This is a solicitation for construction services for the Village of Park Forest Water Main Replacement project in Illinois. The United States Army Corps of Engineers Chicago District is seeking bids to replace approximately 0.72 miles of cast iron water main along Dogwood Street with PVC C900 pipe between Western Avenue and Western Avenue. The project also includes replacing seven fire hydrants, seven main line valves, and 42 two-inch water services, as well as related sewer improvements. The estimated cost of construction is between $1 million and $5 million. The NAICS code is 237110 and small businesses with average annual receipts of less than $39.5 million are eligible to compete. Bids are due by the date specified in the solicitation, which is available as a download from the federal contracting website. The point of contact listed can provide the solicitation package and answer questions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: IFB NO. W912P620B0016; "PROJECT TITLE: VILLAGE OF PARK FOREST WATER MAIN REPLACEMENT, PARK FOREST, IL"
IMPORTANT NOTICE: By w ay of this Amendment, administrative corrections have been made to the bid schedule.
See next page for further details.
THE SPECIFICS OF THIS AMENMENT FOLLOW ON THE NEXT PAGES -
1. CONTRACT ID CODE PAGE OF PAGES
1 50
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P620B0016
X 9B. DATED (SEE ITEM 11)
10-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2020
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P620B0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
AMENDMENT PARTICULARS
A. AMENDED SECTION 00 10 00 (BID SCHEDULE):
The government is providing a revised bid pricing table (Section 00 10 00 – Solicitation Contract Form), which details the following change: The unit of issue for SUBCLIN 0001BG has been listed correctly therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Bidders shall provide their prices on the Revised Bidding Schedule.
B. AMENDED SPECIFICATION SECTIONS:
a. SECTION 33 05 23.13 ‐ UTILITY HORIZONTAL DIRECTIONAL DRILLING has been revised to clarify various portions of this section. Revised pages are enclosed.
C. CONTRACTOR INQUIRIES AND GOVERNMENT RESPONSES:
Contractor Inquiry 1: I was going through the spec book and noticed an extremely stringent spec for directional drilling.(I highlighted the spec and attached it) We can bid some of these items but it requires specialized equipment that will add a substantial amount of money to the overall bid. Some of the logs being requested our physically impossible to record due to the minimal planned depth such as drilling fluid pressure, drill thrust pressure, and drill pullback pressure.
In short I believe it is in the best interest for USACE and Park Forest that these requirements are removed from the spec section for this project. If you have any questions or want to discuss further, please do not hesitate to reach out to me.
USACE Response 1: SECTION 33 05 23.13 has been revised and is attached. The following paragraphs have been revised as follows:
Paragraph 3.1.6 Guidance Systems has been deleted in its entirety.
Paragraph 3.2 FIELD QUALITY CONTROL has been revised to state the following:
“Maintain drilling logs that accurately provide drill bit location (both horizontally and vertically) at least every 2‐feet along the drill path.
Make all instrumentation, readings, and logs available to the Contracting Officer at all times during operation.”.
END OF AMENDMENT
(Revised Bid Schedule and Specifications follows)
REVISED BID SCHEDULE VIA AMENDMENT NO.0002
REVISED BID SCHEDULE
REVISED BID SCHEDULE VIA AMENDMENT NO. 0002
- BIDDERS SHALL USE THE BELOW REVISED BID SCHEDULE TO FURNISH THEIR BIDS
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Base Work (WESTERN AVE TO CROMWELL ROAD)
FFP
This is a parent Contract Line Item, linking its Sub-Items 0001AA through 0001BT. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0001AA through 0001BT, wherein the sub-line items themselves identify the quantities require to perform said work.
