Amendment_0001_W912P619B0022,_Calumet_City_Pump_Station_Upgrades.pdf
PDF 7 MB Posted
- Attached to
- "Calumet City Pump Station Upgrades, City of Calumet, IL, County of Cook (USACE - Chicago District Project)"
- Solicitation number
- W912P619B0022
About this file
This file contains Amendment 0001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6692066213
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE INVITATION FOR BIDS NO. W912P619B0022, "CALUMET CITY PUMP STATION UPGRADES, CITY OF CALUMET, IL, COUNTY OF
COOK (USACE - CHICAGO DISTRICT PROJECT)"
-- THIS AMENDMENT CONTINUES ON THE NEXT PAGES --
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0022
X 9B. DATED (SEE ITEM 11)
23-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Sep-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. BID OPENING DATE AND TIME:
The Bid Opening Date and Time is NOT EXTENDED by this Amendment. Therefore, bids are due by 1:00 p.m. (Central Time) on September 23, 2019. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document – See “IMPORTANT BID NOTES.”
B. AMENDED SPECIFICATION SECTIONS: The following Specification Sections have been revised.
The revised sections are enclosed replacing the previously furnished respective sheet.
a. SECTION 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES has been revised to clarify various measurement and payment bid items. Revised pages are enclosed.
b. SECTION 01 33 00 SUBMITTAL PROCEDURES ENG FORM 4025-R and Submittal Register are enclosed.
c. SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS paragraph 1.6.1.1.1 has been revised to state, “The SSHO may serve as the Quality Control Manager or as the Superintendent but not both.
d. SECTION 01 58 00 PROJECT IDENTIFICATION Sign Graphics standards are enclosed.
C. REVISED DRAWING SHEETS: The following Drawing Sheets have been revised and are hereunder enclosed replacing the previously furnished respective sheets.
Sheet C-2: Bid Item No. Replacement, HMA hatching change
Sheet MP-2: Note 6 was replaced
Sheet MP-4: Note 1 removed. Float levels were added
Sheet E-3: Symbol List updated
Sheet E-4: Electrical Abbreviations updated
D. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries as follows:
Q1. At the discretion of the government, it may award any, all or none of the Option Items within 180 calendar days following the Contractor’s acknowledgment of the Notice to Proceed letter. For any option exercised, the option will be awarded at the price(s) set forth in the resultant contract and the work must be completed within the performance time of the contract, which is 365 calendar days following the Contractor’s acknowledgement of the Notice to Proceed. Should any one of the option items be awarded, the Contractor will be required to secure additional bonding (RE: FAR Clause 52.228-15 at Section 00 70
00 of the solicitation and resulting contract document. If the item #0002AA awards 180 days after NTP then we have only 185 days to complete then the remaining time could exceed the manufacturing lead time of the Generator Alone. Typical lead time could be 26 weeks and with the LDs $ 1,515.37 per day could add up to 90 days.
USACE Response Q1: The equipment supplier has indicated (confirmed) that fabrication of the generator will not exceed 12 weeks from the date of order. In addition, the government may award the options at the time of award. However, should a worst case scenario result, a time adjustment can be implemented at the government’s discretion. Therefore, if a time adjustment is warranted, the Contractor would not be subjected to liquidated damages.
Q2. Will the contractor be responsible for hiring a NACE inspector for the special coatings? 09 96 00
USACE Response Q2: This is not a requirement of this contract.
Q3. If the Generator option is accepted will the contractor be responsible for the diesel fuel during start up and load bank testing?
USACE Response Q3: The contractor shall account for the fuel costs in the generator option item. By this Amendment, a revised Measurement and Payment paragraph, specific to this item, is not being included. Instead, the government will provision the payment for said costs at the pertinent section of the conformed, resulting Contract.
Q4. Is this project tax exempt?
