W912P618B0012
W81G6680741037
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE INVITATION FOR BID NO. W912P618B0012, CHICAGO SHIP AND SANITARY CANAL FISH BARRIER 2A COOLING SYSTEM
REPLACEMENT, ROMEOVILLE, IL (WILL COUNTY)
-- THE DESCRIPTION OF THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES --
1. CONTRACT ID CODE PAGE OF PAGES
J 1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P618B0012
X 9B. DATED (SEE ITEM 11)
16-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2018
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
A. BID DUE DATE AND TIME: This Amendment does not extend the Bid Opening Date and Time, which remains September 18, 2018 at 2:00p.m. (Central time). Therefore, bids shall be delivered to the Chicago District prior to 2:00pm. (Central time) on September 18, 2018. Specifics regarding bid submission is located at Solicitation Section 00 22 13.
B. AMENDED DRAWING SHEET (REVISED DRAWING SHEET ENCLOSED HEREUNDER):
Sheet M-101 note #9 was changed from “components shall be comparable with DI water” to “components shall be compatible with DI water”.
C. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to
Contractor’s inquiries (SEE THE FOLLOWING PAGE).
D. WAGE DETERMINATION: This Amendment encloses the most recent Wage Determination, General Decision IL11, dated 08/31/2018.
E. PRE-BID MEETING ATTENDANCE: By this Amendment, the Chicago District is enclosing a copy of the Attendance Sheet from the pre-bid meeting held on September 5, 2018.
F. PRE-AWARD SURVEY: By way of this Amendment, the government is adding a new submittal to be provided by the Bidder. Accordingly, the Bidder shall fully complete the enclosed PreAward Survey form and furnish it along with all other items called out in the Solicitation (Refer Solicitation Section 00 22 13 – Supplementary Instructions to Bidders, as specifically described at Paragraph 2. “SUBMISSION OF
BIDS.”
G. POINT OF CONTACT: The Point of Contact (POC) for this Amendment is Ericka Hillard at (312) 846‐ 5378; email: ericka.d.hillard@usace.army.mil.
USACE’S RESPONSES TO CONTRACTOR’S INQUIRIES FOLLOW:
Question 1: Page 12 of 55 of the IFB lists a completed SF1442 (acknowledging amendments), any representations or certificates, and a bid guarantee as part of the bid submission but does not list any other items. Does the bid package need to include other technical items such as contractor past experience, past performance, management plan, safety plan and record, key personnel list, project team resumes, etc?
USACE Response Q1: No; the Bidder shall only provide what is called out in Solicitation Section 00 22 13 – Supplementary Instructions to Bidders, as specifically described at Paragraph 2. “SUBMISSION OF BIDS.”
– However, under this Amendment, the government is including a Pre-Award Survey Questionnaire Form, which shall completed by the Bidder and provided along with the items described at the aforementioned Section.
Question 2: Can you confirm if a non-working project superintendent is required to be present on the project full time?
USACE Response Q2: Yes, Specification Section 01 45 00.00 10 Paragraph 3.1 states “The project superintendent maintains a physical presence at the site at all times and is responsible for all construction and related activities at the site…”. This means if there is any work being performed on site the superintendent must be present.
Question 3: Can you confirm if a QC Manager who has been certified thru the USACE Construction Quality Management for Contractors program is required for this project?
USACE Response Q3: Yes, all requirements of Specification Section 01 45 00.00 10 - QUALITY CONTROL must be met. This includes all personnel requirements of paragraph 3.4.
Question 4: Is the contractor required to hire a 3rd party Commissioning agent or will that be the responsibility of
USACE?
USACE Response Q4: The commissioning specialist must be provided by the contractor and meet all requirements set forth in Specification Section 23 08 00.
Question 5: Are there any other chiller manufacturers allowed besides Multi-Stack?
USACE Response Q5: The specification requirements for the chiller is contained in Specification Section 23 64 10 and on the equipment schedules shown on Sheet M-602. A basis of design is presented on M-602 to provide an example of a piece of equipment that meets all the specification criteria. If an alternate manufacture is chosen the equipment must meet all the specification criteria.
