Amendment_0001_W912P618B0003_Water_Main_Replacement_Project_at_the_City_of_Country_Club_Hills,_Cook_County,_IL_(USACE-Chicago_District_Acquisition)).pdf
PDF 275 KB Posted
- Solicitation number
- W912P618B0003
About this file
This file contains Amendment No. 0001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE INVITATION FOR BID NO. W912P618B0003, WATER MAIN REPLACEMENT PROJECT AT THE CITY OF COUNTRY CLUB HILLS, COOK COUNTY, IL (USACE-CHICAGO DISTRICT ACQUISITION)
A. BID DUE DATE: The BID OPENING DATE for the referenced Solicitation (Invitation for Bids, No. W912P618B0003) IS NOT EXTENDED by this Amendment; therefore bids are due by 2:00PM CDT on 17 January 2018. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document.
THIS AMENDMENT CONTINUES ON THE NEXT PAGES
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P618B0003
X 9B. DATED (SEE ITEM 11)
15-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jan-2018
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P618B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
B. CONTRACTOR’S INQUIRIES: By this Amendment, the Chicago District, USACE responds to Contractor’s inquiries.
ANSWERS TO CONTRACTOR’S QUESTIONS FOLLOW:
Q1: We would like to inquire if the existing water main material to be abandoned is known, and if so what is the host pipe material?
A1: The material of the existing water mains are ductile iron and cast iron. It can be found on plan sheets
CU-103 – CU-109.
Q2: I’m contacting you in reference to the Water Main Replacement project and I was trying to determine the installation method of the 3,000 lf of 6 and 8 inch water mains being installed in the project?
A2: The method of water main construction shown on the plans is open trench construction – see plan sheets CU-103 – CU-109. In Article 1.1 References of Section 33 11 00, Water Utility Distribution Piping, AWWA C600 Installation of Ductile-Iron Mains and Their Appurtenances is included. This publication contains the open trench construction method. The specifications and plan details included in the bidding documents are consistent with this publication.
Q3: Our company is interested in bidding this project. I have reviewed the specs, but I cannot find a definitive answer as to whether there are advertising requirements for disadvantaged businesses. Would you please confirm if the Bidder is required to advertise in the Chicago Tribune for this project?
A3: The interested bidder shall refer to the Government's Point of Entry, known as www.fbo.gov (Federal Business Opportunities Website), wherein the full solicitation package is advertised for bidding until the bid opening time of 2p.m. (CDT), 17 January 2018. Note, any bid package furnished must be submitted prior to the bid opening start time of 2p.m (CDT).
Q4: Is the bid due date on January 9th at 2 or January 17th @ 2? What does it mean by “response date”?
A4: The response "date" for submitting a bid package is January 17, 2018. This means any bid package submitted must arrive to the Chicago District by 2:00p.m. (CDT) and in accordance with the requirements stipulated at Section 00 22 13 of the Solicitation Document.
Q5: For this project each bid option is calling out for a payment and performance bond. Do we need to have a separate bond for each option or just one that covers the total cost of all options combined?
A5: When options are awarded, the Contractor will be required to obtain additional bonding in accordance with paragraph (a)(3) of FAR clause 52.228-15. A Payment and Performance bond must be submitted to cover 100% of the increased contract price (e.g. value of options).
Below is the revelant Clause content in full text.
"52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)
(a) Definitions. As used in this clause-- Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
W912P618B0003
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the: U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause)"
C. WAGE DETERMINATION: This Amendment incorporates and encloses the most recently released Wage Determination, General Decision IL9, dated 1/5/2018.
D. PREAWARD SURVEY FORM: Attached is a Pre-Award Survey Form that will aid in the USACE’s process of conducting a preaward survey of the winning Bidder. Please fully complete and submit said form with your Bid.