NET AMT
0001AA 1 Job
MOBILIZATION FOR BASE WORK
FFP
Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
PSC CD: Z2PD
0001AB 1 Job
DEMOBILIZATION FOR BASE WORK
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AC 1 Job
PRECONSTRUCTION VIDEO RECORDING
FFP
0001AD 1 Job
TRAFFIC CONTROL AND PROTECTION
0001AE 350 Linear
Foot
GRANULAR BACKFILL
0001AF 7 Linear
WATER MAIN (OPEN CUT) 6-INCH C900 PVC
WATER MAIN (OPEN CUT) 6-INCH C900 PVC - (RESTRAINED JOINT)
0001AG 69 Linear
WATER MAIN (OPEN CUT) 8-INCH C900 PVC
0001AH 160 Linear
WATER MAIN (OPEN CUT) 8-INCH C900 PVC - (RESTRAINED JOINT)
0001AJ 1,867 Linear
WATER MAIN
WATER MAIN (DIRECTIONALLY DRILLED) 8-INCH C900 PVC
0001AK 1 Each
WATER SERVICE REPLACEMENT
WATER SERVICE REPLACEMENT, 1" FAR SIDE
0001AL 9 Each
WATER SERVICE REPLACEMENT
FFP
WATER SERVICE REPLACEMENT, 2" FAR SIDE
0001AM 2 Each
WATER SERVICE REPLACEMENT
FFP
WATER SERVICE REPLACEMENT, 1" NEAR SIDE
0001AN 14 Each
WATER SERVICE REPLACEMENT, 2" NEAR SIDE
FFP
WATER SERVICE REPLACEMENT, 2" NEAR SIDE
0001AP 1 Each
CONNECT TO EXISTING WATER MAIN
CONNECT TO EXISTING WATER MAIN (NON-PRESSURE)
0001AQ 1 Each
GATE VALVE, 6"
0001AR 4 Each
GATE VALVE, 8"
0001AS 4 Each
VALVE VAULT, 48"
0001AT 5 Each
FIRE HYDRANT
0001AU 2 Each
REMOVE VALVE BOX
0001AV 5 Each
REMOVE FIRE HYDRANT
0001AW 2 Each
PLUG EXISTING WATER MAIN
0001AX 1 Each
LINE STOP, 6"
0001AY 1 Each
LINE STOP, 8"
0001AZ 4 Each
STORM MANHOLE, TYPE A, 4'-DIA.
FFP
STORM MANHOLE, TYPE A, 4'-DIA., TYPE 1 FRAME AND GRATE
0001BA 2 Each
INLET TYPE A, 2'-DIA., TYPE 1 FRAME
FFP
INLET TYPE A, 2'-DIA., TYPE 1 FRAME AND OPEN LID
0001BB 1 Each
CATCH BASIN TYPE A, 4'-DIA.
FFP
CATCH BASIN TYPE A, 4'-DIA., TYPE 1 FRAME AND OPEN LID
0001BC 3
FIRE HYDRANT BARREL EXTENSION
0001BD 140 Square
Yard
CLASS D PATCH, 6"
0001BE 50 Square
HOT-MIX ASPHALT DRIVEWAY REMOVAL
HOT-MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT, 3"
0001BF 150 Linear
CONCRETE CURB AND GUTTER REMOVAL
CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT
0001BG 1,150 Square
CONCRETE SIDEWALK REMOVAL
CONCRETE SIDEWALK REMOVAL AND INSTALLATION, 5"
0001BH 30 Square
DETECTABLE WARNINGS
0001BJ 475 Square
RESTORATION OF LAWNS AND PARKWAYS
0001BK 13 Linear
REPLACEMENT OF STORM SEWER (WMQ), 6"
0001BL 31 Linear
REPLACEMENT OF STORM SEWER (WMQ), 8"
0001BM 59 Linear
REPLACEMENT OF STORM SEWER (WMQ), 12"
0001BN 22 Linear
REPLACEMENT OF STORM SEWER (WMQ), 15"
0001BP 34 Linear
REPLACEMENT OF STORM SEWER (WMQ), 24"
0001BQ 1 Each
SANITARY SEWER SERVICE LINE REPAIR
0001BR 350 Cubic
REMOVAL AND REPLACEMENT OF UNSUITABLE
REMOVAL AND REPLACEMENT OF UNSUITABLE MATERIAL
0001BS 50 Linear
REPLACEMENT OF DRAIN TILES, 6"-12"
0001BT 1 Lot
PAYMENT AND PERFORMANCE BOND
FFP
Payment & Performance Bond for LINE ITEMS 0001AA THROUGH 0001BS - THIS IS A COST REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line amount for the performance and payment bonds. If the actual cost of the bonds is than the line item amount, the contract will be modified to adjust the line item accordingly.Adjustment(s) to the line item will also be made for any revisions to the actual costs associated with contract changes See FAR 52.232-5(g).
OPTION Option Group 1 (CROMWELL ROAD TO CEDAR)
FFP
This is a parent Contract Line Item, linking its Sub-Items 0002AA through 0002BH. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0002AA through 0002BH, wherein the sub-line items themselves identify the quantities required to perform said work.
