AMENDMENT 1 - Pinole Shoals Suisun Bay Channel New York Slough Channel Maintenance Dredging Contra Costa County California.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID RESULTS.pdf | ||
| Readme_Suisun Bay Channel.txt | TXT text file | |
| 03.cal | — | |
| W912P7-09-B-0003_20Jul09_FBO.pdf | ||
| 4.cal | — | |
| 02.cal | — | |
| 08.cal | — | |
| 01.cal | — | |
| Readme_Pinole Shoals Channel.txt | TXT text file | |
| 6.cal | — | |
| 1.cal | — | |
| 13.cal | — | |
| 16.cal | — | |
| 05.cal | — | |
| 06.cal | — | |
| 2.cal | — | |
| 09.cal | — | |
| 5.cal | — | |
| Suisun Bay Channel O M 2009.maxFR | — | |
| 17.cal | — | |
| 15.cal | — | |
| 04.cal | — | |
| 12.cal | — | |
| 3.cal | — | |
| 14.cal | — | |
| 07.cal | — | |
| 10.cal | — | |
| Pinole Shoals Channel O M 2009.maxFR | — |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W62A2B9152550
UNRESTRICTED
PINOLE SHOALS, SUISUN BAY CHANNEL, & NEW YORK SLOUGH CHANNEL MAINTENANCE DREDGING, CONTRA COSTA COUNTY, CALIFORNIA
JOB DESCRIPTION: The work consists of maintenance dredging of the Federal channel located at Suisun Bay Channel and New York Slough with isposal at SF-16 as well as optional advanced maintenance dredging of the Federal channel located at Pinole Shoals with disposal at SF-10, SF-8, F-DODS or the Hamilton Wetland Restoration Site. All dredging, material transportation and material placement shall be in accordance with the roject plans, specifications, permits, regulatory guidance and applicable contract clauses.
d S p
ESTIMATED COST RANGE OF PROJECT: $1,000,000 - $5,000,000
X
JAMES E GARROR 415-503-6988
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
20-July-2009
(RFP)
(IFB)
CALL:
B. TELEPHONE NO.
TEL:
(Include area code) (NO COLLECT CALLS)
See Item
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442
Prescribed by GSA
(REV. 4-85)
11. The Contractor shall begin performance within _______3 calendar days and complete it within ________82 calendar days after receiving award, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the work required are due at the place specified in Item 8 by _1:00 P.M.___ local time19 August 2009__ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
8. ADDRESS OFFER TO
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour) Sealed envelopes containing offers
FAX:
(If Other Than Item 7)
6. PROJECT NO.
7. ISSUED BY CODE
W912P7-09-B-0003
TEL: FAX:
5. REQUISITION/PURCHASE REQUEST NO.
W912P7
US ARMY ENGINEER DISTRICT, SAN FRANCISCO
CONTRACTING DIVISION
1455 MARKET ST., 17TH FLOOR SUITE 1741
SAN FRANCISCO CA 94103-1398
FAR (48 CFR) 53.236-1(e)
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR (Include area code) 15. TELEPHONE NO.
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
(Must be fully completed by offeror) OFFE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
W912P7-09-B-0003
For bid results go to the FedBizOpps.gov website https://www.FedBizOpps.gov. If this site has no bid information, call the Contract Specialist above.
(3) All technical questions on the specifications or drawings must be submitted in writing using one of the following:
MAILING ADDRESS:
Department of the Army U.S. Army Engineer District, San Francisco Contracting Division (Attn: James E. Garror Sr.)
1455 Market Street, 17th Floor, Room 1741 San Francisco, CA 94103-1398
FAX: (415) 503-6694, Attn: James E. Garror Sr.
E-MAIL: ***use the appropriate Contract Specialist's name, AND Team Leader and delete the rest: James.E.Garror@usace.army.mil , Shirley.Turnbo@usace.army.mil
(4) Please include the solicitation number, the project title, the location of the project, the full name of your company and your telephone and FAX numbers in your correspondence. Written inquiries should be received by this office not later than 14 calendar days prior to the date set for bid opening.
(5) Oral explanations or instructions are not binding. Changes to the solicitation can only be made by an amendment to the solicitation.
