This solicitation notice and accompanying bid package outline a construction project to improve water mains in Lemont, Illinois. The U.S. Army Corps of Engineers Chicago District is seeking bids for the installation of approximately 4,800 feet of new 12-inch ductile iron and PVC water main on Main Street and Walker Road, as well as 900 feet of new 8-inch ductile iron main on Singer Avenue. Additional work includes fire hydrants, valves, and related infrastructure. Bids are due by September 4, 2020. The NAICS code is 237990 and the size standard is $39.5 million. The project is set aside for small businesses and is estimated to cost between $1-5 million. Interested parties can download specifications and drawings from the Federal Business Opportunities website using solicitation number W912P620B0015.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: SOLICITATION NO. W912P620B0015, "Project Title:Village of Lemont Water Main Improvements FY20 - (Lemont, IL) Chicago District Project"
By w ay of this Amendment, the government notif ies Bidders that revisions have been made w ithin the Bid Schedule and Project Plans. - See next page for further details.
- Continues on Next Pages -
1. CONTRACT ID CODE PAGE OF PAGES
1 35
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P620B0015
X 9B. DATED (SEE ITEM 11)
04-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Sep-2020
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P620B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
AMENDMENT PARTICULARS
A. AMENDED SECTION 00 10 00 (BID SCHEDULE):
The government is providing a revised bid pricing table (Section 00 10 00 – Solicitation Contract Form), which details the following changes: The unit of issue for SUBCLINS of 0004AD and 0005AD have been listed correctly therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Section 00 10 00 enclosed hereunder. Bidders shall provide their prices on the Revised Bidding Schedule.
B. AMENDED PROJECT PLANS:
The government is providing revised pages to the aforementioned Project Plans Section. Therefore, Bidders shall remove and replace the previously issued respective Section with the Revised Sheets enclosed hereunder.
C. CONTRACTOR INQUIRIES AND GOVERNMENT RESPONSES:
Contractor Inquiry 1: Section 33 11 00 – Water Utility Distribution Piping mentions that butt-fused PVC pipe can be used for trenchless piping. Is Fusible PVC acceptable for the trenchless construction. Pipe details are attached.
USACE Response 1: The Government will not issuing revised specifications on the solicitation; the Government has determined fusible PVC DR 18 C900 to be an acceptable option for the directional bore portion of the project in the resultant award.
Contractor Inquiry 2: The HDPE pipe specified for directional drilling will have a smaller ID than the 12” Ductile Iron pipe that it connects to. Should HDPE be upsized to 14" to make the internal diameter comparable with the ID of the Ductile Iron Pipe?
USACE Response 2: The government has specified HDPE because of the bend in the road and the potential issues boring along the new gas main since it is more flexible. Therefore, the Contractor shall bid as specified.
Contractor Inquiry 3: Class 52 DIP and DR18 PVC provide higher pressure class rating for water main than DR11 HDPE. PE4710 HDPE uses as safety factor of only 1.59 as allowed in C906‐15. Based on a 2.0 safety factor, DR11 only provides 160 psi pressure rating. Should DR9 HDPE pipe be required to provide a closer pressure rating to the connecting water main?
USACE Response 3: The government has not specified DR 9 HDPE or 14” HDPE and is aware that the inside diameter of the 12” DR 11 HDPE is smaller. Nonetheless, the government is not worried about water supply issues given that the running pressures along Main Street are around 105 psi.
Contractor Inquiry 4: Fusible PVC pipe is resistant to water disinfectant oxidation. The UFGS 33 11 00 Water Utility Distribution Piping specification notes states "Polyethylene (PE) pipe is subject to oxidative degradation by many variables including pH, the concentration and type of disinfectant, water temperature, installation procedure and conditions. Disinfectants like chlorine, chloramines, chlorine dioxide, ozone and others may create an Oxidation Reduction Potential (ORP) in PE Pipe".
USACE Response 4: See USACE Response 1.
