INVITATION FOR BIDS (IFB) SMALL BUSINESS SET-ASIDE
PORT OF REDWOOD CITY CHANNEL
MAINTENANCE DREDGING
SAN MATEO COUNTY, CALIFORNIA
IFB NO. W912P7-11-B-0004
US ARMY CORPS OF ENGINEERS
San Francisco District_________
DIRECTIVE NO.
PROJECT NO.
ATTENTION TO BIDDERS:
1. SECURITY REQUIREMENTS
YOUR ATTENTION IS DIRECTED TO THE SECURITY REQUIREMENTS FOR THIS
CONTRACT LOCATED IN SECTION 00800, SPECIAL CONTRACT REQUIREMENTS.
2. FACTS ABOUT THE USE OF INDIVIDUAL SURETIES
The Federal Acquisition Regulation (FAR) permits the use of individual sureties for bid, payment and performance bonds. However, the conditions that must be met are strict, and they may not be waived. Further, the FAR imposes limits with respect to the type of property interest individual sureties may utilize.
Individual sureties have been occasionally and successfully used in accordance with FAR requirements within the San Francisco District, when real property interests have not been provided as the security interest. On at least one occasion, an individual surety was made acceptable when an individual personally known to a bidder provided a business property for the security interest, and legal counsel was engaged to navigate and implement the FAR requirements.
Bidders or proposers considering utilizing individuals or firms providing “brokerage” or “insurance” services to obtain bonds from individual sureties are advised to carefully research their backgrounds. The Government is not responsible for and will not reimburse any bidder for advance payments made to such firms in the event that the bonds are unacceptable to the contracting officer.
The San Francisco District strictly follows the FAR 28.203 “Acceptability of individual sureties.” Frequently, an individual surety’s bid bond raises questions about the real property security interest being offered. Also, individual sureties may use “altered” Standard Form 28 affidavits, which are unacceptable. Documentation containing such flaws will result in rejection of the bonds, and, if it is a bid bond, rejection of the bid.
Some “brokers” apparently represent that “their bonds” are accepted by federal government entities. Yet, be aware that not all federal agencies implement the FAR in a uniform manner. Insufficiencies that go unnoticed by one agency may be perceived as fatal by another. The risk of such results rests with the bidder offering the bid bond.
Know your broker, and ensure that all bonding documents comply with FAR requirements before you submit them. It is important to remember that the contracting officer is vested with a wide degree of discretion and business judgment in determining the acceptability of an individual surety, and the Comptroller General has stated that he will not question such a determination so long as it is reasonable.
So, please make certain that if you intend to use an individual surety you are familiar with the regulations and specific requirements that apply to this form of bonding.
TABLE OF CONTENTS
COVER SHEET
TABLE OF CONTENTS
SECTION TITLE
00010 SOLICITATION, OFFER AND AWARD (STANDARD FORM 1442)
AND PRICING SCHEDULE
00100 INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/
OFFERORS AND EVALUATION CRITERIA FOR AWARD
00600 REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS/OFFERORS
00700 CONTRACT CLAUSES
GENERAL WAGE DECISION
ATTACHMENT
1 GENERAL WAGE DETERMINATION
2 PREAWARD SURVEY
3 SUBCONTRACTING PLAN
TECHNICAL SPECIFICATIONS
(SEE TECHNICAL SPECIFICATIONS' TABLE OF CONTENTS FOR
SPECIFICATION SECTIONS INCLUDED IN THIS SOLICITATION/CONTRACT)
DRAWINGS (SEPARATE PACKAGE) (LIST OF DRAWINGS-SECTION 00700)
NOTE: AS A MINIMUM ANY CONTRACT AWARDED AS A RESULT OF THIS
SOLICITATION SHALL CONSIST OF THE FOLLOWING DOCUMENTS:
STANDARD FORM 1442, SECTIONS 00010, 00700, TECHNICAL
SPECIFICATIONS AND DRAWINGS, AND ATTACHMENTS AS DESCRIBED IN
CONTRACT DOCUMENT.
SECTION 00600, AS COMPLETED BY AWARDEE, IS INCORPORATED INTO
ANY RESULTANT CONTRACT BY REFERENCE.
