This solicitation notice announces a competitive small business set-aside acquisition by the United States Army Corps of Engineers Chicago District. The solicitation seeks bids for the Gary Sanitary District 13th Avenue Sanitary Sewer Replacement project in Gary, Indiana.
The project involves replacing approximately 2,030 linear feet of existing 30-inch, 42-inch, and 48-inch poured in place concrete sanitary sewer lines with new reinforced concrete sewer lines of the same sizes and slopes. Additional work includes installing nine new manholes, removing existing manholes and pipes, dewatering, bypass pumping, and pavement repair. The estimated value of construction is between $1,000,000 and $5,000,000. The North American Industry Classification code is 237110.
Bids are due by 4:00pm Central time on September 10, 2020. The solicitation and project specifications are available for download from the federal business opportunities website. The point of contact is Ms. Ericka Hillard of the USACE Chicago District for any questions. Bidders must be registered in the System for Award Management at the time bids are submitted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6601430730
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: GARY SANITARY DISTRICT 13TH AVENUE SANITARY SEWER REPLACEMENT - SECTION 219, GARY, LAKE COUNTY, INDIANA
A. The Bid Opening Date and Time is unchanged by this Amendment, therefore, Bids are due prior to 4:00 p.m. (Central Time) on September 10, 2020. -For further details regarding bid submission, please refer to Solicitation Section 00 22 13 - Supplementary Instructions to Bidders.
- AMENDMENT CONTINUES ON NEXT PAGE -
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P620B0019
X 9B. DATED (SEE ITEM 11)
07-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2020
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P620B0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
B. AMENDED SECTION 00 10 00 - SOLICITATION – When submitting Bids, only one copy shall be provided to the government. Accordingly, when mailing your bid, only one complete copy is required or if emailing your bid, only one complete copy is required. Either way, the bid shall conform with the Solicitation requirements.
C. AMENDED SPECIFICATION SECTION: The following Specification Section has been revised.
The revised section is enclosed hereunder and replaces the previously furnished section.
Section 00 31 32.13 has been revised to include geotechnical report.
D. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries as follows:
INQUIRY #1: Is there soil borings for review regarding dewatering for this project? I noticed they are mentioned in the specs, but I don't see them in the documents.
If not please ask the owner / engineer for a copy of all geotechnical / soil borings they have for the project so we can properly determine if dewatering is required and to what extent.
USACE RESPONSE INQUIRY #1: Please refer to the added SECTION 00 31 32.13 SUBSURFACE DRILLING AND SAMPLING INFORMATION which includes the attached geotechnical report. Soil borings and other soil condition information is included in the report. This section was inadvertently not included in the original solicitation specifications.
INQUIRY#2: Is there soil borings or geotechnical report available for this project? I am specifically interested in soil borings and grain size analysis if available near the proposed work area.
USACE RESPONSE INQUIRY #2: Please see USACE Response Inquiry #1 of this Amendment number 0002.
E. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846-5378;
email: ericka.d.hillard@usace.army.mil.
END OF AMENDMENT NO. 0002
(The aforementioned revised Specification Section follows)
GSD W 13th Avenue Sewer Replacement Project, Gary, IN W912P620B0019
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 31 32.13
SUBSURFACE DRILLING AND SAMPLING INFORMATION
03/14
PART 1 GENERAL
1.1 SUBSURFACE CONDITIONS
1.2 SITE SPECIFIC DATA
1.3 ADDITIONAL INFORMATION ON SUBSURFACE CONDITIONS
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section Table of Contents --
DOCUMENT 00 31 32.13 Page 1
AMD 0002 - 08/25/20
GSD W 13th Avenue Sewer Replacement Project, Gary, IN W912P620B0019
SECTION 00 31 32.13
SUBSURFACE DRILLING AND SAMPLING INFORMATION
03/14
PART 1 GENERAL
1.1 SUBSURFACE CONDITIONS
Subsurface exploratory borings have been obtained by the Government to determine the general character of the subsurface materials within the project area. The Government assumes no responsibility for any interpretation or deductions made by the Contractor from the logs and data. While the borings are generally representative of subsurface conditions at their respective locations and for their respective vertical reaches, localized variations of characteristics of the subsurface materials of this region should be anticipated. Groundwater elevations, shown on the boring logs, are those encountered at the time when the borings were taken and will fluctuate due to factors such as rainfall, lake and/or river stages and factors unknown.
1.2 SITE SPECIFIC DATA
Locations of the borings that fall within the area of this contract and the logs of those borings and laboratory test results are included at the end of this section for the convenience of the Contractor.
