Richmond_O&M_Dredging_Project_09_Specs_Amendment_1.pdf

PDF 6 MB Posted

Attached to
Port of Richmond Inner Harbor Dredging Project, Contra Costa County, CA
Solicitation number
W912P7-09-B-0001
Issued by

About this file

Richmond_O&M_Dredging_Project_09_Specs_Amendment_1

View the file

Other files

File Type Posted
Questions and Answers_20February2009 —
W912P709B0001_Amendment0002.pdf PDF
Questions and Answers_19Feb09.pdf PDF
Questions and Answers 2-17-09.pdf PDF
4 OF 5.cal —
Richmond_Harbor_O&M_09.maxFR —
1 OF 5.cal —
Readme_Richmond.txt TXT text file
5 OF 5.cal —
2 OF 5.cal —
3 OF 5.cal —
RichmondPlans2009-4 OF 5.cal —
RichmondPlans2009-3 OR 5.cal —
Richmond_Inner-Coversheet.cal —
RichmondPlans2009-2 OF 5.cal —
Richmond_FY09_22Jan2009.pdf PDF
RichmondPlans2009-5 OF 5.cal —
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L3ET9JDH

Typewritten Text 11 February 2009

W62A2B83538816

UNRESTRICTED IFB

PORT OF RICHMOND INNER HARBOR DREDGING PROJECT, CONTRA COSTA COUNTY, CALIFORNIA.

JOB DESCRIPTION: The work consists of maintenance dredging of the Federal channel located at or near the Port of Richmond, Contra Costa County, California. All dredging, material transportation and material placement shall be in accordance with the project plans, specifications, permits, regulatory guidance and applicable contract clauses. Dredged material excavated from the Richmond Inner Harbor shall be transported and off loaded at the Hamilton Wetland Restoration Project (HWRP). The Government will provide off loading at the HWRP. The Contractor may provide proposals for fully permitted beneficial use upland alternatives other than those placement sites listed herein.

ESTIMATED COST RANGE OF PROJECT: $1,000,000 - $5,000,000

X

JAMES E GARROR 415-503-6988

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

22-Jan-2009

(RFP)

(IFB)

CALL:

B. TELEPHONE NO.

TEL:

(Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442

Prescribed by GSA

(REV. 4-85)

11. The Contractor shall begin performance within _______3 calendar days and complete it within __125______calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _ ________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the work required are due at the place specified in Item 8 by _1:00 p.m.___ local time 23 February 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

8. ADDRESS OFFER TO

PAGE OF PAGES

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour) Sealed envelopes containing offers

FAX:

(If Other Than Item 7)

6. PROJECT NO.

7. ISSUED BY CODE

W912P7-09-B-0001

TEL: FAX:

5. REQUISITION/PURCHASE REQUEST NO.

W912P7

US ARMY ENGINEER DISTRICT, SAN FRANCISCO

CONTRACTING DIVISION

1455 MARKET ST., 17TH FLOOR SUITE 1741

SAN FRANCISCO CA 94103-1398

FAR (48 CFR) 53.236-1(e)

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR (Include area code) 15. TELEPHONE NO.

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.

governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

(Must be fully completed by offeror) OFFER

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this

THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR MATERIAL, EQUIPMENT, ETC.

NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND

CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS

THERETO.

BID SCHEDULE - GOVRENMENT FURNISHED SITE

ITEM NO DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

0001 Mobilization and Demobilization 001 LS $ $

0002 Dredging at Richmond Inner Harbor with transport to the Hamilton Offloader

0002AA Standard Dredging to -38 feet MLLW *180,000 CY $ $ at Richmond Inner Harbor 41,000

0002AB Overdepth Dredging at Richmond * 120,000 CY $ $ Inner Harbor 78,000 Item 0002 subtotal Price ( Items 0002AA to 0002AB) $ ________

TOTAL PRICE (Items 0001 + 0002AA + 0002AB ) $ _______

O&M Off Load Cost Share 001 LS $ 2,415,000 966,180 Government Furnished Site TOTAL EVALUATION PRICE (Total Price + O& M Off Load Cost Share) $_________

THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR MATERIAL, EQUIPMENT,

ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE

TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL

ATTACHMENTS THERETO.

BID SCHEDULE – CONTRACTOR FURNISHED SITE

In order to be responsive to this solicitation, prices shall be submitted on all of the items in the Pricing Schedule, above. At the bidder’s discretion, a bid may also be submitted under this Alternate Pricing Schedule. In the event a bidder elects to submit a price under the Alternate Pricing Schedule, all of the individual items in the Alternative Pricing Schedule shall be completed. At the time of bid the bidder must submit proof acceptable to the Contracting Officer that the Alternate Site is both permitted and has sufficient capacity to handle the estimated volume of material specified in the Bid Schedule- Contractor Furnished Site plus non-paid material in the allowable dredging prism.

Disposal of all materials at a permitted upland disposal site.