52.0214-4582 DIRECTIONS FOR SUBMITTING BIDS (MAR 2003)
Envelopes containing bids must be sealed, marked and addressed as follows:
MARK ENVELOPES:
Solicitation No. W912P7-09-B-0003 Bid Opening Date: 19 August 2009 Bid Opening Time: 1:00 PM Local Time
ADDRESS ENVELOPES TO:
Department of the Army U.S. Army Engineer District, San Francisco ATTN: Contracting Division 1455 Market Street, 17th Floor San Francisco, CA 94103-1398
SPECIAL INSTRUCTIONS PERTAINING TO HAND-CARRIED BIDS:
Hand-carried bids must be delivered to: The Building Lobby at 1455 Market Street, San Francisco, CA.
00100 - 2 mailto:James.E.Garror@usace.army.mil mailto:Shirley.Turnbo@usace.army.mil
52.228-4507 BID GUARANTEE FORM AND AMOUNT (NOV 2000)
The bidder shall furnish a separate bid guarantee in accordance with the solicitation provision titled "Bid Guarantee", FAR 52.228-1.
In accordance with FAR 28.101-2 the bid guarantee amount shall be at least 20 percent of the "bid price" but shall not exceed $3 million.
When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated. If there are option line items on the Pricing Schedule (Section 00010), the term "bid price" is hereby defined as the total bid not to include any amount for line items designated as "options". In bids/proposals that contain "additives", the "bid price" is defined as the total of all bid items including additive line items. FAR 28.106-1 states that a Standard Form (SF) 24 shall be used for the bid bond. In accordance with FAR 28.202(a)(1), corporate sureties utilized must appear on the list contained in the Department of Treasury Circular 570 titled "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies."
52.0236-4507 ACCEPTANCE OF OFFERS (AUG 1991)
A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.
52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS
Item Nos. 0002, 0003, 0004, 0005 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
52.211-5001 VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (MAR 1995)--
EFARS
This variation in estimated quantities clause is applicable only to Items Nos. 0002, 0003, 0004, 0005.
a. Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
b. Where the actual quantity of work performed for Items Nos. 0002, 0003, 0004, 0005 are less than 85% of the quantity of the first sub-item listed under such item (0002AA, 0003AA, 0004AA, 0005AA) the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
c. If the quantity of work performed under Items Nos. 0002, 0003, 0004, 0005, exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item (0002AA, 0003AA, 0004AA, 0005AA) and/or if the quantity of work performed under the second sub-item or any subsequent sub-item (0002AB, 0003AB, 0004AB, 0005AB) under Item Nos. 0002, 0003, 0004, 0005 exceeds 115% or is less
00100 - 8 than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008)
(a) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS number or “DUNS+4” that identifies the offeror's name and address exactly as stated in the offer. The DUNS number is a nine-digit number assigned by Dun and Bradstreet, Inc. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11) for the same concern.
(b) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number--
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(End of provision)
00100 - 9
00700 - 15 before entering into a subcontract with a party that is debarred, suspended, or proposed for debarment (see FAR 9.404 for information on the in the Excluded Parties List System). The notice must include the following:
(1) The name of the subcontractor.
(2) The Contractor's knowledge of the reasons for the subcontractor being in the Excluded Parties List System.
(3) The compelling reason(s) for doing business with the subcontractor notwithstanding its inclusion in the Excluded Parties List System.
(4) The systems and procedures the Contractor has established to ensure that it is fully protecting the Government's interests when dealing with such subcontractor in view of the specific basis for the party's debarment, suspension, or proposed debarment.
(End of clause)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 3 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 82 calendar days after receipt of notice to proceed. The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $4,400 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
00700 - 16
52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS
Item Nos. 0002, 0003, 0004, 0005 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
52.211-5001 VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (MAR 1995)--
EFARS
This variation in estimated quantities clause is applicable only to Items Nos. 0002, 0003, 0004, 0005.
a. Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
b. Where the actual quantity of work performed for Items Nos. 0002, 0003, 0004, 0005 are less than 85% of the quantity of the first sub-item listed under such item (0002AA, 0003AA, 0004AA, 0005AA), the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
c. If the quantity of work performed under Items Nos. 0002, 0003, 0004, 0005 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item (0002AA, 0003AA, 0004AA, 0005AA) and/or if the quantity of work performed under the second sub-item or any subsequent sub-item (0002AB, 0003AB, 0004AB, 0005AB) under Item Nos. 0002, 0003, 0004, 0005 exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a bid, (3) by letter or telegram, or (4) by facsimile, if facsimile bids are authorized in the solicitation. The Government must receive the acknowledgment by the time and at the place specified for receipt of bids.
(End of provision)
52.214-26 AUDIT AND RECORDS--SEALED BIDDING (MAR 2009)
(a) As used in this clause, records includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.
