This federal contract solicitation is for dredged material disposal facility vertical expansion project located in Chicago, Illinois. The project involves site preparation with an estimated construction cost between $10M-$25M. Applicable wage rates are IL20220009 dated June 10, 2022. This is a full and open procurement requiring a 10% price evaluation for HUBZone small businesses. Offerors must register in SAM, which is free of charge. A site visit information is provided in FAR Clause 52.236-27 Alt I. The NAICS code is 238910 and size standard is $16.5M. The agency is the Department of the Army Corps of Engineers Engineering District Chicago. The solicitation number is W912P622R0004.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: RENEE BOOTH
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912P622R0004 for Dredged Material Disposal Facility (DMDF), Calumet Harbor Vertical Expansion Project located in Chicago, Illinois is hereby modified as follows:
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P622R0004
X 9B. DATED (SEE ITEM 11)
22-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2022
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912QR
FACILITY CODECODE
EMAIL:TEL:
W912P622R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001 CONTINUATION
Solicitation W912P622R0004 for Dredged Material Disposal Facility (DMDF), Calumet Harbor Vertical Expansion Project located in Chicago, Illinois is hereby modified as follows:
a. The following Specifications have been modified:
Bid Schedule - CLIN 001AK was deleted CLIN 001AL was revised by adding quantities from CLIN 001AK
01 22 00 Measurement and Payment paragraph for Geotextile used as reinforcement was modified
00 31 32 2021-2022 boring plan was added to the section for reference.
31 32 00 Reference to accuracy was revised from 0.1 to 1.0 ft, and paragraph was revised to include “measuring”
b. The following Contract Solicitation Drawings have been modified:
Cover Sheet, plus all other sheets: Title of the project was modified, so title block was revised for each sheet.
c. Wage Determination IL20220009, dated 7/1/22, Revision 6 is hereby replaced in its entirety with the current revision dated 8/5/2022, Revision 8 and must be adhered to.
d. The submission date is extended from 23 August 2022 at 12:00 pm CT to 26 August 2022 at 10:00 am CT.
Acknowledgment of receipt of this amendment and proposals are due at that time.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 23-Aug-2022 12:00 PM to 26-Aug-2022 10:00 AM.
The following have been modified:
PRICE BREAKOUT SCHEDULE
ITEM DESCRIPTION QTY UOM
UNIT
PRICE
AMOUNT
01 A A TEMPORARY CONSTRUCTION FACILITIES 1 JOB
01 A B DEMOLITION AND REMOVAL 1 JOB
01 A C CLEARING AND GRUBBING 1 JOB
01 A D MATERIAL HANDLING 1 JOB
01 A E FILTER CELL / FORCE MAIN INSPECTION REPORT 1 JOB
01 A F NORTH RAMP 1 JOB
01 A G SITE SECURITY 1 JOB
01 A H PIPE CULVERT INSTALLATION 2 EA
01 A J GEOTEXTILE USED AS SEPERATION LAYER 53,515 SY
01 A K GEOTEXTILE USED AS REINFORCEMENT TYPE 1 1,346 SY
01 A L GEOTEXTILE USED AS REINFORCEMENT TYPE 2 16,294 SY
01 A M GEOTEXTILE USED AS REINFORCEMENT TYPE 3 6,866 SY
01 A N SEEDING 17 AC
01 A P EARTHWORK DRAINAGE EAST AND WEST DITCH 3,400 LF
01 A Q CONSTRUCTION MAINTENANCE ACCESS ROAD 10' 2,500 LF
01 A R CONSTRUCTION SITE ACCESS ROAD 20' 6,000 LF
01 A S BERM CONSTRUCTION 58,000 CY
01 A T BERM SETTLEMENT 9,118 CY
01 A U DRYING PADS SEPERATION BERM 700 LF
01 A V TOPSOIL 15,202 CY
01 A W PVD WICK DRAIN INSTALLATION 230,000 LF
01 A X PVD WICK DRAIN OBSTRUCTIONS 23,000 LF
01 A Y DRAINAGE BLANKET FOR PVD WICK DRAINS 26,758 TN
01 A Z INSTRUMENTATION FOR PVD WICK DRAINS
(SETTLEMENT GAGE)
28 EA
01 B A INSTRUMENTATION FOR PVD WICK DRAINS
(PIEZOMETERS)
14 EA
01 B B INSTRUMENTATION FOR PVD WICK DRAINS
(INCLIINOMETERS)
14 EA
01 B C GEOTEXTILE WRAP COVER STONE 2,959 TN
01 B D PERFORMANCE AND PAYMENT BOND (BASE CLINS) 1 LOT
TOTAL (BASE CLINS) $ ______________
NOTE: OPTIONS MAY BE EXERCISED AT ANY TIME DURING THE PERIOD OF PERFORMANCE
WITHOUT ANY ADDITIONAL TIME ADDED TO THE DURATION OF THE CONTRACT.
