This document contains an amendment to a solicitation for a federal construction contract. The U.S. Army Corps of Engineers Engineering District Chicago is seeking a firm-fixed price contract for backup power system installation at the Indiana Harbor Canal Confined Disposal Facility in East Chicago, Indiana. Work will include installing a 250KW generator, 480-12.47kV step-up transformer, switchgear, raising monitoring wells above grade, and adding an above-ground enclosure. The contract duration is one hundred eighty calendar days. This is a 100% small business set-aside acquisition conducted through a sealed bid procurement. The bid will be evaluated based on lowest price. The estimated construction value is between $1-5 million. The North American Industry Classification System code is 237130. Offerors must have active registration in the System for Award Management database. The amendment provides responses to questions from interested parties regarding equipment specifications and dimensions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912P621B0017 for Indiana Harbor Backup Pow er is hereby amended as follow s:

A. Add questions from interested parties and USACE's response to the questions.

B. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P621B0017

X 9B. DATED (SEE ITEM 11)

23-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Sep-2021

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P621B0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

QUESTIONS AND ANSWERS

Questions from Interested Parties and USACE Response:

1. There is no specification for the 12.47 kV ATS or the 12.47 kV main switchgear

USACE Response: Questions was answered in Amendment 0005

2. I read the notes on EE-501 and there is no mention of load shed control to prevent the generator from having the load of all three transformers stepped on it at the same time.

USACE Response: Question was answered in Amendment 0005

3. EE-501, the one-line, shows what I take to be two pieces of metal clad switchgear with draw out circuit breaker construction in NEMA 3R enclosures. We have been discussing a single piece of ANSI pad mount switchgear which utilizes vacuum fault interrupters (VFIs), SEL relays and motorized switches. Will the S&C Electric approach with the VFIs and switches be approved?

USACE Response: Yes

4. Are there any specs available for MV gear?

USACE Response: Question was answered in Amendment 0005

5. Are the dimensions for the MV equipment pad correct?

a. Is 9’ x 9’ measurement taken from any manufacturers design?

USACE Response: The dimensions are not correct. As the design progressed, the dimensions of the pad were not revised to reflect the latest equipment specified for the project. The pad should be sized as required for the approved equipment lineup.

6. Is there a plan to install an Electrical building to house the MV equipment?

USACE Response: No

a. If yes, Would the battery bank shown on the one line for MV equipment reside in the that electrical house? Would specs be issued soon for the electrical house? b. If no, where would the batteries for the battery bank be stored?

USACE Response: It is expected that the batteries would be housed in the MV gear structure. If they will not fit, an adjacent, small structure for battery storage would be considered.

W912P621B0017

(End of Summary of Changes)