(b) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with the pricing of any modification to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor's records, including computations and projections, related to--
SECTION 01 32 30.01
SILENT INSPECTOR
04/09
PART 1 GENERAL
1.1 INTRODUCTION
This section described Silent Inspector (SI) procedures and requirements.
The Silent Inspector (SI) is the standardized enterprise-wide solution used by the United States Army Corps of Engineers (USACE) to provide dredging quality assurance. The SI uses a Contractor owned and operated data acquisition system to collect and transmit operational parametric dredging and dredged material management information to a centralized USACE owned and operated information management system.
1.2 PAYMENTS
No separate payment will be made for activities associated with the Silent Inspector program. The Silent Inspector program is an associated subsidiary obligation of the contract line items
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
RGL 06-04 Guidance for the Implementation of the Silent
Inspector (SI) for dredging projects requiring Department of the Army (DA) permits.
SI Primer Silent Inspector Primer, A Guide for the
Implementation of the Silent Inspector
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submittals having an "I" designation are for information only. The following shall be submitted in accordance with SUBMITTAL PROCEDURES Section:
SD-01: Preconstruction Submittals
Dredge Plant Instrumentation Plan; G
Section 01 32 30.01
Suisun, New York & Pinole FY09 O&M Dredging Project IFB W912P7-09-B-0003
SD-06: Test Reports
Calibration Reports; I Data Upload Reports; I
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 GENERAL
The Contractor shall provide a functional SI System for each dredge plant and equipment used on this project as referenced in RGL 06-04 and SI Primer.
Scows shall be configured to collect record and transmit Tracking, Monitoring and Tons Dry Solids (TDS) profile data.
3.2 DREDGE PLANT INSTRUMENTATION PLAN
The Contractor shall submit a Dredge Plant Instrumentation Plan (DPIP). The DPIP shall provide an explanation of how sensor data will be gathered, perform quality control on those data, calibrate and repair sensors/data reporting equipment when they fail, and distribute the sensor data and computed scow specific data via a standard reporting interface. The Contractor shall maintain a log of sensor problems and repairs. Re-calibration may be directed at any time during contract execution as deemed necessary. No recalibration or adjustments to the calibration controls shall be performed in the absence of the Government or his/her representative without prior written approval. Physical documentation of the calibration procedures and corresponding printed verification data shall be provided for every calibration event.
*Scow Computations and Documentation: All computations for a particular scow concerning deriving computed data elements from sensor data elements will be provided to the Government or his/her representative. For the TDS profile these include the bin volume and scow displacement. The Government will approve any changes to the computing methods (prior to the change being applied) during the dredging contract in writing.
*The Contractor shall provide the Government with dimensioned drawings of the scow. These drawings should include bin length, depth, and width with required sensors referenced to the overall dimensions. A typical mid-ship bin cross-section should be included with dimensions. The drawings should include overall scow dimensions and show the locations of all sensors needed to supply required data. The drawings shall include bin length, depth, and width with bin level sensors referenced to the overall dimensions. The overall scow dimensions shall also be provided, indicating the locations of each draft sensor(s) with regard to; 1) horizontal and vertical distances from the keel, 2) horizontal and vertical distances between each draft sensor, 3) vertical distances to the bin level sensors, 4) distance of aft draft sensor to aft perpendicular, 5) distance of fore draft sensor to fore perpendicular, 6) distance of the aft draft sensor from the midship section, and 7) distance of the fore draft sensor from the midship section. The Contractor shall also provide in writing as part of the DPIP; how to relate fore and aft ullage sensor measurements to bin volume calculations.
*Data Reporting: Contractor proposed additions of non-standard sensor data names not in section 3.4.4 shall be supplied to the Government. An example ASCII format file of data to be exported will be provided at the pre-construction conference or earlier.
*Calibrations: The Contractor will provide certificates of calibration and/or manufacturers certificates of compliance for all needed scow information (Calibration Reports). These include draft, bin level sensors for the TDS profile.
*Instrumentation Quality Control Methods: Test methods used by the Contractor to provide quality control of input sensor data should be documented. These test methods shall include the checking of sensors to verify that reported values are applicable for that sensor and the particular project being dredged. The ability to report out-of-range sensor values must be demonstrated prior to the commencement of dredging operations.