1.3 ADDITIONAL INFORMATION ON SUBSURFACE CONDITIONS
Information on subsurface conditions at the project site including complete laboratory results is contained in the following report:
Geotechnical Engineering Report, Gary Sewer Rehabilitation West 13th Avenue, Gary, Indiana. GEOCON Project No. 20-G0307. Geocon Professional Services, Frankfort, Illinois, March 2020.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
DOCUMENT 00 31 32.13 Page 2
AMD 0002 - 08/25/20
March 2, 2020
Ms. Karen Saavedra, PE, CDT Project Manager Structure Point 9025 River Road, Suite 200 Indianapolis, IN 46240
Re: Geotechnical Engineering Report
Gary Sewer Rehabilitation W. 13th Avenue
Gary, Indiana GEOCON Project No. 20-G0307
Dear Ms. Saavedra:
Pursuant to our proposal for geotechnical engineering services, we have completed a subsurface exploration and geotechnical analyses for the above referenced project. This electronic copy of the Geotechnical Engineering Report includes our findings and recommendations for the proposed project referenced above. Please contact our office if you require hard copies of the report.
GEOCON Professional Services, LLC. (GEOCON) appreciates the opportunity to be of service during this phase of the project. If there are any questions or comments you may have regarding the contents of this report, or if we may be of any further service, please contact us at your convenience.
Sincerely, GEOCON Professional Services, LLC.
Nolan W. Hagge, PE Project Engineer
Kenneth K. Rippy, PE Senior Geotechnical Engineer
Geotechnical Engineering Report
Gary Sewer Rehabilitation
W 13th Avenue
Ms. Karen Saavedra, PE, CDT Project Manager Structure Point
9025 River Road, Suite 200 Indianapolis, IN 46240
Prepared By:
GEOCON Professional Services, LLC.
9370 West Laraway Road, Suite D
Frankfort, Illinois 60423
March 2, 2020
TABLE OF CONTENTS
Page
INTRODUCTION 1
PROJECT AND SITE DESCRIPTION 1
SUBSURFACE EXPLORATION 1
Drilling and Sampling Procedures 1 Laboratory Tests 2
PAVEMENT SECTION 2
SOIL CONDITIONS 3
GROUNDWATER CONDITIONS 3
CONSTRUCTION CONSIDERATIONS 3
Sewer Installation and Backfilling 3 Temporary Earth Retention 4 Pavement Subgrade and Evaluation 4 Groundwater Control 5 Excavations 6
GENERAL COMMENTS 6
APPENDIX
Figure 1 - Boring Location Diagram Soil Boring Logs General Notes Grain Size Distribution Test Report Pavement Core Photograph Log
GEOCON
GEOTECHNICAL ENGINEERING REPORT
Gary Sewer Rehabilitation
W. 13th Avenue
INTRODUCTION
This report presents the results of a subsurface exploration for the proposed sewer replacement project planned for W 13th Avenue, in Gary, Indiana. The location of the site is shown on Figure 1 in the Appendix. The purpose of this report was to determine and evaluate the subsurface conditions existing at the subject site, and to establish related geotechnical parameters to be utilized for the economical design of the new sewer.
Authorization to perform this subsurface exploration and analysis was given in the form of a signed subcontract agreement in accordance with GEOCON’s Proposal Number 19-P766, dated December 19, 2019.
PROJECT AND SITE DESCRIPTION
The project consists of a geotechnical investigation for the proposed W 13th Avenue sanitary sewer replacement project, beginning at Grant Street and extending west to Roosevelt Street, in the City of Gary, Indiana. These improvements include design and installation of a new sanitary sewer that will replace the existing 42-inch sewer line. The existing sewer is located in the center of W 13th Avenue. The total project length is approximately 2,000 feet and the invert of the new sewer is anticipated to be between 10 to 15 feet below grade. Additionally, it is understood that full width pavement replacement will be included in the scope of the project.
The project is in the preliminary planning stages, and no other information regarding the project was available at the time this report was prepared.
SUBSURFACE EXPLORATION
As requested, two (2) borings were advanced for the project at the location shown on the Boring Location Diagram, labeled Figure 1, included in the Appendix. The borings were performed within the pavement surface of W 13th Avenue and the pavement cores were obtained at both of the boring locations. The borings were then advanced to a depth of 25 feet below grade.
The boring locations were staked in the field by GEOCON at the time of drilling, and ground surface elevations of the borings were estimated from the provided topographic survey. The approximate ground surface elevation at the boring location is indicated on the boring logs provided in the Appendix.
Drilling and Sampling Procedures
The soil boring was performed with a truck-mounted drilling rig equipped with a rotary head.
Conventional, continuous flight, hollow-stem augers were used to advance the boring with representative samples obtained in the boring employing split-barrel sampling techniques in accordance
W. 13th Avenue Sewer Rehabilitation Gary, Indiana with ASTM Procedure D-1586. Soil samples were secured at 2.5-foot intervals to 20 feet and then in 5 foot intervals to the termination depth of each boring.