ITEM NO DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

0001 Mobilization and Demobilization 001 LS $ $

0002 Dredging at Richmond Inner Harbor with transport and placement at the Contractor Furnished Site

0002AA Standard Dredging to -38 feet MLLW *180,000 CY $ $ at Richmond Inner Harbor 41,000

0002AB Overdepth Dredging at Richmond *120,000 CY $ $ Inner Harbor 78,000 Item 0002 subtotal Price ( Items 0002AA to 0002AB) $________

TOTAL PRICE (Items 0001 + 0002AA + 0002AB ) $ _______

CONTRCTOR FURNISHED SITE

TOTAL ALTERNATE EVALUATION PRICE

(Items 0001 + 0002AA + 0002AB ) $_________

CONTRACT AWARD

A contract will be awarded on the basis of price and other factors to the lowest responsive, responsible bidder in accordance with FAR 52.214-19. Contract award will be made based on the lowest cost to the O&M Dredging Program. In the event a bidder or bidders submit bids under the Alternate Pricing Schedule, the lowest responsive bid submitted under the Pricing Schedule (Total Evaluation Price) will be compared to the lowest bid submitted under the Alternate Pricing Schedule (Total Alternate Evaluation Price). The O&M cost share associated with Government provided off loading at the Hamilton Wetland Restoration Project will be added to the Total Price submitted under the Pricing Schedule to determine the Total Evaluation Price.

Notes:

*QUANTITY IS AN ESTIMATED AMOUNT, SEE SECTION 00700, FAR 52.211-18 AND

EFARS 52.211-5000, 52.211-5001, FOR SUBDIVIDED BID ITEMS AND FOR VARIATION

IN ESTIMATED QUANTITIES CONTRACT CLAUSE.

1. Prices must be submitted on all individual items of the Pricing Schedule. Failure to do so may be cause for rejection of bids. Prices may at each Bidder’s discretion be submitted on all individual items of the Alternate Pricing Schedule.

2. If a modification to a price based on unit price is submitted which provides for a lump sum adjustment to the total estimated price, the applications of the lump sum adjustment to each unit price in the Pricing Schedule must be stated. If it is not stated, the bidder/offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Pricing Schedule.

3. The lump sum, "LS", line items above are not "estimated quantity" line items and therefore are not subject to the Variation in Quantity contract clause.

4. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES

(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:

1) Obviously misplaced decimal points will be corrected;

2) Discrepancy between unit price and extended price, the unit price will govern;

3) Apparent errors in extension of unit prices will be corrected;

4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

5. Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms P.1 and P.2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.

6. DREDGED QUANTITIES: For payment purposes, all quantities for which the Government will pay under this contract shall be based on the Government pre and post dredge surveys.

7. HAMILTON OFF LOADER OPERATION The Hamilton off Loader is operated by the Manson-Dutra Joint Venture [MDJV] under Contract NO. WP 912P7-07-C-0001, Oakland Navigation Improvement -50 ft Deepening Project Phase 3E, Oakland Inner and Outer Harbor, Alameda and San Francisco Counties. Bidders are advised that the dredged material to be disposed of at the HWRP will be off loaded with a hydraulic offloader, and pumped through several booster pumps and through approximately 35,000 to 40,000 lineal feet of pipeline. As such, the successful bidder is cautioned that its work plan and execution will require coordination with the MDJV and will further require certain equipment and production limitations as described in these contract documents. For coordination of additional requirements and/or further details relating to the Hamilton Off Loader, please contact Manson- Dutra JV, Attention: Terry Hammerwold, Telephone number 415/ 884-2973.

8. It is anticipated that a contract may be awarded to the lowest responsive responsible bidder Submitting a bid under the “bid Schedule – Government Furnished site”. Should award be made this bid schedule, the costs of disposal of this material at the Government furnished site will be paid for by the Federal authorized Hamilton Wetland Restoration Project.

9. BASIS of AWARD: A contract will be awarded to the lowest responsive, responsible bidder in accordance with FAR 52.214-19.

The O&M cost share associated with Government provided off loading at the Hamilton Wetland Restoration Project will be added to the Total Bid submitted under the Bid Schedule – Government Furnished Site to determine the Government Furnished Site – Total Evaluation Bid.

10. In the event a bidder or bidders submit bids under the Bid Schedule – Contractor Furnished Site, the lowest responsive, responsible Contractor Furnished Site – Total Evaluation Bid received will be compared to the lowest responsive, responsible Government Furnished Site – Total Evaluation Bid received. Award will be made to the lowest responsive, responsible bid identified from this comparison.

SUBMITTAL REGISTER CONTRACT NUMBER

(ER 415-1-10)

