W81G6681922059

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

REFERENCE: W912P6-18-B-0015 CHICAGO DISTRICT-USACE, "Fish Barrier Stray Current Mitigation Project at Romeoville, IL”

A. Point of Contact for this Amendment is Anita R. Simpkins at (312) 846-5370 or at anita.r.simpkins@usace.army.mil.

B. Revisions follow on the next pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 25

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P618B0015

X 9B. DATED (SEE ITEM 11)

28-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

-Sep-2018

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P618B0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

C. AMENDED Solicitation Section: None

D. AMENDED SPECIFICATION SECTIONS: The below Specification Sections have been revised; therefore, the

Bidder shall replace the respective pages with the revised pages enclosed herein.

(1) SPECIFICATION SECTION 01 22 00.00 10, PRICE AND PAYMENT PROCEDURES, para 1.2.5.2: A statement was added to clarify the measurement of barbed wire for payment. Barbed wire will be measured per linear foot of the three strands of barbed wire.

(2) SPECIFICATION SECTION 01 10 00, GENERAL PROVISIONS: Para 1.30.2, Clause 13, is not applicable to the project and was removed.

(3) SPECIFICATION SECTION 32 31 13.53, HIGH-SECURITY NON-CONDUCTIVE FENCE AND

GATES: Para 3.7: “security” was removed from these paragraph to address a comment from the BCOES review.

E. AMENDED PLAN SHEETS: The below Drawing Sheets have been revised; therefore, the Bidder shall replace the respective pages with the revised pages enclosed herein.

(1) Plan Sheets G-003, G-004, GC101, GC102, CD101, and CS107: The access road location was moved to a public roadway.

(2) The most recent U.S. DOL Davis Bacon Wage Determination IL180011, dated 09/07/2018 is attached.

General Decision Number: IL180011 09/07/2018 IL11

Superseded General Decision Number: IL20170011

State: Illinois

Construction Types: Heavy and Highway

Counties: Boone, De Kalb, Du Page, Kane, Kendall, Lake, McHenry and Will Counties in Illinois.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (does not include landscape projects).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/05/2018

1 04/06/2018

2 05/11/2018

3 05/25/2018

4 06/01/2018

5 06/08/2018

6 06/15/2018

7 06/22/2018

8 06/29/2018

9 07/06/2018

10 07/13/2018

11 08/10/2018

12 08/17/2018

13 08/24/2018

14 08/31/2018

15 09/07/2018

CARP0555-003 06/01/2018

DUPAGE ANE LAKE COUNTIES

Rates Fringes

CARPENTER

Building....................$ 47.35 32.83

Heavy & Highway.............$ 47.35 32.83

CARP0555-008 06/01/2016

WILL COUNTY

Rates Fringes

Carpenter and Piledriver.........$ 45.35 32.30

CARP0555-011 06/01/2018

KANE, McHENRY (North of Hwy 52), AND KENDALL COUNTIES

Carpenter and Piledriver.........$ 47.35 32.84

CARP0790-003 05/01/2018

DE KALB COUNTY

CARPENTER........................$ 41.77 29.18

CARP0790-004 05/01/2018

CARROLL, JO DAVIESS, LEE, OGLE (Oregon and South thereof), STEPHENSON, and WHITESIDE COUNTIES

CARPENTER........................$ 41.77 29.18

CARP0792-003 05/01/2018

BOONE COUNTY

CARPENTER........................$ 44.22 26.73

ELEC0009-002 06/03/2018

Line Construction

Groundman...................$ 40.48 61.52%

Lineman and Equipment

Operator....................$ 51.90 61.52%

ELEC0117-001 06/04/2018

KANE (Northern Half) and McHENRY (All) COUNTIES

ELECTRICIAN......................$ 48.64 32.60

ELEC0150-001 07/01/2017

LAKE COUNTY

ELECTRICIAN......................$ 40.00 38.49

ELEC0176-011 06/01/2018

ELECTRICIAN......................$ 43.50 39.26

ELEC0196-001 03/05/2018

BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, and MCHENRY COUNTIES

Line Construction

Equipment Operator..........$ 42.59 32.75%+$5.75+A

Groundman...................$ 32.86 32.75%+$5.75+A

Lineman, Substation

Technician, Cable Splicing

Technician, Digger

Operator, Crane Opertor 20 tons and above, and Signal

Technician..................$ 51.06 32.75%+$5.75+A

FOOTNOTE: A. PAID HOLIDAYS: Memorial Day, Independence

Day, Labor Day, and Thanksgiving Day

ELEC0364-003 06/01/2018

BOONE (All) & DEKALB (Remainder) COUNTIES

ELECTRICIAN......................$ 47.00 33.51

ELEC0461-006 06/04/2018

DEKALB (Sandwich TWP), KANE (Southern Half) & KENDALL (All)