The Standard Penetration Test (SPT) is defined as the number of blows required to advance a 2 inch O.D., split-barrel sampler a distance of one foot by a 140 pound hammer falling 30 inches, commonly described as the N-value. These sampler resistances provide a useful indication of the consistency or relative density of most soil deposits and are reported on the boring log presented in the Appendix.
It should be noted that it is difficult to determine the stratigraphy the upper 2 to 3 feet of the profile from soil borings due to the size of the bore hole, about 6 inches in diameter, and intermittent sample intervals.
Further, the split spoon sampler tends to push through softer soils such as fill or topsoil, resulting in little or no sample recovery from these soils. It is recommended that shallow test pits be excavated to better define the exact depth of topsoil or fill if such information is required prior to construction.
Water level observations made during drilling operations are noted on the boring logs.
Laboratory Tests
Additional characteristics of the foundation materials were determined in the laboratory to provide data on which to classify and estimate the engineering properties of the subsurface soil deposits encountered in the boring. All samples were visually classified by the geotechnical engineer according to the Unified Soil Classification System (ASTM D-2488). An explanation of the symbols used in this system is included in the Appendix.
Representative samples were tested in the laboratory to determine the natural moisture content of the soils. All moisture contents are expressed as a percentage of the dry weight of soil. Grain size analyses were performed on selected soil samples in accordance with ASTM D-422.
The laboratory testing program selected for this project is intended to assist with determination of soil classification as well as strength and deformation characteristics of the subsurface soil deposits that will be useful in design of excavations. All laboratory testing was performed in general accordance with the respective ASTM Methods, as applicable, and the results are included on the boring log included in the Appendix. Unless notified to the contrary, all samples will be disposed of after one month.
PAVEMENT SECTION
The following table provides a summary of the pavement section measured at the time of drilling:
TABLE 1: EXISTING PAVEMENT SECTION THICKNESS
Boring No.
HMA Thickness (in.)
Concrete Thickness (in.)
Aggregate Base Thickness (in.)
Subgrade Moisture
Content (%)
IBV
B-1 3.0 6.0 0.0 18.5 1.7 B-2 6.5 6.0 0.0 17.5 3.7
Gary, Indiana
SOIL CONDITIONS
The types of subsurface materials encountered at the test boring locations are described on the Soil Boring Log. The lines delineating the changes in strata on the logs represent an approximate boundary between the various soil classifications. It must be recognized that the soil descriptions are considered representative for the specific test hole location, but that variations may occur between the sampling intervals and at other locations on the site. A summary of the major soil profile components is described in the following paragraphs. A more detailed description and supporting data for the boring location can be found on the individual boring log.
As noted on the logs, the pavement section consisted of 3 to 6.5 inches of HMA underlain by 6 inches of concrete with no underlying aggregate base. Beneath the pavement section dark brown and black sand fill with varying amounts of silt extended to depths ranging between 3 to 4 feet below grade. The sand fill was described as very loose to medium dense with standard penetration resistances (N-values) ranging from 4 to 11 blows per foot and IBVs ranging from 1.7 to 3.7. The upper sand fill was underlain by brown poorly graded sand (SP) which transitioned to gray poorly graded sand with silt (SP-SM) and these strata extended to the termination depth of the borings at 25 feet below grade. The sand was described as very loose to medium dense with standard penetration (N-values) ranging from 3 to 21 blows per foot. The sand was saturated with groundwater below a depth of about 6 feet.
GROUNDWATER CONDITIONS
Groundwater was encountered in the borings at a depth of about 6 feet, which corresponds to an elevation ranging from about 591 to 589 feet, NAVD “88” (based on surface elevations estimated from the provided topographic survey). It should be noted that due to the relatively short times after completion of drilling at which the water level measurements were made, these observed groundwater levels may not indicate the static water level present at the time of construction. It should be noted that groundwater levels fluctuate over time and are influenced by seasonal precipitation.
CONSTRUCTION CONSIDERATIONS
Sewer Installation and Backfilling
It is recommended that the sewer construction be performed in accordance with the INDOT Standard Specifications, or the Project Specifications, as applicable. The trench should be excavated and backfilled in accordance with requirements of the INDOT Standard Specifications, Section 715.
According to the specifications referenced above, if a firm foundation is not encountered at the required grade, the unstable material shall be removed to such a depth that when replaced with suitable material, usually B Borrow or Structural Backfill, compacted, and property shaped, it will produce a uniform and stable foundation along the entire length of pipe. All trenches shall be kept free from water during installation of the pipe and completion of the backfilling operations.
It is recommended that fill materials used for structural support consist of Structure Backfill placed in accordance with Section 211. All structural fill should be placed on firm subgrades, and the fill should be placed in lifts and properly compacted. Unless otherwise specified, structural fill should be placed in 8 inch or less loose lifts and compacted to at least 95 percent of the maximum dry density as determined by AASHTO T-99 (Standard Proctor) method of test. However, structural fill being utilized for pavement
Gary, Indiana subgrade is required to be compacted to 100 percent of a standard proctor. Further, the fill should be placed within (+/–) 2 percent of the optimum moisture content value determined by laboratory Proctor testing.