USACE Response Q4: Please visit Specification Section 01 10 00, paragraph 1.9, wherein it states the following, "Pursuant to the rulings of the Illinois Department of Revenue, materials which are to be physically incorporated into real estate owned by the Government are exempt from Illinois Retailers' Occupational Tax and Use Tax. However, sales of tools, fuel, lumber for forms and other end use or consumption items which are not physically incorporated into real estate are taxable sales. After contract award, the Contractor may request the Government Sales Tax Exemption Number, which must be used when purchasing tax exempt material. Nothing herein shall be construed to affect the provisions contained in Solicitation Section 00 70 00, Contract Clause entitled FEDERAL, STATE, AND LOCAL TAXES."
Q5. If there is a permit review with Calumet City will any fees be waived?
USACE Response Q5: Calumet City is waving all permit fees.
Q6. Has the USACE contacted the state of Illinois or Indiana about NPDES Permits?
USACE Response Q6: No special permits are required or anticipated to complete the work/project, including NPDES, point source, or CWA Section 401/404.
If the Contractor proposes temporary construction features that are not shown on the drawings that would require a permit (including more than one acre of land disturbing activity, or fill in a waterway, etc.) coordination will be required in accordance with Specification Section 01 57 20 paragraph 3.3.1.
Q7. Will 401,402, 403, and or 404 permits be completed by the USACE before construction begins?
USACE Response Q7: See response to Q6 above.
E. WAGE DETERMINATION: This Amendment encloses the most recent Wage Determination, General Decision IL20190009 08/30/2019.
F. PRE-BID MEETING ATTENDANCE: By this Amendment, the Chicago District is enclosing a copy of the Attendance Sheet from the pre-bid meeting held on September 4, 2019.
G. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846- 5378; email: ericka.d.hillard@usace.army.mil.
END OF AMENDMENT NO. 0001
(The aforementioned Specification Sections, Drawing Sheets Wage Determination, and Pre-Bid Meeting Attendance Sheet follows)
Calumet City Yates Pond Pump Station Upgrades, Calumet City, IL W912P619B0022
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1.1 SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Mobilization (Base Bid Item 0001AA)
1.1.1.1 Payment
Payment will be made for costs associated with mobilization. This line item shall include Mobilization, Perimeter Erosion Barrier Construction and Visqueen Sheeting placement.
The Contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site. The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the job price for this item. The Contracting Officer Representative (COR) may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal. The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the contract JOB price. Costs associated with daily mobilization must not be included in this cost. Daily mobilization must be included in the unit prices of materials being installed. This line item shall include Mobilization, Perimeter Erosion Barrier Construction and Visqueen Sheeting placement.
1.1.1.2 Unit of Measure
Unit of Measure: JOB
1.1.2 Demobilization (Base Bid Item 0001AB)
1.1.2.1 Payment
Payment will be made for all labor, materials and equipment costs associated with demobilization. This line item shall include
SECTION 01 22 00.00 10 Page 3
AMD #0001 - 09/12/19
Demobilization, Perimeter Erosion Barrier Removal and Visqueen Sheeting Removal.
The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the contract JOB price. Costs associated with daily demobilization must not be included in this cost.
Daily demobilization must be included in the unit prices of materials being installed. This line item shall include Demobilization, Perimeter Erosion Barrier Removal and Visqueen Sheeting Removal.
The Contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.2.2 Unit of Measure
Unit of Measure: JOB
1.1.3 Demolition: Pump Station (Base Bid Item 0001AC)
1.1.3.1 Payment
Payment will be made for costs associated with Demolition: Lift Station , as defined in Special Clause PAYMENT FOR DEMOLITION: PUMP STATION , and shall include all labor, materials and equipment for the . This line item shall include Pump Station, Diesel Generator, Concrete Pad and Chain-Link Fence Removal.
The Contractor will be compensated for the totality of its activities needed to demolish the lift station. The Government will pay all costs for the demolition of the lift station of all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.3.2 Unit of Measure
Unit of Measure: JOB
1.1.4 Electrical Demolition (Base Bid Item 0001AD)
1.1.4.1 Payment
Payment will be made for costs associated with Electrical Demolition , as defined in Special Clause PAYMENT FOR ELECTRICAL DEMOLITION , and shall include all labor, materials and equipment for Electrical Demolition .
This line item shall include Electrical Demolition.