Contractor Inquiry 5: The Summary of Quantities suggests each bid item for Pressure Connection includes a 5’ dia.
valve vault. However, under Option 1, 2 valve vaults are listed along with 1 – 12” valve and 1 pressure connection.
Please clarify.
USACE Response 5: "Contractors should bid the line items as specified per the Revised Bid Schedule as part of this amendment.". There should only be 1 valve vault listed in Option 1 to coincide with the 1 12” valve. The Pressure Connection includes a valve vault already.
Contractor Inquiry 6: The line item descriptions for Performance and Payment Bonds states the Government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds from the bonding agency. It continues that the Government will not pay more than the total line item amount for the performance and payment bonds. It later states that adjustments to the line item will also be made for any revisions to the actual bond costs associated with contract changes. Please confirm upon submitting a paid invoice from the bonding company or agency that the amount of that invoice will be paid in full regardless of the line item amount in the base bid and subsequent bid options.
USACE Response 6: The Contractor Will be paid for the amount stated on the invoice not to exeed the LINE ITEM
PRICE REGARDLESS OF IT BEING A BASE BID “LINE ITEM” OR OPTION “LINE ITEM”.
Contractor Inquiry 7: The Bid Item for Portland Concrete Sidewalk, 5” under Option 3 and Option 4 is listed as square yards on the bid form but square feet on the plan Summary of Quantities. Please clarify.
USACE Response 7: The Bid Schedule erroneously lists the unit of issue of Square Yards instead of Square Feet on SUBCLINS of 0004AD and 0005AD, the unit of issue has been revised with the issuance of this amendment, See Revised BID Schedule.
Contractor Inquiry 8: The final page of the bid form asks for Group 3 and Group 4 totals through items AR. Please confirm there is no bid item AR.
USACE Response 8: The “Summation of Bid Prices” section lists transposed SUBCLINS of 0004AR and 0005AR, this text has been revised with the issuance of this amendment, See Revised BID Schedule.
Contractor Inquiry 9: The plans do not call for a water service reconnection at 905 Singer Ave. Please advise.
USACE Response 9: An additional 30’ of Water Service Line in Trench, Copper 1.5” has been added to the project.
SUBCLIN 0005AB, has been revised with the issuance of this amendment, See Revised BID Schedule.
Contractor Inquiry 10: Please define the scope of work for call out at Option 1, STA 5+00 “Proposed Emergency Connection to Franciscan Village Water System”. Is this work in addition to the 8” x 8” pressure connection call out?
USACE Response 10: There is no work in addition to the 8” x 8” pressure connection for the “Emergency Connection to Franciscan Village” comment. Contractors should note the Restrained Joints chart on Sheet 23 as this will especially apply to this section of the project.
Contractor Inquiry 11: Please provide the original vectored set of drawings (full size pdf format). Wording and numbers are not clearly readable on the 11 x 17 scans provided.
USACE Response 11: The full‐size set of plans at this link below:
a. https://cloud.novotnyengineering.com/owncloud/s/bOGy82l1J3zp1hh
Contractor Inquiry 12: Please advise whether the EEO goals of 20.9% minority participation and 6.9% female participation are applicable to individuals employed by the Contractor and subcontractors OR if they are participation goals for Minority‐owned and Women‐owned businesses portions of the Contract work.
USACE Response 12: The goals under Executive Order 11246 are stated in percentages of aggerate work force for each construction project.
Contractor Inquiry 13: The Solicitation states ‘Competition for this acquisition is 100% set aside for small business concerns.’ Please confirm bidders need not carry a small business certification but are only required to meet the requirements of completing less than $39.5M of Water and Sewer Line and Related Structures Construction annually and employing fewer than 500 employees.