COUNTIES

ELECTRICIAN......................$ 47.72 32.39

ELEC0701-001 06/04/2018

DUPAGE COUNTY

ELECTRICIAN......................$ 40.50 102.09%

ENGI0150-015 06/01/2018

BOONE and DE KALB COUNTIES

OPERATOR: Power Equipment

Group 1.....................$ 46.65 37.45

Group 2.....................$ 46.10 37.45

Group 3.....................$ 44.80 37.45

Group 4.....................$ 43.35 37.45

Group 5.....................$ 41.90 37.45

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Plant; Asphalt Heater and Planer combination; Asphalt Spreader; Asphalt Silo Tender;

Autograder, GOMACO or similar; Belt Loader; Caisson Rigs;

Car Dumper, Central Redi-Mix Plant; Combination Backhoe

Front End Loader Machine (1 cu yd or over Backhoe bucket with attachments); Backhoe with Shear attachment; Concrete

Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft; Concrete Placer; Concrete Tube Float;

Cranes, all attachments; Cranes, Hammerhead, Linden, Peco and machines of a like nature; Creter Crane; Crusher, stone; Derricks; Derrick Boats; Derricks, traveling;

Dredges; Field Mechanic Welder; Formless Curb and Gutter

Machine; Gradall and machines of a like nature; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted; Hoists, one, two, and three Drum; Hydraulic

Backhoes; Locomotive, all Mucking Machine; Pile Drivers and

Skid Rig; Pre-Stress Machine; Pump Cretes Dual Ram; Rock

Drill-Crawler or Skid Rig; Rock Drill truck mounted; Roto

Mill Grinder, 36" and over; Roto Mill Grinder, less than

36"; Slip- Form Paver; Soil Test Drill Rig, truck mounted;

Straddle Buggies; GCI Crane and similar; Hydraulic

Telescoping Form (tunnel); Tie Back MAchine; Tractor Drawn

Belt Loader: Tractor Drawn Belt Loader with attached

Pusher; Tractor with boom; Tractaire with attachment;

Traffic Barrier Conveyor Machine; Raised or Blind Hoe Drill

(Tunnel & Shaft); Trenching Machine; Truck Mounted Concrete

Pump with boom; Truck mounted Concrete Conveyor;

Underground Boring and/or Mining Machines under 5 ft; Wheel

Excavator & Widener (Apsco)

GROUP 2: Batch Plant; Bituminous Mixer; Bobcats over .75 cu yd; Boiler and Throttle Valve; Bulldozer; Car Loader

Trailing Conveyors; Combination Backkhoe Front End Loader

Machine, less than 1 cu yd Backhoe Bucket with attachments;

Compressor and Throttle Valve; Compressor, common receiver

(3); Concrete Breaker or Hydro Hammer; Concrete Grinding

Machine; Concrete Mixer or Paver 7S series to and including

27 cu ft; Concrete Spreader; Concrete Curing Machine, Burlap Machine; Belting Machine and Sealing Machine;

Conveyor Muck Cars (Haglund or similar type); Finishing

Machine-Concrete; Greaser Engineer; Highlift Shovels or

Front End Loader; Hoist-Sewer Dragging Machine; Hydraulic

Boom Trucks, all attachments; Locomotives, Dinky; Pump

Cretes, Squeeze Cretes-Screw Type pumps, Gypsum Bulker and

Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, etc self-Propelled; Scoops-Tractor Drawn;

Self-propelled Compactor; Spreader-Chip- Stone etc;

Scraper; Scraper-Prime Mover in Tandem regardless of size

(add $1.00 to to Group 2 hourly rate for each hour and for each machine attached thereto); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug

Boats

GROUP 3: Boilers; Brooms, all power propelled; Cement Supply

Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift

Trucks; Grouting Machines; Hoists, Automatic; Hoists, all

Elevators; Hoists, Tugger single Drum; Jeep Diggers; Pipe

Jacking Machines; Post- hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch

Trucks with A-Frame; Work Boats; Tamper-Form motor driven

GROUP 4: Air compressor - Small 185 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 185;

Asphalt Spreader Backend Man; Combination - Small Equipment

Operator; Generators - Small 50 kw and under; Generators -

Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants

All (1 to 5); Pumps, over 3" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines

(2 through 5); Winches, 4 small electric drill winches;

Bobcats up to and including .75 cu yd

GROUP 5: Oilers

PREMIUM PAY:

Long Boom :

Cranes & Derricks 90' to 150' including jib receive an extra

$.50 per hour. Cranes & Derricks over 150' including jib receive an extra $.50 per hour plus an additional $.10 for each additional 10' of boom or jib.

Capacity Pay: Cranes & Derricks with maximum capacity exceeding 50 ton with less than 90' of boom or jib shall be compensated $.01 per hour for each ton of the rated capacity in excess of 50 ton.

Long Boom pay and Capacity pay cannot be combined.

Crane mounted earth auger, raised and blind hole drills, and truck mounted drill rigs receive an extra $.50 per hour.

Creter Cranes:

When the Creter Crane is equipped with a conveyor system capable of extending 70' or more, the engineer shall receive an extra $.50 per hour.

Truck Mounted Concrete Pumps:

When the Truck Mounted Concrete Pump is equipped with a boom, which is capable of extending 90' or more, the engineer shall receive $.50 per hour extra.

Truck Mounted Concrete Conveyor:

Truck Mounted Concrete Conveyors equipped with conveyors that are capable of extending 90' or more, the engineer shall receive an extra $.50 per hour.

Underground Work:

Employees working in tunnels, shafts, etc. shall be paid an additional $.40 per hour. Employees working under air pressure 1/2 pound to 7 pounds shall receive an additional

$.50 per hour. Employees working under air pressure of 7 pounds or over shall receive $.65 per hour more.

Mining Machines- Boring Machines:

The crew operating and maintaining the Mining Machines shall be compensated an additional $.50 per hour.

* ENGI0150-024 06/01/2018

DUPAGE, KANE, KENDALL, LAKE, McHENRY, and WILL COUNTIES

OPERATOR: Power Equipment

GROUP 1.....................$ 49.30 38.15

GROUP 2.....................$ 48.75 38.15

GROUP 3.....................$ 46.70 38.15

GROUP 4.....................$ 45.30 38.15

GROUP 5.....................$ 44.10 38.15

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;

Autograder/ GOMACO or similar; ABG Paver*, Backhoes with

Caisson attachment*, Ballast Regulator, Belt Loader*;

Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker

(truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All

Derricks; Derrick Boats; Derricks, traveling*; Dowell

Machine with Air Compressor ($1.00 above Class 1);

Dredges*; Field Mechanic Welder; Formless Curb and Gutter

Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic

Backhoes*; Backhoes with Shear attachments*; Mucking

Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;

Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form

(tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt

Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer

Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* &

Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*

GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle

Valve; Bulldozer; Car Loader Trailing Conveyors;

Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and

Throttle Valve; Compressor, common receiver (3); Concrete

Breaker or Hydro Hammer; Concrete Grinding Machine;

Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap

Machine; Belting Machine and Sealing Machine; Concrete

Wheel Saw; Conveyor Muck Cars (Haglund or similar type);

Drills (all); Finishing Machine-Concrete; Greaser Engineer;

Highlift Shovels or Front End Loader; Hoist- Sewer Dragging

Machine; Hydraulic Boom Trucks, all attachments;

Hydro-Blaster (requires two operators); Laser Screed*;

Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow

Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor

Drawn; Self- propelled Compactor; Spreader-Chip-Stone;

Scraper; Scraper-Prime Mover in Tandem regardless of size

(add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats

GROUP 3: Boilers; Brooms, all power propelled; Cement Supply

Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift

Trucks; Grouting Machines; Hoists, Automatic; Hoists, all

Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low

Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump

Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven

GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;

Combination - Small Equipment Operator; Directional Boring

Machine; Generators - Small 50 kw and under; Generators -

Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants

(1 to 5); Pumps, over 3" (1 to 3, not to exceed a total of

300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;

GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional

Boring

*Requires Oiler

IRON0001-014 06/01/2018

DU PAGE (Eastern 1/4), LAKE, AND MCHENRY (Hebron, Woodstock, and East thereof) COUNTIES

IRONWORKER

Sheeter.....................$ 49.08 38.28

Structural and Reinforcing..$ 48.83 38.28

* IRON0063-003 06/01/2018

LAKE, DUPAGE (Eastern 1/4) and McHENRY (HEBRON, WOODSTOCK &

EAST THEREOF) COUNTIES

IRONWORKER, ORNAMENTAL...........$ 48.05 35.93

IRON0393-003 06/01/2018

DEKALB (SOUTHEASTERN 2/3 including Sycamore and Dekalb), DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), and MCHENRY

(SOUTHEAST 1/4) COUNTIES

IRONWORKER.......................$ 45.84 35.50

IRON0444-006 06/01/2018

KENDALL (Southern Part) and WILL COUNTIES

IRONWORKER.......................$ 43.00 38.20

IRON0498-003 06/01/2018

BOONE, DEKALB (EXCEPT Southeast), and MCHENRY (Northwest)

COUNTIES

IRONWORKER.......................$ 39.39 38.89

LABO0002-004 06/01/2017

LABORER (SEWER CONSTRUCTION)

GROUP 1.....................$ 41.20 27.47

GROUP 2.....................$ 41.33 27.47

GROUP 3.....................$ 41.43 27.47

GROUP 4.....................$ 41.55 27.47

GROUP 5.....................$ 41.20 27.47

LABORER CLASSIFICATIONS

GROUP 1: Signalmen Top Laborers, and all other Laborers not

Mentioned.

GROUP 2: Concrete Laborers; Steel Setters.

GROUP 3: Cement Carriers; Cement Mixers; Concrete Repairmen;

Mortar Men; Scaffold Men; and Second Bottom Men.

GROUP 4: Bottom Men; Bracers-Bracing; Bricklayer's Tender;

Catch Basin Digger; Drainlayer; Dynamiter; Form Men;

Jackhammermen; Powerpac; Pipelayers; Rodders; Welders &

Burners; Well Point System Men.

GROUP 5: Asbestos Abatement Laborers, Toxic and Hazardous

Waste Removal Laborers & Dosimeter use (any device)

Monitoring Nuclear Exposure.

LABO0002-009 06/01/2017

DU PAGE COUNTY

LABORER (Compressed Air)

0 - 15 lbs..................$ 42.20 27.47

16 - 20 lbs.................$ 42.70 27.47

21 - 26 lbs.................$ 43.20 27.47

27 - 33 lbs.................$ 44.20 27.47

34 lbs and over.............$ 45.20 27.47

LABORER (Tunnel and Sewer)

GROUP 1.....................$ 41.20 27.47

GROUP 2.....................$ 41.33 27.47

GROUP 3.....................$ 41.43 27.47

GROUP 4.....................$ 41.55 27.47

GROUP 5.....................$ 41.20 27.47

LABORER CLASSIFICATIONS (TUNNEL)

GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers

GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher

GROUP 3: Concrete repairmen; Lock tenders (pressure side);

Mortar men; Muckers; Grout machine operators; Track layers

GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;

Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;

Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;

skinners; Maintenance technician

GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure

LABORER CLASSIFICATIONS (SEWER)

GROUP 1: Signalmen; Top laborers and All other laborers

GROUP 2: Concrete laborers and Steel setters

GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;

Mortar men; Scaffold men; Second Bottom men

GROUP 4: Air trac drill operator; Bottom men;

Bracers-bracing; Bricklayer tenders; Catch basin diggers;

Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;

Pipelayers; Rodders; Welder-burners; Well point systems men

GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring

LABO0032-007 05/01/2018

DE KALB COUNTY

LABORER

General Laborer.............$ 35.40 31.73

Skilled Laborer.............$ 38.25 31.73

General Laborer: Carpenter Tender, Tool Cribman, Fireman or

Salamander Tender, Flagman, Gravel Box Man, Bumpman &

Spotter, Form Handler, Material Handler, Fencing Laborer, Cleaning Lumber, Pit Man, Material Checker, Landscaper, Unloading Explosives, Laying of Sod, Planting of Trees, Asphalt Workers With Machine & Layers, Asphalt Plant

Laborer, Wrecking, Fire-proofing, Driving Stakes, Stringlines for All Machinery, Window Cleaning, Demolition