TITLE AND LOCATION CONTRACTOR SPECIFICATION SECTION

PORT OF RICHMOND MAINTENANCE DREDGING PROJECT, CONTRA COSTA COUNTY, CA

CLASSI CONTRACTOR SCHEDULE CONTRACTOR GOVERNMENT

TYPE OF SUBMITTAL FICATION DATES ACTION ACTION

TRANS

MITTAL

NO

ITEM

NO

SPECIFICATION

PARAGRAPH NUMBER

DESCRIPTION OF ITEM

SUBMITTED D

A

TA

D R

A W

IN

G

S

IN

ST

R U

C

TI

O N

S

SC

H

ED

U

LE

S

ST

A

TE

M

EN

TS

R

EP

O R

TS

C

ER

TI

FI

C A

TE

S

SA

M

PL

ES

R

EC

O R

D S

IN

FO

R M

A

TI

O N

O N

LY

G O

VE

R

N M

EN

T

A

PP

R O

VE

D

R

EV

IE

W

ER

SU

B

M

IT

APPROVAL

NEEDED BY

M A

TE

R

IA

L

N

EE

D

ED

B Y

CODE DATE

SU

B

M

IT

T O

G

VE

R N

M

EN

T

CODE DATE REMARKS

01 32 01 - 3.4.1 Preliminary Project Schedule X X X

01 32 01 - 3.5.1.3 File Naming Convention X X X

01 32 01 - 3.4.2 Initial Project Schedule X X X

01 32 01 - 3.4.3 Periodic Schedule Update X X X

01 32 23 - 1.5.4 Equipment Data X X

01 32 23 - 1.6 Software X X X

01 32 23 - 3.3.1 Basic Survey Documentation Submittal X X

01 32 23 - 3.3.3 Progress Payment Survey Documentation X X

01 32 30 - 3.2 Dredge Plant Instrumentation Plan X X X X X X X X X

01 32 30 - 3.6.2 Calibration Reports X X

01 32 30 - 3.3 Data Upload Reports X X

01 33 00 - 3.4.2 Submittal Register X X X X X

01 35 26 - 1.7 APP / IIPP X X X X X

01 35 26 - 1.8 AHA X X X X X

01 35 26 - 1.6.1.4 Proof of Qualification for Crane Operators X X

01 35 26 - 1.12.1 Accident Reports X X

01 35 26 - 1.12.3 Monthly Record of Work-Related Injury / Illness & Exposure X X

01 35 26 - 1.12.4 Crane Report X X

01 35 26 - 3.6.2.1 Floating Plant Checklists X X

01 35 26 - 1.12.6 Summary of Worker Compensation Claim X X

01 35 26 - 1.12.5 Certificate of Crane Compliance X X

01 35 26 - 3.6.2.1 Seaworthiness Certification X X

Highlight

SUBMITTAL REGISTER CONTRACT NUMBER

(ER 415-1-10)

TITLE AND LOCATION CONTRACTOR SPECIFICATION SECTION

PORT OF RICHMOND MAINTENANCE DREDGING PROJECT, CONTRA COSTA COUNTY, CA

CLASSI CONTRACTOR SCHEDULE CONTRACTOR GOVERNMENT

TYPE OF SUBMITTAL FICATION DATES ACTION ACTION

TRANS

MITTAL

NO

ITEM

NO

SPECIFICATION

PARAGRAPH NUMBER

DESCRIPTION OF ITEM

SUBMITTED D

A

TA

D R

A W

IN

G

S

IN

ST

R U

C

TI

O N

S

SC

H

ED

U

LE

S

ST

A

TE

M

EN

TS

R

EP

O R

TS

C

ER

TI

FI

C A

TE

S

SA

M

PL

ES

R

EC

O R

D S

IN

FO

R M

A

TI

O N

O N

LY

G O

VE

R

N M

EN

T

A

PP

R O

VE

D

R

EV

IE

W

ER

SU

B

M

IT

APPROVAL

NEEDED BY

M A

TE

R

IA

L

N

EE

D

ED

B Y

CODE DATE

SU

B

M

IT

T

G

VE

R N

M

EN

T

CODE DATE REMARKS

01 45 04 3.2 Quaity Control Plan X X

01 45 04 3.10 Daily CQC Report X X

01 57 20 -1.5 .1.1 Environmental Pollution Control Plan X X

01 57 20 -1.5.1.13 Leteer of Direction X X

35 20 23 - 3.3.1 Dredging Plant &equipment Schedule X X

35 20 23 - 3.3.2 Dredging Plan X X

35 20 23 - 3.3.4 Coast Guard Notification X X

35 20 23 - 3.3.5 Debris Plan X X

35 20 23 - 3.3.6 DDLS X X

35 20 23 - 3.3.3 Dredging Plan Updates X X X X X X X

35 20 23 -3.3.7 Dredge Material Disposal Site Log X X X X X

35 20 23 - 3.3.8 Survey Plan for outside of the project limit X X X

35 20 23 - 3.3.8 DDLS Reports / Data X X

35 20 25 -3.2.1 Production Day Agreement X X

Line

L3ET9JDH

Line

L3ET9JDH

Line

L3ET9JDH

Line

Highlight

Richmond Inner O&M Dredging Project FY09

Page 1 of 3 Temporary Construction Fac & Controls Section 01 50 00

SECTION 01 50 00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

10/07

PART 1 GENERAL

1.1 SUMMARY

Requirements of this Section apply to, and are a component of, each section of the specifications.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 310-1-6a (2006) Sign Standard Manual, Volume 1

U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

FAA AC 70/7460-1 (Rev K) Obstruction Marking and Lighting

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2000) Manual of Uniform Traffic Control Devices

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submitted the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

1.4 CONSTRUCTION SITE PLAN

Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired.

Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas.

