SOW_WQMP_for_FY19_OM_Dredging_cke.pdf

PDF 217 KB Posted

Attached to
FY19 Maintenance Dredging Water Quality Monitoring Surveys
Solicitation number
W912P719T0002
Issued by

About this file

Scope of Services

View the file

Other files

File Type Posted
Questions_and_Answers_WQM.pdf PDF
PPQ-0_Past_Performance_Questionnaire.pdf PDF
15-5623_Wage_Determinations.pdf PDF
Bid_Schedule_FY19_WQ_Monitoring.pdf PDF
FAR_Provisions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Services for:

PROJECT: FY 2019 Maintenance Dredging

TITLE: Water Quality Monitoring Surveys

CONTRACTOR: TBD

CONTRACT: TBD

LOCATION: Alameda and Contra Costa County, CA

1. MAILING ADDRESS / POINTS OF CONTACT

The point of contact (TPOC) for technical questions at USACE is:

Mr.ChristopherEng,EnvironmentalSectionB(CESPN‐ET‐PB)
U.S.ArmyCorpsofEngineers,SanFranciscoDistrict
450GoldenGateAvenue,4thFloor,Room6751
SanFrancisco,California94102
Phone:(415)503‐6868
Email:Christopher.K.Eng@usace.army.mil
Allcorrespondence,submittals,invoices,etc.shallbee‐mailedtothecontractingofficer’s
representative(COR),attheaddressprovidedbelow.TheCORisthecontractualpointof
contactforthiscontract(toassistsinthetechnicalmonitoringandadministrationofa
contractonly).
Mr.JosephViola,A‐EServicesUnit(CESPN‐ET‐EC)
U.S.ArmyCorpsofEngineers,SanFranciscoDistrict
450GoldenGateAvenue,4thFloor
SanFrancisco,California94102
Phone:(415)503‐6883
Email:Joseph.J.Viola@usace.army.mil

2. INTRODUCTION AND BACKGROUND

Thisscopeofworkdescribesthetasksthatwillbeperformedbythecontractorto
determinemaintenancedredgingoftheseprojectsaretobeconductedbytheU.S.Army
CorpsofEngineersSanFranciscoDistrict(USACE)beginninginthemonthJune2019for
bothRichmondInnerHarborandOaklandHarbor.Differentcontractorswillbedredging
theseprojects.
TocomplywiththewaterqualitymonitoringprogrampursuanttoWaterQuality
Certification(WQC)OrderNo.R2‐2015‐0023forthe2015‐2019MaintenanceDredging
ProgramissuedtoUSACEbytheRegionalWaterQualityControlBoard.Themonitoringwill
beperformedatRichmondInnerHarborandOaklandHarbor.Thedatacollectedwill
helpanalyzeimpactsofcontrolleddecantingduringdredgingonwaterqualityintheproject

area.

TheOaklandInnerandOuterHarborislocatedintheCityofOaklandinAlamedaCounty.
Thesiteiscurrentlyborderedbyindustrialandmarineuses,aswellasrecreationalareas:
PortViewParkandMiddleHarborShorelinePark.TheRichmondInnerHarborislocated
withintheboundariesofContraCostaCounty.

3. DESCRIPTION OF WORK AND SERVICES REQUIRED

Thecontractorshallprovidetheservicesofateamandmappingtechnicianswith
experienceinwaterqualitysamplingandmonitoringintheSanFranciscoBayandcoast
ofCalifornia.
Theproposalwillincludetheresumeofeachproposedprojectteammemberto
demonstratetheaforementionedqualifications.

BASE TASK:

Task1–WaterQualityMonitoringforOaklandandRichmondInnerHarbors
TotalMonitoringdayrequirementsunderthisBaseTaskperprojectlocation:
1(one)pre‐dredgeday(Day0)
1(one)pre‐decantbaselinemonitoring(Day1)
5(five)decantmonitoringdays(day2throughday6)
5(five)Ifrequiredexceedancedecantmonitoringdays,(day7throughday11)

I. Constituents Monitored

TheOaklandHarborandRichmondHarborFederalNavigationChannelFY19Dredging
ProjectsrequiresthefollowingwaterqualitymonitoringprogrampursuanttoWater
QualityCertification(WQC)OrderNo.R2‐2015‐0023forthe2015‐2019Maintenance
DredgingProgramifcontrolleddecantingisrequestedfortheseprojects.Controlled
decantingisanydischargeofwaterentrainedwiththedredgedsedimentfromany
barge/scowintowhichthedredgedsedimentisplaced.