SECTION 00100 IS INCLUDED FOR SOLICITATION PURPOSES ONLY. THIS
SECTION WILL BE REMOVED, MAINTAINED IN THE CONTRACT FILE AND
NOT MADE PART OF THE CONTRACT.
AMENDMENTS ARE INCORPORATED INTO THE RESULTANT CONTRACT.
SUBCONTRACTING PLAN (IF REQUIRED) BECOMES AN ATTACHMENT TO AND A
MATERIAL PART OF THE CONTRACT.
W62A2B10624204
Small Business Set-Aside
PORT OF REDWOOD CITY CHANNEL MAINTENANCE DREDGING, SAN MATEO COUNTY, CALIFORNIA
JOB DESCRITION: The work consists of maintenance dredging of the Redwood City Harbor Channel of approximately 159,500 cubic yards of materials, to maintain the navigable depth of -28.5’ MLLW plus 1 foot allowable paid over-depth (alternate 1 on the bid schedule) or -29’ MLLW plus 1 foot allowable paid over-depth (alternate 2 on the bid schedule) for the Redwood City Harbor Channel. Dredged material excavated from the Redwood City Harbor Channel shall be transported and disposed at the SF-11 disposal site. All dredging, material transportation and material placement shall be in accordance with the project plans, specifications, permits, regulatory guidance and applicable contract clauses.
ESTIMATED COST RANGE OF PROJECT: $1,000,000 - $5,000,000
X
JAMES E GARROR 415-503-6988
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
7-July-2011
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ 3 calendar days and complete it within See Note 11________ calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time __ 8 August 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY ENGINEER DISTRICT, SAN FRANCISCO
CONTRACTING DIVISION
1455 MARKET ST., 17TH FLOOR SUITE 1741
SAN FRANCISCO CA 94103-1398
W912P7
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
W912P7-11-B-0004 329
20B. SIGNATURE
(REV. 4-85) STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY
(Include ZIP Code) 14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
(Include only if different than Item 14) 16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this 28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
W912P7-11-B-0004
CONTINUATION OF STANDARD FORM 1442
BLOCK 20D:
(1) IF THE OFFEROR IS A JOINT VENTURE, EACH PARTICIPANT IN THE JOINT VENTURE
MUST COMPLETE THE FOLLOWING:
Company Name Signature Title
Company Name Signature Title
Company Name Signature Title
NOTE: If a corporation is participating as a member of a Joint Venture, the certificate below must also be completed and signed.
CORPORATION AUTHORIZATION TO PARTICIPATE IN JOINT VENTURE CERTIFICATE
I, _______________________, certify that I am the Secretary of the corporation (name) named as a participant in a Joint Venture on this offer; that _____________________, who signed said offer on behalf of the corporation, was (name) then ______________________ of said corporation; that the signature thereto is (title) genuine; that said contract was duly signed, sealed and attested for and in behalf of said corporation by authority of its governing body; and that the corporation is authorized to participate in the Joint Venture on this offer.
(Name of Corporation)
(Secretary)
(2) IF THE OFFEROR IS A PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS BELOW.
SIGNATURES BY ALL PARTNERS HERE SIGNIFY THAT THE INDIVIDUAL WHO SIGNED THE
OFFER IN BLOCK 20B HAS THE AUTHORITY TO BIND THE PARTNERSHIP.
Name Signature
Name Signature
Name Signature
(3) IF THE OFFEROR IS A CORPORATION, THE OFFER SHALL BE SIGNED IN THE
CORPORATE NAME FOLLOWED BY THE WORD "BY" AND THE SIGNATURE OF THE PERSON
AUTHORIZED TO SIGN THE OFFER IN BLOCK 20B. PROVIDE PROOF THAT THE PERSON
SIGNING FOR THE CORPORATION HAS THE AUTHORITY TO BIND THE CORPORATION BY
COMPLETING THE FOLLOWING CERTIFICATE:
CONTINUATION OF STANDARD FORM 1442
CORPORATION AUTHORIZATION CERTIFICATE
I, ___________________________________, certify that I am the Secretary of the (name) corporation named as offeror in the within offer; that ______________________, (name) who signed said offer on behalf of the corporation, was then
_____________________________________ of said corporation, that the signature (title) thereto is genuine; that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.