Question 6: Is there an existing base building controls system and who is it?
USACE Response Q6: There is not an existing BAS system, this system will stand alone.
Question 7: Can you provide a copy of the sign in sheet for the future 8/23/18 walkthrough?
USACE Response Q7: This Amendment provides the sign-in sheet (Attendance form) from the pre-bid meeting held on September 5, 2018.
END OF QUESTIONS AND ANSWERS
END OF AMENDMENT
(The aformentioned Wage Determination, Pre-Award Survey Questionnaire Form, Revised Drawing Sheet and Attendance Sheet from the Pre-Bid Meeting follows)
General Decision Number: IL180011 08/31/2018 IL11
Superseded General Decision Number: IL20170011
State: Illinois
Construction Types: Heavy and Highway
Counties: Boone, De Kalb, Du Page, Kane, Kendall, Lake, McHenry and Will Counties in Illinois.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (does not include landscape projects).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 04/06/2018 2 05/11/2018 3 05/25/2018 4 06/01/2018 5 06/08/2018 6 06/15/2018 7 06/22/2018 8 06/29/2018 9 07/06/2018 10 07/13/2018 11 08/10/2018 12 08/17/2018 13 08/24/2018 14 08/31/2018
CARP0555-003 06/01/2018
DUPAGE ANE LAKE COUNTIES
Rates Fringes
CARPENTER
Building....................$ 47.35 32.83 Heavy & Highway.............$ 47.35 32.83
CARP0555-008 06/01/2016
WILL COUNTY
Rates Fringes
Carpenter and Piledriver.........$ 45.35 32.30
CARP0555-011 06/01/2018
KANE, McHENRY (North of Hwy 52), AND KENDALL COUNTIES
Rates Fringes
Carpenter and Piledriver.........$ 47.35 32.84
CARP0790-003 05/01/2018
DE KALB COUNTY
Rates Fringes
CARPENTER........................$ 41.77 29.18
CARP0790-004 05/01/2018
CARROLL, JO DAVIESS, LEE, OGLE (Oregon and South thereof), STEPHENSON, and WHITESIDE COUNTIES
CARPENTER........................$ 41.77 29.18
CARP0792-003 05/01/2018
BOONE COUNTY
Rates Fringes
CARPENTER........................$ 44.22 26.73
ELEC0009-002 06/03/2018
WILL COUNTY
Rates Fringes
Line Construction Groundman...................$ 40.48 61.52%
Lineman and Equipment Operator....................$ 51.90 61.52%
ELEC0117-001 06/04/2018
KANE (Northern Half) and McHENRY (All) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 48.64 32.60
ELEC0150-001 07/01/2017
LAKE COUNTY
Rates Fringes
ELECTRICIAN......................$ 40.00 38.49
ELEC0176-011 06/01/2018
WILL COUNTY
Rates Fringes
ELECTRICIAN......................$ 43.50 39.26
ELEC0196-001 03/05/2018
BOONE, DEKALB, DUPAGE, KANE, KENDALL, LAKE, and MCHENRY COUNTIES
Rates Fringes
Line Construction Equipment Operator..........$ 42.59 32.75%+$5.75+A Groundman...................$ 32.86 32.75%+$5.75+A Lineman, Substation Technician, Cable Splicing Technician, Digger Operator, Crane Opertor 20 tons and above, and Signal Technician..................$ 51.06 32.75%+$5.75+A
FOOTNOTE: A. PAID HOLIDAYS: Memorial Day, Independence Day, Labor Day, and Thanksgiving Day
ELEC0364-003 06/01/2018
BOONE (All) & DEKALB (Remainder) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 47.00 33.51
ELEC0461-006 06/04/2018
DEKALB (Sandwich TWP), KANE (Southern Half) & KENDALL (All)
COUNTIES
ELECTRICIAN......................$ 47.72 32.39
ELEC0701-001 06/04/2018
DUPAGE COUNTY
Rates Fringes
ELECTRICIAN......................$ 40.50 102.09%
ENGI0150-015 06/01/2018
BOONE and DE KALB COUNTIES
Rates Fringes
OPERATOR: Power Equipment Group 1.....................$ 46.65 37.45 Group 2.....................$ 46.10 37.45 Group 3.....................$ 44.80 37.45 Group 4.....................$ 43.35 37.45 Group 5.....................$ 41.90 37.45
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant; Asphalt Heater and Planer combination; Asphalt Spreader; Asphalt Silo Tender;