A. Aquatic life turbidity applicable criteria:

1. Turbidity ≤ 50 NTU (or up to 10 percent greater than turbidity at a

backgroundreferencelocationsampledconcurrentlywiththedredging
location,ifthebackgroundturbidityisgreaterthan50NTU)measuredat
thepointofcompliance,whichshallbelocated500feetdowncurrentof
thedredging.

II. Pre-dredge, Pre-decant, and Decant Monitoring Schedule

Note: This is day 0. (1 day of pre-monitoring reconnaissance) Day 0 counts as a pre monitoring mobilization, site reconnaissance day and post monitoring demobilization. This counts as one 12 hour pre-monitoring day

A. Contractorwilltaketurbiditymeasurementswithinthewaterstratainthevicinity
ofwheredredgingwillbetakingplace,asdescribedintheSamplingApproach,aday
beforedredgingoperationstomeasurethebackgroundconditionswithinthe
dredgingarea.

B. Turbidity measurements will be taken, as prescribed in Sampling Approach below,

andthesewillbeusedtocomparedecantingtonon‐decantingconditions(justthe
clamshellbucketworkingwithnodecanting).

C. For five additional days, contractor will be allowed to decant and these

measurementswillbetakenasstatedinthesectionsbelow.Decantingmust
coincidewithdaylightoperations.Adayisonlycountedifdecantingoccursforat
leasttwohours,ataminimum,whilemonitoringistakingplace.

III. Frequency of Monitoring

Note: There will be a total of 11 monitoring days as shown in Paragraphs A through H below and each monitoring day is 12 hours long.

A. Day 1 (one day of monitoring)

Onthefirstfulldayofdredging,thecontractorwillnotbeallowedto
overflow/decant.However,themonitoringwillcommenceasdescribedin
paragraphsBtroughFbelowinordertocollectdataandtoestablishapre‐decant

baseline.

B. Day2throughday6(5daysofmonitoring)
AlldutiesasdescribedinthisparagraphBandthroughGwillapply.
Thecontractor’sdredgingequipmentshallbeoperatingforatleastonehourpriorto
thecollectionofturbidityreadingstoensurereadingsandobservationsare
representativeofturbidityconditionsduringnormalactiveoperations.
C. Thecontractor’sturbiditymonitoringwillcorrespondwith;1)slacktideand2)
strongebborfloodtidalconditionstotheextentthesetimesadequatelyreflect
periodsofactivedredgingandoccurduringdaylighthours.

D. The contractor shall conduct quantitative and visual turbidity monitoring during daylight hours only as follows:

1. Takeandrecordreadingsevery10minutesatone(1)up‐currentandtwo
(2)down‐currentlocationsduringthefirstdayofdredgingandthefirst
five(5)daysofdecantmonitoring.

2. Record (written and photographic) of “visible” turbidity at the point of

complianceduringthefirstdayofdredgingandthefirstfive(5)daysof
decantmonitoring.

E. For safety reasons, no monitoring shall occur before sunrise or after sunset unless authorized by the USACE.

F. Thecontractorshallprovidedailyreports(within24hours)bye‐mailtothe
personnellistedinSectionVIII.A.anduponcompletionofthefive(5)monitoring
daysofdecantmonitoring,thecontractorshallsendthecompiledmonitoringdata
reportwithin24hoursofcompletionofmonitoringactivity.

G. If there are no exceedances in turbidity within the five (5) days of decant

monitoring,thecontractorshallprovidereportsasdescribedinIII.E.andwaitfor
furtherdirectionfromUSACEbeforedemobilizingorcontinuingtodecant.
Additionalmonitoringmayberequiredbasedonqualityofdataandsiteconditions.
TheUSACEwillconsultwithRWQCBandBCDCandwillnotifythecontractor
whetherornotdecantingwillbeallowedtocontinueornot.

H. Exceedance monitoring Day 7 through Day 11 (5 days of monitoring)

Shouldtherebeanexceedenceinturbiditywithintheinitialfive(5)daysofdecant
monitoring,thecontractorshallcontinuemonitoringfor5daysfollowingthesteps
listedin“ExceedanceandExceedanceProtocol.”