ITEM DESCRIPTION QTY UOM
UNIT
PRICE
AMOUNT
OPTIONS
01 B E MONITORING WELLS INSTALLATION 3 EA
01 B F ADDITIONAL BERM CONSTRUCTION MATERIAL 23,000 CY
01 B G MONITORING WELLS DECOMMISSIONING 1 JOB
01 B H CHAIN LINK FENCE WITH GATE 1 JOB
01 B J PERFORMANCE AND PAYMENT BOND
(may be exercised up to four times)
1 EA
TOTAL (OPTIONAL CLINS) $ ______________
TOTAL BASE PLUS ALL OPTIONS $ ______________
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE RATES
"General Decision Number: IL20220009 08/05/2022
Superseded General Decision Number: IL20210009
State: Illinois
Construction Types: Building, Heavy, Highway and Residential
County: Cook County in Illinois.
BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on |. Executive Order 13658 | |or between January 1, 2015 and generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 01/14/2022 2 02/25/2022 3 06/10/2022 4 06/17/2022 5 06/24/2022 6 07/01/2022 7 07/29/2022 8 08/05/2022
ASBE0017-001 06/01/2021
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 51.80 30.60 Fire Stop Technician.............$ 41.44 27.85
HAZARDOUS MATERIAL HANDLER
includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 38.85 27.85
BOIL0001-001 05/01/2021
Rates Fringes
BOILERMAKER......................$ 52.61 33.07
BRIL0021-001 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 44.88 26.62
BRIL0021-004 06/01/2017
Rates Fringes
Marble Mason.....................$ 44.63 26.83
BRIL0021-006 06/01/2017
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 44.38 25.84
TILE FINISHER....................$ 38.56 22.10
TILE SETTER......................$ 45.49 25.72
BRIL0021-009 06/01/2017
Rates Fringes
MARBLE FINISHER..................$ 33.95 26.03
BRIL0021-012 06/01/2017
Rates Fringes
Pointer, cleaner and caulker.....$ 45.42 24.06
CARP0555-001 06/01/2022
BUILDING, HEAVY, AND HIGHWAY
Rates Fringes
CARPENTER
Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer Building...................$ 52.01 37.35 Heavy & Highway............$ 52.01 37.35
CARP0555-002 10/01/2021
RESIDENTIAL CONSTRUCTION
Rates Fringes
CARPENTER........................$ 42.61 33.67
ELEC0009-003 05/29/2022
Rates Fringes
Line Construction Groundman...................$ 45.44 61.70% Lineman and Equipment Operator....................$ 58.25 61.70%
ELEC0134-001 06/06/2022
ELECTRICIAN......................$ 52.05 39.12
ELEC0134-003 06/07/2021
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 46.26 28.23
The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.
ELEV0002-001 01/01/2022
Rates Fringes
ELEVATOR MECHANIC................$ 62.47 36.885+a+b
FOOTNOTES:
a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.
b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service
* ENGI0150-006 06/01/2022
Building and Residential Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 55.10 46.00
GROUP 2....................$ 53.80 46.00
GROUP 3....................$ 51.25 46.00
GROUP 4....................$ 49.50 46.00
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;
Autograde*; Backhoes with Caisson attachment*:Batch Plant*;
Benoto(Requires two Engineers); Boiler and Throttle Valve;
Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;
Concrete Breaker (Truck Mounted)*; Concrete Conveyor;
Concrete Conveyor, Truck Mounted; Concrete Paver over 27E
cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;
Cranes, (GCI and similar type Requires two operators only);
Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;
Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36"" and Over)*; Roto Mill Grinder (Less Than 36"")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.
GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over);
Conveyor, Portable; Forklift Trucks; Greaser Engineer;
Highlift Shovels or Front End loaders under 2 1/4 cu yd;
Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;
Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*;
Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour);
Winch Trucks with ""A"" Frame.
GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;
Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3"" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;
Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)
GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers
*-Requires Oiler
* ENGI0150-025 06/01/2022
Heavy and Highway Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1.....................$ 53.30 46.00
GROUP 2.....................$ 52.75 46.00
GROUP 3.....................$ 50.70 46.00
GROUP 4.....................$ 49.30 46.00
GROUP 5.....................$ 48.10 46.00
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;
Autograder/ GOMACO or similar; ABG Paver*, Backhoes with Caisson attachment*, Ballast Regulator, Belt Loader*;
Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All Derricks; Derrick Boats; Derricks, traveling*; Dowell Machine with Air Compressor ($1.00 above Class 1);
Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic Backhoes*; Backhoes with Shear attachments*; Mucking Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;
Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36"" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* & Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*
GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;
Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and Throttle Valve; Compressor, common receiver (3); Concrete
Breaker or Hydro Hammer; Concrete Grinding Machine;
Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);
Drills (all); Finishing Machine-Concrete; Greaser Engineer;
Highlift Shovels or Front End Loader; Hoist- Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments;
Hydro-Blaster (requires two operators); Laser Screed*;
Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor Drawn; Self- propelled Compactor; Spreader-Chip-Stone;
Scraper; Scraper-Prime Mover in Tandem regardless of size (add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;
Combination - Small Equipment Operator; Directional Boring Machine; Generators - Small 50 kw and under; Generators - Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants (1 to 5); Pumps, over 3"" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional Boring
*Requires Oiler
IRON0001-026 06/01/2021
Rates Fringes
IRONWORKER
Sheeter.....................$ 54.76 41.45 Structural and Reinforcing..$ 54.51 41.45
IRON0063-001 06/01/2021
IRONWORKER, ORNAMENTAL...........$ 52.13 39.47
IRON0063-002 06/01/2020
Rates Fringes
IRONWORKER
Fence Erector...............$ 44.42 29.73
IRON0136-001 07/01/2022
Rates Fringes
IRONWORKER
Machinery Movers; Riggers;
Machinery Erectors..........$ 47.00 40.54 Master Riggers..............$ 49.50 40.54
LABO0002-006 06/01/2018
Rates Fringes
LABORER (BUILDING &
RESIDENTIAL)
GROUP 1....................$ 42.72 28.19
GROUP 2....................$ 42.72 28.19
GROUP 3....................$ 42.80 28.19
GROUP 4....................$ 42.82 28.19
GROUP 5....................$ 42.87 28.19
GROUP 6....................$ 42.92 28.19
GROUP 7....................$ 42.95 28.19
GROUP 8....................$ 43.05 28.19
GROUP 9....................$ 43.07 28.19
GROUP 10....................$ 43.17 28.19
GROUP 11....................$ 43.00 28.19
GROUP 12....................$ 43.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Building Laborers; Plasterer Tenders; Pumps for Dewatering; and other unclassified laborers.
GROUP 2: Fireproofing and Fire Shop laborers.
GROUP 3: Cement Gun.
GROUP 4: Chimney over 40 ft.; Scaffold Laborers.
GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.
GROUP 6: Stone Derrickmen & Handlers.
GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.
GROUP 8: Firebrick & Boiler Laborers.
GROUP 9: Chimney on fire brick; Caisson diggers; & Well Point System men.
GROUP 10: Boiler Setter Plastic Laborers.
GROUP 11: Jackhammermen on fire brick work only.
GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous Waste Removal Laborers.