GEOCON recommends protecting the construction, especially compacted backfill soils, from the effects of frost when construction is carried out during cold weather. GEOCON recommends that the evaluation of the subgrade and selection of fill materials for various applications should be done in consultation with the geotechnical engineer, and placement of fill for structural applications be monitored and tested by a representative of the geotechnical engineer.
Temporary Earth Retention
It is anticipated that the proposed sanitary sewer will be installed using variable width trench boxes to stabilize the excavation side walls, provided the site is adequately dewatered prior to beginning construction. As an alternative, internally braced sheet piling may also be considered to support adjacent structures to reduce groundwater infiltration. The following discussion contains the applicable geotechnical design parameters for design of the earth retention system.
Excavations for the sewer may require an engineered earth retention system (ERS). A typical earth retention system utilized in the area consists of interlocking steel sheeting. The sequence of the excavation process relative to the installation of the retention system will need to be carefully planned and executed. The steel sheeting will need to extend a sufficient distance into the underlying soils to provide sufficient passive resistance, prevent a global stability failure, and allow the system to function as a groundwater cut-off. Due to the anticipated depth, a series of internal brace levels may be required to prevent excessive deflection and ensure adequate stability.
The design of the earth retention system is typically executed by the ERS contractor and completed under the supervision of a Registered Engineer in Indiana. The design of the retention system will need to account for lateral forces not only due to the retained soil profile and groundwater table, but also anticipated surface surcharge loads, equipment loads, construction loads, and deflection limits.
Earth retention systems can be preliminarily designed using equivalent fluid pressures. Above the water table, a pressure of 40 psf per foot of excavation depth should be used for the design. Below the water table, a combined earth and water pressure of 82 psf per foot should be utilized. Adjustments to the recommended general pressure distributions may be necessary depending on construction staging, surcharge loading, or bracing requirements. If multiple brace levels are utilized, the appropriate “apparent earth pressure” distribution should be used in design after multiple brace levels are in place.
Any surcharge loads (due to adjacent roadways, foundations or equipment) within the area that projects upward from the base of the cut on a 45-degree angle, should be included as additional lateral pressures on the system. A uniform surcharge of 250 psf (or an equivalent 2 feet of soil) should be assumed at the ground surface next to the retention system to represent general construction loading and/or traffic.
Higher loading may be computed for specialty equipment such as large excavators, loaders or loaded trucks.
Pavement Subgrade Evaluation and Preparation
The existing HMA ranged in thickness from 3 to 6.5 inches and was underlain by 6 inches of concrete. It understood that full width pavement replacement will be completed for this project.
Gary, Indiana
The subgrade in the new pavement areas will consist primarily of dark brown to black sand fill with moisture contents ranging from 17.5 to 18.5 percent and IBVs ranging from 1.7 to 3.7 which is indicative of loose subgrade soils. For local or municipal roads, the decision whether or not to include subgrade remedial action is typically left to the discretion of the Engineer or Municipality and is based on both pavement design and budgetary constraints. Based on the subgrade conditions encountered at the boring locations, it is recommended that Type III subgrade treatment in accordance with INDOT Standard Specifications be used for the pavement subgrade improvement for this project. The Type III subgrade treatment consists of in place compaction to density and moisture specifications in accordance with Section 203.23. A representative of GEOCON should be present to perform density and DCP testing and make recommendations related to any additional subgrade improvement necessary.
All earthwork, with regards to subgrade preparation should be in accordance with the INDOT Standard Specifications. Compaction for subgrade and aggregate base materials should be at least 100 percent Standard Proctor density (AASHTO T-99) in accordance with INDOT Section 207.03.
The subgrade stability will be influenced by such factors as surface drainage provided by the contractor as well as the prevailing temperature and precipitation experienced during construction. The amount of traffic and subgrade disturbance created by heavy construction vehicles will also have an influence on subgrade stability. The contractor should try to make full use of inlets or ditches in order to maintain positive drainage for subgrade areas. Temporary drainage ditches or pumping from depressional areas should be provided as needed during construction in order to prevent ponded water from affecting the stability of the roadway subgrade.
The need for undercutting unstable subgrade and aggregate replacement fill should be based on direct observations made during construction once the subgrade soils are exposed and proof rolling or DCP testing procedures can be conducted. Normal procedure requires DCP or density testing immediately prior to placing aggregate base material, in order to document the need for further subgrade improvement.
GEOCON recommends that the evaluation of the subgrade and selection of fill materials for various applications should be done in consultation with the geotechnical engineer, and placement of fill be monitored and tested by a representative of the geotechnical engineer.