*Sensor Log: The Contractor shall maintain a log of sensor performance and modifications during the length of the dredging contract. The log shall contain the time when a sensor fails (and subsequently repaired). The log shall also include the time and results of sensor calibrations, the time of sensor replacements, and the time when backup sensor systems are initiated to provide required data. It shall also contain the name of the person responsible for the sensor work. Only sensors that affect the data reported in section 3.4 are affected by this logging requirement. The Contractor may elect to add this log to the quality control report.
*Scow Volume and Displacement: The Contractor will supply the Government with the scow ullage table that lists the bin volume as a function of bin level and a scow draft displacement table listing the scow displacement as a function of draft and vessel trim. Curves of form that provide this information may also be used subject to approval by the Government. A licensed marine surveyor or architect must certify these tables and curves of form independent of the Contractor. The Contractor should specify the most accurate method for calculating bin volume based on fore and aft bin level and displacement based on fore and aft draft. This method and accompanying documentation should be placed into the DPIP used by the Contractor to report vessel weight.
3.3 DATA UPLOAD REPORTS
The Contractor shall submit Data Upload Reports (DUR) using a common data transmission approach based on e-mail messaging. DURs submittal interval shall be less than or equal to 24 hours. Sensor data for all reportable events shall be submitted via DURs.
These specifications define the format of a Simple Mail Transport Protocol (SMTP) e-mail message and an Internet e-mail address where the message will be sent. The Contractor may select any commercial satellite, cellular phone, or other data communications systems that meet the performance criteria to send the message.
The Contractor-supplied systems will only be required to produce the human readable e-mail message with the required data items.
3.4 SENSOR SPECIFICATIONS
The Contractor shall furnish, operate and maintain all hardware and software to meet the following specifications for the Tracking, Monitoring and TDS profiles.
3.4.1 Dredge Scow Sensor Specifications
Horizontal Positioning: Horizontal dredging equipment positioning shall be provided in State Plane coordinates based on North American Datum 1983 when possible. Horizontal positioning shall be obtained using either differential Global Positioning System (DGPS) equipment operating with a minimum accuracy level of 1-3 meters horizontal Circular Error Probable (CEP) or with GPS equipment using the Wide Area Augmentation System. This accuracy level requirement is optional for the tracking profile. Differential Correction broadcasts will be furnished 24 hours/day by the Government in standard RTCM SC-104 version 2.0 output. Horizontal positioning shall be recorded to the nearest whole foot when provided in State Plane coordinates. Datum may vary according the local geodetic coordinate system in common use at a USACE District.
Date and Time: The date and time shall be reported to the nearest second in the format shown in these specifications. The time shall be referenced to Coordinated Universal Time (UTC).
Hull Status: Open/closed measurements of hopper status shall be obtained.
These data correspond to the split/not-split condition for a scow. An OPEN value refers to when the hull is split or bottom doors open. A CLOSED value refers to when the hull is not split or the bottom doors closed.
Scow Heading: Vessel headings shall be provided using industry standard equipment described in written form and approved by the Government prior to dredging. Calibration will be performed according to manufacturer's specifications prior to commencement of work and documented in the DPIP. The scow heading should be accurate to within 5 degrees and the Contractor shall report the heading to the nearest whole degree with values from 000 (true north) to 359 degrees referenced to a clockwise positive direction convention.
Scow Course: Vessel course over ground he shall be provided using industry standard equipment described in written form and approved by the Government prior to dredging. The Contractor shall provide scow course over ground (to the nearest whole degree) with values from 000 (true north) to 359 degrees referenced to a clockwise positive direction convention.
Scow Speed: Vessel speed over ground shall be provided using industry standard equipment described in written form and approved by the Government prior to dredging.
Scow Draft: Draft measurements shall be obtained to the nearest 1/10 foot from the scow's keel. Industry standard pressure sensors or an equivalent system approved by the Government or his/her representative prior to dredging may be used by the Contractor. The Contractor must provide in writing as part of the DPIP how to relate measured draft values to external draft markings on the scow. The Contractor will verify draft sensor calibration according to manufacturer's specifications prior to commencement of work and document the calibration in the DPIP. A single draft sensor may be used as part of the monitoring profile. The TDS profile will require two draft sensors one fore and one aft.
Scow Bin Level: Fore and aft bin material level measurements shall be obtained to the nearest 1/10 foot. A minimum of two sensors are required, one fore and one aft. If only two sensors are used, they should be mounted in a location as close as possible over the bin centerline. If more than one fore or one aft sensor is used, then they should be placed near the corners of the hopper and the average value of the fore sensors and the average value of the aft sensors shall be reported. A spare sensor shall be maintained for replacement during dredging. The Contractor will install and calibrate the sensors according to manufacturer's directions and guidelines.