PART 2 PRODUCTS

Page 2 of 3 Temporary Construction Fac & Controls Section 01 50 00

2.1 TEMPORARY SIGNAGE

2.1.1. PROJECT SIGN.

The construction site, dredge(s) and survey boat(s) shall each have a project sign mounted at a highly visible location at the site and on the dredge(s) and the survey boat(s) as designated by the Contracting Officer Representative. The construction package signs shall be constructed in accordance with specifications and requirements provided by the following website:

http://140.194.76.129/publications/eng-pamphlets/ep310-1-6a/s-16.pdf Figure 1 to Figure 3(Attachment 1 to 3) included at the end of this Section . Figures 1 is “ . Two project signs shall be installed. One Project Sign shall be the “Project Identification Sign”. The other project sign shall be used to show on-the-job “Safety Performance Sign” of the contractor.

These two signs are to be displayed side by side and mounted for reading by passing viewers.

The panel sizes and graphic formats have been standardized for visual consistency throughout all Corps operations. Panels are fabricated using HDO (High Density Overlaid) plywood with dimensional lumber uprights and bracing. The sign faces are non reflective vinyl. All legends are to be die-out or computer-cut in the sizes and typefaces specified and applied to the white panel background following the graphic formats. shown on Attachment 2 and 3 after the end of this section. The Communications Red panel on the left side of the construction project sign with Corps signature (reverse version) is screen printed onto the white back ground.

a/ Mounting and fabrication details are provided on Attachment 3, Figure 3. (Detail information about specifications for materials, fabrication techniques, and installation of signs and posts, please refer to http://www.usace.army.mil/publications/eng.-pamphlets/ep310-1-6a/s-16.pdf) The signs shall be erected as soon as possible and no later than 5 days after NTP.

b/ Other Identification. All floating plant, including survey vessels, shall carry signs, both port and starboard, identifying that they are working under Corps of Engineers contract. The signs shall have red block lettering, not less than six inches high with the wording "U.S. ARMY CORPS OF ENGINEERS CONTRACT NO.

W912P7-XX-X-XXXX”. Sign background shall be white. Number and size of sign, lettering and other sign features shall be determined at the Pre-construction Conference.

2.1.2. BULLETIN BOARDS.

a/ General. The Contractor shall construct and erect a bulletin board which shall be accessible to all employees at all times and shall contain a copy of wage rates, equal opportunity notice and such other items required to be posted. The bulletin board shall be mounted at a highly visible location on the dredge(s), or erected at the location directed by the Contracting Officer. The bulletin boards shall be erected as soon as possible and within 5 days after date of receipt of notice to proceed. The Bulletin Boards may also contain the Section 01 35 26 Safety Information.

b/ Construction. The bulletin boards shall be weatherproof, approximately 36

Page 3 of 3 Temporary Construction Fac & Controls Section 01 50 00 inches wide and 30 inches high, with hinged glass door. Bulletin board shall be painted or have approved factory finish. (Detail information about specifications for materials, fabrication techniques, and installation of signs and posts, please refer to http://www.usace.army.mil/publications/eng-pamphelets/ep310-1-6a/s-16.pdf) c/ Maintenance and Disposal. The Contractor shall maintain the bulletin boards in good condition throughout the life of the contract. The bulletin boards shall remain the property of the Contractor and upon completion the contract, shall be removed from the site.

2.1.3. HARD HAT SIGNS.

The Contractor shall provide and install Hard Hat signs at all work sites and areas requiring all personnel to wear the personal protective equipment. Hard hat signs shall be installed in visible locations to personnel entering the work site or area. The hard hat signs shall be constructed in accordance with Figure 4 and 4A (See Appendix 10) included at the end of this section.

Supporting post or posts shall be sufficiently rigid to support the sign in an upright position under all anticipated conditions. Where necessary, posts shall be braced. The hard hat signs shall be erected as soon as possible and no later than 5 days after date of commencement of dredging.

PART 3 EXECUTION

Not Used.

SAFETY IS A TEAM EFFORT

Page 1 of 8 Dredging Section 35 20 23

E) ns of on als

SECTION 35 20 23

DREDGING

PART 1 GENERAL

INTRODUCTION

This section primarily describes the procedures and methodology required to complete Dredging to include excavation and material loading.

PAYMENTS PROCEDURES

Payment procedures for work described in this section shall be in accordance with the HYDROGRAPHIC SURVEYING Section.

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

Department of the Army, U.S. Army Corps of Engineers (USAC EM 1110-1-2909 (2005) Geospatial Data and Systems EM 1110-2-1003 (2002) Hydrographic Surveying EM 1110-2-1601 (1991) Dredging and Dredged Material Disposal

USACE / USEPA / BCDC / SFBRWQCB Publicatio

SF Bay LTMS (2001) Long-Term Management Strategy for the Placement Dredge Material in the San Francisco Bay Regi

SUBMITTALS

Government approval is required for submittals with a "G" designation. Submittals having an “I” designation are for information only. The following shall be submitted in accordance with SUBMITTAL PROCEDURES Section:

SD-01: Preconstruction Submitt

Page 2 of 8 Dredging le .1 an .2 on .4 an .5

S) .6 rts es G .3 og I .7 ta I .8

Dredging Plant & Equipment Schedu G 35 20 23-3.3 Dredging Pl G 35 20 23-3.3 Coast Guard Notificati I 35 20 23-3.3 Debris Pl G 35 20 23-3.3 Dredge Data Logging System (DDL G 35 20 23-3.3

SD-06: Test Repo

Dredging Plan Updat 35 20 23-3.3 Dredge Material Disposal Site L 35 20 23-3.3 DDLS Report/Da 35 20 23-3.3

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION

GENERAL

All plant and equipment to be used in performing the work shall be of sufficient size and efficiency to meet the job requirement. The Government and other authorized personnel shall be allowed access to all equipment and materials pertaining to this contract for the purposes of monitoring and inspection.