Groundwater Control
We anticipate that a groundwater control system and an earth retention system will be required to facilitate construction. Recommendations for the design and construction of these systems are beyond the scope of this report and are typically provided by the contractor(s) involved in the construction. It should be noted that lowering a groundwater level increases the effective stress of soils and can contribute to settlement of adjacent structures. Special design and construction considerations will therefore be required for this project due to the proximity of existing improvements.
Groundwater was encountered in the soil borings, while drilling, at a depth of about 6 feet and the trench depth is anticipated to be around 15 feet below grade. The depth of excavation extends below the groundwater table present at the time of the subsurface exploration. The contractor should anticipate the presence of significant groundwater infiltration into the excavation, which will affect excavation stability. It is recommended that appropriate dewatering methods be utilized for this
Gary, Indiana project, to control any groundwater seepage encountered during excavation, and that the construction is completed under relatively dry conditions.
Design and implementation of an adequate dewatering system should be the sole responsibility of the contractor or their qualified dewatering subcontractor.
Excavations
All excavations should comply with the requirements of OSHA 29CFR, Part 1926, Subpart P, "Excavations" and its appendices, as well as other applicable codes. This document states that the excavation safety is the sole responsibility of the contractor. Reference to this OSHA requirement should be included in the project specifications. Slope heights, slope inclinations and/or excavation depths should in no case exceed those specified in local, state or federal safety regulations, including current OSHA excavation and trench safety standards. We understand excavation to about 15 feet below the existing grade will be required for the sewer construction. According to OSHA regulations, side slopes and/or bracing must be designed by a professional engineer for any excavations extending to a depth greater than 20 feet. Where variable fill and/or groundwater is present, flatter slopes than those required by OSHA could be required to maintain the stability of the excavation(s). It should be noted that the subsurface soil types may vary between or beyond the boring locations.
Excavations near existing foundations, roads and utilities should be made with caution as disturbance within influence zones that support adjacent elements could result in damage and excessive settlement.
If the proposed construction will extend into the influence zone of the existing structures or utilities, a shoring or underpinning system would be required to protect or support the adjacent structures.
GENERAL COMMENTS
This geotechnical exploration and analysis has been conducted to aid in the evaluation of the subsurface conditions on the subject site. The recommendations presented herein are based on the available soil information obtained and the design information provided. Any changes in the soil conditions encountered during construction, design, or location should be brought to the attention of the soils engineer to determine if modifications in the recommendations are required. The final design plans and specifications should also be reviewed by the soils engineer to determine that the recommendations presented herein have been interpreted and implemented as intended. It is recommended that the earthwork and foundation operations be monitored by the Geotechnical Engineer, to test and evaluate the bearing capacities, and the selection, placement and compaction of controlled fills.
This geotechnical study has been conducted in a manner consistent with that level of care ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. The findings, recommendations, and opinions contained herein have been promulgated in accordance with generally accepted practice in the fields of foundation engineering, soils mechanics, and engineering geology. No other representations, expressed or implied, and no warranty or guarantee is included or intended in this report.
APPENDIX
Figure 1 - Boring Location Diagram
Soil Boring Logs General Notes
Grain Size Distribution Test Report
9370 Laraway Road, Suite D Frankfort, IL 60423 P.815.806.9986 F. 815.464.8691
FIGURE 1
BORING LOCATION DIAGRAM
Sewer Rehabilitation Project
PROJECT NO. 20-G0307
DATE: February 2020
18.5
8.8
23.1
25.6
27.2
29.7
30.2
25.7
25.2
596.3
594.0
586.5
572.0
SS
SS
SS
SS
SS
SS
SS
SS
SS
3" Asphalt 6" Concrete dark brown to black SILTY SAND
(FILL)
very loose, moist brown POORLY GRADED SAND very loose to medium dense, moist to wet gray POORLY GRADED SAND with
SILT
very loose to medium dense, wet
Bottom of borehole at 25.0 feet.
3-2-2 (4)
2-1-2 (3)
3-3-3 (6)
5-5-8 (13)
6-9-11 (20)
2-1-2 (3)
2-1-1 (2)
3-3-1 (4)
4-6-8 (14)
1.7
GROUND WATER LEVELS:
NOTESCOMPLETION DEPTH 25 ft
AT TIME OF DRILLING 6.00 ft / Elev 591.00 ft
AT END OF DRILLING 6.00 ft / Elev 591.00 ft
AFTER DRILLING ---
BACKFILL Soil Cuttings
GROUND ELEVATION 597 ft
CAVE DEPTH ft
DATE COMPLETED 2/20/20 LOGGED BY TW/KM DRILLING METHOD 3.25 in. HSA
D E
P T
H (f t)
G R
A P
H
IC
LO
G
P O
C K
E T
P E
N
(Q p)
(t sf
ATTERBERG
LIMITS
O R
G A
N
IC
C O
N T
E N
T
M O
IS
T
U R
E C
O N
T E
N T
D R
Y U
N
IT
W T
(p cf
E
LE
V A
T
IO
N ft.