3.5 PERFORMANCE REQUIREMENTS
3.5.1 The Contractor shall replace or repair of sensors and other necessary data acquisition equipment needed to supply the required data. Repairs shall be completed within 48 hours after a sensor failure occurs or the Contractor fails to report required data within the specified time window for scow measurements.
3.5.2 System Performance Requirement: Data return shall be greater than or equal to 95 %. Data return is defined as the total number of records sent divided by the total possible number of records if the system worked normally.
3.5.3 Data Reporting Interface: The Contractor may use any available means to transmit the data to the COE via the Internet in the required mail message format (Data Upload Reports). The data may be sent directly from the scow or from a shore based computer.
Data Measurement Interval: All profiles require a history of the time of events and report data as a series of events. Data should be measured frequently enough by the scow system to resolve the events to the accuracy specified in the following table:
Event Description Event Time Resolution Event Position Resolution
An elapsed time of 1 hour since the last event 1 minute
1 minute NA
Scow transition across a map grid cell.
1 Second 10%
An elapsed time of 1 hour since the last event 1 minute
1 second NA
When the scow hull is closed, each map grid cell shall have a maximum dimension of 1km square. This event can also be interpreted as when the distance from the last position equals or exceeds 1km. When the scow hull is open the grid cell dimension shall be 10m square and a sampling interval of 6 seconds is typically used. Each event report shall include the event time, position, and the hull open status. The system will have the capability of storing at least 1000 event reports.
3.5.4 Contractor Data Backup: The dredging Contractor shall maintain an archive of the data sent via SMTP for the length of the dredging project. The Contractor shall include a complete archive of project data on PC format CD-R disks with the project close out documentation.
3.6 QUALITY ASSURANCE TESTS
3.6.1 Scow QA Tests
Scow Water Test: The Contractor shall provide up to six water tests for the initial calibration associated with the TDS profile. Each water test will consist of pumping the bin out to its lowest level and then filling the bin to capacity with water. At each of the stages of the test (empty and full state), a time duration of at least two minutes will pass before going to next stage. After the first three water tests, the Government will evaluate the data for accuracy. If the data indicates an unsatisfactory calibration, a re-calibration of the sensors and review of Contractor-supplied displacement and hopper volume may be necessary before completing the final three water tests. During dredging operations, one water test per week shall be conducted.
Scow Bin Level: The Contractor shall provide a clearly readable steel weighted tape for Government use. The tape measure shall have measurements shown in foot-and-tenths and be capable of measuring the full depth in the scow bin from bin coaming. The weight for this tape will be a 6-inch diameter disk weighing between 2 and 3 pounds.
Scow Position Checks: The Government will periodically check the reported position of scows. Independent position measuring equipment will be used to verify locations. Sailing points with known locations may also be used to verify position information.
-- End of Section --
SECTION 35 20 23.13
SCOW SILENT INSPECTOR
1.1 DESCRIPTION
The work under this contract requires use of the Silent Inspector System to monitor the trip number, the time-position history for the scow, course over ground, speed and the hull status. Instrumentation will also be required to provide the heading, scow draft and displacement. This performance-based specifications section identifies the minimum required output and precision and instrumentation requirements. The requirements may be satisfied using equipment and technical procedures selected by the Contractor.
1.2 SUBMITTALS
Government approval is required for submittals with a “G” designation;
submittals not having a “G” designation are for information only. When used, a designation following the “G” designation identifies the office responsible for review of the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00, “SUBMITTAL PROCEDURES”:
SD-01 Preconstruction Submittals
Dredge Plant Instrumentation Plan; G, SAM-OP-J
SD-07 Certificates
Letter of Silent Inspector Certification; G, OP
1.3 PAYMENT
No separate payment will be made for installation, operation and maintenance of the SI system as specified herein for the duration of the dredging operations; all costs in connection therewith will be considered a subsidiary obligation of the Contractor and covered under the contract unit prices for dredging in the bidding schedule.
1.4 SILENT INSPECTOR CERTIFICATION
The Contractor is required to have a current Silent Inspector Certification for the scow instrumentation system to be used under this contract not later than ten working days after issuance of the Notice to Proceed. Certification shall be based
Suisun, New York & Pinole FY09 O&M Dredging Project IFB No. W912P7-09-B-0003
Section 35 20 23.13 on an on-site scow inspection conducted by Silent Inspector Support Center personnel.