0002AA 1 Job
OPTION PRECONSTRUCTION VIDEO RECORDING
0002AB 1 Job
OPTION TRAFFIC CONTROL AND PROTECTION
0002AC 370 Linear
OPTION GRANULAR BACKFILL
0002AD 44 Linear
OPTION WATER MAIN (OPEN CUT) 6-INCH C900 PVC
WATER MAIN (OPEN CUT) 6-INCH C900 PVC - (RESTRAINED JOINT)
0002AE 57 Linear
OPTION WATER MAIN (OPEN CUT) 8-INCH C900 PVC
0002AF 229 Linear
0002AG 288 Linear
OPTION WATER MAIN (DIRECTIONALLY DRILLED)
0002AH 10 Each
OPTION WATER SERVICE REPLACEMENT, 1" FAR SIDE
0002AJ 3 Each
OPTION WATER SERVICE REPLACEMENT, 2" NEAR SIDE
0002AK 3 Each
OPTION CONNECT TO EXISTING WATER MAIN
FFP
(NON-PRESSURE)
0002AL 3 Each
OPTION GATE VALVE, 8"
0002AM 3 Each
OPTION VALVE VAULT, 48"
0002AN 2 Each
OPTION FIRE HYDRANT
0002AP 1 Each
OPTION REMOVE VALVE BOX
0002AQ 1 Each
OPTION REMOVE FIRE HYDRANT
0002AR 1 Each
OPTION PLUG EXISTING WATER MAIN
0002AS 1 Each
OPTION LINE STOP, 6"
0002AT 1 Each
OPTION LINE STOP, 8"
0002AU 2 Each
OPTION STORM MANHOLE, TYPE A,
4" DIA, TYPE 1 FRAME AND GRATE
0002AV 1 Each
OPTION CATCH BASIN TYPE A, 4'-DIA., TYPE 1
FFP
FRAME AND OPEN LID
0002AW 1
OPTION FIRE HYDRANT BARREL EXTENSION
0002AX 60 Square
OPTION CLASS D PATCH, 6"
0002AY 10 Square
OPTION HOT-MIX ASPHALT DRIVEWAY REMOVAL
0002AZ 30 Linear
OPTION CONCRETE CURB AND GUTTER REMOVAL
0002BA 1,325 Square
OPTION CONCRETE SIDEWALK REMOVAL
0002BB 20 Square
OPTION DETECTABLE WARNINGS
0002BC 175 Square
OPTION RESTORATION OF LAWNS AND PARKWAYS
0002BD 20 Linear
OPTION REPLACEMENT OF STORM SEWER (WMQ), 10"
0002BE 46 Linear
OPTION REPLACEMENT OF STORM SEWER (WMQ), 12"
0002BF 50 Cubic
OPTION
0002BG 10 Linear
REPLACEMENT OF DRAIN TILES, 6"-12"
0002BH 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
Payment & Performance Bond for LINE ITEMS 0002AA THROUGH 0002BG - THIS IS A COST REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line amount for the performance and payment bonds. If the actual cost of the bonds is than the line item amount, the contract will be modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual costs associated with contract changes See FAR 52.232-5(g).
0002BJ
DUE TO A SYSTEM ERROR THIS CLIN CANOT BE DELETED
FOB: Destination
0002BK
DUE TO A SYSTEM ERROR THIS CLIN CANOT BE DELETED
FOB: Destination
OPTION Option Group 2 (CEDAR STREET TO WESTERN)
FFP
This is a parent Contract Line Item, linking its Sub-Items 0003AA through 0003BK. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0003AA through 0003BK, wherein the sub-line items themselves identify the quantities required to perform said work
0003AA 1 Job
OPTION PRECONSTRUCTION VIDEO RECORDING
0003AB 1 Job
OPTION TRAFFIC CONTROL AND PROTECTION
0003AC 380 Linear
0003AD 78 Linear
0003AE 235 Linear
0003AF 1,010 Linear
OPTION WATER MAIN (DIRECTIONALLY DRILLED)
0003AG 5 Each
OPTION WATER SERVICE REPLACEMENT, 1" FAR SIDE
0003AH 4 Each
OPTION WATER SERVICE REPLACEMENT, 2" FAR SIDE
0003AJ 4 Each
OPTION WATER SERVICE REPLACEMENT, 2" NEAR SIDE
0003AK 2 Each
OPTION CONNECT TO EXISTING WATER MAIN
0003AL 3 Each
OPTION GATE VALVE, 8"
0003AM 3 Each
OPTION VALVE VAULT, 48"
0003AN 4 Each
OPTION FIRE HYDRANT
0003AP 2 Each
OPTION REMOVE VALVE BOX
0003AQ 1 Each
OPTION REMOVE FIRE HYDRANT
0003AR 2 Each
OPTION PLUG EXISTING WATER MAIN
0003AS 1 Each
OPTION LINE STOP, 6"
0003AT 2 Each
OPTION STORM MANHOLE, TYPE A, 4'-DIA., TYPE 1
STORM MANHOLE, TYPE A, 4'-DIA., TYPE 1 FRAME AND GRATE
0003AU 1 Each
OPTION INLET TYPE A, 2'-DIA., TYPE 1 FRAME AND
FFP
INLET TYPE A, 2'-DIA., TYPE 1 FRAME AND OPEN LID