Worker, Explosive Handling, Trimming & Removal of Trees, Multi-Plate Pipe, Pilot Cars for Traffic Control, Power

Rigging

Skilled Laborer: Asbestos Abatement Worker; Hazardous Waste

Worker Handling any Materials with any Foreign Matter

Harmful to Skin or Clothing, Track Labor, Cement Handler, Chloride Handler, Unloading & Laborers with Steel Workers &

Re-bars, Wet Concrete Workers, Tunnel Tenders in Free Air, Batch Dumper, Mason Tender, Kettle & Tar Man, Tank Cleaner, Plastic Installer, Scaffold Worker, Motorized Buggies or

Motorized Unit Used For Wet Concrete or Handling of

Building Materials, Laborers With De-Watering Systems, Sewer Workers Plus Depth, Vibrator Operator; Cement Silica, Clay, Fly Ash, Lime & Plasters Handlers (Bulk or Bag);

Cofferdam Worker Plus Depth, Concrete Paving, Placing, Cutting & Tying of Reinforcing, Deck Hand, Dredge Hand and

Shore Laborer, Bankman on Floating Plant, Grade Checker, Power Tools, Front End Man on Chip Spreader, Caisson Worker

Plus Depth, Gunnite Nozzleman, Leadman on Sewer Work, Welder, Cutter, Burner & Torchman, Chain Saw Operator, Jackhammer & Drill Operator, Layout Man and/or Tile Layer, Steel Form Setter - Street & Highway, Air Tamping

Hammerman, Signal Man On Crane, Concrete Saw Operator, Screenman on Asphalt Paver, Tending Masons with Hot

Material or Where Foreign Materials are used, Mortar Mixer

Operator, Multiple Concrete Duct - Leadman, Luteman, Asphalt Raker Curb Asphalt Machine Operator, Ready Mix

Scaleman Permanent Portable or Temporart Plant, Laborer

Handling Masterplate or Similar Materials, Laser Beam

Operator, Concrete Burning Machine Operator, Coring Machine

Operator, Plaster Tender, Underpinning & Shoring of

Buildings, Pump Man, Manhole & Catch Basin, Dirt & Stone

Tamper, Hoseman on Concrete Pump.

LABO0075-002 06/01/2017

GROUP 2.....................$ 41.55 27.47

GROUP 3.....................$ 41.20 27.47

GROUP 4.....................$ 41.55 27.47

GROUP 5.....................$ 41.40 27.47

GROUP 6.....................$ 41.55 27.47

GROUP 7.....................$ 41.40 27.47

GROUP 1 - Mortar mixers, handling asphalt shingles;

Scaffolds; Sewer and trench work (ground level down to 8 feet); Catch basin and manhole diggers, mesh handling on road work; Cement and mineral filler handler; Concrete puddlers; Batch dumpers (cement & asphalt); Vibrator operators; Sand and stone wheelers to mixer Handlers);

Concrete wheelers; Airtamping hammermen; Concrete & paving breakers; Rock drillers/Jackhammermen; Chipping hammermen

1-Bag mixer; Asphalt laborer; Chain and power saws; Pit men; Fencing laborers; Mason tenders (mortar and brick wheeler); Kettlemen & tarmen, tank cleaners; Scaffold and staging laborers; Pot Firemen (tarmen); Heaters tender for any purpose; Water pumps (portable water pumps shall be tended by laborers if the employer determines tending is required); Rip rap; Handling of slab steel road forms in any manner, except road form setting, setting center strips, Contraction and expansion joints (road work);

Unloading and handling of lumber, brick, transite materials, cast iron water pipe, reinforced concrete rods, sewer and drain tile, railroad tiles and all other creosoted materials; paving blocks and concrete forms;

Handling of insulation of any type; all work involving the unloading of materials, fixtures, or furnishing, whether crated or uncrated; all mortar and composition mixers of sewer work; track laborers; Chimney and silo laborers working at a height of 1 to 48 feet; All laborers working on swinging suspended, or any type or make of scaffolding 1 to 48 feet; All laborers working inside a sphere or any type or make of tank; Working inside a sphere or any type or make of tank from bottom to a height of 48 feet; Form strippers (any type); Mechanical or motorized buggies, for concrete or masons employers; Use of skid steer loads or any other machinery which replaces the wheelbarrow or buggy; Handling multiple concrete duct or any other type of pipe used in public utility work unless otherwise specified herein; Snapping of wall ties and removal of rods; drilling of anchor bolt holes; Concrete or asphalt clipper type saws and self-propelled saws; Shoulder and grade laborers; All hydraulic electric and air or any other type of tools;