(Name of Corporation)
(Secretary)
(4) IF THE OFFEROR IS AN INDIVIDUAL DOING BUSINESS AS A FIRM, THE OFFER SHALL
BE SIGNED BY THAT INDIVIDUAL IN BLOCK 20B FOLLOWED BY THE WORDS "AN INDIVIDUAL
DOING BUSINESS AS _____________________________________ (INSERT NAME OF FIRM).
(5) WHEN AN AGENT SIGNS THE OFFER, PROVIDE PROOF OF THE AGENT'S AUTHORITY TO
BIND THE PRINCIPAL.
Port of Redwood City Harbor Channel O&M Dredging Project FY11
*QUANTITY IS AN ESTIMATED AMOUNT, SEE SECTION 00700, FAR 52.211-18 AND EFARS 52.211-5000, 52.211- 5001, FOR SUBDIVIDED BID ITEMS AND FOR VARIATION IN ESTIMATED QUANTITIES CONTRACT CLAUSE.
00010 - 1 Bid Schedule
SECTION 00010
BID SCHEDULE
THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY
TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH
IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
PRICING SCHEDULE - GOVERNMENT FURNISHED SITE
ITEM NO DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
Alternate 1 Base
0001 Mobilization and Demobilization 001 LS $ _________ $ _________
0002 Maintenance Dredging at Redwood City Harbor Channel including transport and disposal of the dredged material at the Alcatraz Disposal Site, SF-11
0002A Standard Dredging to -28.5 feet MLLW *94,000 CY $ _________ $ _________ at Redwood City Harbor Channel
0002B Overdepth Dredging to -29.5 feet MLLW *65,500 CY $ _________ $ _________
Item 0002 Subtotal Price (Items 0002A + 0002B) $ _________
Government Furnished Site SUBTOTAL PRICE (Items 0001 + 0002A + 0002B) $ _________
Alternate 2 Base
0001 Mobilization and Demobilization 001 LS $ _________ $ _________
0002 Maintenance Dredging at Redwood City Harbor Channel including transport and disposal of the dredged material at the Alcatraz Disposal Site, SF-11
0002A Standard Dredging to -29 feet MLLW *136,000 CY $ _________ $ _________
0002B Overdepth Dredging to -30 feet MLLW *113,000 CY $ _________ $ _________
Item 0002 Subtotal Price (Items 0002A + 0002B) $ _________
Government Furnished Site SUBTOTAL PRICE (Items 0001 + 0002A + 0002B) $ _________
TOTAL BASE EVALUATION PRICE
For Alternate 1 Base:
5001, FOR SUBDIVIDED BID ITEMS AND FOR VARIATION IN ESTIMATED QUANTITIES CONTRACT CLAUSE.
00010 - 2 Bid Schedule
(Items 0001+ 0002A + 0002B) $_________
For Alternate 2 Base:
(Items 0001+ 0002A + 0002B ) $_________
5001, FOR SUBDIVIDED BID ITEMS AND FOR VARIATION IN ESTIMATED QUANTITIES CONTRACT CLAUSE.
00010 - 3 Bid Schedule
THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR MATERIAL, EQUIPMENT,
ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE
TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL
ATTACHMENTS THERETO.
BID SCHEDULE – CONTRACTOR FURNISHED SITE
In order to be responsive to this solicitation, prices shall be submitted on all of the items in the Pricing Schedule, above. At the bidder’s discretion, a bid may also be submitted under this Alternate Pricing Schedule. In the event a bidder elects to submit a price under the Alternate Pricing Schedule, all of the individual items in the Alternative Pricing Schedule shall be completed. At the time of bid the bidder must submit proof acceptable to the Contracting Officer that the Alternate Site is both permitted and has sufficient capacity to handle the estimated volume of material specified in the Bid Schedule- Contractor Furnished Site plus non-paid material in the allowable dredging prism.