IV. Sampling Approach

A. The contractor shall establish turbidity conditions according to the following:

a. Contractor shall take turbidity measurements within the water strata, one

daybeforedredgingoperationstomeasurethebackgroundconditionswithin
thedredgingarea(SeeSectionEforlocations).

b. The contractor shall measure turbidity using a turbidity meter, starting at

leastonehourafterthedredgingequipmenthasbeenoperating,toensure
readingsandobservationsarereflectiveofturbidityconditionsduringactive

operations.

c. The contractor shall verify the calibration of the turbidity meter and calibrate

asnecessarywithstandardizedsamplespriortothestartofeachday’s
monitoring,perthemanufacturer’sspecifications.

d. The contractor shall collect turbidity readings within the water strata:

1. near the surface (~2 feet below).

2. mid‐depth.

3. near the bottom (~2 feet above).

e. The contractor shall compare turbidity readings taken at the point of

compliancetobackgroundlevelswithinthesamewatercolumnstrata(i.e.,at
eachpointinthewaterstrata–surface,mid‐depthandnearbottom,with
comparisonsofthepointsofcompliancecomparedtothesamestrataatthe
currentbackgroundstation)todeterminecompliancewithturbidity

standards.

f. The contractor shall visually observe turbidity beyond the point of compliance and record the findings at the same time the turbidity levels are measured.

g. The contractor will ensure that all decant events are notated in with date and time. Also, coordinates where the turbidity readings are being recorded.

h. Ifmultipledredgesarebeingdeployedonsite,USACEmayrequiretwo
separatemonitoringefforts(oneforeachdredge)dependingonthelocations
ofthedredgeoperations(seeoptionsbelow).

V. Monitoring Locations

A. Theareaofmixingpointofcomplianceforturbidityduringclamshelldredgingis500
feetdowncurrentfromthepointofclamshelldredgingandthuswillmoveasthe
dredgingprogresses.

B. The contractor shall establish Monitoring Points at:

1. Measured Background – A minimum of 200 feet up current from the dredging

2. Measured Downstream Early Warning – 300 feet down current of the dredging

3. Measured Downstream Point of Compliance – 500 feet down current of the dredging

VI. Exceedence and Exceedence Protocol

A. Ifanyofthethreemeasurementstakenatthedowncurrentpointofcompliance
whendecantisoccurringshowrecordedturbidityisgreaterthan50NTUwherethe
backgroundislessthan50NTU,orifmorethana10percentincreaseinturbidity
whenthebackgroundturbidityismorethan50NTU,thecontractorshallnotifythe
USACEwithintwo(2)hoursand,assumingdredgingcontinues,shallcontinueto
monitorpertheprotocoldescribedabove,restartingthe5consecutiveday
monitoringseriesonthedayoftheinitialturbidityexceedence.Contractorwillnot
ceasemonitoringuntildirectedbyUSACE,RegionalWaterQualityControlBoard
andBCDC.Therefore,timelycommunicationsarerequested.

B. If additional exceedences are reported, the USACE will consult with the Regional

WaterQualityControlBoardandBCDCtodeterminewhethertocontinue
monitoringorwhethertoterminatedecantandturbiditymonitoring.

VII. Reporting

A. The contractor shall document any turbidity criteria exceedences, decant or dredging

shutdownswithanIncidentReport,whichwillbetransmittedbyemailtothe
personslisteninVIII.B.within24hours.

B. In addition turbidity data, contractor will report 1) dredging activity (e.g. tug and

bargemovement)activity2)decantingoperations3)diggingoperations4)tide
level(ebb,slack,floodand5)externalactivitythatarenotrelatedtodredgingsuch
aspassingvesselsduringdredgingoperations.

C. The Incident Report shall document all exceedence and will include the date, time,

location,activity,turbiditydatacollected,nameofpersoncollectingthedata,names
ofpersonsnotifiedoftheexceedence,photographsiftaken,andsummaryofhowthe
exceedencewasresolvedfollowingtheaboveprotocol.

D. A summary table and graphs of daily data, along with the WQMP worksheets will be

includedinthefinalreport.Thissubmittalwillalsobeprovidedinelectronicformat
compatiblewithMicrosoftExcel.Exampletemplate:

Date Dredging

(Digging) Start Time (hh:mm)

Dredging (Digging) Stop Time (hh:mm)

Decant Start Time (hh:mm)

Decant Stop Time (hh:mm)

Turbidity Monitoring Start Time

Turbidity Monitoring Stop Time

No. of Times Upcurrent/Ambient

StationMonitored
DuringDecanting

No. of Times Early Warning Station Monitored During Decanting

No. of Times Compliance Station Monitored During Decanting

VIII. Responsibility and Communication Plan

A. Thepartyresponsibleformonitoringwaterqualityfortheprojectwillattendapre‐
monitoringmeetingwithUSACEatleast48hourspriortocommencementofthe

plan.