Grouting and caulking; Cleaning lumber, Nail pulling, Deck hand; Dredgehand; Shore laborer; Bankmen on Floating Plant;

Tool and material checkers; Signalmen and Flagmen on all construction work; Cleaning of debris; Removal of trees;

Concrete curing, temporary concrete protection regardless of manner or materials used; Laborers on Apsco; Janitorial;

Wrecking and demolition laborers

GROUP 2 - Sewer and drain pipe layers and multiple concrete duct or any other type of pipe used, on public utility work

(ground level to 8 feet); Pumpcrete pipe handlers

GROUP 3 - Asphalt rakers; Hod carriers; Plasterer laborers;

Gunnite laborers, Slab for setters on roads, highways, streets, airport runaways, and radii (any type of form) stringline men for all aforementioned work; Wagon and tower drillers on land and floating plant used on dredging;

Asphalt gunners and plug men (undercoating on road work);

Mortar pump laborers; Plaster pump laborers

GROUP 4 - Tunnel miners, and all laborers inside tunnel; Air blow pipemen; Torchmen (burners); Mortaring men on sewer and drain pipe (the applying of mortar and composition mixes); All bottom men on sewer work-all sewer and drain pipelayers-multiple concrete duct or any other type of pipe used on public utility work-8 feet or more below ground level, and all other sewer and trench laborers 8 feet or more below ground level regardless of excavation area; All labor work inside cofferdam; Use of a 10 foot or more drill steel for hand held drills; Caisson laborers ground level down 15 feet; All air tools 8 feet or more below ground level; All laborers working on swinging-suspended or any type or make of scaffolds, 48 feet to 100 feet; All chimney and silo laborers working at a height of 48 to 100 feet;

All tamping hammers over 150 lbs.; All laborers working inside of a sphere or any type or make of tank at a height of 48 feet to 100 feet; all hydraulic, electric and air tools or any other type 8 feet or more below ground level;

Vibrators-any type-8 feet or more below ground level

GROUP 5 - Gunnite nozzle men; Caisson laborers and all tamping hammers from 150 lbs and over; from 15 feet below ground level down to 50 feet; and all laborers working inside of a sphere or any type of tank for every additional

50 feet or part thereof above 100 feet in height

GROUP 6 - All underground cavern laborers; Caisson laborers

50 feet or more below ground level; Laborers working under radio active conditions (suiting up); Blasting men

(Powdermen)

GROUP 7 - Dosimeter (any device) used for monitoring nuclear exposure; Asbestos abatement worker; Toxic and hazardous waste removal laborer; and chimney and silo laborers for every additional 50 feet or any part thereof above 100 feet high

LABO0149-002 06/01/2017

BOONE, KANE, KENDALL, AND McHENRY COUNTIES

GROUP 2.....................$ 41.43 27.47

GROUP 3.....................$ 41.20 27.47

GROUP 4.....................$ 41.20 27.47

GROUP 5.....................$ 41.43 27.47

GROUP 6.....................$ 41.55 27.47

GROUP 7.....................$ 41.55 27.47

GROUP 8.....................$ 41.20 27.47

GROUP 9.....................$ 41.40 27.47

GROUP 1: Common laborer, Asphalt laborer, Asphalt plant laborer, Striping laborer, Clipper type concrete saw, Self-propelled saws

GROUP 2: Air tampers & Vibrators

GROUP 3: Mortar & Concrete mixers

GROUP 4: Stringline & form setter; Torchman (demolition), Sheeting & Cribbing, Black top rakers & lutemen, Machine screwmen

GROUP 5: Chain saw man, Jackhammer man, Drillman, Concrete breaders & air spade, GROUP 6: Tunnel laborers, Tile layers & bottom men

GROUP 7: Caisson diggers, Dynamiters

GROUP 8: Flagman

GROUP 9: Asbestos apatement laborers, Toxic & hazardous waste removal laborers & Dosimeter (any device) monitoring