Disposal of all materials at a permitted upland disposal site.
ITEM NO DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
Alternate 1 Base
0001 Mobilization and Demobilization 001 LS $ $
0002 Maintenance Dredging at Redwood City Harbor Channel with transport and placement at the Contractor Furnished Site
0002AA Standard Dredging to -28.5 feet MLLW *94,000 CY $ $
0002AB Overdepth Dredging to -29.5 feet MLLW *65,500 CY $ $
Item 0002 subtotal Price ( Items 0002AA to 0002AB) $________
CONTRACTOR FURNISHED SITE
SUBTOTAL PRICE
(Items 0001 + 0002AA + 0002AB ) $_________
Alternate 2 Base
0001 Mobilization and Demobilization 001 LS $ $
0002 Maintenance Dredging at Redwood City Harbor Channel with transport and placement at the Contractor Furnished Site
0002AA Standard Dredging to -29 feet MLLW *136,000 CY $ $
0002AB Overdepth Dredging to -30 feet MLLW *113,000 CY $ $
5001, FOR SUBDIVIDED BID ITEMS AND FOR VARIATION IN ESTIMATED QUANTITIES CONTRACT CLAUSE.
00010 - 4 Bid Schedule
Item 0002 subtotal Price ( Items 0002AA to 0002AB) $________
CONTRACTOR FURNISHED SITE
SUBTOTAL PRICE
(Items 0001 + 0002AA + 0002AB ) $_________
TOTAL BASE EVALUATION PRICE
For Alternate 1 Base:
(Items 0001+ 0002AA + 0002AB) $_________
For Alternate 2 Base:
(Items 0001+ 0002AA + 0002AB ) $_________
00010 - 5 Bid Schedule
CONTRACT AWARD
A contract will be awarded on the basis of price and other factors to the lowest responsive, responsible bidder in accordance with FAR 52.214-19, “Contract Award – Sealed Bidding – Construction” . Contract award will be made based on the lowest cost to the O&M Dredging Program.
Notes:
*QUANTITY IS AN ESTIMATED AMOUNT, SEE SECTION 00700, FAR 52.211-18 AND
EFARS 52.211-5000, 52.211-5001, FOR SUBDIVIDED BID ITEMS AND FOR VARIATION
IN ESTIMATED QUANTITIES CONTRACT CLAUSE.
1. Prices must be submitted on all individual items of the Pricing Schedule – Government Furnished Site. Failure to do so may be cause for rejection of bids.
2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.
3. The lump sum, "LS", line items above are not "estimated quantity" line items and therefore are not subject to the Variation in Quantity contract clause.
4. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:
1) Obviously misplaced decimal points will be corrected;
2) Discrepancy between unit price and extended price, the unit price will govern;
3) Apparent errors in extension of unit prices will be corrected;
4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
5. Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms P.1 and P.2, as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.
00010 - 6 Bid Schedule
6. DREDGED QUANTITIES: For payment purposes, all quantities for which the Government will pay under this contract shall be based on the Government pre and post dredge surveys.
7. BASIS OF AWARD: Award will be based on the least cost to the Federal O&M program. A contract will be awarded on this basis to the lowest responsive, responsible bidder in accordance with FAR 52.214-19 for the Alternate 1 Base or for Alternate 2 Base. Award will be made to the lowest responsive, responsible bid identified from this comparison. The Government intends to award a contract that provides the greatest depth for the available funding. The award amount cannot exceed the Independent Government Estimate to dredge and place material at the placement site that represents the Government's authorized standard. For this contract, the standard placement dredged material disposal is the SF-11.
8. In the event a bidder or bidders submit bids under the Pricing Schedule –Award will be made to the lowest responsive, responsible bid identified from this comparison.
9. The nature of sediment deposition in the Redwood Harbor Channel is very dynamic owing to the affects of waves and tidal flows. Therefore, the Contractor should anticipate that the advertised dredge quantities and/or the distribution of dredge material may differ significantly during the period between the pre-solicitation update survey and the Before-Dredge survey. The Contractor shall be responsible for all shoaling during the execution of the dredging contract and this should be reflected in the Contractor's bid proposal.