An Inspection Shall Include:
• A series of data quality checks as described in paragraph 3.4 “Compliance Inspection and Quality Assurance Checks”,
• Verification of data acquisition and transfer (Paragraph 3.2),
• Review of the Dredge Plant Instrumentation Plan (DPIP) as described in
Paragraph 1.5.
A Silent Inspector Certification is valid for one year from the date of certification if the system is not turned off, disconnected or removed from the scow. The owner or operator of the scow should contact the SI Support Center at 1-877-840- 8024 on an annual basis to schedule re-inspection, allowing ample time for recertification, and coordinate this with all local authorities. The Contractor shall have personnel, who are familiar with the SI system instrumentation and who have the ability to recalibrate the sensors, on site during the inspection. Re-inspection is required for any changes in sensor type or location; these changes will be reported in the sensor log section of the DPIP.
1.5 DREDGE PLANT INSTRUMENTATION PLAN (DPIP)
The Contractor shall have a DPIP on file with the National SI Support Center.
The Contractor shall also maintain a copy of the DPIP on a working dredge on site which is readily accessible to Government personnel at all times. This document shall describe how sensor data will be collected, how quality control on the data will be performed, and how sensors/data reporting equipment will be calibrated and repaired if they fail. A description of computed scow specific data and how the sensor data will be transmitted to the Silent Inspector Database shall also be included. The Contractor shall submit to the SI Support Center any addendum or modifications made to the plan, subsequent to its original submission, prior to Notice to Proceed.
The DPIP shall include the following as a minimum:
(DPIP must have table of content in the following order)
Dredging Company
• Dredge Point of Contact
• Phone Number
Scow Monitoring System Provider
• Scow Monitoring System Point of Contact
• Telephone Number
Scow ID Sensor repair, replacement, installation, modification or calibration methods Data reporting equipment
Suisun, New York & Pinole FY09 O&M Dredging Project IFB No. W912P7-09-B-0003
Procedure for providing sensor data/computed data to SI Database via e-mail
System Power Supply System Battery Charge Method If the system is left in place past the end of the contract, how will the contract number be changed System telemetry Dimensioned Drawings of the Scow
• A typical plan and profile view of the scow showing:
o Locations of required sensors referenced to:
fore and aft perpendicular each other o overall scow dimensions Criteria and method used to increment trip number Description of how the UTC time stamp is collected Positioning system
• brand name and specifications
• sampling rates for data acquisition (standard vs. dump)
• scow heading instrumentation brand name and specifications
• instrument used to calculate COG
• any calculation done external to the instrumentation
• certificates of calibration and/or manufacturer certificates of compliance
• A description of how scow speed is determined
Hull status
• Instrumentation brand name and specifications
• Certificates of calibration and/or manufacturer certificates of compliance
• Any calculation done external to the instrumentation
• Criteria for determining hull open/closed
Drafts:
• instrumentation brand name and specifications
• certificates of calibration and/or manufacturer certificates of compliance
• any calculation done external to the instrumentation
• criteria used to determine draft
Displacement:
• Method used by Contractor to calculate displacement based on fore and aft draft
• Tables listing (fresh and salt water) displacement as a function of draft (ft and tenths of ft) Bin status criteria used to determine open/closed measurements of bin status Contractor Data
Suisun, New York & Pinole FY09 O&M Dredging Project IFB No. W912P7-09-B-0003
• Backup frequency
• Backup method
• post processing
Archive capability Documentation of :
• test methods used by the Contractor to provide quality control of data
• verification that the reported values are applicable for the sensor and application
Log of sensor performance and modifications
Any changes to the computation methods during the contract shall be approved by the Silent Inspector Support Center prior to their implementation.
PART 2 PRODUCTS (Not Applicable)
3.1 REQUIREMENTS FOR REPORTED DATA
The Contractor shall provide, operate and maintain all hardware and software to meet the specifications. The Contractor shall be responsible for replacement, repair and calibration of sensors and other necessary data acquisition equipment needed to supply the required data.
Repairs shall be completed within 48 hours after any sensor failure occurs. Upon completion of a repair, replacement, installation, modification or calibration the Contractor shall notify the Contracting Office’s Representative. The Contracting Office’s Representative may request re-calibration of sensors or other hardware components at any time during contract execution as deemed necessary.
