W912P7-20-B-0007 Amendment 0001 June 19 2020.pdf

PDF 46 KB Posted

Attached to
Sacramento Deep Water Ship Channel (DWSC) Maintenance Dredging Project
Solicitation number
W912P720B0007
Issued by

About this file

This document includes an amendment to a solicitation and details of the related federal contract opportunity. The amendment decreases the contractor period of performance for maintenance dredging of the Sacramento Deep Water Ship Channel by 19 days to 99 days. The solicitation seeks bids for dredging reaches of the channel to a depth of 29.5 feet below mean lower low water plus one foot of overdepth dredging, with disposal of approximately 125,000 cubic yards of dredged material at various upland sites. Bids are due by July 6, 2020 for the work, which is estimated to cost between $1 million and $5 million. The U.S. Army Corps of Engineers, Engineering District San Francisco will award the contract and administer the project for maintenance dredging to maintain the channel.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

This amendment makes changes to the solicitation; these changes represent one of three types, either adding new information, or revising existing information. Changes made by this amendment replace the previously issued sections of the advertisement, as referenced in the below summary of changes:

STANDARD FORM (SF) 1442:

(1) The contractor period of performance end date has decreased by 19 days from 118 days to 99 days.

ADVERTISEMENT FRONT-END (DIVISION 00):

(1) Revised Section 00 10 00

(a) Pricing Schedule - Estimated Quantities

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P720B0007

X 9B. DATED (SEE ITEM 11)

05-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jun-2020

CODE

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

450 GOLDEN GATE AVE, 4TH FLOOR, SUITE 0134

SAN FRANCISCO CA 94102-3406

W912P7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P720B0007

SUMMARY OF CHANGES

The contractor period of performance end date has decreased by 19 days from 118 days to 99 days.

The following have been modified:

SECTION 00 10 00

PRICING SCHEDULE

SACRAMENTO DEEP WATER SHIP CHANNEL (DWSC) FY20 MAINTENANCE DREDGING WITH

DISPOSAL AT VARIOUS UPLAND SITES

Contract

Line Item

No. (CLIN)

Description of Supplies and Services *Estimated

Quantity Unit Unit Price Amount

Mobilization and Demobilization

1 Job

Dredging Reach 9 to -29.5-ft MLLW including 1-foot of paid Over-depth with Disposal at S31-III

110,000

102,000

CY

Dredging Reach 2 to -29.5-ft MLLW including 1-foot of paid Over-depth with Disposal at S31-III

24,000

23,000

CY

Total (Items 0001 through 0003)

134,000

125,000 CY + 1 Job

*ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL

CONDITIONS) OF THE CONTRACT.

Notes:

1. To be considered responsive, prices must be submitted on all individual items within Pricing

Schedule. Failure to do so may be cause for rejection of bids.

2. must complete and submit attached "Dredging Plant and Equipment Schedule", forms Page 1 and

Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

3. The term "Job", which appears on the Pricing Schedule (Section 00 10 00) under "Unit" for Bid

Item No. 0001 shall be considered as a Lump Sum. The Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to Bid Item No. 0001.

4. BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19 Contract

Award - Sealed Bidding - Construction.

5. The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR

52.243-4.

6. The Contractor shall necessary to perform conditions set forth furnish all plant, all work in strict in the contract to labor, material, equipment, etc., accordance with the terms and include all attachments thereto.

End of Document

(End of Summary of Changes)

File details come from the government source that posted it. Updated .