The Contractor will be compensated for the totality of its activities needed to demolish for electrical demolition. The Government will pay all
SECTION 01 22 00.00 10 Page 4 costs for the electrical demolition of the lift station of all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.4.2 Unit of Measure
Unit of Measure: JOB
1.1.5 Pump Station Construction (Base Bid Item 0001AE)
1.1.5.1 Payment
Payment will be made for costs associated with Pump Station Construction, as defined in Special Clause PAYMENT FOR PUMP STATION CONSTRUCTION. This line item shall include Pump Station Construction that includes the labor involved in the construction of the Pump Station, including installing three new submersible pumps and piping and associated appurtenances and concrete flat-top. Assume pump station construction includes hatches, replacement of three new gate valves, replacement of three new check valves, adjustment of existing dresser coupling to match new piping, application of coatings. It does not include the generator and its concrete pad. Payment will be made for all labor for Pump Station Construction, and shall include all labor for the installation of three new submersible pumps and piping and associated appurtenances, replacement of three new gate valves, replacement of three new check valves, adjustment of existing dresser coupling to match new piping and application of coatings. This line item does not include the labor for the generator and its concrete pad for Option 1 Bid Item 0002AF, labor for the concrete pad for the traffic box and electrical controls (Base Bid Item 0001AN), or labor for the concrete flat-top (Base Bid Item 0001AJ).
The Contractor will be compensated for the totality of its activities needed for Pump Station Construction. The Government will pay all costs for the Pump Station Construction all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.5.2 Unit of Measure
Unit of Measure: JOB
1.1.6 Valves and Discharge Piping (Base Bid Item 0001AF)
1.1.6.1 Payment
Payment shall be made at the contract unit price for the Valves and Discharge Piping, for furnishing materials, equipment, plant and tools for labor, fabrication and delivery for other incidental work, and shall include material, equipment only, and all incidentals for accomplishing the work, excluding labor. will be made for costs associated with Valves and Discharge Piping, as defined in Special Clause PAYMENT FOR VALVES AND
SECTION 01 22 00.00 10 Page 5
DISCHARGE PIPING. This line item shall include Valves and Discharge Piping. Valves shall include consists of three 14 - inch - ductile iron Gate Valves and three 14 - inch ductile iron Swing Check Valves.
The Contractor will be compensated for the totality of its activities needed for Valves and Discharge Piping. The Government will pay all costs for the Valves and Discharge Piping all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.6.2 Unit of Measure
Unit of Measure: JOB
1.1.7 Bypass Pumping (Base Bid Item 0001AG)
1.1.7.1 Payment
Payment will be made for the following materials, and all incidentals for accomplishing the work costs associated with the Bypass Pumping, as defined in the Special Clause PAYMENT FOR BYPASS PUMPING . This line item shall include the following equipment: Force Main Bypass Pumping, Valve Vault, Type A, 4 foot Diameter, Type 5 Frame, Closed Lid.
The Contractor will be compensated for the totality of its activities needed for the bypass pumping. The Government will pay all costs for the bypass pumping of all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.7.2 Unit of Measure
Unit of Measure: JOB
1.1.8 Pump Station - Electrical, Complete (Base Bid Item 0001AH)
1.1.8.1 Payment
Payment will be made for all labor, materials, and all incidentals for accomplishing the work for the costs associated with the Lift Station - Electrical, Complete , as defined in the Special Clause PAYMENT FOR LIFT STATION - ELECTRICAL, COMPLETE . This line item shall include the complete electrical construction for the pump station.
The Contractor will be compensated for the totality of its activities needed for the Lift Station - Electrical, Complete. The Government will pay all costs for the Lift Station - Electrical of all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the
SECTION 01 22 00.00 10 Page 6 satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.8.2 Unit of Measure
Unit of Measure: JOB
1.1.9 Concrete Flat-Top (Base Bid Item 0001AJ)
1.1.9.1 Payment
Payment will be made for all labor, materials, equipment, and all incidentals for accomplishing the work costs associated with for the Concrete Flat-Top , as defined in the Special Clause PAYMENT FOR CONCRETE FLAT-TOP. This line item shall include all labor, materials, equipment and all incidentals for the following materials and equipment: the complete concrete flat-top construction for the pump station , including the hatches and frames .