B. All exceedences, daily report logs, and other reporting must also be sent directly

totheUSACEPointsofContactforturbiditymonitoringbye‐mail:Mr.ChrisEng,
EnvironmentalSciences(415)503‐6868,Christopher.K.Eng@usace.army.milandthe
RWQCBpointofcontact,echristian@waterboards.ca.gov.
OPTION:Theoption(s)willexercisedatthediscretionoftheContractingOfficersubjectto
availabilityoffunds.Ifexercised,option(s)wouldbeexercisedpriortotheexpirationofthe
base(priortoNovember30,2019).Theoverallperiodofperformancewillnotbe
extended,allexercisedoptionsrequiretobeperformedconcurrentwiththeother
requirementsasdescribedwithinthiscontract.Unlessotherwiseamended,the
performanceperiodforcompletionoftheoptionswillbeasstatedtherein.The
Governmentwillnotifythecontractor30calendardayspriortoexerciseofoption(s).The
pricingoftheoptionswillbeevaluatedwiththeoverallpricetoensurethereisnoevidence
ofunbalancing.
Optionmonitoringdurations(days)areasdescribedinPara.III. Frequency of
Monitoring. Note: Allothermonitoringrequirementsasdescribedinthisscopeof
services,willapplytotheoptions.

Pricing for the options shall address a total of 12 days of monitoring thereof:

Day 0 (1 (one) 12 hrs. day of pre-monitoring reconnaissance

Day 1 (1(one)12hrs.dayofbaseline‐monitoring)
Day2throughday6(5days12hrs/dayofmonitoring)
Day7through11(5days12hrs/dayofmonitoring)ifrequired
Option1foroneadditionalWaterQualityMonitoringforRichmondInnerHarbor‐If
multipledredgesarebeingdeployedonsite,USACEmayrequiretwoseparatemonitoring
efforts(oneforeachdredge).Thisoptionwillbeexercisedfortheadditionalconcurrent
monitoringeffort,ifthisoccurs.
Option2foroneadditionalWaterQualityMonitoringforOaklandHarbor‐Ifmultiple
dredgesarebeingdeployedonsite,USACEmayrequiretwoseparatemonitoringefforts
(oneforeachdredge).Thisoptionwillbeexercisedfortheadditionalconcurrent
monitoringeffort,ifthisoccurs

4. DELIVERABLES/SUBMITTALS/REPORTS SCHEDULE

Acomprehensivereportforeachprojectshallbeconductedasdescribedinthe
“deliverables”sectionbelow.
a. WaterQualityMonitoring–DailyReports(dailye‐mails),DraftandFinal
Reports(3hardcopies,oneelectroniccopy,andallsourcefiles).Draftreport
isduewithin10calendardaysofsurveycompletion.Uponreceiptof
comments,Finalreportisduewithin30calendardaysafterreceiptof

comments.

5. RESPONSIBILITY FOR FIELD WORK

Thecontractorshallberesponsibleforalldamagestopersonsandpropertythatoccurasa
resultofactionsbythecontractor’semployeesinconnectionwithexecutionofthework
underthiscontract.ThecontractorshallholdtheUnitedStatesGovernmentfreefromall
claimsandsuitsfordamagesasaresultofthiswork.Damagestopersonsandproperty
proximatelyresultingfromthenegligenceoffederalgovernmentemployeesareexcluded
fromthisprovision.

