation for information purposes only and is not required as part of the Proposal package.

(a) If required to determine that a prospective contractor is responsible, the offeror must:

1) Demonstrate that they have adequate financial resources to perform the contract or the ability to obtain them.

2) Be able to comply with the required or proposed delivery or performance schedule, taking into

SECTION 00 21 00 - PAGE 5

consideration all existing commercial and governmental business commitments.

3) Have a satisfactory performance record. In making the determination of responsibility, the

Government Contracting Officer shall consider relevant past performance information. A prospective contractor shall not be determined as responsible or not responsible solely based on a lack of relevant performance history except when there are special standards set forth in the solicitation, which applies, to all offerors that must be met in order to receive the award. These special standards may be necessary when unusual expertise or specialized facilities are necessary in the performance of the contract; therefore, in order to be determined as responsible for a particular contract, the offeror must be able to meet those special standards. A prospective contractor that is or recently has been seriously deficient in contract performance shall be presumed to be nonresponsive unless the Contracting Officer determines that the circumstances were beyond the contractor's control or that the contractor has taken appropriate corrective action.

Other responsibility considerations by the Contracting Officer will include past efforts by the contractor to apply sufficient tenacity and perseverance to perform acceptably, to meet quality requirements of contracts, and the contractor's past compliance with subcontracting plans (if required) under recent contracts.

4) Have a satisfactory record of integrity and business ethics.

5) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).

6) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.

7) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

2.4 PREPARATION OF SUBCONTRACTING PLAN (SEP 2004)

(a) See FAR 52.219-9, Section 00 72 00, Small Business Subcontracting Plan, incorporated by reference into this contract in Section 00 72 00.

(b) The Small Business Subcontracting Plan is not required from the low bidder until after the Bid Opening; it is not required as part of the bid package. After the Bid Opening, if the selected bidder fails to submit an acceptable plan within the time prescribed by the Contracting Officer, the bidder will be ineligible for award.

(c) Contact Mr. Theodore T. Turney, Chief, Contracting Division, (415) 503-6990, with questions on the Small Business Subcontracting Plan requirements.

(d) The acceptable Small Business Subcontracting Plan will be incorporated into and made a material part of the contract.

(e) The Corps of Engineers high encourages all bidders/offerors to meet the recommended subcontracting goals as follows:

Small Businesses 20.0%

Small, Disadvantaged Businesses 15.0%

Women-Owned Small Businesses 5.0%

Service Disabled Veteran Owned Small Business 3.0%

SECTION 00 21 00 - PAGE 6

Historically Underutilized Business Zone (HUBZone) 1.0% The goals are calculated as a percentage of the TOTAL SUBCONTRACTING DOLLARS, NOT THE TOTAL

CONTRACT AMOUNT.

2.5 ATTENTION TO BIDDERS:

1. FACTS ABOUT THE USE OF INDIVIDUAL SURETIES

The Federal Acquisition Regulation (FAR 28.200) permits the use of individual sureties for bid, payment and performance bonds. However, the conditions that must be met are strict, and they may not be waived. Further, the FAR imposes limits with respect to the type of property interest individual sureties may utilize.

Individual sureties have been occasionally and successfully used in accordance with FAR requirements within the San Francisco District, when real property interests have not been provided as the security interest. On at least one occasion, an individual surety was made acceptable when an individual personally known to a bidder provided a business property for the security interest, and legal counsel was engaged to navigate and implement the FAR requirements.

Bidders or proposers considering utilizing individuals or firms providing “brokerage” or “insurance” services to obtain bonds from individual sureties are advised to carefully research their backgrounds. The Government is not responsible for and will not reimburse any bidder for advance payments made to such firms in the event that the bonds are unacceptable to the contracting officer.

The San Francisco District strictly follows the FAR 28.203 “Acceptability of individual sureties.”

Frequently, an individual surety’s bid bond raises questions about the real property security interest being offered.

Also, individual sureties may use “altered” Standard Form 28 affidavits, which are unacceptable. Documentation containing such flaws will result in rejection of the bonds, and, if it is a bid bond, rejection of the bid.

Some “brokers” apparently represent that “their bonds” are accepted by federal government entities. Yet, be aware that not all federal agencies implement the FAR in a uniform manner. Insufficiencies that go unnoticed by one agency may be perceived as fatal by another. The risk of such results rests with the bidder offering the bid bond.

Know your broker, and ensure that all bonding documents comply with FAR requirements before you submit them. It is important to remember that the contracting officer is vested with a wide degree of discretion and business judgment in determining the acceptability of an individual surety, and the Comptroller General has stated that he will not question such a determination so long as it is reasonable.

So, please make certain that if you intend to use an individual surety you are familiar with the regulations and specific requirements that apply to this form of bonding.

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm fix price contract resulting from this solicitation.

(End of provision)

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS

CONCERNS (OCT 2014)

(a) Definitions. See 13 CFR 125.6(e) for definitions of terms used in paragraph (d).

SECTION 00 21 00 - PAGE 7

(b) Evaluation preference. (1) Offers will be evaluated by adding a factor of 10 percent to the price of all offers, except--

(i) Offers from HUBZone small business concerns that have not waived the evaluation preference; and

(ii) Otherwise successful offers from small business concerns.