Dredging prior to Contractor Certification of the Government provided Pre Dredge Survey is unauthorized. The use of explosives is prohibited.

MOBILIZATION

Mobilization shall include all work required to prepare for contract work including preparing the Contractor's dredging plant and equipment for shipment; moving plant, equipment, labor, materials, supplies and incidentals to the job site; making ready for dredging; and maintaining plant and equipment in working condition at the site during the dredging period.

SUBMITTAL REQUIREMENTS

Page 3 of 8 Dredging

3. 3.1 Dredging Plant & Equipment Schedule: The Contractor shall submit a schedule, within 20 calendar days after NTP, that describes the major equipment to be used on this job including dredge plants, scows, barges, tug boats and hydrographic survey vessels. Descriptions shall include but are not limited to equipment name, type, capacity and other identifying information.

3.3.2 Dredging Plan: The Contractor shall submit a Dredging Plan within 20 calendar days after NTP. Dredging prior to Government approval of the Dredge Plan is unauthorized. The Dredging Plan shall clearly and concisely describe the project specific procedures and methodologies proposed to ensure successful project delivery. Industry standards, regulations and information provided in other project submittals shall be incorporated by reference to the maximum extent practicable to avoid unnecessary redundant submittals. The Plan shall include but is not limited to:

General Project Information: A summary of project specific information including but not limited to contract identification information, major project milestones, methods of execution and key players.

Dredging Procedures: A narrative description of proposed project specific activities and methodologies.

Dredging Sequencing Description: A schedule and/or narrative description of the sequence of project activities that includes the start and end of dredging in each reach and identifies hydrographic survey activities. Coordinate and reference project submittals to avoid the duplication of information.

3.3. 3 Dredging Plan Drawings: These drawing(s) shall graphically present dredging activity including project channel data, barge anchoring locations, instrumentation, coordinates and land elevations of all control points for electronic positioning system and MLLW determination, estimated daily dredge advances, quality control survey procedures, anticipated problem areas of the project involving poor access due to boat traffic congestion or boat docking, and procedures to assure that dredging will proceed within the contract template and be performed in the most economical manner. Drawings shall be submitted in paper format and in electronic (.dwg and .pdf) format on a CD-ROM.

Material Monitoring Plan: Clearly and concisely describe the project specific procedures and methodologies proposed for the purpose of verifying no unauthorized placement, release and/or disposal of dredged material associated with dredged material management activities. The plan should include but is not limited to applicable information regarding monitoring for overflow, spillage and leakage associated with scow loading and transit operations, pipeline operations and hopper dredge operations. Typical quality control methodologies include but are not limited to

Page 4 of 8 Dredging before and after hydrographic surveys of scow fill areas, sensor monitoring of scow operational parameters and visual verifications.

Dredging Plan Updates: The Contractor shall submit updates to the Dredging Plan on a weekly basis.

3. 3 .4 Coast Guard Notification: The Contractor shall submit copies of written Coast Guard notifications prior to conducting dredging activities. The Contractor shall utilize the Dredging Plan to forecast the activities in the channels and shall notify the United States Coast Guard Marine Safety Office in writing with a copy to the Contracting Officer. When utilizing the Government-furnished open water disposal area, the Contractor shall notify the U.S. Coast Guard via radio five minutes in advance of actual departure from the dredge site and immediately prior to arrival at the disposal site and to begin actual disposal operations.

3.3.5 Debris. Debris, including but not limited to man-made objects, timber, chains, anchors, flotsam, miscellaneous metal objects, tires, cables, plastics, lumber, abandoned utilities, pilings, tree branches and other foreign material removed during dredging shall not be disposed of in the Government-furnished disposal and fill areas. The Contractor shall remove any errantly placed debris found in the Government-furnished disposal and fill areas at no expense to the Government.

3.3.5.1 Debris Plan. The Contractor, at the dredge site, shall pass the dredged material through a grid with openings of not more than 10 inches in any dimension to prevent debris larger than 10 inches in diameter to enter the scow. The Contractor may propose another method, such as slurrying, that will similarly break up the dredged material. The Contractor shall submit his grid plan or an alternate plan for breaking up the material, including but not limited to procedures and equipment used to generate the slurry, testing procedures and test reporting procedures at least ten (10) days prior to dredging.

3.3.5.2 Debris Delays. The Contractor shall anticipate delays that may occur for removal and disposal of debris. The time to remove debris will not be the basis for a contract time extension.

3.3.5.3 Debris Separation. The Contractor shall remove all debris encountered within the dredging prism and placed it in a separate scow or other conveyance and shall disposed of all debris as specified in subparagraph 3.3.5.4.