USACE Response 13: Contractors must meet the Small Business Size Standards for NAICS 237110 Water and Sewer Line and Related Structures, which is stated in dollars at $39.5M. The certification must be made by the contractor within their representations and certifications maintained at Sam.gov
Contractor Inquiry 14: The Geotechnical Report recommends 4” bedding material of FA‐1, FA‐2, or FA‐6 for water main pipe. The Village of Lemont Utility Street Cut detail (sheet 23) calls for 4” bedding material of CA‐11 or CA‐16.
The detail for Rigid Pipe Installation (sheet 22) notes bedding is not required for ductile iron water main on virgin clay. Please clarify all bedding/backfill requirements.
USACE Response 14: Bid as specified. The Geotechnical Report is a recommendation.
Contractor Inquiry 15: On the Lemont project is it possible to give an option to open cut the areas of HDPE that are called to be bored? The Jack and Bore is doable, and we are not having any issues with that. The location the project is starting at, we installed some main over there as well as attempted to bore in some water services in that area last year and our boring contractors are not wanting to quote the job due to the cobble in that area that we have encountered in the past. As the boring logs show we are not into the rock but the cobblestone that we have previously encountered makes boring in that area a nightmare.
USACE Response 15: Bid as specified. If the successful offeror prefers to use an alternate method of construction and pipe materials for this segment of water main, the contractor may offer a Value Engineering proposal under FAR Clause 52.248‐3 Value Engineering‐Construction (OCT 2015) for Government review.
Contractor Inquiry 16: Sheet 10 shows 32' of 12" DI water main in both PVC casing and steel casing? Obviously can't be both
USACE Response 16: Sheet 10 should only show 32' of 20" PVC encasing pipe. Sheet 10 profile has been modified to show that.
Contractor Inquiry 17: The jack/bored casings for this project are planned right at the top of the bedrock. That will likely be a mixed interface bore, which is very difficult to control line and grade. Because there are existing gas mains to cross very close in elevation to the bore, we would like to lower the bore into the rock for a safer and more homogeneous construction procedure. Would this be allowed?
USACE Response 17: Bid as specified. Elevation modifications due to utility conflicts will be determined in the field during construction.
END OF AMENDMENT
(Updated Project Plans and Revised Bid Schedule follows)
REVISED BID SCHEDULE
REVISED BID SCHEDULE VIA AMENDMENT NO. 0002
- BIDDERS SHALL USE THE BELOW REVISED BID SCHEDULE TO FURNISH THEIR BIDS
Section 00 10 00 - Solicitation
BID SCHEDULE PRICING -
THE BELOW PRICING SCHEDULE SHALL BE USED BY BIDDERS TO SUBMIT THEIR
BID PRICES; IT IS CONSIDERED THE “BID SCHEDULE” AS TERMED THROUGHOUT
THE SOLICITATION.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE WORK
FFP
MAIN ST - STA 25+00 TO 61+00
This is a parent Contract Line Item, linking its Sub-Items 0001AA through 0001AS. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0001AA through 0001AS, wherein the sub-line items themselves identify the quantities required to perform said work.
NET AMT
0001AA 1 Job
MOBILIZATION
FFP
Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AB 1 Job
DEMOBILIZATION
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0001AC 1,700 Linear
Foot
WATER MAIN IN TRENCH, DUCTILE IRON 12"
FFP
0001AD 76 Linear
PVC ENCASEMENT 20"
0001AE 1,600 Linear
WATER MAIN DIRECTIONALLY BORED
WATER MAIN DIRECTIONALLY BORED, DIPS, HDPE 12"
0001AF 52 Linear
JACKED IN PLACE, ENCASING PIPE
JACKED IN PLACE, ENCASING PIPE, STEEL, 24x1/4"
0001AG 18 Square
PORTLAND CONCRETE SIDEWALK 5"
0001AH 10 Linear
CONCRETE CURB & GUTTER, TYPE M-4.12
0001AJ 26 Square
Yard
ASPHALT PATCHING-CLASS D, TYPE 2, 10"
0001AK 4 Each
VALVE VAULTS TYPE A, 5' DIA
0001AL 4 Each
GATE VALVES 12"
0001AM 1 Each
PRESSURE CONNECTION 12" X 12"
0001AN 13 Each
FIRE HYDRANTS
0001AP 1 Job
LANDSCAPE RESTORATION
0001AQ 1 Job
TRAFFIC CONTROL
0001AR 350 Cubic
ROCK EXCAVATION
0001AS 1 Lot
PERFORMANCE AND PAYMENT BONDS
FFP
BOND COVERAGE FOR LINE ITEMS 0001AA THROUGH 0001AS
THIS IS A COST REIMBURSABLE LINE ITEM FOR BONDS
The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changesSee FAR 52.232-5(g).