Autograder, GOMACO or similar; Belt Loader; Caisson Rigs;
Car Dumper, Central Redi-Mix Plant; Combination Backhoe Front End Loader Machine (1 cu yd or over Backhoe bucket with attachments); Backhoe with Shear attachment; Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft; Concrete Placer; Concrete Tube Float;
Cranes, all attachments; Cranes, Hammerhead, Linden, Peco and machines of a like nature; Creter Crane; Crusher, stone; Derricks; Derrick Boats; Derricks, traveling;
Dredges; Field Mechanic Welder; Formless Curb and Gutter Machine; Gradall and machines of a like nature; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted; Hoists, one, two, and three Drum; Hydraulic Backhoes; Locomotive, all Mucking Machine; Pile Drivers and Skid Rig; Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill-Crawler or Skid Rig; Rock Drill truck mounted; Roto Mill Grinder, 36" and over; Roto Mill Grinder, less than 36"; Slip- Form Paver; Soil Test Drill Rig, truck mounted;
Straddle Buggies; GCI Crane and similar; Hydraulic Telescoping Form (tunnel); Tie Back MAchine; Tractor Drawn Belt Loader: Tractor Drawn Belt Loader with attached
Pusher; Tractor with boom; Tractaire with attachment;
Traffic Barrier Conveyor Machine; Raised or Blind Hoe Drill (Tunnel & Shaft); Trenching Machine; Truck Mounted Concrete Pump with boom; Truck mounted Concrete Conveyor;
Underground Boring and/or Mining Machines under 5 ft; Wheel Excavator & Widener (Apsco)
GROUP 2: Batch Plant; Bituminous Mixer; Bobcats over .75 cu yd; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors; Combination Backkhoe Front End Loader Machine, less than 1 cu yd Backhoe Bucket with attachments;
Compressor and Throttle Valve; Compressor, common receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine; Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine, Burlap Machine; Belting Machine and Sealing Machine;
Conveyor Muck Cars (Haglund or similar type); Finishing Machine-Concrete; Greaser Engineer; Highlift Shovels or Front End Loader; Hoist-Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments; Locomotives, Dinky; Pump Cretes, Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, etc self-Propelled; Scoops-Tractor Drawn;
Self-propelled Compactor; Spreader-Chip- Stone etc;
Scraper; Scraper-Prime Mover in Tandem regardless of size (add $1.00 to to Group 2 hourly rate for each hour and for each machine attached thereto); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Pipe Jacking Machines; Post- hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 185 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 185;
Asphalt Spreader Backend Man; Combination - Small Equipment Operator; Generators - Small 50 kw and under; Generators - Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants All (1 to 5); Pumps, over 3" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
Bobcats up to and including .75 cu yd
GROUP 5: Oilers
PREMIUM PAY:
Long Boom :
Cranes & Derricks 90' to 150' including jib receive an extra $.50 per hour. Cranes & Derricks over 150' including jib receive an extra $.50 per hour plus an additional $.10 for each additional 10' of boom or jib.
Capacity Pay: Cranes & Derricks with maximum capacity exceeding 50 ton with less than 90' of boom or jib shall be compensated $.01 per hour for each ton of the rated capacity in excess of 50 ton.
Long Boom pay and Capacity pay cannot be combined.
Crane mounted earth auger, raised and blind hole drills, and truck mounted drill rigs receive an extra $.50 per hour.
Creter Cranes:
When the Creter Crane is equipped with a conveyor system capable of extending 70' or more, the engineer shall receive an extra $.50 per hour.