10. If it is determined to be in the best interest of the Government, the Contracting Officer may negotiate a modification to the contract which could result in the selection of an alternative disposal site. This site could either be an upland site or an aquatic site in accordance with the Change Clause FAR 52.243-4.
11. The contractor shall complete the project of alternate 1 within 71 calendar days, alternate 2 within 98 calendar days after receiving Notice to Proceed.
Redwood City Channel Harbor O&M Dredging Project FY11
Section 00 01 0 Dredging Plant & Equipment Schedule P.1
DREDGING PLANT AND EQUIPMENT SCHEDULE
Available Plant to be Used
Age and O verall No. Type Capacity Manufacturer Condition Location Dimensions
Dredges:
Scows:
Tugboats:
Quantity Measurement Equipment:
Quality Control:
DDLS:
1. In preparing the above tabulation the bidder shall insert the following information under the appropriate heading, using a separate line for each major item and an additional page if necessary.
Redwood City Channel Harbor O&M Dredging Project FY11 Dredging Plant and Equipment Schedule
DREDGING PLANT AND EQUIPMENT SCHEDULE
a. Number. For dredges give identifying number or name.
b. Type. Under this heading give description as follows: For clamshell dredge show bucket capacity in in-situ cubic yards, for clamshell and/or pipe-line dredges show inside diameter of intake and discharge pipe, horsepower of pump engine, and type of power; for hopper dredges show capacity at overflow, number of dredge pumps, suction pipe size, propulsion type and horsepower, dredge length O/A and beam O/A.
c. Capacity. Under this heading, state the estimated capacity of the plant in cubic yards per month when working materials similar to those which it is anticipated will be encountered in the performance of the work for clamshell, hopper, pipeline, and scow.
d. Overall Dimensions. State overall length and beam.
e. DDLS. List the DDLS equipment and number of each that will be used in accordance with Appendix 5 of the specifications.
2. List two dredging projects with location, dates of completion, and name of project owner:
(a)
(b)
P.2
00100 - i
Section 00100 Bidding Schedule/Instructions to Bidders
52.204-4005 SUBMITTAL INFORMATION FOR SUPPLIERS (RFQS), BIDDERS (IFBS) AND
OFFERORS (RFPS) (SEP 2004)
52.0214-4581 INQUIRIES (NOV 2002)
52.0214-4582 DIRECTIONS FOR SUBMITTING BIDS (MAR 2003) 2
52.0209-4501 CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY (MAR 2002) 3
52.0211-4805 AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS 4
52.0214-4503 EVALUATION FOR AWARD (JAN 1991) 5
52.0214-4583 TELEGRAPHIC BIDS (JUL 2000) 5
52.0214-4584 FACSIMILE BIDS/OFFERS (APR 1992) 5
52.0228-4504 PERFORMANCE AND PAYMENT BONDS (MAY 2000) 6
52.0228-4506 INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS (AUG 1991) 6
52.228-4507 BID GUARANTEE FORM AND AMOUNT (NOV 2000) 6
52.0236-4507 ACCEPTANCE OF OFFERS (AUG 1991) 6
52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS 7
52.211-5001 VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (MAR 1995)--
EFARS
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008) 7
52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM
DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION
INFORMATION SYSTEM (ASSIST) (JAN 2006) 8
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989) 8
52.214-4 FALSE STATEMENTS IN BIDS (APR 1984) 9
52.214-5 SUBMISSION OF BIDS (MAR 1997) . 9
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984) 9
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV
1999)
52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984) 10
52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996) 11
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991) 11
(End of provision)
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991) 11
52.216-1 TYPE OF CONTRACT (APR 1984)
52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT--CONSTRUCTION
MATERIALS (FEB 2009)
52.233-2 SERVICE OF PROTEST (SEP 2006) .. 12
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) 13
00100 - ii
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984) 13
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) 13
00100 - 1
52.204-4005 SUBMITTAL INFORMATION FOR SUPPLIERS (RFQS), BIDDERS (IFBS) AND
OFFERORS (RFPS) (SEP 2004)
The following documents must be returned with your quote, bid, or offer.