OPTION GROUP 1 OPTION ITEMS
FFP
WALKER S. OF MAIN – STAT 5+00 to 12+00
This is a Parent Line Item identifying the option work that relates directly to its Sub-Line Items 0002AA through 0002AQ; the Sub-Line Items themselves identify the quantities required to perform said work. Therefore, the Contractor shall provide its pricing separately at Sub-Line Items 0002AA through 0002AQ.
0002AA 700 Linear
OPTION WATER MAIN IN TRENCH, DUCTILE IRON 12"
0002AB 22 Linear
OPTION PVC ENCASEMENT 20"
0002AC 85 Linear
OPTION JACKED IN PLACE, ENCASING PIPE
JACKED IN PLACE, ENCASING PIPE, STEEL, 24x1/4"
0002AD 71 Square
OPTION ASPHALT PATCHING - CLASS D, TYPE 3, 10"
0002AE 1 Each
OPTION VALVE VAULTS TYPE A, 5' DIA
0002AF 1 Each
OPTION GATE VALVES 12"
0002AG 2 Each
OPTION FIRE HYDRANTS
0002AH 1 Job
OPTION LANDSCAPE RESTORATION
0002AJ 1 Job
OPTION TRAFFIC CONTROL
0002AK 1 Each
OPTION PRESSURE CONNECTION 8" X 8"
0002AL 80 Linear
OPTION DI TYPE 2 STORM SEWER 16"
0002AM 160 Linear
OPTION DI TYPE 2 STORM SEWER 20"
0002AN 73 Linear
OPTION DI TYPE 2 STORM SEWER 24"
0002AP 50 Cubic
OPTION ROCK EXCAVATION
0002AQ 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
BOND COVERAGE FOR “GROUP 1 OPTIONS”
( LINE ITEMS 0002AA THROUGH 0002AP)
THIS IS A COST REIMBURSABLE LINE ITEM FOR BONDS
The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item the actual bond costs associated with contract changes See FAR 52.232-5(g).
OPTION GROUP 2 OPTION ITEMS
FFP
WALKER S. OF MAIN – STAT 12+00 to 16+00
This is a Parent Line Item identifying the option work that relates directly to its Sub-Line Items 0003AA through 0003AH; the Sub-Line Items themselves identify provide its pricing separately at Sub-Line Items 0003AA through 0003AH.
0003AA 455 Linear
OPTION WATER MAIN IN TRENCH, DUCTILE IRON 12"
0003AB 2 Each
OPTION VALVE VAULTS TYPE A, 5' DIA
0003AC 2 Each
OPTION GATE VALVES 12"
0003AD 3 Each
0003AE 1 Job
0003AF 1 Job
0003AG 10 Cubic
OPTION ROCK EXCAVATION
0003AH 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
BOND COVERAGE FOR “GROUP 2 OPTIONS”
( LINE ITEMS 0003AA THROUGH 0003AG)
THIS IS A COST REIMBURSABLE LINE ITEM FOR BONDS
The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item
OPTION GROUP 3 OPTION ITEMS
FFP
SINGER S. OF PEIFFER – STA 1+00 ATO 4+05
This is a Parent Line Item identifying the option work that relates directly to its Sub-Line Items 0004AA through 0004AR; the Sub-Line Items themselves identify provide its pricing separately at Sub-Line Items 0004AA through 0004AR.