0003AV 2 Each
OPTION CATCH BASIN TYPE A, 4'-DIA., TYPE 1
CATCH BASIN TYPE A, 4'-DIA., TYPE 1 FRAME AND OPEN LID
0003AW 2
OPTION FIRE HYDRANT BARREL EXTENSION
0003AX 170 Square
OPTION CLASS D PATCH, 6"
0003AY 20 Square
OPTION HOT-MIX ASPHALT DRIVEWAY REMOVAL AND
0003AZ 130 Linear
0003BA 800 Square
OPTION CONCRETE SIDEWALK REMOVAL
0003BB 40 Square
0003BC 550 Square
0003BD 33 Linear
OPTION REPLACEMENT OF STORM SEWER (WMQ), 8"
0003BE 25 Linear
OPTION REPLACEMENT OF STORM SEWER (WMQ), 12"
0003BF 43 Linear
OPTION REPLACEMENT OF STORM SEWER (WMQ), 15"
0003BG 7 Each
OPTION SANITARY SEWER SERVICE LINE REPAIR
0003BH 50 Cubic
0003BJ 25 Linear
OPTION REPLACEMENT OF DRAIN TILES, 6"-12"
0003BK 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
Payment & Performance Bond for LINE ITEMS 0003AA THROUGH 0003BJ - THIS IS A COST REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line amount for the performance and payment bonds. If the actual cost of the bonds is than the line item amount, the contract will be modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual
OPTION Option Group 3 (WESTERN AVE AT DOGWOOD)
FFP
This is a parent Contract Line Item, linking its Sub-Items 0004AA through 0004AQ. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0004AA through 0004AQ, wherein the sub-line items themselves identify the quantities required to perform said work.
0004AA 1 Job
OPTION PRECONSTRUCTION VIDEO RECORDING
0004AB 1 Job
OPTION TRAFFIC CONTROL AND PROTECTION
0004AC 50 Linear
0004AD 31 Linear
0004AE 5 Linear
0004AF 1 Each
OPTION CONNECT TO EXISTING WATER MAIN
FFP
0004AG 1 Each
OPTION REMOVE VALVE BOX
0004AH 1 Each
OPTION PLUG EXISTING WATER MAIN
0004AJ 1 Each
OPTION LINE STOP, 8"
0004AK 100 Square
OPTION CLASS D PATCH, 6
0004AL 50 Linear
0004AM 200 Square
0004AN 20 Square
0004AP 50 Square
0004AQ 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
Payment & Performance Bond for LINE ITEMS 0004AA THROUGH 0004AP - THIS IS A COST REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line amount for the performance and payment bonds. If the actual cost of the bonds is than the line item amount, the contract will be modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual
SUMMATION OF PRICES-
BASE BID ITEMS (0001AA THROUGH 0001BT): $_____________________________________
GROUP 1 OPTION ITEMS (0002AA THROUGH 0002BH):$______________________________
GROUP 2 OPTION ITEMS (0003AA THROUGH 0003BP):$_______________________________
GROUP 3 OPTION ITEMS (0004AA THROUGH 0004AQ):$_______________________________
OVERALL TOTAL BID PRICE (ALL BID ITEMS, TO INCLUDE THE RESPECTIVE SUB‐ITEMS & OPTION ITEMS):
Dogwood Street Water Main Improvements, Village of Park Forest,IL W912P620B0016
a. Vertical Tolerance: Provide minimum cover below channel bottom as specified on the plans. Pilot hole may go deeper if necessary to prevent breakout.
b. Horizontal Tolerance: Plus/minus - 60-inches from the centerline of the product pipe.
c. Curve Radius: No curve is acceptable with a radius less than 1,000-feet .
d. Entry Point Location: Make pilot hole entry point within plus/minus - 60-inches of the location shown on the drawings or as directed by the Contracting Officer in the field.
e. Exit Point Location: Make the exit point location within plus/minus - 60-inches of the location shown on the drawings or as directed by the Contracting Officer in the field.
f. Mandatory pipeline cover requirements are as shown on the drawings or as specified.