Truck Mounted Concrete Pumps:
When the Truck Mounted Concrete Pump is equipped with a boom, which is capable of extending 90' or more, the engineer shall receive $.50 per hour extra.
Truck Mounted Concrete Conveyor:
Truck Mounted Concrete Conveyors equipped with conveyors that are capable of extending 90' or more, the engineer shall receive an extra $.50 per hour.
Underground Work:
Employees working in tunnels, shafts, etc. shall be paid an additional $.40 per hour. Employees working under air pressure 1/2 pound to 7 pounds shall receive an additional $.50 per hour. Employees working under air pressure of 7 pounds or over shall receive $.65 per hour more.
Mining Machines- Boring Machines:
The crew operating and maintaining the Mining Machines shall be compensated an additional $.50 per hour.
* ENGI0150-024 06/01/2018
DUPAGE, KANE, KENDALL, LAKE, McHENRY, and WILL COUNTIES
Rates Fringes
OPERATOR: Power Equipment
GROUP 1.....................$ 49.30 38.15
GROUP 2.....................$ 48.75 38.15
GROUP 3.....................$ 46.70 38.15
GROUP 4.....................$ 45.30 38.15
GROUP 5.....................$ 44.10 38.15
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;
Autograder/ GOMACO or similar; ABG Paver*, Backhoes with Caisson attachment*, Ballast Regulator, Belt Loader*;
Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All Derricks; Derrick Boats; Derricks, traveling*; Dowell Machine with Air Compressor ($1.00 above Class 1);
Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic Backhoes*; Backhoes with Shear attachments*; Mucking Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;
Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* & Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*
GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;
Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and Throttle Valve; Compressor, common receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine;
Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);
Drills (all); Finishing Machine-Concrete; Greaser Engineer;
Highlift Shovels or Front End Loader; Hoist- Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments;
Hydro-Blaster (requires two operators); Laser Screed*;
Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor Drawn; Self- propelled Compactor; Spreader-Chip-Stone;
Scraper; Scraper-Prime Mover in Tandem regardless of size (add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;
Combination - Small Equipment Operator; Directional Boring Machine; Generators - Small 50 kw and under; Generators - Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants (1 to 5); Pumps, over 3" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional Boring
*Requires Oiler
* IRON0001-014 06/01/2018
DU PAGE (Eastern 1/4), LAKE, AND MCHENRY (Hebron, Woodstock, and East thereof) COUNTIES
IRONWORKER
Sheeter.....................$ 49.08 38.28 Structural and Reinforcing..$ 48.83 38.28
IRON0063-003 06/01/2017
LAKE, DUPAGE (Eastern 1/4) and McHENRY (HEBRON, WOODSTOCK &
EAST THEREOF) COUNTIES
IRONWORKER, ORNAMENTAL...........$ 46.75 34.44
* IRON0393-003 06/01/2018
DEKALB (SOUTHEASTERN 2/3 including Sycamore and Dekalb), DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), and MCHENRY
(SOUTHEAST 1/4) COUNTIES
IRONWORKER.......................$ 45.84 35.50
* IRON0444-006 06/01/2018
KENDALL (Southern Part) and WILL COUNTIES
Rates Fringes
IRONWORKER.......................$ 43.00 38.20
* IRON0498-003 06/01/2018
BOONE, DEKALB (EXCEPT Southeast), and MCHENRY (Northwest)
COUNTIES
IRONWORKER.......................$ 39.39 38.89
LABO0002-004 06/01/2017
DUPAGE COUNTY
Rates Fringes
LABORER (SEWER CONSTRUCTION)
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.33 27.47
GROUP 3.....................$ 41.43 27.47
GROUP 4.....................$ 41.55 27.47
GROUP 5.....................$ 41.20 27.47
LABORER CLASSIFICATIONS
GROUP 1: Signalmen Top Laborers, and all other Laborers not Mentioned.
GROUP 2: Concrete Laborers; Steel Setters.