The Contractor will be compensated for the totality of its activities needed for the Concrete Flat-Top. The Government will pay all costs for the Concrete Flat-Top of all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.9.2 Unit of Measure
Unit of Measure: JOB
1.1.10 Site Restoration (Base Bid Item 0001AK and Option 1 Bid Item 0002AG)
1.1.10.1 Payment
Payment will be made for costs associated with the Site Restoration , as defined in Special Clause PAYMENT FOR SITE RESTORATION , and shall include labor, materials and equipment for . This line item shall include all work included with Site Restoration, including Topsoil, Fur nbish and Place, 4 inch - For Existing Generator footprint only , Seeding - For Generator Footprint Only , and Mulching - f For the existing Generator Footprint only.
The Contractor will be compensated for the totality of its activities needed for the Site Restoration. The Government will pay all costs for the Site Restoration, including all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for the item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.10.2 Unit of Measure
Unit of Measure: JOB
SECTION 01 22 00.00 10 Page 7
1.1.11 Hot-Mix Asphalt (HMA) Driveway Pavement Removal and Repavement (Base Bid Item 0001AM)
1.1.11.1 Payment
Payment will be made for accosts associated with HMA Driveway Removal and Replacement , as defined in the Special Clause PAYMNT FOR HMA DRIVEAY PAVEMENT REMOVAL AND REPAVEMENT, and shall include all labor, equipment and materials for HMA Driveway Removal and Repavement, including . This line item shall include HMA Driveway Pavement Removal, Excavation, HMA Surface Course, Mix "D", N50, 1.5 inch, HMA Binder Course, IL-19.0, N50,
2.25 inch, and Aggregate Base Course, Type B, 10 inch.
The Contractor will be compensated for the totality of its activities needed for the HMA Driveway Pavement Removal and Repavement. The Government will pay all costs for the HMA Driveway Pavement Removal and Repavement of all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this bid item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.11.2 Unit of Measure
Unit of Measure: JOB
1.1.12 Concrete Pad (Base Bid Item 0001AN)
1.1.12.1 Payment
Payment will be made for all costs associated with the Concrete Pad , as defined in the Special Clause PAYMENT FOR CONCRETE PAD , and shall include all labor, equipment and materials and all incidentals for accomplishing the work for the concrete pad for the traffic box and electrical controls, which includes 12-inch Portland Cement Concrete, Welded Write Reinforcement, 6 inch CA - 6 Granular Base and Excavation .
This line item shall include the concrete pad for the traffic box and electrical controls. This line item includes 12-inch Portland Cement Concrete, Welded Write Reinforcement, 6 inch CA - 6 Granular Base and Excavation.
The Contractor will be compensated for the totality of its activities needed for the Concrete Pad. The Government will pay all costs for the Concrete Pad of all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for this bid item if the COR deems there is no reasonable relationship to the cost of the work in this contract.
Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.12.2 Unit of Measure
Unit of Measure: JOB
SECTION 01 22 00.00 10 Page 8
1.1.13 Demolition: Pump Station - Generator with Concrete Pad and Chain Link Fence Only (Option 1 Bid Item 0002AB)
1.1.13.1 Payment
Payment will be made for costs associated with Demolition: Pump Station - Generator with Concrete Pad and Chain Link Fence Only , as defined in Special Clause PAYMENT FOR DEMOLITION: PUMP STATION - GENERATOR WITH CONCRETE PAD AND CHAIN LINK FENCE ONLY. This line item shall include all labor, materials and equipment for Demolition of the Generator with Concrete Pad and Chain Link Fence only.
The Contractor will be compensated for the totality of its activities needed for the Demolition: Pump Station - Generator with Concrete Pad and Chain Link Fence Only. The Government will pay all costs for the Demolition: Pump Station - Generator with Concrete Pad and Chain Link Fence only including all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for the item if the COR deems there is no reasonable relationship to the cost of the work in this contract.
Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.13.2 Unit of Measure
Unit of Measure: JOB
1.1.14 Electrical Demolition (Option 1 Bid Item 0002AC)
1.1.14.1 Payment
Payment will be made for costs associated with Electrical Demolition , as defined in Special Clause PAYMENT FOR ELECTRICAL DEMOLITION , and shall include all labor, materials and equipment . This line item shall include all work included with the demolition of the generator.
The Contractor will be compensated for the totality of its activities needed for the Electrical Demolition. The Government will pay all costs for the Electrical Demolition, including all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for the item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.14.2 Unit of Measure
Unit of Measure: JOB
1.1.15 Pump Station Construction - Proposed Generator with Concrete Pad Only (Option 1 Bid Item 0002AD)
1.1.15.1 Payment
Payment will be made for all labor for the costs associated with Pump Station Construction - Proposed Generator with Concrete Pad Only , as defined in Special Clause PAYMENT FOR PUMP STATION CONSTRUCTION - PROPOSED
SECTION 01 22 00.00 10 Page 9
GENERATOR WITH CONCRETE PAD ONLY. This line item shall include all labor for work included with the Pump Station Construction - Proposed Generator with Concrete Pad Only.
The Contractor will be compensated for the totality of its activities needed for the Pump Station Construction - Proposed Generator with Concrete Pad Only. The Government will pay all costs for the Pump Station Construction - Proposed Generator with Concrete Pad Only, including all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for the item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.15.2 Unit of Measure
Unit of Measure: JOB
1.1.16 Pump Station - Electrical, Complete (Option 1 Bid Item 0002AE)
1.1.16.1 Payment
Payment will be made for all labor, materials, and all incidentals for accomplishing the work for the costs associated with Pump Station - Electrical, Complete , as defined in Special Clause PAYMENT FOR PUMP STATION - ELECTRICAL, COMPLETE . This line item shall include all work included with the installation of the electrical components for the proposed generator.
The Contractor will be compensated for the totality of its activities needed for the Pump Station - Electrical, Complete. The Government will pay all costs for the Pump Station - Electrical, Complete, including all of the Contractor's plant and equipment at the job price for this item.
The COR may require the Contractor to furnish cost data to justify its bid price for the item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.16.2 Unit of Measure
Unit of Measure: JOB
1.1.17 Concrete Pad (Option 1 Bid Item 0002AF)
1.1.17.1 Payment
Payment will be made for all labor, materials, equipment, and all incidentals for installing costs associated with the Concrete Pad , as defined in Special Clause PAYMENT FOR CONCRETE PAD. This line item shall includ ing e all work included with the installation of th e concrete pad for the proposed generator . This work shall include the 12-inch Portland Cement Concrete Pavement, Welded Wire Reinforcement, and 6 inch CA-6 Granular Base.
The Contractor will be compensated for the totality of its activities needed for the Concrete Pad. The Government will pay all costs for the Concrete Pad, including all of the Contractor's plant and equipment at the
SECTION 01 22 00.00 10 Page 10 job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for the item if the COR deems there is no reasonable relationship to the cost of the work in this contract.
Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.17.2 Unit of Measure
Unit of Measure: JOB
1.1.18 Excavation (Option 1 Bid Item 0002AH)
1.1.18.1 Payment
Payment will be made for costs for all labor, materials and equipment for associated with Excavation. This line item shall include all labor, materials and equipment for excavation for the Existing Generator Pad, Proposed Generator Concrete Pad and Proposed HMA Driveway South of the Proposed Generator.
The Contractor will be paid for the totality of its activities needed for the excavation. The Government will pay all costs for the Excavation for all of the Contractor's plant and equipment at the job price for the line item. The COR may require the Contractor to furbish cost data to justify its bid price for this item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR deems there is no reasonable relationship to the cost of the work in the contract. Failure to justify the line item to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
1.1.18.2 Unit of Measure
Unit of Measure: JOB
1.1.19 Hot-Mix Asphalt (HMA) Driveway Pavement (Option 1 Bid Item 0002AJ)
1.1.19.1 Payment
Payment will be made for costs for all labor, materials and equipment for associated with the HMA Driveway Pavement , as defined in Special Clause PAYMENT FOR HOT-MIX ASPHALT DRIVEWAY PAVEMENT. This line item shall include all labor, equipment and materials for the work included with HMA Driveway Pavement, including HMA Surface Course, Mix "D", N50, 1.5 inch, HMA Binder Course, IL-19.0, N50, 2.25 inch and Aggregate Base Course, Type B, 10 inch.