6. METADATA AND TABULAR DELIVERABLES

ThedeliverablesshallincludemetadatacompliantwiththeFederalGeographicData
Committeemetadatastandardforeachdatasetthatispartofthereportorthatwasused
inmakingthereport.
TheFederalGeographicDataCommitteemetadatastandardisdescribedindocuments
listedonthispage:http://www.fgdc.gov/metadata/geospatial‐metadata‐standards
Allgeospatialinformationshallbegeo‐referenced.AllCADDandGISfilesshallbe
registeredinawell‐knowncoordinatesystem.Rectifiedimageryandscannedmapsshall
includeafile(e.g.aworldfile)allowingGISandCADDapplicationstoimportthemasgeo‐
referencedimages.
AllCADDandGISfileswithattributetablesshallconformtotheSpatialDataStandardsfor
facilities,InfrastructureandEnvironment(SDSFIE)for:
Entitytypes
Attributetables
AttributeNames
DomainTables
TheSDSFIErequirementonlyappliestoGISdata,i.e.vectordata(suchaspoints,linesand
polygons)thathaveanattributetable.Itdoesnotapplytopre‐existingdata,elevationdata
orimagedata.TheSDSFIEisavailableathttp://www.sdsfie.org.

7. TRANSMITTALS

Transmittallettersshallbedatedandsignedbytheappropriatecontractofficer
representative(contractor)andbeprovidedtotheGovernmenton8‐1/2"x11"paper.An
electroniccopyofthetransmittalletterinMicrosoftWord,version2007ornewerformat
shallalsobeprovidedontheelectronicdigitalmediasubmittedtotheGovernment.As
applicable,electronictransmissionsshallinclude:
Anexternallabeloneachmediaunit(i.e.,CD)alongwiththetotalnumberbeingdelivered.
Thislabelwillincludealistofthenamesanddescriptionofeachfilecontainedonthe

media.

Brief instructions for transferring files from the media.

Certificationthatalldeliverymediaarefreeofknowncomputerviruses.Astatement
includingthename(s)andreleasedate(s)ofthevirus‐scanningsoftwareusedtoanalyze
thedeliverymedia,thedatethevirusscanwasperformed,andtheoperator'snameshall
alsobeincludedwiththecertification.Thereleaseorversiondateofthevirus‐scanning
softwareshallbethecurrentversionandcapableofdetectingthelatestknownvirusesat
thetimeofdeliveryofthedigitalmedia.
Astatementindicatingthecontractofficerrepresentative(contractor)willretainacopyof
alldeliveredelectronicdigitalmedia(withallfilesincluded)foratleastoneyearand,
duringthisperiodoftime,willprovideoneadditionalcopyofeachtothegovernment,if
requested,atnoadditionalcost.
Instructionsconcerninghowtogenerateplotted,orhardcopy,drawingsfromtheprovided
plotfiles.Forgeo‐referencedmaps,notatingthecoordinatesystemisrequired.

List of any deviations from the government's standard layer/level scheme and file naming conventions.

Listofallnewsymbolcells/blockscreatedfortheprojectwhichwasnotprovidedtothe
contractorwiththedocumentsandreports.

List of any non‐IGES crosshatch/ patterns used.

Listofallnewfigures,symbols,tables,schedules,details,andothercells/blockscreatedfor
theproject,whichwasnotprovidedtothecontractofficerrepresentativewiththeA/E/C
CADDStandardRelease3.0andanyassociatedproperties.
Listofalldatabasefilesassociatedwitheachdrawingaswellasadescriptionand
documentationofthedatabaseformatandschemadesignasused.

8. PERIOD OF SERVICE

Task 1: Total duration for the base contract is date of award through November 30, 2019.

Option1:Totalduration,ifawarded,throughNovember30,2019.
Option2:Totalduration,ifawarded,throughNovember30,2019.

9. PERFORMANCE STANDARDS

During the execution of the tasks outlined in this scope of work, the contractor shall:

a. Execute the work diligently and aggressively.

b. PromptlyadvisetheTPOCandCORofallsignificantdevelopmentswhichmayaffect
thescopeofthecontract.

c. Prepare notes on all meetings, discussions, and telephone conversations between

thecontractorandrepresentativesofothergovernmentagencies,theircontractors,
andotherUSACEcontractorsrelatedtotheworkoutlinedinthiscontract.Written
summariesofsignificantdiscussionsshallbeprovidedtotheTPOCandCOR.

d. Promptly furnish to the appropriate USACE point(s) of contact all written

communicationspertainingtotheworkdescribedunderthiscontractfromother
governmentagencies,theircontractors,orotherUSACEcontractors;

e. Take appropriate measures to obtain clarification of project and data assumptions

anddesigncriteriarequirements,toacquireallpertinentinformation,andto
incorporatesuchinformationintheworkbeingperformed;

f. Be responsible for producing complete, competent, properly coordinated, well written and thoroughly checked documents within agreed upon schedules; and

g. Beresponsibleforthequalitycontroloftheworkconductedunderthiscontractand
havealogicalandfunctionalqualitycontrolprogramtoassurethaterrorsand
deficienciesinallsubmittalsarenon‐existenttominimal.