LI
Q
U
ID
LI
M
IT
P
LA
S T
IC
LI
M
IT
P
LA
S T
IC
IT
Y
IN
D E
X
BORING NO. B-1
S A
M P
LE
T
Y P
E N
U M
B E
R
MATERIAL DESCRIPTION
R E
C O
V E
R Y
(R
Q D
B
LO
W C
O U
N T
S (N
V A
LU
E
U N
C
S T
R E
N G
T H
Q
u) (t sf
IB
V
V A
LU
E
G P
S P
A V
E M
E N
T L
O G
O
Z S
T D
D A
T A
T E
M P
LA
T
E .G
D T
/2 /2
:5
K
:\G E
O T
E C
H N
IC
A
L\
0\
-G
G E
O G
A R
Y S
E W
E R
R E
H A
B
IL
IT
A
T
IO
N , I
N D
IA
N
A P
O
LI
S , I
N \P
R O
JE
C
T D
O C
S \2
0- G
7.
G
P J
PROJECT LOCATION West 13th Avenue, Gary, Indiana
PROJECT NAME Gary Sewer Rehabilitation
PROJECT NUMBER 20-G0307
CLIENT Structure Point
Lines of Demarcation represent an approximate boundary between soil types. Variations may occur between sampling intervals and between boring locations, and the transition may be gradual. Dashed lines are indicative of potentially erratic or unknown changes.
nhagge Typewritten Text
(NAVD "88")
nhagge Typewritten Text
(NAVD "88")
nhagge Typewritten Text
,NAVD"88"
17.5
17.6
25.2
24.2
30.6
24.2
25.6
23.6
23.0
594.0
591.0
582.0
570.0
SS
SS
SS
SS
SS
SS
SS
SS
SS
6.5" Asphalt 6" Concrete dark brown to black SAND (FILL) medium dense, moist brown POORLY GRADED SAND loose to medium dense, moist to wet gray POORLY GRADED SAND with
SILT
loose to medium dense, wet
Bottom of borehole at 25.0 feet.
11-7-4 (11)
1-2-3 (5)
8-3-4 (7)
10-8-9 (17)
3-5-8 (13)
6-5-11 (16)
5-8-13 (21)
4-4-4 (8)
2-3-3 (6)
3.7
GROUND WATER LEVELS:
NOTESCOMPLETION DEPTH 25 ft
AT TIME OF DRILLING 6.00 ft / Elev 589.00 ft
AT END OF DRILLING 6.00 ft / Elev 589.00 ft
AFTER DRILLING ---
BACKFILL Soil Cuttings
GROUND ELEVATION 595 ft
CAVE DEPTH ft
DATE COMPLETED 2/20/20 LOGGED BY TW/KM DRILLING METHOD 3.25 in. HSA
D E
P T
H (f t)
G R
A P
H
IC
LO
G
P O
C K
E T
P E
N
(Q p)
(t sf
ATTERBERG
LIMITS
O R
G A
N
IC
C O
N T
E N
T
M O
IS
T
U R
E C
O N
T E
N T
D R
Y U
N
IT
W T
(p cf
E
LE
V A
T
IO
N ft.
LI
Q
U
ID
LI
M
IT
P
LA
S T
IC
LI
M
IT
P
LA
S T
IC
IT
Y
IN
D E
X
BORING NO. B-2
S A
M P
LE
T
Y P
E N
U M
B E
R
MATERIAL DESCRIPTION
R E
C O
V E
R Y
(R
Q D
B
LO
W C
O U
N T
S (N
V A
LU
E
U N
C
S T
R E
N G
T H
Q
u) (t sf
IB
V
V A
LU
E
G P
S P
A V
E M
E N
T L
O G
O
Z S
T D
D A
T A
T E
M P
LA
T
E .G
D T
/2 /2
:5
K
:\G E
O T
E C
H N
IC
A
L\
0\
-G
G E
O G
A R
Y S
E W
E R
R E
H A
B
IL
IT
A
T
IO
N , I
N D
IA
N
A P
O
LI
S , I
N \P
R O
JE
C
T D
O C
S \2
0- G
7.