GROUP 3: Cement Carriers; Cement Mixers; Concrete Repairmen;
Mortar Men; Scaffold Men; and Second Bottom Men.
GROUP 4: Bottom Men; Bracers-Bracing; Bricklayer's Tender;
Catch Basin Digger; Drainlayer; Dynamiter; Form Men;
Jackhammermen; Powerpac; Pipelayers; Rodders; Welders & Burners; Well Point System Men.
GROUP 5: Asbestos Abatement Laborers, Toxic and Hazardous
Waste Removal Laborers & Dosimeter use (any device) Monitoring Nuclear Exposure.
LABO0002-009 06/01/2017
DU PAGE COUNTY
Rates Fringes
LABORER (Compressed Air) 0 - 15 lbs..................$ 42.20 27.47 16 - 20 lbs.................$ 42.70 27.47 21 - 26 lbs.................$ 43.20 27.47 27 - 33 lbs.................$ 44.20 27.47 34 lbs and over.............$ 45.20 27.47 LABORER (Tunnel and Sewer)
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.33 27.47
GROUP 3.....................$ 41.43 27.47
GROUP 4.....................$ 41.55 27.47
GROUP 5.....................$ 41.20 27.47
LABORER CLASSIFICATIONS (TUNNEL)
GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers
GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher
GROUP 3: Concrete repairmen; Lock tenders (pressure side);
Mortar men; Muckers; Grout machine operators; Track layers
GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;
Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;
Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;
skinners; Maintenance technician
GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABORER CLASSIFICATIONS (SEWER)
GROUP 1: Signalmen; Top laborers and All other laborers
GROUP 2: Concrete laborers and Steel setters
GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;
Mortar men; Scaffold men; Second Bottom men
GROUP 4: Air trac drill operator; Bottom men;
Bracers-bracing; Bricklayer tenders; Catch basin diggers;
Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;
Pipelayers; Rodders; Welder-burners; Well point systems men
GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABO0032-007 05/01/2018
DE KALB COUNTY
Rates Fringes
LABORER
General Laborer.............$ 35.40 31.73 Skilled Laborer.............$ 38.25 31.73
LABORER CLASSIFICATIONS
General Laborer: Carpenter Tender, Tool Cribman, Fireman or Salamander Tender, Flagman, Gravel Box Man, Bumpman & Spotter, Form Handler, Material Handler, Fencing Laborer, Cleaning Lumber, Pit Man, Material Checker, Landscaper, Unloading Explosives, Laying of Sod, Planting of Trees, Asphalt Workers With Machine & Layers, Asphalt Plant Laborer, Wrecking, Fire-proofing, Driving Stakes, Stringlines for All Machinery, Window Cleaning, Demolition Worker, Explosive Handling, Trimming & Removal of Trees, Multi-Plate Pipe, Pilot Cars for Traffic Control, Power Rigging
Skilled Laborer: Asbestos Abatement Worker; Hazardous Waste Worker Handling any Materials with any Foreign Matter Harmful to Skin or Clothing, Track Labor, Cement Handler, Chloride Handler, Unloading & Laborers with Steel Workers & Re-bars, Wet Concrete Workers, Tunnel Tenders in Free Air, Batch Dumper, Mason Tender, Kettle & Tar Man, Tank Cleaner, Plastic Installer, Scaffold Worker, Motorized Buggies or Motorized Unit Used For Wet Concrete or Handling of Building Materials, Laborers With De-Watering Systems, Sewer Workers Plus Depth, Vibrator Operator; Cement Silica, Clay, Fly Ash, Lime & Plasters Handlers (Bulk or Bag);
Cofferdam Worker Plus Depth, Concrete Paving, Placing, Cutting & Tying of Reinforcing, Deck Hand, Dredge Hand and Shore Laborer, Bankman on Floating Plant, Grade Checker, Power Tools, Front End Man on Chip Spreader, Caisson Worker Plus Depth, Gunnite Nozzleman, Leadman on Sewer Work, Welder, Cutter, Burner & Torchman, Chain Saw Operator, Jackhammer & Drill Operator, Layout Man and/or Tile Layer, Steel Form Setter - Street & Highway, Air Tamping Hammerman, Signal Man On Crane, Concrete Saw Operator, Screenman on Asphalt Paver, Tending Masons with Hot Material or Where Foreign Materials are used, Mortar Mixer
Operator, Multiple Concrete Duct - Leadman, Luteman, Asphalt Raker Curb Asphalt Machine Operator, Ready Mix Scaleman Permanent Portable or Temporart Plant, Laborer Handling Masterplate or Similar Materials, Laser Beam Operator, Concrete Burning Machine Operator, Coring Machine Operator, Plaster Tender, Underpinning & Shoring of Buildings, Pump Man, Manhole & Catch Basin, Dirt & Stone Tamper, Hoseman on Concrete Pump.