The Contractor shall keep a log of sensor repair, replacement, installation, modification and calibration in the dredge’s onboard copy of the DPIP. The log shall contain a three year history of sensor maintenance to include: the time of sensor failure (and its subsequent repair), the time and results of sensor calibrations, the time of sensor replacements, and the time when backup sensor systems are initiated to provide required data. It shall also contain the name of the person responsible for the sensor work. Only sensors that affect the data reported in paragraph 3.2.6, “Reporting Data Metadata”, are affected by this logging requirement.
3.1.1 Scow Name
Each scow shall be assigned a unique name that will remain constant from one dredge operation to the next.
Suisun, New York & Pinole FY09 O&M Dredging Project IFB No. W912P7-09-B-0003
3.1.2 Trip Number
A trip number shall be reported for each dump run. The trip number will be incremented at the completion of each dump/emptying of the scow. Each scow shall maintain a separate trip numbering sequence – i.e. each scow will start with a trip number of 1, that will be incremented by 1 each time that scow completes a dump.
3.1.3 Horizontal Positioning
Horizontal positioning of the antenna location or center of scow shall be obtained using a Positioning System operating with a minimum accuracy level of 1 to 3 meters horizontal Circular Error Probable (CEP). Positions shall be reported as Latitude/Longitude WGS 84.
3.1.4 Date and Time
The date and time shall be reported to the nearest second and referenced to UTC time based on a 24 hour format.
3.1.5 Hull Status
Open/closed status of the bin, corresponding to the split/non-split condition of a split hull scow shall be monitored. An “OPEN” value shall indicate the hull is split. A “CLOSED” value shall indicate the hull is not split. For non-dump scows, the “OPEN” value shall indicate that the bin is in the process of being unloaded, either by pumping or mechanical means.
3.1.6 Scow Course
Scow course-over-ground shall be provided using industry standard equipment.
The Contractor shall provide scow course over ground (to the nearest whole degree) with values from 000 (true north) to 359 degrees referenced to a clockwise positive direction convention.
3.1.7 Scow Speed
Scow speed-over-ground shall be provided in knots using industry standard equipment with a minimum accuracy of 1.0 knots and resolution to the nearest 0.1 knot.
3.1.8 Scow Heading
Scow heading shall be provided using industry standard equipment. The scow heading shall be accurate to within 5 degrees and reported to the nearest whole
Suisun, New York & Pinole FY09 O&M Dredging Project IFB No. W912P7-09-B-0003 degree, with values from 000 (true north) to 359 degrees referenced to a
3.1.9 Scow Draft
Draft measurements shall be in feet with an accuracy of 0.1 foot, and reported with a resolution to the nearest 0.01 foot relative to the fore and aft draft marks.
Each sensor shall be placed at an optimum location on the scow. Industry standard pressure sensors, or an equivalent system, may be used. Two draft sensors, one fore and one aft, will be required. At the discretion of the SI support Center, a system may use other means of measuring drafts if accuracies and resolution are maintained relative to the draft marks.
3.1.10 Scow Displacement
Scow displacement shall be reported in long tons, based on the most accurate method available for the scow. The minimum standard of accuracy for displacement is interpolation from the displacement table, based on the average fore and aft draft readings.
3.2 DATA REPORTING REQUIREMENTS
Contractor collected information shall be transmitted to the SI Database. The parameters which shall be reported to the SI Database include: trip number, date and time, hull status, scow course, scow speed, scow heading, scow draft and displacement.
3.2.1 Data Reporting Interface
The Contractor may select any commercial satellite, cellular phone, or other data communications systems available to transmit the data to the SI Database via the Internet in the required mail message format. The data transition process from the scow to the SI database must be automated. The data may be sent from the scow directly to the SI database or to a shore based computer. Data transmitted to the SI Database shall be raw data; any processing of the data conducted shore side shall be done using an automated software or programming routine. A description of this process shall be included in the DPIP.
3.2.2 Data Measurement Frequency
Data shall be logged as a series of events. Each set of measurements (e.g. time, position, etc…) will be considered an event. Data shall be measured with sufficient frequency by the scow system to resolve the events to the accuracy specified in the following table.
Suisun, New York & Pinole FY09 O&M Dredging Project IFB No. W912P7-09-B-0003
Event Type
Scow Status Event Description Event Time Resolution
Event Position Resolution
1 Stationary/loading with hull status
“CLOSED”
An elapsed time of 1 hour since the last event
1 minute NA
2 Moving with hull status “CLOSED”
Distance from the last event position equals or exceeds 0.5 nautical miles
1 second +/- 10 ft
3 Hull status “OPEN” A position must be recorded within 1 second of the hull status going from CLOSED to OPEN – distance from the last event position equals or exceeds 30 feet
1 second +/- 10 ft
The system shall have the capability of storing at least the previous 1000 events.