3.3.5.4 Disposal of Debris. The Contractor shall transport all debris by truck or other conveyance off Government or Port property and shall dispose of the debris in a land disposal site in accordance with local, State and Federal laws and regulations.

Page 5 of 8 Dredging

3.3.5.5 The Contractor shall obtain all necessary permits and approvals required for disposal of debris.

3.3.6 Dredge Data Logging System (DDLS): The Contractor shall submit the DDLS, the DDLS backup system and the qualifications of the DDLS QC firm to the Contracting Officer for approval.

3.3.7 Dredge Material Disposal Log (DMDSL): The Contractor shall maintain a DMDSL using the “Dredge Material Disposal Site Log” form in the appendices. Every Monday, the Contractor shall email the prior week’s DMDSL data to DLL-SPN-ET-C@usace.army.mil and Shelah.Sweatt@usace.army.mil

3.3.8 DDLS Report/Data: The Contractor shall submit electronic copies of the DDLS positional data for all dredge equipment and all disposal/fill vessels utilized; and dredged quantity, sediment type and GPS positional data on the dredge and disposal or fill locations for all scows and barges. This electronic data shall be included in the daily CQC Report on a CD-ROM.

3.4 EQUIPMENT

3.4.1 Dredging Plant: Dredging shall be performed by either/or a combination of pipeline dredging, clamshell dredging, hopper dredging or other method provided that the dredged material is managed is accordance with the Debris Plan requirements.

3. 4.2 Silent Inspector: The Contractor shall provide Silent Inspector system components in accordance with this section, the SILENT INSPECTOR Section(s) of these specifications, EM 1110-2-1003 and applicable contract clauses.

3. 5 SITE CONDITIONS

3.5.1 Character of Materials: The material to be restore the depth within the limits shown on the drawings is composed of material that has accumulated since the channel was last dredged to the depth.

3.5.2 In accordance with Contract Clause “ SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK( FAR 52.236-3)” the Contractor us expected to examine the site of the work . The records of previous dredging are available at the office of the District Commander, U.S. Army Corps of Engineers, 1445 Market Street, San Francisco, California 94103.

mailto:DLL-SPN-ET-C@usace.army.mil mailto:Shelah.Sweatt@usace.army.mil

Page 6 of 8 Dredging

3.6 GENERAL DREDGING

3.6.1 Dredging prior to Contractor Certification of the Government provided pre dredge survey is unauthorized.

3.6.2 Reaches: The project area has been divided into reaches as presented in the project plans.

The Contractor shall not dredge in a reach without the written approval of the Contracting Officer. Written requests to begin dredging in a reach shall be initiated by the Contractor and shall include a copy of the request for Reach Acceptance Survey for the previous reach if there is a previous reach.

3.6.3 Performance period. The Performance period is specified in Special Clause 53.211-10 Commencement , Prosecution and Completion of Work.

3.6.4 Coordination The Contractor shall coordinate all activities in such a way as not to interfere with other activities in dredging and disposal areas.

3.6.5 The Contractor shall coordinate with all other contractors to ensure smooth operating conditions in accordance with Contract Clause 52.236-8 Other Contracts.

3.6.6. Inherent Delays. The Contractor shall anticipate inherent delays for dredging around obstructions, including but not limited to, cables and moored vessels, and for accommodating marine traffic. Such delays will not be the basis for a contract extension or for an increase in the unit prices for dredged material.

3.6.7 Dredge Prisms

3.6.7.1 Required Dredging Prism: The Required Dredging Prism is defined by the required channel depth and required cannel width (between the channel toes). The total quantity of payable Standard Dredging material shall be the material available in the Required Dredging Prism and the Optional Side slope Prism as determined by the Government pre-dredge survey.

3.6.7.2 Side Slope Prism: Dredging in the Side Slope Prism, as defined in the project plans and specifications, is unauthorized.

3.6.7.3 Allowable Overdepth (Paid) Prism: Dredging in the Allowable Overdepth (Paid) Prism, as defined in the project plans and specifications, is authorized but not required.

3.6.7.4 Allowable Overdepth (Unpaid) Prism: Dredging in the Allowable Overdepth (Unpaid) Prism, as defined in the project plans and specifications, is authorized but not required.

Page 7 of 8 Dredging

3.6.7.5 All Other: Dredging outside of authorized prisms, as defined in the project plans and specification, is unauthorized.

3.6.8 Overflow, Spillage and Leakage: Overflow, spillage and leakage of any and all dredge material or water is prohibited outside of areas specifically authorize in accordance with the project plans, specifications and permits. Any material that is spilled, escapes, leaks, sloughs, or is lost or misplaced outside of authorized areas at any time during operations, to include but not limited to dredging, loading or transporting, shall be retrieved and deposited in accordance with the project plans, specifications and permits.

3.6.8.1 Overflow from Scows: No overflow of dredge material or water is allowed from equipment (dredges, scows, barges, pipelines, etc) during dredge operations.

3.6.8.2 Spill over or leakage of dredge material and water outside of the authorized Dredged Material Management site(s) is prohibited.

3.6.8.3 Barge Filling Areas: Placing or disposing of dredged material outside of authorized Dredged Material Management site(s) is prohibited.