3.1.6 Guidance Systems
Walkover guidance systems are not acceptable for this project; use a magnetic survey tool locator installed behind the pilot string cutting head and an electric grid (tru-tracker) system for this project.
3.1.6 Reaming
Conduct reaming operations at the Contractor's discretion. Determine the type of back reamer to be utilized by the type of subsurface soil conditions that are encountered during the pilot hole drilling operation.
The reamer type is at the Contractor's discretion.
3.1.7 Pull Back
Fully assemble the entire pipeline to be installed via direction drill prior to commencement of pull back operations.
Support the pipeline during pullback operations in a manner to enable it to move freely and prevent damage. Install the pipeline in one continuous pull.
Minimize torsion stress by using a swivel to connect the pull section to the reaming assembly.
Maximum allowable tensile force imposed on the pull section is not to exceed 90percent of the pipe manufacturer's safe pull (or tensile) strength. If the pull section is made up of multiple pipe size or materials, the lowest safe pull strength value governs and the maximum allowable tensile force is not to exceed 90 percent of this value.
Minimize external pressure during installation of the pullback section in the reamed hole. Replace damaged pipe resulting from external pressure at no cost to the Government. Buoyancy modification is at the discretion of the Contractor.
SECTION 33 05 23.13 Page 6
AMD #0002 - 09/10/20
Dogwood Street Water Main Improvements, Village of Park Forest,IL W912P620B0016
3.1.8 Drilling Fluids Disposal
Collect drilling fluid returns in the entrance pit, exit pit, or spoils recovery pit. Immediately clean up any drilling fluid spills or overflows from these pits.
Dispose of fluids in a manner that is in compliance with all permits and applicable Federal, State, and local regulations. Disposal of the drilling fluids may occur on approved land owned by the Government subject to written approval from the Contracting Officer. Spread the drilling slurry over the Government-approved disposal area and plow into the soil.
Conduct disposal in compliance with all relative environmental regulations, right-of-way and work space agreements, and permit requirements.
3.1.9 Burp Holes
Provide burp holes to reduce the amount of dilling fluid spills and spoil overflows throught out the project.
3.1.10 Connection of Product Pipe to Pipeline
After the product pipe has been successfully installed, allow the product pipe to recover for 24 hours prior to connection of the pipeline. Ensure that a sufficient length of the product pipe has been pulled through the hole so that the pull-nose is not pulled back into bore hole due to stretch recovery of the product pipe.
3.2 FIELD QUALITY CONTROL
Maintain drilling logs that accurately provide drill bit location (both horizontally and vertically) at least every 2-inches 2-feet along the drill path. In addition, keep logs that record, as a minimum the following, every 15 minutes throughout each drill pass, back ream pass, or pipe installation pass:
a. Drilling Fluid Pressure,
b. Drilling Fluid Flow Rate,
c. Drill Thrust Pressure,
d. Drill Pullback Pressure, and
e. Drill Head Torque.
Make all instrumentation, readings, and logs available to the Contracting Officer at all times during operation.
3.3 CLOSEOUT ACTIVITIES
Immediately upon completion of work, remove all rubbish and debris from the job site. Remove all construction equipment and implements of service leaving the entire area involved in a neat condition acceptable of the Contracting Officer.
Immediately clean "blow holes" or "breakouts" of drilling fluid to the surface and return the surface area to its original condition. Dispose of
SECTION 33 05 23.13 Page 7
AMD #0002 - 09/10/20
| W912P620B0016,A0002 Village of Park Forest WaterMain Improvement |
| W912P620B0016_472678_Water_Main_Replacement_Park_Forest_IL_AMD0002_SPECS(10-Sep-20) |
| 33 05 23.13 - UTILITY HORIZONTAL DIRECTIONAL DRILLING |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.6 Reaming |
| 3.1.7 Pull Back |
| 3.1.8 Drilling Fluids Disposal |
| 3.1.9 Burp Holes |
| 3.1.10 Connection of Product Pipe to Pipeline |
| 3.2 FIELD QUALITY CONTROL |
| 3.3 CLOSEOUT ACTIVITIES |