--The completed Standard Form 1442 with continuation pages, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s DUNS or DUNS+4 Number is entered in the block with its name and address.
--Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.
Note: If the SF 1442 and/or the pricing schedule was changed by amendment, be sure to use the amended pages when submitting your quote, bid, or offer.
--The completed Pricing Schedule with your proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all contract line items and priced sub-line items.
Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.
--Your completed Representations, Certifications, and Other Statements of Bidders/Offerors (Section 00600).
--Your Bid Guarantee (e.g., Standard Form 24, “Bid Bond”)
--Any other documents required by the solicitation.
52.0214-4581 INQUIRIES (NOV 2002)
Prospective bidders should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):
(1) For information related to ordering solicitation packages, amendments, the time and dates of bid openings, and for copies of the solicitation mailing list, please check our website at the following URL: https://www.FedBizOpps.gov. If the site is temporarily unavailable, please FAX your inquiry to Contracting Divisions at (415) 503-6694.
(2) For inquiries of a contractual nature (solicitation requirements, interpretation of contractual language):
Contract Specialist: James E. Garror Sr.
Telephone: (415) 503-6988
FAX: (415) 503-6694
00100 - 2
For bid results go to the FedBizOpps.gov website https://www.FedBizOpps.gov. If this site has no bid information, call the Contract Specialist above.
(3) All technical questions on the specifications or drawings must be submitted in writing using one of the following:
MAILING ADDRESS:
Department of the Army U.S. Army Engineer District, San Francisco Contracting Division (Attn: James E. Garror Sr.)
1455 Market Street, 17th Floor, Room 1741 San Francisco, CA 94103-1398
FAX: (415) 503-6694, Attn: James E. Garror Sr.
E-MAIL: ***use the appropriate Contract Specialist's name, AND Team Leader and delete the rest: James.E.Garror@usace.army.mil , Shirley.Turnbo@usace.army.mil
(4) Please include the solicitation number, the project title, the location of the project, the full name of your company and your telephone and FAX numbers in your correspondence. Written inquiries should be received by this office not later than 14 calendar days prior to the date set for bid opening.
(5) Oral explanations or instructions are not binding. Changes to the solicitation can only be made by an amendment to the solicitation.
52.0214-4582 DIRECTIONS FOR SUBMITTING BIDS (MAR 2003)
Envelopes containing bids must be sealed, marked and addressed as follows:
MARK ENVELOPES:
Solicitation No. W912P7-11-B-0004 Bid Opening Date: 8 August 2011 Bid Opening Time: 1:00 PM Local Time
ADDRESS ENVELOPES TO:
Department of the Army U.S. Army Engineer District, San Francisco ATTN: Contracting Division 1455 Market Street, 17th Floor San Francisco, CA 94103-1398
SPECIAL INSTRUCTIONS PERTAINING TO HAND-CARRIED BIDS:
Hand-carried bids must be delivered to: The Building Lobby at 1455 Market Street, San Francisco, CA.
mailto:James.E.Garror@usace.army.mil� mailto:Shirley.Turnbo@usace.army.mil�
00100 - 3
Due to security precautions, all Corps of Engineers visitors are now required to sign-in, show a Photo-ID (such as a drivers license), and get a Visitor’s Pass at the Security Desk in the Building Lobby.
Bidders may no longer hand-carry their bids directly to Contracting Division without an authorized escort. Bids may NOT be either turned-in at the Security Desk or left unattended elsewhere in the Lobby.
Additionally, you are advised that there is no longer public parking in the Building.
The Bid Opening Officer will be in the Building Lobby 20 minutes prior to the scheduled bid opening time to accept sealed bids. After announcing that no further bids will be received, the Bid Opening Officer will take the hand-carried bids and have them x-rayed as a security precaution. After the bids have been x-rayed, the bidders waiting in the Building Lobby will then be escorted as a group to the Bid Opening Room, where the bids will be publicly opened and read.
Bidders who desire to hand-deliver their bids at an earlier time must notify the contract specialist in advance to arrange to be met in the Building Lobby by Contracting Division personnel. In the event the contract specialist cannot be reached, please call the main Contracting Division telephone number, (415) 503-6990, in order to request assistance.