LABO0075-002 06/01/2017
WILL COUNTY
Rates Fringes
LABORER
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.55 27.47
GROUP 3.....................$ 41.20 27.47
GROUP 4.....................$ 41.55 27.47
GROUP 5.....................$ 41.40 27.47
GROUP 6.....................$ 41.55 27.47
GROUP 7.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1 - Mortar mixers, handling asphalt shingles;
Scaffolds; Sewer and trench work (ground level down to 8 feet); Catch basin and manhole diggers, mesh handling on road work; Cement and mineral filler handler; Concrete puddlers; Batch dumpers (cement & asphalt); Vibrator operators; Sand and stone wheelers to mixer Handlers);
Concrete wheelers; Airtamping hammermen; Concrete & paving breakers; Rock drillers/Jackhammermen; Chipping hammermen 1-Bag mixer; Asphalt laborer; Chain and power saws; Pit men; Fencing laborers; Mason tenders (mortar and brick wheeler); Kettlemen & tarmen, tank cleaners; Scaffold and staging laborers; Pot Firemen (tarmen); Heaters tender for any purpose; Water pumps (portable water pumps shall be tended by laborers if the employer determines tending is required); Rip rap; Handling of slab steel road forms in any manner, except road form setting, setting center strips, Contraction and expansion joints (road work);
Unloading and handling of lumber, brick, transite materials, cast iron water pipe, reinforced concrete rods, sewer and drain tile, railroad tiles and all other creosoted materials; paving blocks and concrete forms;
Handling of insulation of any type; all work involving the unloading of materials, fixtures, or furnishing, whether crated or uncrated; all mortar and composition mixers of sewer work; track laborers; Chimney and silo laborers working at a height of 1 to 48 feet; All laborers working on swinging suspended, or any type or make of scaffolding 1 to 48 feet; All laborers working inside a sphere or any type or make of tank; Working inside a sphere or any type or make of tank from bottom to a height of 48 feet; Form strippers (any type); Mechanical or motorized buggies, for concrete or masons employers; Use of skid steer loads or any other machinery which replaces the wheelbarrow or buggy; Handling multiple concrete duct or any other type of pipe used in public utility work unless otherwise specified herein; Snapping of wall ties and removal of rods; drilling of anchor bolt holes; Concrete or asphalt clipper type saws and self-propelled saws; Shoulder and grade laborers; All hydraulic electric and air or any other type of tools;
Grouting and caulking; Cleaning lumber, Nail pulling, Deck hand; Dredgehand; Shore laborer; Bankmen on Floating Plant;
Tool and material checkers; Signalmen and Flagmen on all construction work; Cleaning of debris; Removal of trees;
Concrete curing, temporary concrete protection regardless of manner or materials used; Laborers on Apsco; Janitorial;
Wrecking and demolition laborers
GROUP 2 - Sewer and drain pipe layers and multiple concrete duct or any other type of pipe used, on public utility work (ground level to 8 feet); Pumpcrete pipe handlers
GROUP 3 - Asphalt rakers; Hod carriers; Plasterer laborers;
Gunnite laborers, Slab for setters on roads, highways, streets, airport runaways, and radii (any type of form) stringline men for all aforementioned work; Wagon and tower drillers on land and floating plant used on dredging;
Asphalt gunners and plug men (undercoating on road work);
Mortar pump laborers; Plaster pump laborers
GROUP 4 - Tunnel miners, and all laborers inside tunnel; Air blow pipemen; Torchmen (burners); Mortaring men on sewer and drain pipe (the applying of mortar and composition mixes); All bottom men on sewer work-all sewer and drain pipelayers-multiple concrete duct or any other type of pipe used on public utility work-8 feet or more below ground level, and all other sewer and trench laborers 8 feet or more below ground level regardless of excavation area; All labor work inside cofferdam; Use of a 10 foot or more drill steel for hand held drills; Caisson laborers ground level down 15 feet; All air tools 8 feet or more below ground level; All laborers working on swinging-suspended or any type or make of scaffolds, 48 feet to 100 feet; All chimney and silo laborers working at a height of 48 to 100 feet;