A time trigger may be used for event types 2 and 3 at the discretion of the SI Support Center, if it can be demonstrated that the data density will be consistent with the above logic.
3.2.3 Data Reporting
The system shall report the event history via Simple Mail Transport Protocol (SMTP) e-mail message to the SI Database Server. For this contract data will be reported on an event basis (Sent as data is collected). All data for an event shall be transmitted to the SI Database no later than 24 hours after the event’s occurrence.
If the scow has a certified system aboard, it shall transmit data continuously to the SI Database from mobilization until the final USACE post-dredging survey has been accepted. If the scow does not have a certified system at the time of issuance of the Notice to Proceed, it shall begin transmitting data at the time it is certified prior to the start of dredging operations, and continue until acceptance of the final dredging survey.
In the event of sensor failure, a manual dump log shall be maintained and submitted on a daily basis, to the Contracting Officer’s Representative.
3.2.4 Mail Message Format
Suisun, New York & Pinole FY09 O&M Dredging Project IFB No. W912P7-09-B-0003
The Simple Mail Transport Protocol, SMTP, (Internet FRC 2821) shall be used to report data to the SI Database. Mail messages shall have the following contents (Internet RFC 2822):
To: sidatatransfer@usace.army.mil From: contractor’s email address Subject: SISDATA Transfer Attachment: SI SDATA html file
Mail message start of body
SISDATA
SI Scow Data Transfer Blank line
Optional additional annotations from the Contractor – all data after the blank line are ignored.
End of message
3.2.5 Mail Attachment File Format
The attached data file shall be a MIME encoded (Internet RFC 2045) Extensible HyperText Markup Language (W3C standard XHTML 1.1) document. Any length of data may be included, but the file attachment size should not exceed six Megabytes. Only the html, table, tr, th, td, h2, h3 and body tags are permissible.
<?xml version="1.0" encoding="UTF-8"?> <!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Strict//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-strict.dtd"> <html xmlns="http://www.w3.org/1999/xhtml" xml:lang="en" lang="eng"> <body> <h2 class = “contract”>contract number</h2> <h3 class = “vessel_name”>scow name</h3> <table class = “SISDATA”> <tr> <th>TRIP_NUMBER</th> <th coord_type = “(LL)”>X_POSITION</th> <th coord_type = “(LL)”>Y_POSITION</th> <th>DATE_TIME</th> <th>HULL_STATUS</th> <th>SCOW_COURSE</th> <th>SCOW_SPEED</th> <th>SCOW_HEADING</th>
Suisun, New York & Pinole FY09 O&M Dredging Project IFB No. W912P7-09-B-0003
<th>SCOW_AVG_DRAFT</th> <th>SCOW_FWD_DRAFT</th> <th>SCOW_AFT_DRAFT</th> <th>SCOW_DISPLACEMENT</th> </tr> <tr> <td>trip number value</td> <td>x position value</td> <td>y position value</td> <td>date time value</td> <td>hull status value</td> <td>scow course value</td> <td>scow speed value</td> <td>scow heading value</td> <td>average draft value</td> <td>fwd draft value</td> <td>aft draft value</td> <td>displacement value</td> </tr> <tr> … repeated for additional data records </tr> </table> </html> </body>
3.2.6 Reporting Data Metadata
Data shall be reported to the SI database using the tags and criteria specified in the following table:
Header Tag Tag Notes vessel_name The name of the scow contract The USACE contract number under which the work is being performed, or the applicable permit number.
TRIP_NUMBER Trip numbers shall start at 1 at the beginning of work for each contract or permit. Trip numbers are incremented at the completion of the disposal/placement part of the scow cycle. Each scow maintains a unique set of trip numbers.
X_POSITION Longitude in decimal degrees. West Longitude values are reported as negative.
Y_POSITION Latitude in decimal degrees. North Latitude values are reported as positive.
Suisun, New York & Pinole FY09 O&M Dredging Project IFB No. W912P7-09-B-0003
Header Tag Tag Notes DATE_TIME mm/dd/yyyy hh:mm:ss defined as UTC time in 24hr format.
HULL_STATUS OPEN or CLOSED are the only permissible values.
SCOW_COURSE The scow course over ground…