The Contractor will be compensated for the totality of its activities needed for the HMA Driveway Pavement. The Government will pay all costs for the HMA Driveway Pavement, including all of the Contractor's plant and equipment at the job price for this item. The COR may require the Contractor to furnish cost data to justify its bid price for the item if the COR deems there is no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the COR will result in payment determined by the COR of the actual cost, which is not subject to appeal.
SECTION 01 22 00.00 10 Page 11
1.1.19.2 Unit of Measure
Unit of Measure: JOB
1.1.20 Performance and Payment Bond (Base Bid Item 0001AQ and Option 1 Bid Item 0002AL)
1.1.20.1 Payment
Payment will be made for the performance and payment bonds that are required as part of this contract. The Government will pay the actual cost of the bonds or the Contractor's bid price, whichever is less, after receiving evidence of payment (paid invoice) from the bonding company or agency.
1.1.20.2 Unit of Measure
Unit of Measure: LOT
1.2 UNIT PRICE PAYMENT ITEMS
Notwithstanding the requirements of any other specification, drawing, or clause in this Contract, the Government will only pay for the actual quantities of the unit price items incorporated into the work, up to the estimated contract quantities listed on the BIDDING SCHEDULE. Any quantity placed in excess of the contract quantity without first receiving a contract modification increasing the estimated quantity of that unit price item shall be at the Contractor's expense. The Contractor is responsible for notifying the Government of the need to increase the contract quantity of a line item at least seven calendar days before the item is needed.
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.2.1 Submersible Pumps (Base Bid Item 0001AL)
1.2.1.1 Payment
Payment shall be made at the contract unit price for the Submersible Pumps, for furnishing materials, equipment, plant and tools for labor, fabrication and delivery for other incidental work, and shall include material, equipment only, and all incidentals for accomplishing the work, excluding labor. Payment for the Submersible Pumps will be made at the contract unit price for Base Bid Item 0001AL of the Bid Schedule, including the Submersible Pumps Construction. The contract unit price shall include full compensation for furnishing all plant, labor, materials and incidentals necessary to complete the Lift Station Construction.
Payment for Submersible Pumps Construction will be made under Bid Item
0001AL.
1.2.1.2 Measurement
Item will be measured by each. The payment will be for the Submersible
SECTION 01 22 00.00 10 Page 12
Pumps. Construction as listed in the above paragraph.
1.2.1.3 Unit of Measure
Unit of Measure: Each (EA)
1.2.2 Disposal of CCDD (Base Bid Item 0001AP and Option 1 Bid Item 0002AK)
1.2.2.1 Payment
Payment will be made for disposal of CCDD and shall include labor, materials and equipment for the removal and disposal of CCDD. The disposal of CCDD will be paid at the contract unit price for Base Bid Item 0001AP and Option 1 Bid Item 0002AK of the Bid Schedule. Payment shall constitute full compensation for preparing the Disposal of CCDD for furnishing materials, equipment, plan tools and for labors and other incidental work necessary to complete the work.
1.2.2.2 Measurement
Item The disposal of CCDD will be measured by Tons (TN) (2,000 pounds).
1.2.2.3 Unit of Measure
Unit of Measure: Tons (TN) (2,000 pounds)
1.2.3 Diesel Engine Generator (Option 1 Bid Item 0002AA)
1.2.3.1 Payment
The Diesel Engine Generator will be paid at the contract unit price for Option 1 Bid Item 0002AA of the Bid Schedule. Payments shall constitute full compensation for the Diesel Engine Generator, for furnishing materials equipment, plant and tools, fabrication and delivery and other incidental work, excluding labor. The Diesel Engine Generator will be paid at the contract unit price for Option 1 Bid Item 0002AA of the Bid Schedule. Payments shall constitute full compensation for the Diesel Engine Generator, for furnishing materials, equipment, plant and tools and for labors and other incidental work necessary to complete the work.