Please ensure that all courier and delivery personnel are aware of these procedures.
52.0209-4501 CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY (MAR 2002)
In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Attachments, Preaward Survey). The Preaward Survey is attached to the solicitation for information purposes only.
It will be required from only the low bidder. After the Bid Opening, the Government will request this information from the low bidder if the low bidder has not had a contract with the San Francisco District within the last twelve months and the Government will set a due date for its submission. The Preaward Survey is not required as part of the bid package.
In order to be determined to be responsible a prospective contractor must:
a. Have adequate financial resources to perform the contract or the ability to obtain them.
b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.
c. Have a satisfactory performance record. In making the determination of responsibility, the Government Contracting Officer shall consider relevant past performance information. A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history except when
00100 - 4 there are special standards set forth in the solicitation which applies to all bidders that must be met in order to receive the award. These special standards may be necessary when unusual expertise or specialized facilities are necessary in the performance of the contract; therefore, in order to be determined to be responsible for that particular contract, the offeror must be able to meet those special standards. A prospective contractor that is or recently has been seriously deficient in contract performance shall be presumed to be nonresponsible unless the Contracting Officer determines that the circumstances were beyond the contractor's control or that the contractor has taken appropriate corrective action. Other responsibility considerations by the Contracting Officer will include past efforts by the contractor to apply sufficient tenacity and perseverance to perform acceptably, to meet quality requirements of contracts, and the contractor's past compliance with subcontracting plans (if required) under recent contracts.
d. Have a satisfactory record of integrity and business ethics.
e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.
g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed Preaward Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in subparagraphs a, e, and f above) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.
52.0211-4805 AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS
DESCRIPTIONS (AUG 1998)
a. Corps of Engineers publications are available for inspection at the following location:
U.S. Army Corps of Engineers, San Francisco District 1455 Market Street Engineering Division, District Library, San Francisco, CA 94103 Telephone Number (415) 503-6947
b. Construction Criteria Base (CCB). The Construction Criteria Base (CCB) system available through the National Institute of Building Sciences includes copies of Corps of Engineers methods and specifications. Documents that are available from this or other such sources will no longer be available directly from the Corps and should be obtained from those sources. Information about the CCB and ordering instructions can be obtained from:
00100 - 5
National Institute of Building Sciences 1090 Vermont Ave., NW, Suite 700 Washington, D.C. 20005 Phone: 202/289-7800 (ask for CCB Information)
c. The Corps of Engineers manual, EM 385-1-1, Safety and Health Requirements Manual, is available on the Internet at the following location:
http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/.
52.0214-4503 EVALUATION FOR AWARD (JAN 1991)
The Government contemplates award of one contract to the responsive, responsible bidder who submits the low bid for the total of the following items in Pricing Schedule:
All line items listed in Pricing Schedule.
If the solicitation's Pricing Schedule contains options, see evaluation of options clause below for information on the procedure used by the Government to determine "low bid".
52.0214-4583 TELEGRAPHIC BIDS (JUL 2000)
TELEGRAPHIC BIDS/OFFERS ARE NOT ACCEPTABLE.
However, bids may be modified or withdrawn by written or telegraphic notice. Any telegram to modify or withdraw a bid sent to this office must be received in the office designated in the Invitation for Bids (IFB) for receipt of bids not later than the exact date and time set for bid opening. A telegraphic modification or withdrawal of a bid received in such office by telephone from the receiving telegraph office not later than the exact date and time set for bid opening shall be considered. However, the telephone message shall be confirmed by the telegraph company by sending a copy of the written telegram that formed the basis for the telephone call. The written telegram shall be sealed in an envelope by a proper official and sent to the office designated in the IFB for receipt of bids. The official shall write on the envelope (1) the date and time of receipt and by whom, and (2) the number of the IFB, and shall sign the envelope. The bidder is responsible to inform the telegraph company of these requirements. No one from this office will be dispatched to the local telegraph office to pick up any telegram for any reason.