h. The contractor will comply with Executive Order 13423 Section 1: To the greatest

extentpracticable,thecontractorshallconductworkinanenvironmentally,
economically,fiscally,andsustainablemanner(FederalRegister:Vol.72,No.17;
Friday,January26,2007).Thecontractormayalsobeaskedtocomplywith
ExecutiveOrder13423onsustainability(October6,2009)asmorespecificdetails
areprovided.Thecontractorshallstatehowthisshallbeaccomplished,inthecost

proposal.

10. QUALITY CONTROL

Thecontractormustprovidedocumentedqualitycontrol(QC)onallwork.Thedocument
shallbewellwritteninstandard,properEnglish,plainlanguage,andactivevoice,generally
conformingtoawidelyacceptedstylemanualconsistentwiththeproductssuchasthe
GovernmentPrintingOfficeStyleManual.Thetechnicallevelofwritingshouldbesuchthat
thematerialisfullyunderstandablebyapersonwithoutspecifictraininginthefieldat
handbutwithoutcompromisingitsvaluetothetargetaudience.Thetargetaudience
includestechnical,managerial,executive,andseniorscientistpersonnelinvarious
regulatoryandrelatedgovernmentagencies.Theworkwillbeusedforregulatory,
permitting,policyandrelatedissuesaswellaspossiblefollow‐upresearch.Jargonspecific
tovariousfieldsshouldeitherbeclearlyexplainedinthetextordefinedinaglossary.

11. MONTHLY SAFETY EXPOSURE REPORT

Thecontractorshallsubmitthe“USACEPRIMECONTRACTOR,MonthlyRecordofWork‐
RelatedInjuries/Illnesses&Exposureinelectronicspreadsheetformatthroughemail.

The form can be downloaded from:

https://team.usace.army.mil/sites/NAE/EP/W/WG/admin/Safety/Safety General/Monthly Record of Work‐Related Injuries Illnesses Exposure.xls

For further information regarding the “Monthly Safety Exposure Reports”, please contact:

Mr.JosephViola
U.S.ArmyCorpsofEngineers,SanFranciscoDistrict
A‐EServicesUnit
450GoldenGateAvenue,4thFloor
SanFrancisco,California94102
Phone:415‐503‐6883
Email:Joseph.J.Viola@usace.army.mil

12. MONTHLY PROGRESS REPORT

Thecontractorshallprovideamonthlyprogressreportsthroughoutthedurationofthis
project.Thereportshallbeabriefdescriptionofprogresstodate,anyproblems/issuesand
theirresolution.Thereportmaybesubmittedasaworddocumentsviaemail.Such
reportsshallbeprovidedtotheTPOCandCOR.Intheeventthereareinformationneeds
notbeingmetbyUSACEwhicharedelayingprogress,reportsofsuchshallbeprovided
monthlytotheTPOCandCOR.

13. ACCEPTANCE

Acceptanceofthefinalsubmittalfortheworkdescribedintheforegoingparagraphswill
bemadebythecontractingofficer.Noothergovernmentrepresentativeisauthorizedto
changethescopeofservicesortermsofthecontract.

14. INVOICE AND PAYMENT

Invoices shall be submitted through email to:

Attn: Joseph Viola, A‐E Unit

U.S.ArmyCorpsofEngineers
450GoldenGateAvenue,4thFloor
SanFrancisco,California94102
Tel.No.415‐503‐6883
Email:Joseph.J.Viola@usace.army.mil

In addition please carbon copy (cc) the invoices to:

BickY.Lee
U.S.ArmyCorpsofEngineers
450GoldenGateAvenue,4thFloor
SanFrancisco,California94102
Tel.No.415‐503‐6882
Email:Bick.Y.Lee@usace.army.mil
15.PROPOSALSUBMITTALPACKAGE
Acostproposalshallbesubmittedfortheworkdescribedinthisscopeofservices.Thecost
proposalmustbepresentedinsuchamannertofacilitatethegovernment'sreviewand

analysis.

The submittal package shall contain:

a. Costproposal
b. TechnicalProposal
i. Statementofcontractorqualifications
ii. Staffingplan(includingavailability)includingresumesofkey

personnel

File details come from the government source that posted it.