0004AA 289 Linear
OPTION WATER MAIN IN TRENCH, DUCTILE IRON 8"
0004AB 191 Linear
OPTION WATER SERVICE LINE IN TRENCH,COPPER 1.5"
0004AC 21 Square
OPTION PORTLAND CONCRETE DRIVEWAY 7"
0004AD 62 Square
OPTION PORTLAND CONCRETE SIDEWALK 5"
0004AE 23 Linear
OPTION CONCRETE CURB & GUTTER, TYPE M-4.12
0004AF 9 Square
OPTION HMA DRIVEWAY 3"
0004AG 40 Linear
OPTION PVC ENCASEMENT 12"
0004AH 1 Each
0004AJ 71 Square
OPTION ASPHALT PATCHING - CLASS D, 4"
0004AK 1 Each
OPTION CONNECTION TO EXISTING WATER MAIN
CONNECTION TO EXISTING WATER MAIN, 6"
0004AL 40 Linear
OPTION SANITARY SEWER 8" (WATER MAIN) PVC
0004AM 20 Linear
OPTION DI TYPE 2 STORM SEWER 12"
0004AN 1 Job
0004AP 1 Job
0004AQ 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
BOND COVERAGE FOR “GROUP 3 OPTIONS”
( LINE ITEMS 0004AA THROUGH 0004AQ)
THIS IS A COST REIMBURSABLE LINE ITEM FOR BONDS
The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item
OPTION GROUP 4 OPTION ITEMS
FFP
SINGER N. OF PEIFFER – STA 4+05 to 12+00
This is a Parent Line Item identifying the option work that relates directly to its Sub-Line Items 0005AA through 0005AR; the Sub-Line Items themselves identify provide its pricing separately at Sub-Line Items 0005AA through 0005AR.
0005AA 600 Linear
OPTION WATER MAIN IN TRENCH, DUCTILE IRON 8"
0005AB 430 Linear
OPTION WATER SERVICE LINE IN TRENCH, COPPER 1.5
0005AC 21 Square
OPTION PORTLAND CONCRETE DRIVEWAY 7"
0005AD 50 Square
OPTION PORTLAND CONCRETE SIDEWALK 5"
0005AE 23 Linear
OPTION CONCRETE CURB & GUTTER, TYPE M-4.12
0005AF 9 Square
OPTION HMA DRIVEWAY 3"
0005AG 160 Linear
OPTION PVC ENCASEMENT 12"
0005AH 2 Each
0005AJ 369 Square
OPTION ASPHALT PATCHING - CLASS D, 4"
0005AK 2 Each
OPTION PRESSURE CONNECTION 8" X 8"
0005AL 40 Linear
OPTION SANITARY SEWER 8" (WATER MAIN) PVC
0005AM 20 Linear
OPTION DI TYPE 2 STORM SEWER 12"
0005AN 1 Job
0005AP 1 Job
0005AQ 1 Lot
OPTION PERFORMANCE AND PAYMENT BONDS
FFP
BOND COVERAGE FOR “GROUP 4 OPTIONS”
(LINE ITEMS 0005AA THROUGH 0005AQ)
THIS IS A COST REIMBURSABLE LINE ITEM FOR BONDS
The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item
SUMMATION OF BID PRICES:
BASE BID ITEMS (0001AA THROUGH 0001AS): $_____________________________________
GROUP 1 OPTION ITEMS (0002AA THROUGH 0002AQ):$______________________________
GROUP 2 OPTION ITEMS (0003AA THROUGH 0003AH):$_______________________________
GROUP 3 OPTION ITEMS (0004AA THROUGH 0004AQ): $_______________________________
GROUP 4 OPTION ITEMS (0005AA THROUGH 0005AQ):$_______________________________
OVERALL TOTAL BID PRICE (ALL BID ITEMS, TO INCLUDE THE RESPECTIVE SUB-ITEMS &
OPTION ITEMS):