LABO0152-003 06/01/2017

GROUP 2.....................$ 41.28 27.47

GROUP 3.....................$ 41.20 27.47

GROUP 4.....................$ 41.43 27.47

GROUP 5.....................$ 41.40 27.47

GROUP 6.....................$ 41.40 27.47

GROUP 1: General laborers; Asphalt

GROUP 2: Cement gun laborers

GROUP 3: Asphalt Tampers and Smoothers

GROUP 4: Rakers and Lutemen; Machine screwman; Kettlemen;

Mixermen, Drum-Men; Jackhammermen (Asphalt); Mite Box

Spreaders; Laborers on birch overman and similar spreader equipment; Laborers on apsco; Laborers on Air Compressors;

Paving Form Setters; Jackhammerman (Concrete); Power Drive

Concrete Saws

GROUP 5: Cement Gun Nozzle (Gunite)

GROUP 6: Asbestos abatement laborers; Toxic and hazardous waste removal laborers; Dosimeter (any device monitoring nuclear exposure)

PAIN0014-003 06/01/2018

LAKE and WILL COUNTIES

PAINTER: Brush Only.............$ 46.55 27.24

PAIN0030-001 07/01/2018

DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES

PAINTER

Brush, Drywall

Taper/Finisher, Sandblaster, and Spray......$ 46.55 21.58

PAIN0030-004 07/01/2018

BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES

PAINTER

Brush, Roller, Spray, Sandblasting, Paperhanger, Drywall Finishing, Taper, and Spray Structural Steel..$ 39.95 22.61

PLAS0011-002 06/01/2017

CEMENT MASON/CONCRETE FINISHER...$ 42.00 34.56

PLAS0011-008 06/01/2017

DE KALB, KANE, KENDALL, AND McHENRY COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 44.84 31.60

PLAS0011-013 06/01/2017

CEMENT MASON/CONCRETE FINISHER...$ 44.98 31.47

PLAS0011-015 06/01/2017

BOONE COUNTY

CEMENT MASON/CONCRETE FINISHER...$ 36.99 26.93

PLASTERER........................$ 34.78 27.28

PLAS0803-001 08/01/2010

CEMENT MASON/CONCRETE FINISHER...$ 38.00 24.03

* TEAM0179-002 06/01/2017

KENDALL and WILL COUNTIES

TRUCK DRIVER

2 or 3 Axle Trucks..........$ 37.68 0.15+a

4 Axle Trucks...............$ 37.83 0.15+a

5 Axle Trucks...............$ 38.03 0.15+a

6 Axle Trucks...............$ 38.23 0.15+a

FOOTNOTES:

a. $733.20 per week.

b. Lowboy rate based on number of axles

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes;

Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to

40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick

Change Barrier; Self-Propelled Chip Spreader; Shipping and

Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or

3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump

Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper

Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump

Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer

Trucks 7 yards or over; Mobile Cranes while in transit; Oil

Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front

* TEAM0301-001 06/01/2017

LAKE AND MCHENRY COUNTIES

2-3 AXLES...................$ 37.69 10.15+a

4 AXLES.....................$ 37.84 10.15+a

5 AXLES.....................$ 38.04 10.15+a

6 AXLES.....................$ 38.24 10.15+a

FOOTNOTES:

a. 325.20 per week.

b. Lowboy rate based on number of axles

Paid Holidays: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day.

900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years -

2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.

by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to

40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick

Change Barrier; Self-Propelled Chip Spreader; Shipping and

Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or

3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen

Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic

Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer

Trucks 7 yards or over; Mobile Cranes while in transit; Oil

Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it

* TEAM0325-004 06/01/2017

BOONE and WINNEBAGO COUNTIES

2 - 3 Axles.................$ 36.62 20.40

4 Axles.....................$ 36.77 20.40

5 Axles.....................$ 36.97 20.40

6 Axles.....................$ 37.08 20.40

FOOTNOTE: An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

by cars, pick-up trucks and tractors; Ambulances; Batch

Gate Lockers; Batch Hopperman; Car and Truck Washers; Forl

Lifts and Hoisters; Helpers;

Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers

Pole Trailer, up to 40 feet; Power Mower Tractors; Skipman;

Slurry Trucks, two-man operation; Teamsters; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or

Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer

Trucks under 7 yards; Ready-Mix Plant Hopper Operator;