G
P J
PROJECT LOCATION West 13th Avenue, Gary, Indiana
PROJECT NAME Gary Sewer Rehabilitation
PROJECT NUMBER 20-G0307
CLIENT Structure Point
Lines of Demarcation represent an approximate boundary between soil types. Variations may occur between sampling intervals and between boring locations, and the transition may be gradual. Dashed lines are indicative of potentially erratic or unknown changes.
nhagge Cross-Out nhagge Typewritten Text
(NAVD "88")
nhagge Typewritten Text
(NAVD "88")
nhagge Typewritten Text
,NAVD"88"
CLIENT: Structure Point
PROJECT NUMBER: 20-G0307
PROJECT NAME: W 13th Avenue, Sewer Rehabilitation Project
PROJECT LOCATION: Gary, Indiana
SAMPLE IDENTIFICATION
Visual soil classifications are made in general accordance with the United Soil Classification System (USCS) on the basis of textural and particle size categorization, and various soil behavior characteristics. Visual classifications should be substantiated by appropriate laboratory testing when a more exact soil identification is required to satisfy specific project applications criteria.
UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D-2487-98)
P
LA
S T
IC
IT
Y
IN
D E
X
PLASTICITY CHART
"A " L
IN
E
CL-ML
0 10 20 30 40 50 60 70 80 90 100 110 120
OH & MHCL
CH
LIQUID LIMIT (%)
Split Spoon (SS)
Shelby Tube (ST)
PROJECT SAMPLE TYPES
SS
ST
AU
MC
-200
Qp
Qu
ABBREVIATIONS
LIQUID LIMIT (%)
PLASTIC LIMT (%)
PLASTIC INDEX (%)
NON PLASTIC
DRY DENSITY (PCF)
DYNAMIC CONE PENETROMETER
IMMEDIATE BEARING VALUE
SPLIT-SPOON SAMPLE
SHELBY TUBE SAMPLE
AUGER SAMPLE
MOISTURE CONTENT (%)
PERCENT PASSING NO. 200 SIEVE
POCKET PENETROMETER (TSF)
UNCONFINED STRENGTH (TSF)
LL
PL
PI
NP
DD
DCP
IBV
ASPHALT: Asphalt CL: USCS Low Plasticity Clay CL-ML: USCS Low Plasticity Silty Clay
CLS: USCS Low Plasticity Sandy Clay FILL: Fill (made ground) SP: Poorly Graded Sand
TOPSOIL: Topsoil
PROJECT LITHOLOGIC SYMBOLS (USCS)
GENERAL NOTES
G
P S
G E
O G
E N
E R
A L
N O
T E
S
O Z
S T
D D
A T
A T
E M
P
LA
T E
.G D
T
0/
7/
6:
K
:\G
IN
T \P
R O
JE
C
T S
\1 8-
G
C
O M
M U
N
IT
Y
IC
E C
E N
T E
R , G
LE
N
V
IE
W , I
L.
G
P J
ORGANIC
INORGANIC
SANDS AND FINES
>12% FINES
CLEAN SANDS
<5% FINES
F
IN
E -G
R A
IN
E
D S
O
IL
S
P A
S S
E S
N O
. 2
S
IE
V E
Cu 6 AND 1 Cc 3
Cu 6 AND/OR 1 Cc 3
FINES CLASSIFY AS ML OR MH
FINES CLASSIFY AS CL OR CH
PI>7 AND PLOTS>"A" LINE
PI>4 AND PLOTS<"A" LINE
LL (oven dried)/LL (not dried)<0.75
PI PLOTS >"A" LINE
PI PLOTS <"A" LINE
LL (oven dried)/LL (not dried)<0.75
FINES CLASSIFY AS ML OR CL
FINES CLASSIFY AS CL OR CH
HIGHLY ORGANIC SOILS
C O
A R
S E
-G R
A
IN
E D
S O
IL
S
R
E T
A
IN
E D
O N
N O
. 2
S
IE
V E
PEAT
ORGANIC
MATERIAL
TYPES CRITERIA FOR ASSIGNING SOIL GROUP NAMES
GW
GP
GM
GC
SW
SP
SM
SC
CL
ML
OL
CH
MH
OH
PT
CLEAN GRAVELS
<5% FINES
PRIMARILY ORGANIC MATTER, DARK IN COLOR, AND ORGANIC ODOR
WELL-GRADED GRAVEL
POORLY-GRADED GRAVEL
SILTY GRAVEL
CLAYEY GRAVEL
WELL-GRADED SAND
POORLY-GRADED SAND
SILTY SAND
CLAYEY SAND
LEAN CLAY
SILT
ORGANIC CLAY OR SILT
FAT CLAY
ELASTIC SILT
ORGANIC CLAY OR SILT
>50% OF COARSE
FRACTION PASSES
ON NO 4. SIEVE
GRAVELS WITH FINES
>12% FINES
SOIL GROUP NAMES & LEGENDGROUP
SYMBOL
GRAVELS
INORGANIC
>50% OF COARSE
FRACTION RETAINED
ON NO 4. SIEVE
SILTS AND CLAYS
LIQUID LIMIT<50
SILTS AND CLAYS
LIQUID LIMIT>50
SANDS
RELATIVE DENSITY CONSISTENCY
0 - 0.25
0.25 - 0.50
0.50 - 1.0
1.0 - 2.0
2.0 - 4.0
OVER 4.0
VERY LOOSE
LOOSE
MEDIUM DENSE
DENSE
VERY DENSE
COMPRESSIVE
STRENGTH (TSF)
NON-COHESIVE SOILS COHESIVE SOILS
* N-VALUE: NUMBER OF BLOWS OF 140 LB HAMMER FALLING 30 INCHES TO DRIVE A 2
INCH O.D. (1-3/8 INCH I.D.) SPLIT-BARREL SAMPLER THE LAST 12 INCHES OF AN 18-INCH
DRIVE (ASTM-1586 STANDARD PENETRATION TEST).