LABO0002-007 06/01/2018
Rates Fringes
LABORER (HEAVY & HIGHWAY)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.80 28.19
GROUP 3.....................$ 42.87 28.19
GROUP 4.....................$ 43.00 28.19
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Common laborer; Tenders; Material expeditor (asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned
GROUP 2: Asphalt tampers & smoothers; Cement gun laborers
GROUP 3: Cement Gun Nozzle (laborers), Gunite
GROUP 4: Rakers, Lutemen; Machine-Screwmen; Kettlemen;
Mixermen; Drun-men; Jackhammermen (asphalt); Paintmen;
Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);
Power drive concrete saws; other power tools.
GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure
LABO0002-008 06/01/2018
LABORER (Compressed Air)
0 - 15 POUNDS...............$ 43.72 28.19
16 - 20 POUNDS..............$ 44.22 28.19
21 - 26 POUNDS..............$ 44.72 28.19
27 - 33 POUNDS..............$ 45.72 28.19
34 - AND OVER...............$ 46.72 28.19
LABORER (Tunnel and Sewer)
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 42.85 28.19
GROUP 3.....................$ 42.95 28.19
GROUP 4.....................$ 43.07 28.19
GROUP 5.....................$ 42.72 28.19
LABORER CLASSIFICATIONS (TUNNEL)
GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers
GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher
GROUP 3: Concrete repairmen; Lock tenders (pressure side);
Mortar men; Muckers; Grout machine operators; Track layers
GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;
Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;
Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;
skinners; Maintenance technician
GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABORER CLASSIFICATIONS (SEWER)
GROUP 1: Signalmen; Top laborers and All other laborers
GROUP 2: Concrete laborers and Steel setters
GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;
Mortar men; Scaffold men; Second Bottom men
GROUP 4: Air trac drill operator; Bottom men;
Bracers-bracing; Bricklayer tenders; Catch basin diggers;
Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;
Pipelayers; Rodders; Welder-burners; Well point systems men
GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABO0225-001 06/01/2018
LABORER (DEMOLITION/WRECKING)
GROUP 1.....................$ 37.52 28.19
GROUP 2.....................$ 42.72 28.19
GROUP 3.....................$ 42.72 28.19
LABORER CLASSIFICATIONS
GROUP 1 - Complete Demolition
GROUP 2 - Interior Wrecking and Strip Out Work
GROUP 3 - Asbestos Work with Complete Demolition/Wrecking or Strip Out Work
PAIN0014-001 06/01/2020
Rates Fringes
PAINTER (including taper)........$ 48.30 28.72
* PAIN0027-001 06/01/2022
Rates Fringes
GLAZIER..........................$ 48.75 41.32
PLAS0005-002 07/01/2015
Rates Fringes
PLASTERER........................$ 42.25 26.65
PLAS0502-001 06/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 45.25 33.48
PLUM0130-001 06/01/2021
Rates Fringes
PLUMBER..........................$ 52.80 34.67
PLUM0597-002 06/01/2022
Rates Fringes
PIPEFITTER.......................$ 53.00 37.62
ROOF0011-001 06/01/2022
ROOFER...........................$ 47.80 27.25
SFIL0281-001 07/01/2022
Rates Fringes
SPRINKLER FITTER.................$ 53.25 33.55
SHEE0073-001 06/01/2021
Rates Fringes
Sheet Metal Worker...............$ 47.50 41.67
SHEE0073-002 06/08/2018
Rates Fringes
Sheet Metal Worker
ALUMINUM GUTTER WORK........$ 31.32 37.02
TEAM0731-001 06/01/2017
COOK COUNTY - HEAVY AND HIGHWAY
Rates Fringes
TRUCK DRIVER
2 or 3 Axles................$ 35.60 22.10 4 Axles.....................$ 35.85 22.10 5 Axles.....................$ 36.05 22.10 6 Axles.....................$ 36.25 22.10
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
TEAM0731-002 04/01/2021
Rates Fringes
Traffic Control Device Monitor
TRAFFIC SAFETY WORKER:
Primary duties include but are not limited to the delivery, maintenance and pick-up of traffic control devices, the set-up and installation of traffic signs, pavement markings, barricades, crash barrels and glare screens, traffic control surveillance, the repair and maintenance trucks, cars, arrow boards, message signs, barricade and sign fabrication equipment.......$ 38.50 18.70
TEAM0786-001 06/01/2017
COOK COUNTY - BUILDING AND RESIDENTIAL
Rates Fringes
TRUCK DRIVER
2 & 3 Axles.................$ 39.942 0.25+a 4 Axles.....................$ 39.75 0.25+a 5 Axles.....................$ 39.967 0.25+a 6 Axles.....................$ 40.184 0.25+a
FOOTNOTES:
a. $719.00 per week.
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
CAL-17-03
CAL-17-07
CAL-17-05
CAL-17-06
CDM-8-06
AE-06-09
CH-10-81
CH-12-81
CH-19-81
CH-6-81
CH-8-81
CDM-G3-06
CDM-G2-06
CDM-9-06
CAL-17-02
CAL-17-04
CAL-17-03(SPT)
CAL-17-07b(SPT)
CAL-17-07A(SPT)
CAL-21-19C
CAL-21-19C_2
CAL-21-19BCAL-21-19B_2
CAL-21-18S
CAL-21-17A
CAL-21-17A_2
CAL-21-17BCAL-21-17B_2
CAL-21-17B_3
CAL-21-17C
CAL-21-16B_3CAL-21-16B_2
CAL-21-16B
CAL-21-16A_2CAL-21-16A
CAL-21-20S
CAL-21-02B
CAL-21-02C
CAL-21-02A
CAL-21-19A
CAL-21-01S
CAL-21-03S
CAL-21-04C
CAL-21-04B
CAL-21-04A
CAL-21-05A
CAL-21-05B CAL-21-05C_2
CAL-21-06S
CAL-21-14B_3CAL-21-14B_2
CAL-21-14B
CAL-21-15S
CAL-21-13S
CAL-21-11S CAL-21-10S
CAL-21-09B
CAL-21-09A
CAL-21-08S
CAL-21-07C
CAL-21-07B
CAL-21-07A
CAL-21-DU-29A
CAL-21-DU-32A
CAL-21-DU-37A
CAL-21-DU-41A
CAL-22-CPT-31
CAL-22-CPT-29
CAL-22-CPT-32
CAL-22-CPT-34
CAL-22-CPT-34A
CAL-22-CPT-35
CAL-22-CPT-36
CAL-22-CPT-42
CAL-22-CPT-38
CAL-22-CPT-38O
CAL-22-CPT-39
CAL-22-CPT-40
1+
33+
11+00
14+00
8+00
32+
27+
+0
18+
22+
23+
24+
25+
29+
30+
31+
21+
7+0
26+
17+00
0+
2+
3+
4+
5+
6+
28+
10+00
12+00
13+00
15+00
16+00
9+00
²
0 150 30075 Feet
LEGEND
Investigation Type
Historic Subsurface Investigation
Boring
CPT
Berm Toe and Crest
Centerline (Alignment)
Stationing Marks
( 2 0 2 1 ) ( 2 0 2 1 & 2 0 2 2 )
D R W N B Y : C T F W A P P R V D B Y : G L
Calumet Harbor DMDF Vertical Expansion Phase 1 Project W912P622R0004
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1.1 SUBMITTALS
1.2 LOT SINGLE JOB PAYMENT ITEMS
1.2.1 Temporary Construction Facilities (Bid Item 0001AA)
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 Demolition and Removal (Bid Item 0001AB)
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.3 Clearing and grubbing (Bid Item 0001AC)
1.2.3.1 Payment
1.2.3.2 Unit of Measure
1.2.4 Material Handling (Bid Item 0001AD)
1.2.4.1 Payment
1.2.4.2 Unit of Measure
1.2.5 Monitoring Wells Decommissioning (Option Bid Item 0001BG)
1.2.5.1 Payment
1.2.5.2 Unit of Measure
1.2.6 Chain Link Fence with Gate (Option Bid Item 0001BH)
1.2.6.1 Payment
1.2.6.2 Unit of Measure
1.2.7 Filter Cell / Force Main Inspection Report (Bid Item 0001AE)
1.2.7.1 Payment
1.2.7.2 Unit of Measure
1.2.8 North Ramp (Bid Item 0001AF)
1.2.8.1 Payment
1.2.8.2 Unit of Measure
1.2.9 Site Security d (Bid Item 0001AG)
1.2.9.1 Payment
1.2.9.2 Unit of Measure
1.2.10 Performance and Payment Bonds (Bid Item 0001BD AND OPTION
0001BJ)
1.2.10.1 Payment
1.2.10.2 Unit of Measure
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Pipe Culvert Installation (Bid Items 0001AH)
1.3.1.1 Payment
1.3.1.2 Measurement
1.3.1.3 Unit of Measure
1.3.2 Geotextile used as seperation layer (Bid Item 0001AJ)
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.3 Unit of Measure
1.3.3 Geotextile used as reinforcement type 2, and type 3(Bid Item , 0001AL, and 0001AM)
SECTION 01 22 00.00 10 Page 1 AMD#0001 - Aug 19, 2022
1.3.3.1 Payment
1.3.3.2 Measurement
1.3.3.3 Unit of Measure
1.3.4 Seeding (Bid Item 0001AN)
1.3.4.1 Payment
1.3.4.2 Measurement
1.3.4.3 Unit of Measure
1.3.5 Earthwork Drainage East and West Ditch (Bid Item 0001AP)
1.3.5.1 Payment
1.3.5.2 Unit of Measure
1.3.6 Construction Maintenance Access Road 10' (Bid Item 0001AQ)
1.3.6.1 Payment
1.3.6.2 Unit of Measure
1.3.7 Construction Site Access Road 20' (Bid Item 0001AR)
1.3.7.1 Payment
1.3.7.2 Unit of Measure
1.3.8 Berm Construction (Bid Item 0001AS)
1.3.8.1 Payment
1.3.8.2 Measurement
1.3.8.3 Unit of Measure
1.3.9 Berm Settlement (Bid Item 0001AT)
1.3.9.1 Payment
1.3.9.2 Measurement
1.3.9.3 Unit of Measure
1.3.10 Drying Pad Seperation Berm (Bid Item 0001AU)
1.3.10.1 Payment
1.3.10.2 Unit of Measure
1.3.11 Topsoil (Bid Item 0001AV)
1.3.11.1 Payment
1.3.11.2 Measurement
1.3.11.3 Unit of Measure
1.3.12 PVD Wick Drain Installation (Bid Item 0001AW)
1.3.12.1 Payment
1.3.12.2 Measurement
1.3.12.3 Unit of Measure
1.3.13 PVD Wick Drain Obstructions (Bid Item 0001AX)
1.3.13.1 Payment
1.3.13.2 Measurement
1.3.13.3 Unit of Measure
1.3.14 Drainage Blanket for PVD Wick Drains (Bid Item 0001AY)
1.3.14.1 Payment
1.3.14.2 Measurement
1.3.14.3 Unit of Measure
1.3.15 Instrumentation for PVD Wick Drains (Settlement Gage) (Bid
Items 0001AZ)
1.3.15.1 Payment
1.3.15.2 Measurement
1.3.15.3 Unit of Measure
1.3.16 Instrumentation for PVD Wick Drains (Piezometers) (Bid Items
0001BA)
1.3.16.1 Payment
1.3.16.2 Measurement
1.3.16.3 Unit of Measure
1.3.17 Instrumentation for PVD Wick Drains (Inclinometers) (Bid
Items 0001BB)
1.3.17.1 Payment
1.3.17.2 Measurement
1.3.17.3 Unit of Measure
1.3.18 Monitoring Wells Installation (OPTION Bid Items 0001BE)
SECTION 01 22 00.00 10 Page 2
1.3.18.1 Payment
1.3.18.2 Measurement
1.3.18.3 Unit of Measure
1.3.19 Geotextile Seperation Layer Cover Stone (Bid Item 0001BC)
1.3.19.1 Payment
1.3.19.2 Measurement
1.3.19.3 Unit of Measure
1.3.20 Additional Berm Construction Material (Optional Bid Item
0001BF)
1.3.20.1 Payment
1.3.20.2 Measurement
1.3.20.3 Unit of Measure
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 CONTRACT COST BREAKDOWN
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 3
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Weight Certificates ; G, DC
1.2 LOT SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING PROPOSAL SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2.1 Temporary Construction Facilities (Bid Item 0001AA)
1.2.1.1 Payment
Payment will be made at the contract Job price for all labor, equipment and materials for the contractor's and the Goverment temporary field office,temporary fencing and gates, restoration of haul roads, staging and storage areas, and onsite areas damaged by construction activities to pre-construction conditions upon completion of construction, project and safety signs, protection and maintenance of traffic and maintenance of access roads, silt fence installed along the drying pads, and other incidental items as described in Section 01 50 00 TEMPORARY CONSTRUCTION
FACILITIES.
1.2.1.2 Unit of Measure
Unit of Measure: JOB
SECTION 01 22 00.00 10 Page 4
1.2.2 Demolition and Removal (Bid Item 0001AB)
1.2.2.1 Payment
Payment will be made at the contract Job price for the demolition and removal of the buried concrete, removal of the existing chain link fence that runs along parcel #6 and other items shown for demolition and removal in the contract drawings and as described in Section 02 41 00 DEMOLITION.
Payment constitutes full compensation for all plant, labor, materials, equipment, tools, hauling and disposing off site and incidentals necessary to complete the work.
1.2.2.2 Unit of Measure
Unit of Measure: JOB
1.2.3 Clearing and grubbing (Bid Item 0001AC)
1.2.3.1 Payment
Payment will be made at the contract Job price for the clearing and grubbing on site, mostly at the stockpiled material where heavy vegetation started to grow. In addition, area along the proposed access road shall be cleared as described in Section 31 11 00 CLEARING, GRUBBING AND STRIPPING. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, hauling and disposing off site, and incidentals necessary to complete the work.
1.2.3.2 Unit of Measure
Unit of Measure: JOB
1.2.4 Material Handling (Bid Item 0001AD)
1.2.4.1 Payment
Payment will be made at the contract Job price for material handling prior to berm construction, including not limited to grading within footprint of the berm to 1% towards the ditch, excavating matrial in order to construct the new fence and access road as shown on cross sections, sloping drying pads as shown on the drawings, relocating stockpiled material on the South part of the site to be used for berm construction, partially filling the pond with new CA-7 stone or with stone similar in size found on site, and tilting and relocating material from drying pad I to construct the berms as shown on drawings. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.4.2 Unit of Measure
Unit of Measure: JOB
1.2.5 Monitoring Wells Decommissioning (Option Bid Item 0001BG)
1.2.5.1 Payment
Payment shall be made at the contract Job price for costs associated with piezometer decommissioning under the Option Scope, not limited to preparation of Drilling Program Plan, removal of concrete pad, gravel
SECTION 01 22 00.00 10 Page 5 base, well protector casing and riser pipe, grouting, and concrete plug as described in Section 33 51 39 MONITORING WELL as shown on drawings.
Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.5.2 Unit of Measure
Unit of Measure: JOB
1.2.6 Chain Link Fence with Gate (Option Bid Item 0001BH)
1.2.6.1 Payment
Payment shall be made at the contract Job price for costs associated with installation of 8ft chain link fence and 20ft wide gate, as shown on drawings. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.6.2 Unit of Measure
Unit of Measure: JOB
1.2.7 Filter Cell / Force Main Inspection Report (Bid Item 0001AE)
1.2.7.1 Payment
Payment shall be made at the contract Job price for costs associated with force main and filter cells inspection report as described in Section 01 11 00 SUMMARY OF WORK. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.7.2 Unit of Measure
Unit of Measure: JOB
1.2.8 North Ramp (Bid Item 0001AF)
1.2.8.1 Payment
Payment shall be made at the contract Job price for costs associated with construction of the North ramp, including seeding, material to construct the ramp on top of the constructed berm, placing top soil, and 10ft wide gravel road as described in Section 31 24 00 EMBANKMENT and as shown on drawings. The material to construct the berm is included in Bid Item 0001AS Berm Construction. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.8.2 Unit of Measure
Unit of Measure: JOB
SECTION 01 22 00.00 10 Page 6
1.2.9 Site Security d (Bid Item 0001AG)
1.2.9.1 Payment
Payment shall be made at the contract Job price for costs associated with providing a site security as described in Section 01 10 00 GENERAL PROVISIONS. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.9.2 Unit of Measure
Unit of Measure: JOB
1.2.10 Performance and Payment Bonds (Bid Item 0001BD AND OPTION 0001BJ)
1.2.10.1 Payment
Payment will be made for the performance and payment bonds that are required as part of this contract. The Government will pay the the Contractor's bid price after receiving evidence of payment (e.g., paid invoice) from the bonding company or agency.
1.2.10.2 Unit of Measure
Unit of Measure: LOT
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
Notwithstanding the requirements of any other specification, drawing, or clause in this Contract, the Government will only pay for the actual quantities of the unit price items incorporated into the work, up to the estimated Contract Quantities listed on the BIDDING SCHEDULE. Any quantity placed in excess of the Contract Quantity without first receiving a Contract Modification increasing the estimated quantity of that unit price item shall be at the Contractor's expense. The Contractor is responsible for notifying the Government of the need to increase the contract quantity of a line item at least seven calendar days before the item is needed.
1.3.1 Pipe Culvert Installation (Bid Items 0001AH)
1.3.1.1 Payment
All costs associated with manufacturing, furnishing, delivering, installing concrete box culverts and check valves as shown on drawings.
Including headwalls, installing subbase, ductbill, geotextile fabric, and other miscellaneous components.
SECTION 01 22 00.00 10 Page 7
1.3.1.2 Measurement
All payments shall be based on number of culverts installed.
1.3.1.3 Unit of Measure
Unit of measure: Each (EA)
1.3.2 Geotextile used as seperation layer (Bid Item 0001AJ)
1.3.2.1 Payment
Payment shall be made at the contract unit price and shall constitute full compensation to the Contractor for providing all plant, labor, material, and equipment and performing all operations necessary for the complete and satisfactory installation of the geotextile around the stone blanket as shown on drawings. The following items are included in the contract unit price for "Geotextile used as seperation layer" and shall not be counted a second time in the process of determining the extent of geotextile placed: Material and associated equipment and operation used in laps, seams, or extra length; securing pins and associated material, equipment, and operations. No payment will be made for geotextiles replaced because of waste, contamination, damage, repair, or due to Contractor fault or negligence.
1.3.2.2 Measurement
Installed geotextiles will be measured for payment in place to the nearest square yard of protected area as delineated in the drawings for a complete wrap around the drainage blanket.
1.3.2.3 Unit of Measure
Unit of Measure: Square Yard (SY)
1.3.3 Geotextile used as reinforcement type 1, type 2, and type 3(Bid Item 0001AK, 0001AL, and 0001AM)
1.3.3.1 Payment
Payment will be made at the contract unit price for furnishing and installation of a geotextile , Type 2 - 6,840 lb/ft and Type 3 - 10,272 lb/ft, for the area covered as shown on drawings, additional material for laps, seams, extra material, etc is not included in the measurement.
Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.3.2 Measurement
Geotextile will be measured per the squre yard of the geotextile installed and accepted.
1.3.3.3 Unit of Measure
Unit of Measure: Square Yard (SY)
SECTION 01 22 00.00 10 Page 8
1.3.4 Seeding (Bid Item 0001AN)
1.3.4.1 Payment
Payment will be made at the contract unit price for seeding over the crest of the berm, on the exterior side of the berm, the entire parcel 6 between the new fence and existing fence (to be removed), as described in Section 32 92 19 SEEDING, including loading, hauling, and placement of this material. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.3.4.2 Measurement
The seeding will be measured for payment in acre of seed, completed and accepted.
1.3.4.3 Unit of Measure
Unit of Measure: Acre (AC)
1.3.5 Earthwork Drainage East and West Ditch (Bid Item 0001AP)
1.3.5.1 Payment
Payment will be made at the contract unit price for all work associated with construction of the ditch.
This is the start of the file's text. The full file is on GovTribe.