Winch Trucks, 2 Axles

Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer

Trucks 7 yards or over; Mobile Cranes while in transit; Oil

Distributors, one-man operation

Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long, additional $0.50 per hour; Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more

*Mechanic*Truck Welder and Truck Painter; *Winter Rate:

Between Dec. 15 and Feb. 28 the mechanic and welder rate shall be $2.00 less than the scheduled scale. Truck Painter and Truck Welder classifications shall only apply in areas where and when it has been a past area practice;

Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories

Group 4 - Foreman; Master Mechanic; Self-loading equipment like P.B. and trucks with scoops on the front

* TEAM0330-002 06/01/2017

DEKALB COUNTY

2-3 AXLES...................$ 36.64 0.15+a

4 AXLES.....................$ 36.79 0.15+a

5 AXLES.....................$ 36.99 0.15+a

6 AXLES.....................$ 37.19 0.15+a

FOOTNOTE: a. $780.90 per week by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to

40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick

Change Barrier; Self-Propelled Chip Spreader; Shipping and

Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or

3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen

Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic

Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer

Trucks 7 yards or over; Mobile Cranes while in transit; Oil

Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it

* TEAM0673-003 06/01/2017

DU PAGE and KANE COUNTIES

2-3 AXLES...................$ 36.93 0.15+a

4 AXLES.....................$ 37.08 0.15+a

5 AXLES.....................$ 37.28 0.15+a

6 AXLES.....................$ 37.48 0.15+a

FOOTNOTE: a. $767.70 per week.

by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to

40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick

Change Barrier; Self-Propelled Chip Spreader; Shipping and

Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or

3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen

Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic

Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer

Trucks 7 yards or over; Mobile Cranes while in transit; Oil

Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Fish Barrier Stray Current Mitigation Phase 1 W912P6-18-B-0015

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 00

GENERAL PROVISIONS

06/15

PART 1 GENERAL

1.1 REFERENCES

1.2 CERTIFICATES OF COMPLIANCE

1.3 RESPONSIBLITY OF THE CONTRACTOR

1.4 SUBMITTALS

1.5 DRUG FREE WORKPLACE

1.6 REAL ESTATE

1.7 CONSTRUCTION SCHEDULE

1.8 CONSTRUCTION PROGRESS PHOTOGRAPHS

1.8.1 Photographic Documentation

1.8.1.1 Digital Photographic Media

1.8.2 Construction Complete Photographs

1.8.3 Payment and Acceptance

1.9 INSPECTION

1.10 CONDITION OF EXISTING STRUCTURES

1.11 PRESERVATION OF HISTORICAL, ARCHAEOLOGICAL AND CULTURAL RESOURCES

1.12 MINIMUM AMOUNT OF INSURANCE REQUIRED

1.13 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1.14 PERMITS AND RESPONSIBILITIES

1.15 COORDINATION WITH OTHERS

1.16 SPECIAL SAFETY REQUIREMENTS

1.17 ELECTRICAL HAZARDS ON SITE

1.18 ONE CALL SYSTEMS FOR EXCAVATORS

1.19 ELECTRICAL POWER LINES

1.20 BORROW/DISPOSAL SITES AND QUARRIES

1.21 TAX EXEMPTION

1.22 BARRICADES AND WARNING SIGNS

1.23 PRECONSTRUCTION CONFERENCE

1.24 PROGRESS MEETINGS

1.25 EQUAL OPPORTUNITY FOR VETERANS (FAR Clause 52.222.35)

1.26 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.27 UAI 5152.222-9000 CONTRACTOR SUPPLY AND USE OF ELECTRONIC

SOFTWARE FOR PROCESSING WAGE RATE REQUIREMENTS STATUTE CERTIFIED

LABOR PAYROLLS (APR 2011)

1.28 UAI 5152.231-9000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE

SCHEDULE (MAR 1995)

1.29 UAI 5152.249-9000 BASIS FOR SETTLEMENT OF PROPOSALS (MAR 2009)

1.30 SECURITY REQUIREMENTS

1.30.1 CLAUSE 2 - Access and General Protection/Security Policy and

Procedures

1.30.2 CLAUSE 15 - E-Verify Program

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

SECTION 01 10 00 Page 1

AMD 0001 - 09/07/18

-- End of Section Table of Contents --

SECTION 01 10 00 Page 2

SECTION 01 10 00

06/15

GENERAL PROVISIONS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of materials with specification requirements must be…