1.2.3.2 Measurement
Item The Diesel Engine Generator will be measured by each.
1.2.3.3 Unit of Measurement
Unit of Measure: Each (EA)
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
SECTION 01 22 00.00 10 Page 13
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 8 PAGES
Calumet City Yates Pond Pump Station Upgrades
01 10 00 SD-01 Preconstruction Submittals
1.7 G CSConstruction Schedule
1.10Condition of Existing Structures
1.14 G CSCoordination with Others
1.5Drug Free Workplace
1.23.1 G GSEList of E-Verified/Eligible
Candidates
SD-06 Test Reports
1.8 G CSConstruction Progress
Photographs
1.21Progress Meeting Minutes
SD-11 Closeout Submittals
1.8.2 G CSConstruction Complete
Photographs
01 11 00 SD-01 Preconstruction Submittals
1.5 G CSSalvage Plan
01 33 00 SD-01 Preconstruction Submittals
1.8 G CSSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 G CS SOAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G CS SOAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 8 PAGES
Calumet City Yates Pond Pump Station Upgrades
01 35 26 1.6.1.5Crane Operators/Riggers
1.7.2.2 G CSStandard Lift Plan
1.7.2.3 G CSCritical Lift Plan
1.7.2.4 G CSNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
1.14.1Radiography Operation Planning
Work Sheet
1.14.1Portable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G CSContractor Quality Control (CQC)
Plan
01 55 26.00 03 SD-01 Preconstruction Submittals
3.2 G CS AETraffic Control Plan
01 57 20.01 03 SD-01 Preconstruction Submittals
1.8 G DHEnvironmental Protection Plan
01 58 00 SD-02 Shop Drawings
1.4 G CSSign Legend Orders
01 78 00 SD-03 Product Data
1.9.1As-Built Record of Equipment and Materials
1.13Final Cleaning
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 8 PAGES
Calumet City Yates Pond Pump Station Upgrades
01 78 00 SD-08 Manufacturer’s Instructions
1.10Preventative Maintenance
1.10Condition Monitoring (Predictive
Testing)
1.10Inspection
SD-10 Operation and Maintenance
Data
1.12 G CSOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.6Intermediate Working CAD
Drawing Submittal
1.7.1Final CAD Drawing Submittal
1.7.2 G CSFinal CAD Drawing Backcheck
Submittal
02 41 00 SD-11 Closeout Submittals
3.4.3 G AEReceipts
03 30 00 SD-02 Shop Drawings
2.16.1 G AEReinforcing Steel Shop Drawing
SD-03 Product Data
2.16.3 G AEAir-Entraining Admixture
2.16.3 G AEAccelerating Admixture
2.16.3 G AEWater-Reducing or Retarding
Admixture
2.16.3 G AEManufacturer's Literature
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 8 PAGES
Calumet City Yates Pond Pump Station Upgrades
03 30 00 2.16.2 G AEReinforcing Steel Manufacturer's
Product Data
SD-05 Design Data
1.4.2 G AEMix Design
SD-06 Test Reports
3.18.2 G AECompressive Strength Tests
3.18.2 G AEAir Content
3.18.2 G AESlump
2.5.4 G AEWater
SD-11 Closeout Submittals
2.16.4 G AEWarranties
03 45 33 SD-02 Shop Drawings
2.9.2 G AEDrawings of Precast Prestressed
Concrete Members
SD-03 Product Data
2.9.6 G AEAir-Entraining Admixture
2.9.6 G AEAccelerating Admixture
2.9.6 G AEWater-Reducing or Retarding
Admixture
2.9.6 G AEManufacturer's Literature
SD-05 Design Data
2.9.1 G AEConcrete Mix Design
SD-06 Test Reports
3.3 G AEAggregate Tests
3.3 G AECompressive Strength Tests
3.3 G AEAir Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 8 PAGES
Calumet City Yates Pond Pump Station Upgrades
03 45 33 3.3 G AESlump Tests
3.3 G AEWater
09 96 00 SD-03 Product Data
1.4.1 G AEManufacturer's Standard Color
Chart
2.2.5 G AEManufacturer's Standard Color
Chart
26 05 00.00 40 SD-02 Shop Drawings