0 - 4
4 - 10 10 - 30 30 - 50
OVER 50
N-VALUE* N-VALUE*
0 - 2
2 - 5
5 - 10
10 - 14
14 - 32
OVER 32
VERY SOFT
SOFT
MEDIUM STIFF
STIFF
VERY STIFF
HARD
SOIL RELATIVE DENSITY AND CONSISTENCY CLASSIFICATION
9370 W. Laraway Road, Suite D Frankfort, IL 60423 Phone 815-806-9986
Cu 4 AND 1 Cc 3
Cu 4 AND/OR 1 Cc 3
0.0010.010.1110100
PI Cc CuLL PL
2.25
1.51
0.94
0.92
GRAIN SIZE DISTRIBUTION
COBBLES
GRAVEL
1.5
5.0
1.18
SAND
GRAIN SIZE IN MILLIMETERS
coarse fine
POORLY GRADED SAND(SP)
POORLY GRADED SAND with SILT(SP-SM)
Classification
D100 D60 %Gravel
0.198
0.118
B-1
B-2 coarse
SILT OR CLAY
finemedium
6.0
16.0
%Sand %Silt %Clay
0.0
0.0
98.5
95.0
BOREHOLE DEPTH
D50
0.174
0.109
3 100
B-1
B-2
24 16 30
1 2006 10 501/2
HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS
1403 4 20 406 601.5 8 143/4 3/8
6.0
16.0
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
BOREHOLE DEPTH D10
0.088
0.078
CLIENT Structure Point
PROJECT NUMBER 20-G0307
PROJECT NAME Gary Sewer Rehabilitation
PROJECT LOCATION West 13th Avenue, Gary, Indiana
PRINT DATE 2/27/2020
G R
A
IN
S
IZ
E
O Z
S T
D D
A T
A T
E M
P
LA
T E
.G D
T
/2
/2
3:
K
:\G E
O T
E C
H N
IC
A
L\
\2
0- G
G E
O G
A R
Y S
E W
E R
R E
H A
B
IL
IT
A
T
IO
N , I
N D
IA
N
A P
O
LI
S , I
N \P
R O
JE
C
T D
O C
S \2
0- G
.G P
J
B-01 Pavement Core Location: W. 13th Ave 3” Asphalt Pavement
6” Concrete *** Asphalt Core thickness based on field measurement
Various Streets Gary, Indiana
PROJECT NUMBER:
20-G0307
B-02 Pavement Core Location: W. 13th Ave
6.5” Asphalt Pavement 6” Concrete
*** Asphalt Core thickness based on field measurement
Various Streets Gary, Indiana
PROJECT NUMBER:
20-G0307
| AMD0002_SPECS_W912P620B0019_459450_GSD_W_13th_Ave_Sewer_Replacement_Gary,IN (25-Aug-20).pdf |
| 00 31 32.13 |
| 00 31 32.13 - SUBSURFACE DRILLING AND SAMPLING INFORMATION |
| 00 31 32.13 - SUBSURFACE DRILLING AND SAMPLING INFORMATION |
| PART 1 GENERAL |
| 1.1 SUBSURFACE CONDITIONS |
| 1.2 SITE SPECIFIC DATA |
| 1.3 ADDITIONAL INFORMATION ON SUBSURFACE CONDITIONS |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION NOT USED |
| 00 31 32.13_Gary Sewer Rehabilitation W 13th Ave Gary Indiana - geotech report_Updated |
| 20-G0307 Gary Sewer Rehabilitation W 13th Ave Gary Indiana - geotech report |
| TABLE OF CONTENTS |
| INTRODUCTION |
| PROJECT AND SITE DESCRIPTION |
| subsurface EXPLORATION |
| Laboratory Tests |
| Pavement section |
| SOIL CONDITIONS |
| GROUNDWATER CONDITIONS |
| CONSTRUCTION CONSIDERATIONS |
| Sewer Installation and Backfilling |
| Temporary Earth Retention |
| Pavement Subgrade Evaluation and Preparation |
| Groundwater Control |
| Excavations |
GENERAL COMMENTS
| 20-G0307 Figure 1 |
| boring logs |
| gps notes |
| grain size |
| B-01 |
| B-02 |
File details come from the government source that posted it. Updated .