All tamping hammers over 150 lbs.; All laborers working inside of a sphere or any type or make of tank at a height of 48 feet to 100 feet; all hydraulic, electric and air tools or any other type 8 feet or more below ground level;
Vibrators-any type-8 feet or more below ground level
GROUP 5 - Gunnite nozzle men; Caisson laborers and all tamping hammers from 150 lbs and over; from 15 feet below ground level down to 50 feet; and all laborers working inside of a sphere or any type of tank for every additional 50 feet or part thereof above 100 feet in height
GROUP 6 - All underground cavern laborers; Caisson laborers 50 feet or more below ground level; Laborers working under radio active conditions (suiting up); Blasting men (Powdermen) GROUP 7 - Dosimeter (any device) used for monitoring nuclear exposure; Asbestos abatement worker; Toxic and hazardous waste removal laborer; and chimney and silo laborers for every additional 50 feet or any part thereof above 100 feet high
LABO0149-002 06/01/2017
BOONE, KANE, KENDALL, AND McHENRY COUNTIES
Rates Fringes
LABORER
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.43 27.47
GROUP 3.....................$ 41.20 27.47
GROUP 4.....................$ 41.20 27.47
GROUP 5.....................$ 41.43 27.47
GROUP 6.....................$ 41.55 27.47
GROUP 7.....................$ 41.55 27.47
GROUP 8.....................$ 41.20 27.47
GROUP 9.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1: Common laborer, Asphalt laborer, Asphalt plant laborer, Striping laborer, Clipper type concrete saw, Self-propelled saws
GROUP 2: Air tampers & Vibrators
GROUP 3: Mortar & Concrete mixers
GROUP 4: Stringline & form setter; Torchman (demolition), Sheeting & Cribbing, Black top rakers & lutemen, Machine screwmen
GROUP 5: Chain saw man, Jackhammer man, Drillman, Concrete breaders & air spade, GROUP 6: Tunnel laborers, Tile layers & bottom men
GROUP 7: Caisson diggers, Dynamiters
GROUP 8: Flagman
GROUP 9: Asbestos apatement laborers, Toxic & hazardous waste removal laborers & Dosimeter (any device) monitoring nuclear exposure
LABO0152-003 06/01/2017
LAKE COUNTY
Rates Fringes
LABORER
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.28 27.47
GROUP 3.....................$ 41.20 27.47
GROUP 4.....................$ 41.43 27.47
GROUP 5.....................$ 41.40 27.47
GROUP 6.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1: General laborers; Asphalt
GROUP 2: Cement gun laborers
GROUP 3: Asphalt Tampers and Smoothers
GROUP 4: Rakers and Lutemen; Machine screwman; Kettlemen;
Mixermen, Drum-Men; Jackhammermen (Asphalt); Mite Box Spreaders; Laborers on birch overman and similar spreader equipment; Laborers on apsco; Laborers on Air Compressors;
Paving Form Setters; Jackhammerman (Concrete); Power Drive Concrete Saws
GROUP 5: Cement Gun Nozzle (Gunite)
GROUP 6: Asbestos abatement laborers; Toxic and hazardous waste removal laborers; Dosimeter (any device monitoring nuclear exposure)
PAIN0014-003 06/01/2018
LAKE and WILL COUNTIES
Rates Fringes
PAINTER: Brush Only.............$ 46.55 27.24
PAIN0030-001 07/01/2018
DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES
Rates Fringes
PAINTER
Brush, Drywall Taper/Finisher, Sandblaster, and Spray......$ 46.55 21.58
PAIN0030-004 07/01/2018
BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES
PAINTER
Brush, Roller, Spray, Sandblasting, Paperhanger, Drywall Finishing, Taper, and Spray Structural Steel..$ 39.95 22.61
PLAS0011-002 06/01/2017
WILL COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 42.00 34.56