3.6.9 Slurrying of Material: All dredged material shall be slurried prior to disposal to prevent any accumulation or build up of material at the disposal site. Dredged material will be either pumped with a centrifugal pump prior to leaving the dredge site for the disposal site or, if the material is mechanically dredged, passed through a debris grid, with a maximum opening size of 10 inches by 10 inches that will cover the entire loading area of the dump scow. Everything that does not pass through the grid will be considered solid debris and shall be disposed in areas outside of Corps jurisdiction. All such material shall be promptly removed from the grid at the end of each 8 hour shift or sooner.

3.6.10 Barring and Knock-Down Dredging: Barring, dragging and all other methods of bed leveling are prohibited without prior authorization by the Contracting Officer. Descriptions of any proposed barring activities, to smooth out high spots as needed after dredging is complete, shall be incorporated in to the Dredging Plan and shall be allowed after Clamshell dredging operations are completed in order to knock down spikes left in the previously dredged channels.

channels. No separate payment will be made for Barring and Knockdown Dredging. All costs associated with barring and knock-down dredging shall be included in the dredging line items under the payment schedule.

3.6.11 Shoaling: The Contractor shall remove any and all shoaling that occurs within the Required Dredge Prism prior to acceptance of a reach. The Government may direct the

Page 8 of 8 Dredging

Contractor to remove shoaling that occurs within the project limits after acceptance of a reach and prior to completion of the contract.

3.7 DREDGE MATERIAL MANAGEMENT

Dredged Material Management; including the transportation, placement, reuse and/or disposal of dredged material; shall be in accordance with the project drawing, specifications, permits, regulatory guidance and applicable contract clauses. Additional guidance for dredged material management is provided in separate section(s) and appendices of these specifications.

3.8 DEMOBILIZATION

3.8.1 General: Demobilization shall include all work required at the completion of the contract work to prepare the Contractor's dredging plant and equipment for shipment and to remove all plant, equipment, labor, unused supplies and incidentals from the job site, including cleaning up any land based staging site used in the prosecution of the work.

3.8.2 Authorization for Demobilizing: Written permission from the Contracting Officer shall be obtained prior to removing construction plant, equipment and materials from the project site.

Structures and facilities prepared or erected for the prosecution of the contract work shall be maintained and shall not be dismantled or removed prior to the completion and acceptance of the entire work without the written permission of the Contracting Officer.

-- End of Section --

Appendix 10

Signage

7.75”

6”

4.5”

4.5”

6”

1.875”

1.875”

2.25”

The Graphic Format for this 4’X6’ sign panel follows the legend guidelines and layout as specified below. The large 4’X4’ section of panel on the right is to be white with black legend. The 2’X4’ section of the sign on the left with the full Corps signature (reverse version) is to be screen printed Communications Red on the White background. The sign is to be placed with the Safety Performance Sign (See Fig. 2).

Legend Group 1: One to two-line description of Corps relationship to project Color: White Typeface 1.25” Helvetica Regular Maximum line length: 19”

Legend Group 2: Division District Name Place below 10.5” Reverse Signature (6” castle).

Color: White Typeface: 1.25” Helvetica Regular

Legend Group 3: One- to three-line Project title legend describes the work being done under this contract.

Color: Black Typeface: 3” Helvetica Bold Maximum line length: 42”

Legend Group 4: One- to two-line identification of project or facility (civil works) or name of sponsoring department (military) Color: Black Typeface: 1.5” Helvetica Regular Maximum line length: 42”

Cross-align the first line of Legend Group 4 with the first line of the Corps Signature (U.S. Army Corps) as shown.

Legend Group 5a-5: One-to five-line identification of prime contractors including: type (architect, general contractor, etc.), corporate or firm name, city, state.

Use of Legend Group 5 is optional.

Color: Black Typeface: 1.25” Helvetica Regular Maximum line length: 21”

All Typography is flush left and rag right, upper and lower case with initial capitals only as shown.

Letter- and word-spacing to follow Corps standard.

Sign Legend Panel Post Specification Mounting Color Type Size Size Size Code Height Bkg/Lgd

CID-01 Various 4’X6’ 4”X4” HDO-3 48” WH-RD/BK

PROJECT IDENTIFICATION SIGN

FIGURE 1

(Used with Fig. 3)

Design and Construction Supervised by:

U.S. Army Corps Of Engineers

South Pacific Division San Francisco District

Richmond Harbor O&M Dredging Project

Contra Costa County, California

Design by: Contractor:

U.S. Army Corps Name Of Engineers City and State San Francisco

3” 3” 42” 3”21”

4.5”

2”

6.25”

10.5”

2.5”

21” 3” 1” 2”21”

1.875” 1.875”

Appendix 10

L3ET9JDH

Line

Line

Each contractor’s safety record is to be posted on Corps managed or supervised construction projects and mounted with the construction project identification sign.

The graphic format, color, size and type-faces used on the sign are to be reproduced exactly as specified below. The title with First Aid logo in the top section of the sign and the performance record captions are

Legend Group 1: Standard two-line title “Safety is a Job requirement” with (8” od.) Safety Green First Aid Logo.

Color: to match PMS 347 Typeface: 3” Helvetica Bold Color: Black

Legend Group 2: One to two-line project title legend describes the work being done under this contract and name of host project.