(2) The factor of 10 percent shall be applied on a line item basis or to any group of items on which award may be made. Other evaluation factors described in the solicitation shall be applied before application of the factor.

(3) When the two highest rated offerors are a HUBZone small business concern and a large business, and the evaluated offer of the HUBZone small business concern is equal to the evaluated offer of the large business after considering the price evaluation preference, award will be made to the HUBZone small business concern.

(c) Waiver of evaluation preference. A HUBZone small business concern may elect to waive the evaluation preference, in which case the factor will be added to its offer for evaluation purposes. The agreements in paragraphs

(d) and (e) of this clause do not apply if the offeror has waived the evaluation preference.

___ Offeror elects to waive the evaluation preference.

(d) Agreement. A HUBZone small business concern agrees that in the performance of the contract, in the case of a contract for

(1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other HUBZone small business concerns;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, will be performed by the concern or other HUBZone small business concerns;

(3) General construction. (i) At least 15 percent of the cost of contract performance to be incurred for personnel will be spent on the prime contractor's employees;

(ii) At least 50 percent of the cost of the contract performance to be incurred for personnel will be spent on the prime contractor's employees or on a combination of the prime contractor's employees and employees of HUBZone small business concern subcontractors;

(iii) No more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone small business concerns; or

(4) Construction by special trade contractors. (i) At least 25 percent of the cost of contract performance to be incurred for personnel will be spent on the prime contractor's employees;

(ii) At least 50 percent of the cost of the contract performance to be incurred for personnel will be spent on the prime contractor's employees or on a combination of the prime contractor's employees and employees of HUBZone small business concern subcontractors;

(iii) No more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone small business concerns.

(e) A HUBZone joint venture agrees that the aggregate of the HUBZone small business concerns to the joint venture, not each concern separately, will perform the applicable percentage of work requirements.

SECTION 00 21 00 - PAGE 8

(f)(1) When the total value of the contract exceeds $25,000, a HUBZone small business concern nonmanufacturer agrees to furnish in performing this contract only end items manufactured or produced by HUBZone small business concern manufacturers.

(2) When the total value of the contract is equal to or less than $25,000, a HUBZone small business concern nonmanufacturer may provide end items manufactured by other than a HUBZone small business concern manufacturer provided the end items are produced or manufactured in the United States.

(3) Paragraphs (f)(1) and (f)(2) of this section do not apply in connection with construction or service contracts.

(g) Notice. The HUBZone small business offeror acknowledges that a prospective HUBZone awardee must be a HUBZone small business concern at the time of award of this contract. The HUBZone offeror shall provide the Contracting Officer a copy of the notice required by 13 CFR 126.501 if material changes occur before contract award that could affect its HUBZone eligibility. If the apparently successful HUBZone offeror is not a HUBZone small business concern at the time of award of this contract, the Contracting Officer will proceed to award to the next otherwise successful HUBZone small business concern or other offeror.

(End of clause)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers, San Francisco District Attn: Contracting Officer 450 Golden Gate Avenue, 4th Floor, Room 1471 San Francisco, CA 94102-3406

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Justin Yee Address: 450 Golden Gate Avenue, San Francisco, CA 94102- 3406 Telephone: 415-503-6788

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by

SECTION 00 21 00 - PAGE 9

paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

52.219-9 Alt I

52.232.23 Alt I

52.236-13 Alt I 52.236-16 Alt I 52.236-21 Alt I 52.249-2 Alt I

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Department of Defense FAR Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

https://www.acquisition.gov/browse/index/far

Section 00 72 00 - Page 1

SECTION 00 72 00

GENERAL CONDITIONS

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

APR 2014

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

JAN 2017

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

OCT 2018

52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

JUL 2018

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

DEC 2019

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance

AUG 2020

Services or Equipment 52.204-26 Covered Telecommunications Equipment or Services-

Representation

DEC 2019

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.209-13 Violation of Arms Control Treaties or Agreements -- Certification.

JUN 2018

52.210-1 Market Research APR 2011 52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-9 Alt I Small Business Subcontracting Plan (AUG 2018) Alternate I NOV 2016 52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

Section 00 73 00 Wage Determination - Page 1

ATTACHEMENT 1 WAGE DETERMINATION

"General Decision Number: CA20200018 08/21/2020

Superseded General Decision Number: CA20190018

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and

Highway

Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and

Tuolumne Counties in California.

BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth

Section 00 73 00 Wage Determination - Page 2 in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2020

1 01/10/2020

2 01/24/2020

3 01/31/2020

4 02/07/2020

5 03/06/2020

6 03/13/2020

7 04/17/2020

8 06/05/2020

9 06/19/2020

10 06/26/2020

11 07/03/2020

12 07/10/2020

13 07/17/2020

14 07/24/2020

15 08/07/2020

16 08/14/2020

17 08/21/2020

ASBE0016-004 01/01/2019

AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,

Section 00 73 00 Wage Determination - Page 3

MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &

TOULMNE COUNTIES

AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA

CLARA COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)

Area 1......................$ 28.20 9.27

Area 2......................$ 36.53 9.27

ASBE0016-008 01/01/2020

AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN

FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ

AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,

MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE

Asbestos Workers/Insulator

(Includes the application of

Section 00 73 00 Wage Determination - Page 4 all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems)

Area 1......................$ 71.16 23.39

Area 2......................$ 54.26 23.39

BOIL0549-001 10/01/2016

AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES

AREA 2: REMAINING COUNTIES

BOILERMAKER

Area 1......................$ 43.28 37.91

Area 2......................$ 39.68 35.71

BRCA0003-001 08/01/2019

MARBLE FINISHER..................$ 35.41 16.45

BRCA0003-003 08/01/2019

MARBLE MASON.....................$ 49.42 27.86

BRCA0003-005 05/01/2019

Section 00 73 00 Wage Determination - Page 5

BRICKLAYER

( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 41.88 22.19

( 7) San Francisco, San

Mateo.......................$ 42.34 25.83

( 8) Alameda, Contra

Costa, San Benito, Santa

Clara.......................$ 44.16 21.71

( 9) Calaveras, San

Joaquin, Stanislaus, Toulumne....................$ 39.66 20.76

(16) Monterey, Santa Cruz...$ 39.51 23.49

BRCA0003-008 07/01/2019

TERRAZZO FINISHER................$ 37.58 17.33

TERRAZZO WORKER/SETTER...........$ 48.53 26.84

BRCA0003-011 04/01/2019

AREA 1: Alameda, Contra Costa, Monterey, San Benito, San

Francisco, San Mateo, Santa Clara, Santa Cruz

AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne

AREA 3: Fresno, Kings, Madera, Mariposa, Merced

TILE FINISHER

Section 00 73 00 Wage Determination - Page 6

Area 1......................$ 29.94 16.38

Area 2......................$ 25.60 14.30

Area 3......................$ 26.58 15.65

Tile Layer

Area 1......................$ 49.90 19.16

Area 2......................$ 42.67 16.81

Area 3......................$ 40.27 18.58

CARP0022-001 07/01/2020

San Francisco County

Carpenters

Bridge Builder/Highway

Carpenter...................$ 52.65 30.82

Hardwood Floorlayer, Shingler, Power Saw

Operator, Steel Scaffold &

Steel Shoring Erector, Saw

Filer.......................$ 52.80 30.82

Journeyman Carpenter........$ 52.65 30.82

Millwright..................$ 52.75 32.41

CARP0034-001 07/01/2020

Diver

Assistant Tender, ROV

Tender/Technician...........$ 51.90 34.02

Diver standby...............$ 58.09 34.02

Diver Tender................$ 57.09 34.02

Diver wet...................$ 101.42 34.02

Section 00 73 00 Wage Determination - Page 7

Manifold Operator (mixed gas)........................$ 62.09 34.02

Manifold Operator (Standby).$ 57.09 34.02

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot

101 to 150 ft $3.00 per foot

151 to 220 ft $4.00 per foot

221 ft.-deeper $5.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be

$1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2020

Section 00 73 00 Wage Determination - Page 8

Piledriver.......................$ 52.90 34.02

CARP0035-007 07/01/2019

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa

Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San

Joaquin, Stanislaus, Tuolumne Counties

Modular Furniture Installer

Area 1

Installer I................$ 27.46 22.14

Installer II...............$ 22.18 20.42

Lead Installer.............$ 30.91 22.64

Master Installer...........$ 35.13 22.64

Area 2

Installer I................$ 24.81 22.14

Installer II...............$ 20.01 20.42

Lead Installer.............$ 27.78 22.64

Master Installer...........$ 31.41 22.64

Area 3

Installer I................$ 23.86 22.14

Installer II...............$ 19.24 20.42

Lead Installer.............$ 26.66 22.64

Master Installer...........$ 30.08 22.64

CARP0035-008 08/01/2019

Section 00 73 00 Wage Determination - Page 9

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa

Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: San Joaquin

AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties

Drywall Installers/Lathers:

Area 1......................$ 50.50 30.64

Area 2......................$ 44.62 30.64

Area 3......................$ 41.02 29.15

Area 4......................$ 43.77 30.64

Drywall Stocker/Scrapper

Area 1......................$ 25.25 17.86

Area 2......................$ 22.31 17.86

Area 3......................$ 20.51 16.88

Area 4......................$ 21.89 17.86

CARP0152-001 07/01/2019

Contra Costa County

Carpenter...................$ 50.50 30.20

Hardwood Floorlayer, Section 00 73 00 Wage Determination - Page 10

Shingler, Power Saw

Operator, Steel Scaffold &

Steel Shoring Erector, Saw

Filer.......................$ 50.65 30.20

Journeyman Carpenter........$ 50.50 30.20

Millwright..................$ 50.60 31.79

CARP0152-002 07/01/2019

San Joaquin County

Carpenter...................$ 50.50 30.20

Hardwood Floorlayer, Shingler, Power Saw

Operator, Steel Scaffold &

Steel Shoring Erector, Saw

File…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .