Amendment 0001 W912P622B0008 Crossroads Lift Station Phase 2B.pdf
PDF 902 KB Posted
- Attached to
- CROSSROADS LIFT STATION PHASE 2B, LAKE STATION, LAKE COUNTY, INDIANA (USACE ACQUISITION)
- Solicitation number
- W912P622B0008
About this file
This solicitation notice seeks bids for the construction of a new lift station in Lake Station, Indiana. The project includes installing two 1,600 gallon per minute pumps, electrical and control panels at least two feet above the 100-year flood elevation, and all necessary connections. Optional work includes an emergency generator, enclosure, and abandonment of the existing lift station. The solicitation is reserved exclusively for small businesses with a size standard of $39.5 million. Bids are due by September 26, 2022 and can be downloaded from the internet. The contracting office is the U.S. Army Corps of Engineers Chicago District. The point of contact is provided for any questions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6621404542
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: INVITATION FOR BIDS NO. W912P622B0008, "CROSSROADS LIFT STATION PHASE 2B - SECTION 219, LAKE STATION, LAKE
COUNTY, INDIANA (USACE ACQUISITION)"
A. A. The Bid Opening Date and Time is NOT EXTENDED by this Amendment. Therefore, Bidders are required to submit their Bid packages prior to 2:00 p.m. (Central Time) on September 26, 2022. For further details regarding bid submission, please refer to Solicitation Section 00 22 13 – “Supplementary Instructions to Bidders.”
- THIS AMENDMENT CONTINUES ON THE NEXT PAGES -
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Sep-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P622B0008
X 9B. DATED (SEE ITEM 11)
26-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Sep-2022
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P622B0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
B. AMENDED SPECIFICATION SECTION: The following Specification Section has been revised. The revised section is enclosed hereunder and replace the previously furnished section.
- Specifications Section 33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS.
Delete the last two sentences under paragraph 2.3 PUMP MOTOR. Pumps provided for approval by the Government shall meet all other requirements as specified in SECTION 33 32 16.
C. AMENDED DRAWING SHEET: The following Drawing Sheet has been revised and is hereunder enclosed replacing the previously furnished respective sheet.
- Plan Sheet C-500 Standard Details. Delete note on “FLEXIBLE PIPE BEDDING DETAIL (PVC & HDPE)” to remove reference to Spec Section 02600. Does not apply to this project.
D. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846-5378;
email: ericka.d.hillard@usace.army.mil.
END OF AMENDMENT NO. 0001
(The aforementioned Specification Section and Drawing Sheet follows)
Cal Reg 219 - Crosslift Phase 2B - Lake Station, IN W912P622B0008
SECTION TABLE OF CONTENTS
DIVISION 33 - UTILITIES
SECTION 33 32 16
PACKAGED UTILITY WASTEWATER PUMPING STATIONS
11/19
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY CONTROL
1.3.1 Installer Qualifications
1.4 DELIVERY, STORAGE, AND HANDLING OF MATERIALS
1.4.1 Delivery and Storage
1.4.2 Handling
1.5 WARRANTY
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 SUBMERSIBLE SEWAGE NONCLOG PUMPS
2.2.1 Pump Construction
2.2.1.1 Casing
2.2.1.2 Impeller
2.2.1.3 Bearings
2.2.1.4 Lubrication
2.2.1.5 Balance
2.3 PUMP MOTOR
2.4 PUMP CONTROL SYSTEM
2.4.1 General
2.4.2 Enclosure
2.4.3 Level Control System
2.4.4 Alternator
2.4.5 Sewage Pump Alarm and Control Panel
2.4.5.1 Alarms
2.4.5.2 Circuit Breakers
2.4.5.3 Motor Starter and Overload Protection
2.4.5.4 Power Lugs
2.4.5.5 Anti-Condensation Heater
2.4.5.6 Trouble Light
2.4.5.7 Convenience Outletse
2.4.5.8 Connection for Portable Generator
2.4.5.9 Additional Requirements
2.4.6 Electrical Requirements
2.5 STATION PIPING
2.5.1 Ductile-Iron Pressure Pipe and Associated Fittings
2.5.1.1 Flanged Pipe
2.5.1.2 Fittings
2.5.1.3 Joints
2.5.2 PVC Plastic Pressure Pipe and Associated Fittings
2.5.3 Insulating Joints
2.5.4 Accessories
SECTION 33 32 16 Page 1
AMD_0001 - 09/08/22
2.5.5 Flexible Flanged Coupling
2.6 OTHER PIPING ACCESSORIES
2.6.1 Pipe Support
2.6.2 Miscellaneous Metals
2.6.3 Identification Tags and Plates
2.7 EXCAVATION, TRENCHING, AND BACKFILLING
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Equipment Installation
3.1.2 Installation of Ductile-Iron Pressure Pipe and Fittings
3.1.3 Installation of PVC Plastic Pressure Pipe and Fittings
3.1.4 Miscellaneous
3.2 FIELD QUALITY CONTROL
3.2.1 Testing Procedure
3.2.2 Field Representative
3.3 CLOSEOUT ACTIVITIES
3.3.1 Operation and Maintenance
-- End of Section Table of Contents --
SECTION 33 32 16 Page 2
SECTION 33 32 16
PACKAGED UTILITY WASTEWATER PUMPING STATIONS
11/19
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C115/A21.15 (2011) Flanged Ductile-Iron Pipe With Ductile-Iron or Gray-Iron Threaded Flanges
AWWA C151/A21.51 (2017) Ductile-Iron Pipe, Centrifugally Cast
AWWA C600 (2017) Installation of Ductile-Iron Mains and Their Appurtenances
AWWA C605 (2014) Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings
AWWA M23 (2002; 2nd Ed) Manual: PVC Pipe - Design and Installation
ASTM INTERNATIONAL (ASTM)
ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings
SECTION 33 32 16 Page 3
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings
ASTM C478 (2018) Standard Specification for Circular Precast Reinforced Concrete Manhole Sections
ASTM D2441 Standard Test Method for Hydrolyzable Chlorine Compounds in Chlorinated Aromatic Hydrocarbons (Askarels) by Refluxing
ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 1940-1 (2003; R 2008) Mechanical Vibration - Balance Quality Requirements for Rotors in a Constant (Rigid) State - Part 1:
Specification and Verification of Balance Tolerances
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 7 Ref Title
NEMA MG 1 (2018) Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2019; TIA 19-1; TIA 19-2; TIA 19-3; TIA
19-4; ERTA 1 2019) National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 67 (2018; Reprint Oct 2019) UL Standard for Safety Panelboards
UL 489 (2016) UL Standard for Safety Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Fabrication Drawings
SECTION 33 32 16 Page 4
Erection/Installation Drawings
SD-03 Product Data
Manhole Chambers ; G, AE
Submersible Sewage Nonclog Pumps ; G, AE
Flexible Flanged Coupling ; G, AE
Station Piping and fittings; G, AE
Pump Performance Curve ; G, AE
Pump Motor ; G, AE
SD-06 Test Reports
Pump Test
Pressure Sensor Test
Float Test
SD-07 Certificates
Submersible Sewage Nonclog Pumps ; G, AE
Pump Motor ; G, AE
SD-08 Manufacturer's Instructions
Pump Control System ; G, AE
Pump Motor ; G, AE
Warranty
1.3 QUALITY CONTROL
1.3.1 Installer Qualifications
Provide manufacturer's authorized pump representative who is trained and approved for installation of pumps and packaged pump station required for this project.
1.4 DELIVERY, STORAGE, AND HANDLING OF MATERIALS
1.4.1 Delivery and Storage
Inspect materials delivered to site for damage. Unload and store with minimum handling. Store materials in enclosures or under protective covering. Rubber gaskets which are not to be installed immediately must be stored under cover, out of direct sunlight. Do not store materials directly on the ground. Keep interior of pipes, valves and fittings free of dirt and debris.
SECTION 33 32 16 Page 5
1.4.2 Handling
Handle pipe, fittings, valves, and other accessories in such manner as to ensure delivery to the trench in sound, undamaged condition. Avoid injury to coatings and linings on pipe and fittings; make repairs if coatings or linings are damaged. Carry pipe to the trench; do not drag it. Do not use any device or fitting inserted into (such as loader forks) or attached to (such as chain hooks) the bell or spigot ends of the pipe to transport pipe. Handle ductile iron pipe, fittings, and accessories in accordance with AWWA C600. Handle PVC pipe, fittings, and accessories in accordance with AWWA C605.
1.5 WARRANTY
Provide manufacturer's warranty for a minimum of two years for package pump station including pumps and controls.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide a complete packaged sewage pump station with submersible nonclog pumps including equipment and materials, installed and ready for operation. The pump supplier furnishes the controls and pumps to ensure unit integrity.
Submit fabrication drawings before installation. Submit drawings covering necessary or recommended changes to accommodate the equipment offered.
Show on the drawings the design of the chamber, with dimensions, types, and thicknesses of materials, and elevation levels with reference to those elevations indicated.
Submit erection/installation drawings for the manhole chambers with the required equipment and accessories. Provide precast reinforced concrete manhole sections conforming to ASTM C478. Show the design of the chamber, with dimensions, types, and thicknesses of materials, and elevation levels with reference to those elevations indicated.
2.2 SUBMERSIBLE SEWAGE NONCLOG PUMPS
Provide submersible sewage nonclog pumps as indicated. Provide UL listed pumps for explosion proof Class 1, Division 1, Groups C and D hazardous locations. Provide submersible, centrifugal sewage pumps of the nonclogging type with passageways designed to pass 3 inch diameter spheres without clogging. Provide pump capacity, number of pumps and motor characteristics as indicated on the drawings. Select pumps to continuously operate in a submerged or partially submerged condition.
2.2.1 Pump Construction
2.2.1.1 Casing
Provide hard, close-grained cast iron casing or steel that is free from blow holes, porosity, hard spots, shrinkage defects, cracks, and other injurious defects. Provide casings permitting replacement of wearing parts. Ensure all joints are gasketed to prevent leakage. Ensure passageways permit smooth flow of sewage and are free of sharp turns and projections. Use free standing pump support legs of cast-iron providing
SECTION 33 32 16 Page 6 enough clearance for the solids to get into the grinder.
2.2.1.2 Impeller
Provide nonclogging type cast-iron impeller, conforming to ASTM A48/A48M, Class 30, for a submersible nonclog pump. Ensure the impeller has a smooth surface and allows free flowing with the clearance to permit objects in the sewage to pass. Fit and key, spline, or thread impeller on shaft, and lock in such manner that lateral movement is prevented and reverse rotation will not cause loosening
2.2.1.3 Bearings
Provide heavy duty ball thrust bearing or roller type bearing sized to withstand imposed loads. Oil lubricate bearings.
2.2.1.4 Lubrication
Provide the pump manufacturer's standard type grease fittings.
2.2.1.5 Balance
Balance rotating parts of the equipment mechanically and hydraulically to operate throughout the required range without excessive end thrust, vibration, and noise. Conform allowable vibration limits with ISO 1940-1 , Table 1. Existence of defects that cannot be eliminated by adjustment will be sufficient cause for rejection of the equipment.
2.3 PUMP MOTOR
Provide hermetically sealed electric motors with moisture and temperature-sensing probes in the wet well NEMA MG 1, 1760 RPM, 460 volt , three phase, and 60 Hz cycle for submersible pumps. Motor horsepower must not be less than pump horsepower at any point on the pump performance curve .
Fit motors with lifting "eyes" capable of supporting entire weight of pump and motor. Seal the power cable inside the motor end bell. Provide a waterproof power cable for its full length. Motors shall be UL listed for explosion proof Class 1, Division 1, Groups C and D. Air filled motors are not acceptable. Oil used must be able to be disposed as non-hazardous waste.
2.4 PUMP CONTROL SYSTEM
2.4.1 General
Provide an automatic type pump operating control including all necessary components to function reliably. Mount controls in a NEMA 4X rated stainless steel control panel. Ensure equipment subject to contact with sewage or sewage gases is corrosion-resistant metal. Provide an electronic controller that automatically activates and alternates the pump operation. If the liquid level continues to rise to the plans-specified level, the controller engages both pumps to operate simultaneously until both shut off at the specified low level. Provide hand-off-auto switches to choose the mode of operation for each pump. Provide controls with a 12 VDC powered float switch connected to the alarm contact of the battery charger to activate high-level alarms. Protect pumping stations from lightning and transient voltage surges and equip with phase protection.Provide the station with a three-wire, four-pole (grounding) receptacle for a portable generator in case there is an external power
SECTION 33 32 16 Page 7 outage as shown in the drawings.Design the control system to operate pumps at the power characteristics as shown on the plans.
Ensure all controls and wiring meet or exceed the requirements of NFPA 70 .
For pumps specified as explosion proof, have pump power and control installation meets NEC requirements for Class 1, Division 1, Group D Hazardous Location, including intrinsically safe controls. Provide components that are UL listed or FM approved.Require the control function to provide for the operation of the pumps under normal conditions and alternates the pumps on each pump down cycle.In the event the incoming flow exceeds the pumping capacity of the lead pump, the offline pumps automatically start to handle the increased flow. As the flow decreases, the pumps cut off at the elevations set on the controller.
2.4.2 Enclosure
Provide a NEMA 4X rated enclosure manufactured from stainless steel.
Provide a rubber composition door gasket and assures a positive weatherproof seal. Provide a door that opens a minimum of 180 degrees and is equipped with a 3-point latch and padlockable handle. Provide a dead front mounted in the panel to provide protection of personnel from live internal wiring. Install cutouts for breaker handles to allow operation of breakers without entering the compartment.Mount all control switches, indicator pilot lights, elapsed time meters, duplex receptacle and other operational devices on the external surface of the dead front.Ensure the dead front opens a minimum of 150 degrees to allow access to equipment for maintenance. Mount all hardware to the subpanel with machine thread tapped holes. Sheet metal screws are not acceptable. Permanently identify all devices to match the schematic diagram. Provide an enclosure ventilator located near the top of the enclosure on the opposite side of the generator receptacle. Provide a rain and vermin proof ventilator and made of fire retardant thermoplastic material.
2.4.3 Level Control System
Provide a sealed, mercury-free float switch control system as the back up alarm high and low level. Provide pressure transducer for primary pump control as indicated in the drawings. Use a direct acting float switch consisting of a normally-open mercury-free switch enclosed in a float.
Use float molded of rigid high-density polyurethane foam, color-coded and coated with a durable, water and corrosion-resistant jacket of clear urethane. Provide stainless steel float brackets in accordance with manufacturer's recommendations.Mount floats at fixed elevations as shown on the drawings. Provide the pump station with a submersible pressure type level sensor and an electronic pump controller. Sense levels by a 24 DVC, one percent submersible pressure transmitter provided by controller manufacturer. Construct the system as follows:
a. The pressure type level sensor is a submersible type, suspended on its cable.
b. Install the sensor per manufacturer's instructions for wet well installations, including any recommended mounting accessories.
c. The level sensor is as follows:
(1) Select the sensor range based on the wet well depth.
(2) The sensor output is 4-20mA proportional to water level, two-wire
SECTION 33 32 16 Page 8 type.
(3) Construct all exposed parts of 316 Stainless Steel.
(4) Fill the sensor with Silicon Oil.
(5) Power the Sensor by 24 VDC output from electronic pump controller.
d. Mount the electronic pump controller in the starter panel enclosure, and be visible from the front of the swing-out panel, with the enclosure door opened. The electronic pump controller is as follows:
(1) Accept a 4-20 mA, two wire level signal, and indicate the wet well level digitally in direct engineering units (feet).
(2) Provide pump control outputs, with independent adjustment for each pump starting and stopping setpoint. Indicate each level setpoint digitally in direct engineering units.
(3) Power to the unit is 120 VAC.
(4) Equip controller with hand/off/auto (H.O.A.) switches and pump on indicating lights (one each per pump).Provide an intrinsically safe barrier relay between the wet well and the control panel.
2.4.4 Alternator
Provide an alternator control switch to operate in connection with each set-point. Use an alternator control switch to alternate the operation of the pumps and operate both pumps if the water level rises above the second high water level. Incorporate time delay function and devices in the alternator controls such that both sewage pumps cannot be started simultaneously for an adjustable period of 10 to 120 seconds after shutdown. Use the delay function designed to operate in any condition of start-up in either normal or emergency operational mode.
2.4.5 Sewage Pump Alarm and Control Panel
Enclose alarm panel in NEMA 4X enclosure and with a flashing red light that is visible from 50 feet away, with long life bulb in guarded enclosure and 6 inch diameter horn. Use horns capable of emitting 120 DB at 10 feet . Power alarm horn and light from 12V DC power supply with battery backup. Provide a rechargeable battery rated to power both the horn and light for a minimum of two hours upon loss of main power.
Provide circuitry to automatically recharge the battery after main power is restored. Use batteries capable of being fully recharged in no more than 20 hours . Use panel with power on light, push to test button for horn and light and push to silence button for horn and light with automatic reset for next alarm.
2.4.5.1 Alarms
Provide a test function ability for the alarm system. Provide alarms to activate under the following conditions:
a. High liquid level as sensed by the level control system;
b. Loss of main power;
SECTION 33 32 16 Page 9
c. Low liquid level as sensed by the level control system;
d. Pump failure via temperature overload or motor heat sensor trip, provide motor high temperature light;
e. Seal failure with indication light;
f. Low low level alarm.
2.4.5.2 Circuit Breakers
Provide an individual circuit breaker for each pump.Include a control circuit breaker and an alarm circuit breaker in the control panel. Allow for two additional spare 115V single phase 20A circuit breakers for local pole lighting and future spare. Provide circuit breakers in accordance with UL 489 . Conform to UL 67 for circuit breaker mounting.
2.4.5.3 Motor Starter and Overload Protection
Provide an International Electrotechnical Commission (IEC) rated motor starter and thermal overload protection located in the control panel for each pump. Include undervoltage release, manual reset buttons and hand-automatic selector switches.
2.4.5.4 Power Lugs
Size the incoming power lugs for the proper voltage, amperage, and horsepower for each pump station.Include grounding lugs for the incoming power. Provide a dedicated grounding lug in the control panel for each pump. Size ground lug and rod according to local and base electrical codes and install by a licensed electrician.Use UL listed power lugs.
Conform to UL 67 for required power lug mounting.
2.4.5.5 Anti-Condensation Heater
Provide an anti-condensation heater in the control panel that is sized based upon the size of the particular pump station's control panel size.
Power the heater from the control voltage transformer for three phase pump motor units and from the incoming power for single phase pump motor units. Control the heater by a thermostat, coming on at 50 degree Fahrenheit (F) and going off at 65 degree F . Clearly label panel directory for breakers.
2.4.5.6 Trouble Light
Provide a fluorescent trouble shooting light in the panel that is hard-wired into an appropriately sized circuit breaker. It is acceptable for the light and one of the convenience outlets to share the same circuit breaker.
2.4.5.7 Convenience Outletse
Place two duplex convenience outlets in the control panel; utilize one for the battery charger. The battery receives power from the control voltage transformer via the alarm fuse. Upsize the alarm fuse to 1 amp to 1.5 amps for the battery charger. Provide each outlet with its own 20 amp 115/1/60 circuit breaker.
SECTION 33 32 16 Page 10
2.4.5.8 Connection for Portable Generator
Provide receptacle for connection for portable generator. Provide manual transfer switch for receptacle matching generator electrical power requirements.
2.4.5.9 Additional Requirements
Provide elapsed time meter for each pump that measures run time in hours to 9999.9. Do not place junction boxes between pumps, control systems and control panels; provide conduit seals at all wet well penetrations. If this is unavoidable, use NEMA 7 construction.
2.4.6 Electrical Requirements
Install labels to identify switches and controls. Provide internal wiring for components of packaged equipment as an integral part of the equipment. Provide power wiring and conduit for field installed equipment.
2.5 STATION PIPING
Provide pressure piping, emergency pump connection, air release valves, and related accessories for force main piping outside the sewage wet well in accordance with Section 33 30 00 SANITARY SEWERAGE.
2.5.1 Ductile-Iron Pressure Pipe and Associated Fittings
Conform to AWWA C151/A21.51 , Pressure Class 350.
2.5.1.1 Flanged Pipe
Conform to AWWA C115/A21.15 , ductile iron.
2.5.1.2 Fittings
AWWA C110/A21.10 , flanged. Provide flanged joint fittings within wet well and valve vault as indicated. Provide mechanical joint fittings outside valve vault enclosure as indicated. Use fittings with pressure rating at least equivalent to that of the pipe.
2.5.1.3 Joints
AWWA C115/A21.15 for flanged joints. Use stainless steel bolts, nuts, and rubber gaskets for flanged connections recommended in the Appendix to AWWA C115/A21.15 . Provide ductile iron flange for setscrewed flanges in accordance with ASTM A536, Grade 70-50-05 or 60-42-10, and meeting the applicable requirements of ASME B16.1 , Class 125. Use 190,000 psi tensile strength, heat treated, and zinc-coated steel setscrews for setscrewed flanges. Conform to the applicable requirements for mechanical-joint gaskets specified in AWWA C111/A21.11 for setscrewed flange gaskets. Use setscrewed gasket designed to provide for confinement and compression of gasket when joint to adjoining flange is made.
2.5.2 PVC Plastic Pressure Pipe and Associated Fittings
Push-On Joint: ASTM D2441, with ASTM F477 gaskets. Fittings for push-on joints: AWWA C110/A21.10 or AWWA C111/A21.11 . Iron fittings and specials:
cement-mortar lined (standard thickness) in accordance with AWWA C104/A21.4 .
SECTION 33 32 16 Page 11
2.5.3 Insulating Joints
Provide between pipes of dissimilar metals a rubber gasket or other approved type of insulating joint or dielectric coupling to effectively prevent metal-to-metal contact between adjacent sections of piping.
2.5.4 Accessories
Provide flanges, connecting pieces, transition glands, transition sleeves, and other adapters as required.
2.5.5 Flexible Flanged Coupling
Provide flexible flanged couplings applicable for sewage as indicated.
Use flexible flanged coupling designed for a working pressure of 350 psi .
2.6 OTHER PIPING ACCESSORIES
2.6.1 Pipe Support
Use pipe support schedule 40 galvanized steel piping matching ASTM A53/A53M.
Provide either ASME B16.3 or ASME B16.11 galvanized threaded fittings.
2.6.2 Miscellaneous Metals
Use stainless steel bolts, nuts, washers, anchors, and supports for installation of equipment.
2.6.3 Identification Tags and Plates
Provide the manufacturer's name or trademark on a corrosion-resistant identification plate or cast integrally, stamped, or otherwise permanently marked in a conspicuous place on each item of equipment. Include on the pump identification plate the pump capacity in gpm, pump head in feet and speed of rotation. Cast on the body of the pump the direction of rotation.
2.7 EXCAVATION, TRENCHING, AND BACKFILLING
Provide in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL, except as specified herein.
PART 3 EXECUTION
3.1 INSTALLATION
Provide pump station in accordance with drawings and requirements of the respective equipment manufacturers. Dampen and isolate equipment vibration.
3.1.1 Equipment Installation
Install equipment in accordance with these specifications and the manufacturer's installation instructions. Grout equipment mounted on concrete foundations before installing piping. Install piping to avoid imposing stress on equipment. Match flanges before securing bolts.
SECTION 33 32 16 Page 12
3.1.2 Installation of Ductile-Iron Pressure Pipe and Fittings
Unless otherwise specified, install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS FOR INSTALLATION OF PIPELINES of Section 33 30 00 SANITARY SEWERAGE, and with the requirements of AWWA C600 for pipe installation, joint assembly, and valve-and-fitting installation.
Make flanged joint with gaskets, bolts, and nuts specified for this type joint. Make flanged joints tight, avoid strain on flanges, fittings, and other accessories. Align bolt holes for each flanged joint. Use bolts sized for the bolt holes; use of undersized bolts is not permitted. Do not allow adjoining flange faces to be out of parallel to such degree that the flanged joint cannot be made watertight without overstraining the flange.
3.1.3 Installation of PVC Plastic Pressure Pipe and Fittings
Unless otherwise specified, install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS FOR INSTALLATION OF PIPELINES of Section 33 30 00 SANITARY SEWERAGE, with the recommendations for pipe joint assembly and appurtenance installation in AWWA M23, "Installation".
3.1.4 Miscellaneous
Attach a plactic laminated final as-built controls drawing to the inside of the front door. Include a list of all legends. Identify the pump nameplate data on the drawing and on the as-built plans.
Permanently mark all component parts in the control panel and identified as they are indicated on the drawing. Mark on the back plate adjacent to the component. Identify all control conductors with wire markers at each end as close as practical to the end of conductor.
3.2 FIELD QUALITY CONTROL
Provide appliances, materials, water, and equipment for testing, and bear full expenses in connection with the testing. Conduct testing after equipment, electrical services, and piping are installed, and the pump station is ready for operation. Correct defects discovered to the satisfaction of the Contracting Officer, and tests repeated, at no expense to the Government, until the equipment functions as intended and designed.
3.2.1 Testing Procedure
Perform a pump test , pressure sensor test , and float test . Submit the test results to the Contracting Officer.Test all panels to the power requirements as shown on the plans to assure proper component operation.
Activate each control function to check for proper operation and indication.
3.2.2 Field Representative
A representative of the pump manufacturer is to direct the startup of the station and instruct representatives of the Government in startup and operation procedures.
SECTION 33 32 16 Page 13
3.3 CLOSEOUT ACTIVITIES
3.3.1 Operation and Maintenance
Submit operation and maintenance manuals in accordance with 01 78 00 CLOSEOUT SUBMITTALS for package lift stations, including Equipment Description, Assembly and Installation Procedures, Adjustment and Alignment, Checkout Procedures, Procedures of Operation and Troubleshooting. Include preventative maintenance and inspection procedures for package lift stations. Include in procedures the frequency of preventative maintenance, inspection, adjustment, lubrication, and cleaning necessary to minimize corrective maintenance and repair.
Supply special tools that are required for maintenance and testing of the package lift stations.Submit spare parts data, including a complete list of parts and supplies with current unit prices and source of supply. List parts and supplies that are either normally furnished at no extra cost with the purchase of equipment, or specified to be furnished as a part of the contract, and list additional items recommended by the manufacturer to ensure an efficient operation for a period of one year.
Install on or near the package lift stations, a complete package of posted instructions, consisting of labels, signs, and templates of operating instructions.Provide a list or reference all specific operation and maintenance procedures that are required to keep the warranty valid.
-- End of Section --
SECTION 33 32 16 Page 14
D R
H
PJ
T
BL
H
BL
H
ST
AN
D
AR
D D
ET
AI
LS
C-500
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AM
ER
IC
AN
S
TR
U C
TU
R
EP
O
IN
T, IN
C
R
IV
ER
R O
AD
, S
U
IT
E
IN
D
IA
N
AP
O
LI
S, IN
D
IA
N A
C H
IC
AG
O D
IS
TR
IC
T
C H
IC
AG
O , I
LL
IN
O
IS
6-
-2
AN
SI
D
W
2P
2B
N O
R
TH
EA
ST
E N
D S
EW
ER
R
ER
O U
TE
, P
H
AS
E 2B
LA
KE
S
TA
TI
O
N C
R O
SS
R
O
AD
S
LI
FT
S
TA
TI
O N
R
EP
LA
C
EM
EN
T
FINAL DESIGNPLOT SCALE: 1:1 EDIT DATE: 2/9/21 - 8:06 AM EDITED BY: PTRAWINSKI DRAWING FILE: P:\2019\02950\D. DRAWINGS\UTILITY INFRASTRUCTURE\CROSSROADS LS\PHASE 2B\C-500 - DT.DWG
STATE OF
11500233
VARIES
NEW CONNECTION TO EXISTING MANHOLE
NOT TO SCALE
STRUCTURE WALL
ADD RX WATERSTOP PRIOR
TO GROUT FILL (TYP.)
GROUT FILL (TYP.)
GASKET BAND
SUPPORT PIPE IN
CENTER OF OPENING
CORE DRILL HOLE
PIPE CLAMP 305
STAINLESS STEEL
FLEXIBLE CONNECTOR KOR-N-SEAL
DURA-A-SEAL, OR A-LOK, OR APPROVED EQUAL
1/2 O.D.
FOR BACKFILL AND REQUIREMENTS REFER
TO SPECIFICATIONS SECTION 02600
TRENCH BOX
FLEXIBLE PIPE BEDDING DETAIL (PVC & HDPE)
NOT TO SCALE
#8 CRUSHED STONE HAND
TAMPED OR WALKED IN 1/2
O.D., PER SPECS.
#8 CRUSHED STONE BELL
HOLE EXCAVATED
O.D.
4" MIN. (BELOW
THE BARREL)
3" MIN.
(BELOW THE BELL)
MINIMUM WIDTH =
1.25(O.D.) +12"
#8 CRUSHED STONE HAND
TAMPED OR WALKED IN 1/2
O.D., PER SPECS. TO 12"
OVER TOP OF PIPE
BACKFILL NOTES:
1. FINAL BACKFILL (FROM 12 INCHES ABOVE TOP OF PIPE) SHALL BE
COMPACTED #53 AGGREGATE WHEN THE TRENCH IS UNDER OR
WITHIN 5 FT. OF PAVEMENT.
2. FINAL BACKFILL SHALL BE NATIVE MATERIAL IN AREAS OUTSIDE
PAVEMENT, COMPACTED TO PREVENT SETTLEMENT.
3. NATIVE MATERIAL USED FOR BACKFILL SHALL BE CLEAN FILL
MATERIAL FREE FROM ROCKS LARGER THAN 6".
4. HAUNCHING AND INITIAL BACKFILL SHALL BE INSTALLED IN 6 INCH
LIFTS.
5. #8 CRUSHED STONE BEDDING & BACKFILL SHALL BE COMPACTED
TO A RELATIVE DENSITY GREATER THAN 70% PER ASTM 4253.
6. FINAL BACKFILL SHALL BE PLACED IN SUCH A MANNER THAT WILL
NOT DISTURB THE SANITARY SEWER PIPE; AND WILL NOT CONSIST
OF DEBRIS, ORGANIC MATERIAL, FROZEN MATERIAL, OR UNSTABLE
MATERIAL. NO ROCKS LARGER THAN 2-INCHES WILL BE PLACED
CLOSER THAN 2 FEET OF THE SEWER PIPE.
7. ALL COMPACTION AND BEDDING MATERIAL SHALL COMPLY WITH 327
IAC 3-6-18.F, G, & H.
COMPACTED #53/#73
AGGREGATE BACKFILL, PLACE OVER
NON-WOVEN GEOTEXTILE FABRIC,
MIN. 3 OUNCES AT LIFT STATION SITE
8"
COMPACTED SUBGRADE
STONE DRIVE SECTION
NOT TO SCALE
SANITARY SEWER
BENCH SLOPE = 1/2" PER FOOT
TROUGH WIDTH = PIPE DIAMETER
STANDARD MANHOLE BENCHES
NOT TO SCALE
NOTES:
1. MANHOLE SHALL CONFORM TO ASTM C-478.
2. JOINTS SHALL CONFORM TO ASTM C-433.
3. PIPE CONNECTIONS TO MANHOLES SHALL BE MADE WITH WATERTIGHT FLEXIBLE RUBBER BOOTS WITH STAINLESS STEEL BANDS OR FLEXIBLE WATERTIGHT GASKETS. ACCEPTABLE PRODUCTS ARE: KORE-N-SEAL AS MANUFACTURED BY CORE AND SEAL COMPANY, DURA-SEAL III AS MANUFACTURED BY DURA TECH, INC., PSX AS MANUFACTURED BY THE PRESS SEAL GASKET CORPORATION, OR APPROVED EQUAL. PIPE SEAL SHALL MEET ASTM C-443.
4. PIPE OPENINGS IN BASE AND RISER SECTIONS SHALL BE FORMED OR CORE-DRILLED.
5. ALL MANHOLE CASTINGS AT OR BELOW ELEVATION 596.00 SHALL HAVE BOLT DOWN WATERTIGHT CASTINGS.
6" M
AX
24"
VARIES
DIA
3" M
IN
2"
TOP OF CONCRETE BASE AT SPRING LINE
OF PIPE WHERE POURED IN PLACE.
FINISH GRADE
STANDARD PRECAST CONCRETE MANHOLE
(FOR PIPE SIZES 8" TO 24")
NOT TO SCALE
PRECAST CONCRETE INTEGRAL MANHOLE
BOTTOM 6" FOR 48" MANHOLE; 8" FOR
MANHOLE GREATER THAN 48"
12" OF #8 CRUSHED STONE
BEDDING UNDER BASE
REINFORCING STEEL PER ASTM C-478
"O" RING GASKETED JOINT BETWEEN
ALL RISER AND CONE SECTIONS PER
ASTM C443 PLUS 12" EXTRUDED
GASKET MATERIAL, KENT SEAL NO.2
GROUT FILLED
PRECAST ADJUSTING RINGS,
2" MIN., 12" MAX.
CONCRETE ADJUSTING RINGS UTILIZED TO RAISE MANHOLE
FRAME AND COVER TO FINISH GRADE. KENT-SEAL NO. 2
BETWEEN ALL RINGS & CASTING. TROWABLE BUYTL
RUBBER BACKPLASTER 14" MINIMUM THICKNESS WHEN DRY.
2" BELOW BOTTOM OF ADJUSTING RINGS AND COVERING
BASE OF CASTING
ASTM C478 PRECAST CONCRETE MANHOLE SECTION.
REPLACE CONE WITH FLAT TOP WHEN DEPTH IS
5'-6" OR LESS AND ANY INSTALLATION WHERE
MANHOLE EXTENDS MORE THAN 18" ABOVE GRADE.
MINIMUM SLOPE
1/2" PER FOOT
MANHOLE STEPS AT 16"
ON CENTER (SEE DETAIL)
C.I. MANHOLE FRAME AND COVER
SECTION "A-A"
d
1" 1" d1
2d1
16"
8"
41 4" d1 2d1
41 4"
2"
16" d
RISER RING THICKNESS
PER MANHOLE DETAIL
O-RING JOINT FOR MANHOLE SECTIONS
NOT TO SCALE
MANHOLE FRAME ADJUSTING RING AND GASKET DETAIL
NOT TO SCALE
PLACE 1/2" DIAMETER
EXTRUDABLE PREFORMED
GASKET MATERIAL IN KEYWAY
PRECAST CONCRETE ADJUSTING
RING OR FLANGE OF CASTING
"O" RING GASKETED JOINT, NOMINAL 1/2"
BUTYL RUBBER BASE EXTRUDABLE
PREFORMED GASKET MATERIAL (TYP.) PER
ASTM C-990 (KENT SEAL NO. 2 OR APPROVED
EQUAL)
1/ 2"
1"
4" -1
2"
63°
RUBBER GASKET E-Z STICK OR
EQUAL PER ASTM C-443
NOMINAL 1/2" BUTYL RUBBER BASE
EXTRUDABLE PREFORMED GASKET MATERIAL
(TYP.) PER ASTM C-990 (KENT SEAL NO. 2 OR
APPROVED EQUAL)
ADJUSTING RING PLAN
NOTE:
1. "d" = WALL THICKNESS bhood Cloud+ bhood Cloud+ bhood PolyLine bhood Text Box Revision 1 bhood Text Box Delete Note in its entirety bhood Text Box 9/8/2022 bhood PolyLine
| W912P622B0008_463527_Lake_Station_Phase2B_AMD#0001_SPECS(8-Sep-22).pdf |
| 33 32 16 - PACKAGED UTILITY WASTEWATER PUMPING STATIONS |
| 33 32 16 - PACKAGED UTILITY WASTEWATER PUMPING STATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY CONTROL |
| 1.3.1 Installer Qualifications |
| 1.4 DELIVERY, STORAGE, AND HANDLING OF MATERIALS |
| 1.4.1 Delivery and Storage |
| 1.4.2 Handling |
1.5 WARRANTY
| PART 2 PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| 2.2 SUBMERSIBLE SEWAGE NONCLOG PUMPS |
| 2.2.1 Pump Construction |
| 2.2.1.1 Casing |
| 2.2.1.2 Impeller |
| 2.2.1.3 Bearings |
| 2.2.1.4 Lubrication |
| 2.2.1.5 Balance |
| 2.3 PUMP MOTOR |
| 2.4 PUMP CONTROL SYSTEM |
| 2.4.1 General |
| 2.4.2 Enclosure |
| 2.4.3 Level Control System |
| 2.4.4 Alternator |
| 2.4.5 Sewage Pump Alarm and Control Panel |
| 2.4.5.1 Alarms |
| 2.4.5.2 Circuit Breakers |
| 2.4.5.3 Motor Starter and Overload Protection |
| 2.4.5.4 Power Lugs |
| 2.4.5.5 Anti-Condensation Heater |
| 2.4.5.6 Trouble Light |
| 2.4.5.7 Convenience Outletse |
| 2.4.5.8 Connection for Portable Generator |
| 2.4.5.9 Additional Requirements |
2.4.6 Electrical Requirements
| 2.5 STATION PIPING |
| 2.5.1 Ductile-Iron Pressure Pipe and Associated Fittings |
| 2.5.1.1 Flanged Pipe |
| 2.5.1.2 Fittings |
| 2.5.1.3 Joints |
| 2.5.2 PVC Plastic Pressure Pipe and Associated Fittings |
| 2.5.3 Insulating Joints |
| 2.5.4 Accessories |
| 2.5.5 Flexible Flanged Coupling |
| 2.6 OTHER PIPING ACCESSORIES |
| 2.6.1 Pipe Support |
| 2.6.2 Miscellaneous Metals |
| 2.6.3 Identification Tags and Plates |
2.7 EXCAVATION, TRENCHING, AND BACKFILLING
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Equipment Installation |
| 3.1.2 Installation of Ductile-Iron Pressure Pipe and Fittings |
| 3.1.3 Installation of PVC Plastic Pressure Pipe and Fittings |
| 3.1.4 Miscellaneous |
| 3.2 FIELD QUALITY CONTROL |
| 3.2.1 Testing Procedure |
| 3.2.2 Field Representative |
| 3.3 CLOSEOUT ACTIVITIES |
| 3.3.1 Operation and Maintenance |
File details come from the government source that posted it. Updated .