Color: Black Typeface: 1.5” Helvetica Regular Maximum line length: 42”

Legend Group 3: One to two-line identification:

name of prime contractor and city, state address.

Sign Legend Panel Post Specification Mounting Color Type Size Size Size Code Height Bkg/Lgd

CID-02 various 4”x4” 4”x4” HDO-3 48” WH/BK-GR

Color: Black Typeface: 1.5” Helvetica Regular Maximum line length: 42”

Legend Group 4: Standard safety record caption as shown.

Color: Black Typeface: 1.25” Helvetica Regular

Replaceable numbers are to be mounted on white .060 aluminum plates and screw-mounted to background.

Color: Black Typeface: 3” Helvetica Regular Plate size: 2.5” x 4.5”

All typography is flush left and rag right. Upper and lower case with initial capitals only as shown. Letter- and word- spacing to follow Corps standards.

standard for all signs of the type.

Legend Groups 2 and 3 below identify the project and the contractor and are to be placed on the sign as shown.

Safety record numbers are mounted on individual metal plates and are screw-mounted to the background to allow for daily revisions to posted safety performance record

Richmond Harbor O & M Dredgeing Project

Contractor’s Name City, State

This project has operated:

SAFETY PERFORMANCE SIGN

FIGURE 2

Appendix 10

L3ET9JDH

Line

All Construction Project Identification signs and Safety performance signs are to be fabricated and installed as described below. The signs are to be erected at a location designated by the contracting officer and shall conform to size, format and typographic standards.

The sign panels are to be fabricated from .75” High Density Overlay Plywood.

Sign graphics to be prepared on a white non-reflective vinyl film with positionable adhesive backing.

All graphics except for the Communications Red background with Corps signature on the project sign are to die-cut or computer cut non-reflective vinyl, pre-spaced legends prepared in the sizes and typefaces specified and applied to the background panel following the graphic formats shown.

The 2’ x 4’ Communications Red panel (to match PMS-032) with full Corps signature (reverse version) is to be screen printed on the white background identification of the District / Division may be applied under the signature with white cut vinyl letters prepared to Corps standards

Drill and insert six (6) .375 T-nuts from the front face of the HDO sign panel. Position holes as shown. Flange of T-nut to be flush with sign face.

Apply Graphic panel to prepared HDO plywood panel following manufactures instructions

Sign uprights to be structural grade 4” x 4” treated Douglas Fir or Southern Yellow Pine, No 1 or better. Post to be 12’ long Drill six (6) .375” mounting holes in uprights to align with T-nuts in sign panel.

Countersink (.5”) back of hole to accept socket head cap screw (4” x .375”).

Assemble sign panel and uprights. Embed assembled sign panel and uprights in 4’ hole. Local soil conditions and/or wind loading may require bolting additional 2” x 4” struts on inside face of uprights to reinforce installation shown.

Shown below the mounting diagram is a panel layout grid with spaces provided for project information. Photocopy this page and use as a worksheet when preparing sign legend orders.

Construction Project Sign Legend Group 1 1________________________ 2________________________

Legend Group 2 Division/District Names 1________________________ 2________________________

Legend Group 3 Project Title 1________________________ 2________________________ 3________________________

Legend Group 4 Facility Name 1____________________________________ 2____________________________________

Legend Group 5a: Contractor/A&E Legend Group 5b: Contractor/A&E 1__________________________ 1__________________________ 2__________________________ 2__________________________ 3__________________________ 3__________________________ 4__________________________ 4__________________________ 5__________________________ 5__________________________

Safety Performance Sign Legend Group 1: Project Title 1____________________________________ 2____________________________________

Legend Group 2: Contractor/A&E 1____________________________________ 2____________________________________

FABRICATION AND MOUNTING GUIDELINES

FIGURE 3

Appendix 10

L3ET9JDH

Line

HARD HAT

AREA

PAINT

WHITE

PAINT

GREEN

GENERAL NOTES

1. Green & White Paint shall be opaque as specified in ANSI Std Z53.1.

2. Paint Back of Sign White.

3. Hard hat Decal Furnished by Government.

HARD HAT AREA SIGN

FIGURE 4A

FOR DREDGES AND FLOATING

PLANT

3 ½"

3 ½"

2' – 4"

1' – 8"

Appendix 10

L3ET9JDH

Line

HARD HAT

AREA

PAINT

WHITE

PAINT

GREEN

4" X 4" POST,

PAINT GREEN,

EMBED 4’ MIN. INTO

GROUND

GENERAL NOTES

1. Green & White Paint shall be opaque as specified in ANSI Std Z53.1.

2. Bolt Sign to Post w/2, 1/2" Dia. Carriage Bolts.

3. Paint Back of Sign White.

4. Hard hat Decal Furnished by Government.

HARD HAT AREA SIGN

FIGURE 4B

FOR LAND DISPOSAL

AREAS

2' – 4"

3 1/2"

3 1/2"

4' – 4"

1' – 8"

Appendix 10

L3ET9JDH

Line

SF30
Bid Schedule
Submittal Register 01 33 00
Section 01 50 00
Section 35 20 23
Appendix 10

File details come from the government source that posted it. Updated .