2.1.6.1 G AERaceways and Conduit Drawings
2.1.6.1 G AEWires and Cables Drawings
2.1.6.1 G AEBoxes Drawings
2.1.6.1 G AESupporting Devices
SD-03 Product Data
2.1.6.2 G AERaceways Product Data
2.1.6.2 G AEWires and Cables Product Data
2.1.6.2 G AEBoxes Product Data
2.1.6.2 G AESupporting Devices Product Data
2.1 G AEMaterial, Equipment, And Fixture
Lists
SD-08 Manufacturer’s Instructions
2.1.6.3 G AEManufacturer's Instructions
26 32 14.00 10 SD-02 Shop Drawings
2.12 G AEDetailed Drawings
SD-05 Design Data
2.12 G AEGenerator
2.12 G AEDay Tank
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 8 PAGES
Calumet City Yates Pond Pump Station Upgrades
26 32 14.00 10 SD-06 Test Reports
2.12 G AEPerformance Tests
SD-10 Operation and Maintenance
Data
2.12 G AEOperation and Maintenance
Manuals
31 05 19 SD-03 Product Data
2.1.2Thread
2.2Manufacturing Quality Control
Sampling and Testing
SD-04 Samples
3.1Quality Assurance Samples and
Tests
SD-07 Certificates
2.1.1Geotextile
32 01 13.62 SD-06 Test Reports
3.2 G AETests
32 92 19 SD-03 Product Data
1.2 G AEDelivery Schedule
33 31 23.00 10 SD-03 Product Data
2.1.5 G AELists of Materials
SD-06 Test Reports
3.2.3 G AEHydrostatic Tests
3.2.3 G AELeak Tests
35 45 02.00 10 SD-02 Shop Drawings
2.10 G AEDetail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 8 PAGES
Calumet City Yates Pond Pump Station Upgrades
35 45 02.00 10 SD-03 Product Data
2.10 G AEMaterials
2.10 G AEEquipment
2.10Spare Parts
2.10 G AEInstallation Instruction Manual
SD-06 Test Reports
3.1 G AEFactory Test Reports
SD-10 Operation and Maintenance
Data
2.9 G AEOperation and Maintenance
Manuals
40 05 13 SD-03 Product Data
2.2.12 G AELists of Materials and Equipment
SD-06 Test Reports
3.3 G AEPipe Leakage Tests
G AEHydrostatic Tests
3.5.2 G AEStormwater Piping Pressure
Tests
3.6.2 G AEValve Pressure Tests
40 95 00 SD-02 Shop Drawings
2.20 G AEDetail Drawings
SD-03 Product Data
2.20 G AEMaterials
2.20 G AEEquipment
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 8 PAGES
Calumet City Yates Pond Pump Station Upgrades
40 95 00 2.20 G AEOperation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
1.5 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, comply with the most recent edition of USACE EM 385-1-1 , and the following federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.6.1 Personnel Qualifications
1.6.1.1 Site Safety and Health Officer (SSHO)
Provide an SSHO that meets the requirements of EM 385-1-1 Section 1. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs.
If the SSHO is off-site for a period longer than 24 hours, an equally-qualified alternate SSHO must be provided and must fulfill the same roles and responsibilities as the primary SSHO. When the SSHO is temporarily (up to 24 hours) off-site, a Designated Representative (DR), as identified in the AHA may be used in lieu of an Alternate SSHO, and must be on the project site at all times when work is being performed.
Note that the DR is a collateral duty safety position, with safety duties in addition to their full time occupation.
1.6.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties
The SSHO may also serve as the Quality Control Manager or . The SSHO may not serve as the Superintendent , but not both .
1.6.1.2 Competent Person Qualifications
Provide Competent Persons in accordance with EM 385-1-1 , Appendix Q and herein. Competent Persons for high risk activities include confined space, cranes and rigging, excavation/trenching, fall protection, and electrical work.