52.0214-4584 FACSIMILE BIDS/OFFERS (APR 1992)
Facsimile bids/offers, modifications thereto, or cancellations of bids/offers will not be accepted.
00100 - 6
52.0228-4504 PERFORMANCE AND PAYMENT BONDS (MAY 2000)
The bidder/offeror whose bid/offer is accepted will, within the time established in the contract, furnish performance and payment bonds in accordance with FAR 52.228-15 located in Section 00700.
52.0228-4506 INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS (AUG 1991)
Bidders/offerors utilizing individual sureties in support of a bid bond shall include a Standard Form (SF) 28 (Affidavit of Individual Surety), accompanied by a pledge of acceptable assets from each person acting as an individual surety, and include these with the SF 24 (Bid Bond), and the bid itself (see clause titled "Pledges of Assets," FAR 52.228-11).
Pledges of acceptable assets shall be in the form of (1) evidence of an escrow account and/or (2) a recorded lien on real estate. If this is an IFB, failure to provide pledges of acceptable assets, with the bid, in the specified form, accompanied by a properly executed SF 24 and SF 28, will render the bidder nonresponsible and thus ineligible for award. If this is an RFP, failure to provide required documentation described herein may cause the offeror to be deemed "unacceptable".
52.228-4507 BID GUARANTEE FORM AND AMOUNT (NOV 2000)
The bidder shall furnish a separate bid guarantee in accordance with the solicitation provision titled "Bid Guarantee", FAR 52.228-1.
In accordance with FAR 28.101-2 the bid guarantee amount shall be at least 20 percent of the "bid price" but shall not exceed $3 million.
When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated. If there are option line items on the Pricing Schedule (Section 00010), the term "bid price" is hereby defined as the total bid not to include any amount for line items designated as "options". In bids/proposals that contain "additives", the "bid price" is defined as the total of all bid items including additive line items. FAR 28.106-1 states that a Standard Form (SF) 24 shall be used for the bid bond. In accordance with FAR 28.202(a)(1), corporate sureties utilized must appear on the list contained in the Department of Treasury Circular 570 titled "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies."
52.0236-4507 ACCEPTANCE OF OFFERS (AUG 1991)
A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.
00100 - 7
52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS
Item Nos. 0002, are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
52.211-5001 VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (MAR 1995)--
EFARS
This variation in estimated quantities clause is applicable only to Items Nos. 0002.
a. Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
b. Where the actual quantity of work performed for Items Nos. 0002 are less than 85% of the quantity of the first sub-item listed under such item (0002AA), the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
c. If the quantity of work performed under Items Nos. 0002 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item (0002AA) and/or if the quantity of work performed under the second sub-item or any subsequent sub-item (0002AB) under Item Nos. 0002 exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008)
(a) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS number or “DUNS+4” that identifies the offeror's name and address exactly as stated in the offer. The DUNS number is a nine-digit number assigned by Dun and Bradstreet, Inc. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11) for the same concern.
(b) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number--
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
00100 - 8
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(End of provision)
52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM
DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION
INFORMATION SYSTEM (ASSIST) (JAN 2006)
(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(1) ASSIST (http://assist.daps.dla.mil);
(2) Quick Search (http://assist.daps.dla.mil/quicksearch);
(3) ASSISTdocs.com (http://assistdocs.com).
(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--
(1) Using the ASSIST Shopping Wizard (http://assist.daps.dla.mil/wizard);
(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a bid, (3) by letter or telegram, or (4) by facsimile, if facsimile bids are authorized in the solicitation. The Government must receive the acknowledgment by the time and at the place specified for receipt of bids.
00100 - 9
52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)
Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments. The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.
52.214-5 SUBMISSION OF BIDS (MAR 1997)
(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.
(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.
(c) Telegraphic bids will not be considered unless authorized by the solicitation; however, bids may be modified or withdrawn by written or telegraphic notice.
(d) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.
(e) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV
1999)
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.
(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--
00100 - 10
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.
(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.
52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)
(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and
(2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.
(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--
(1) Lump sum bidding;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of subparagraphs (1) through (3) above.
(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.
(d) Alternate bids will not be considered unless this…