AMENDMENT NO 0001 W912P621B0006 LAKE STATION LIFT STATION REPLACEMENT.pdf

PDF 452 KB Posted

Attached to
LAKE STATION CROSSROADS LIFT STATION REPLACEMENT - SECTION 219, LAKE STATION, LAKE COUNTY, INDIANA (USACE ACQUISITION)
Solicitation number
W912P621B0006
Issued by

About this file

This document provides an amendment to a solicitation and the related solicitation notice for a federal construction contract. The U.S. Army Corps of Engineers Chicago District is seeking bids to replace an existing lift station in Lake Station, Indiana for between $1 million and $5 million. Bids are due by September 21, 2021. The amendment responds to contractor questions by clarifying that general backfill can be used in certain areas and that the contractor must meet dewatering specifications. It also identifies the point of contact for the amendment and notes that the pre-bid attendee list is posted online. The solicitation is reserved for small businesses and involves replacing an existing crossroads lift station with a new, larger one including electrical and control panels above flood levels, a new emergency generator, and an electrical building.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6603224355

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REFERENCE INVITATION FOR BIDS NO. W912P621B0006, LAKE STATION CROSSROADS LIFT STATION REPLACEMENT - SECTION 219, LAKE STATION, LAKE COUNTY, INDIANA (USACE ACQUISITION)

A. The Bid Opening Date and Time is unchanged by this Amendment. Therefore, Bids are due prior to 2:00 p.m. (Central Time) on September 21, 2021 -For further details regarding bid submission, please refer to Solicitation Section 00 21 13 - Instructions to Bidders.

-- THIS AMENDMENT CONTINUES ON THE NEXT PAGE --

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P621B0006

X 9B. DATED (SEE ITEM 11)

20-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Sep-2021

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P621B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

B. CONTRACTOR INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries as follows:

INQUIRY 1: We would like to know if the USACE will allow the contractor to clam/trimmie the wet well in.

USACE RESPONSE INQUIRY 1: The contractor must meet the project specifications for installation. See especially the dewatering subpart 3.2.10 in Section 31 00 00.

INQUIRY 2: The project has (1) base bid and (1) option. If accepted, will the option be included in the base bid duration (365 calendar days)?

USACE RESPONSE INQUIRY 2: Please see clause 52.217-7 Option for Increased Quantity--Separately Priced Line Item of the solicitation

INQUIRY 3: Please advise if the pre-bid attendee list will be posted.

USACE RESPONSE INQUIRY 3: The pre-bid attendee list is posted at sam.gov in the attachments section of the solicitation notice

INQUIRY 4: For the fills underneath the building area (subbase on the lift station side), can we use existing materials, or it need imported aggregate materials for the whole area?

USACE RESPONSE INQUIRY 4: Yes, general backfill can be used to build up the lift station/building site.

Compacted aggregate shall be placed to a depth as indicated in the details as it pertains to pipe bedding, drives, footings, etc.

C. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846-5378;

email: ericka.d.hillard@usace.army.mil.

END OF AMENDMENT NO. 0001

File details come from the government source that posted it. Updated .