PLAS0011-008 06/01/2017
DE KALB, KANE, KENDALL, AND McHENRY COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 44.84 31.60
PLAS0011-013 06/01/2017
LAKE COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 44.98 31.47
PLAS0011-015 06/01/2017
BOONE COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 36.99 26.93
PLASTERER........................$ 34.78 27.28
PLAS0803-001 08/01/2010
DUPAGE COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 38.00 24.03
* TEAM0179-002 06/01/2017
KENDALL and WILL COUNTIES
TRUCK DRIVER
2 or 3 Axle Trucks..........$ 37.68 0.15+a 4 Axle Trucks...............$ 37.83 0.15+a 5 Axle Trucks...............$ 38.03 0.15+a 6 Axle Trucks...............$ 38.23 0.15+a
FOOTNOTES:
a. $733.20 per week.
b. Lowboy rate based on number of axles
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;
Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;
Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;
Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice
Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front
* TEAM0301-001 06/01/2017
LAKE AND MCHENRY COUNTIES
Rates Fringes
TRUCK DRIVER
2-3 AXLES...................$ 37.69 10.15+a 4 AXLES.....................$ 37.84 10.15+a 5 AXLES.....................$ 38.04 10.15+a 6 AXLES.....................$ 38.24 10.15+a
FOOTNOTES:
a. 325.20 per week.
b. Lowboy rate based on number of axles
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;
Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;
Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;
Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice
Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front
* TEAM0325-004 06/01/2017
BOONE and WINNEBAGO COUNTIES
Rates Fringes
TRUCK DRIVER
2 - 3 Axles.................$ 36.62 20.40 4 Axles.....................$ 36.77 20.40 5 Axles.....................$ 36.97 20.40 6 Axles.....................$ 37.08 20.40
FOOTNOTE: An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Forl Lifts and Hoisters; Helpers;
Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers Pole Trailer, up to 40 feet; Power Mower Tractors; Skipman;
Slurry Trucks, two-man operation; Teamsters; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator;
Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long, additional $0.50 per hour; Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more *Mechanic*Truck Welder and Truck Painter; *Winter Rate:
Between Dec. 15 and Feb. 28 the mechanic and welder rate shall be $2.00 less than the scheduled scale. Truck Painter and Truck Welder classifications shall only apply in areas where and when it has been a past area practice;
Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories
Group 4 - Foreman; Master Mechanic; Self-loading equipment like P.B. and trucks with scoops on the front
* TEAM0330-002 06/01/2017
DEKALB COUNTY
Rates Fringes
TRUCK DRIVER
2-3 AXLES...................$ 36.64 0.15+a 4 AXLES.....................$ 36.79 0.15+a 5 AXLES.....................$ 36.99 0.15+a 6 AXLES.....................$ 37.19 0.15+a
FOOTNOTE: a. $780.90 per week
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;
Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;
Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;
Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice
Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front
* TEAM0673-003 06/01/2017
DU PAGE and KANE COUNTIES
Rates Fringes
TRUCK DRIVER
2-3 AXLES...................$ 36.93 0.15+a 4 AXLES.....................$ 37.08 0.15+a 5 AXLES.....................$ 37.28 0.15+a 6 AXLES.....................$ 37.48 0.15+a
FOOTNOTE: a. $767.70 per week.
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;
Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;
Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;
Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice
Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.