E. Point of Contact for this Amendment is Ericka Hillard at (312) 846-5378; email ericka.d.hillard@usace.army.mil.
(END OF SUMMARY OF CHANGES – THE NEW WAGE RATES AND PREAWARD SURVEY FORM
FOLLOWS)
ATTACHMENT A
PREAWARD SURVEY INFORMATION
(RE: Subparts 9.104-1 and 9.105-1 of the Federal Acquisition Regulation)
CONTRACTOR: _______________________________________
SOLICITATION W912P6-18-B-0003, WATER MAIN REPLACEMENT PROJECT AT THE CITY
OF COUNTRY CLUB HILLS, COOK COUNTY, IL (USACE-CHICAGO DISTRICT
ACQUISITION)
Please complete the below form to assist in the completion of a Pre-award Survey:
1. Month and Year started in business:______________________
2. Year and State Incorporated:____________________________
3. Key Personnel:
President/Owner :__________________________________
Vice President/Partner:______________________________
Secretary/Treasurer:________________________________
4. Number of Full-Time Employees:________________________
5. Surety:
Agency:__________________________________________
Agent:____________________________________________
Address, City & State:_______________________________________
Telephone#:_______________________________________
6. Insurance Company:
Agency:__________________________________________
Agent:____________________________________________
Address, City & State:_______________________________________
Telephone#:_______________________________________
7. Financial Institution Information:
Name of Bank:_____________________________________
Contact Person:_____________________________________
Address, City & State:_______________________________________
Telephone#:________________________________________
8. References: Provide the names and contact information of three references. Information obtained from references will be used to determine if you have been diligent in the following areas: a) Quality of Work; b) Timely Performance; c) Effectiveness of Management; d) Compliance with Safety Standards; and e) Compliance with Labor Standards.
9. Does your company have any ongoing projects that may cause a problem with completing or beginning performance of the subject project?
END OF FORM
General Decision Number: IL180009 01/05/2018 IL9
Superseded General Decision Number: IL20170009
State: Illinois
Construction Types: Building, Heavy, Highway and Residential
County: Cook County in Illinois.
BUILDING, RESIDENTIAL, HEAVY, AND HIGHWAY PROJECTS (does not include landscape projects).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018
ASBE0017-001 06/01/2017
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 50.50 25.80 Fire Stop Technician.............$ 40.40 24.54
HAZARDOUS MATERIAL HANDLER
includes preparation, wetting, stripping removal scrapping, vacuuming, bagging and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 37.80 24.54
1/9/2018https://www.wdol.gov/wdol/scafiles/davisbacon/IL9.dvb?v=0
BOIL0001-001 05/01/2017
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BRIL0021-001 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 44.88 26.62
BRIL0021-004 06/01/2017
Rates Fringes
Marble Mason.....................$ 44.63 26.83
BRIL0021-006 06/01/2017
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 44.38 25.84
TILE FINISHER....................$ 38.56 22.10
TILE SETTER......................$ 45.49 25.72
BRIL0021-009 06/01/2017
Rates Fringes
MARBLE FINISHER..................$ 33.95 26.03
BRIL0021-012 06/01/2017
Rates Fringes
Pointer, cleaner and caulker.....$ 45.42 24.06
CARP0555-001 06/01/2017
BUILDING, HEAVY, AND HIGHWAY
Rates Fringes
CARPENTER
Carpenter, Lather, Millwright, Piledriver, and Soft Floor Layer Building...................$ 46.35 31.29 Heavy & Highway............$ 46.35 31.31
* CARP0555-002 10/01/2017
RESIDENTIAL CONSTRUCTION
Rates Fringes
CARPENTER........................$ 37.11 31.29
ELEC0009-003 06/04/2017
Line Construction Groundman...................$ 39.39 61.37% Lineman and Equipment Operator....................$ 50.50 61.37%
ELEC0134-001 06/05/2017
Rates Fringes
ELECTRICIAN......................$ 47.40 32.21
ELEC0134-003 06/05/2017
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 43.10 23.95
The work shall consist of the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound vision production and reproduction, telephone and telephone interconnect, facsimile, data appatatus, coaxial, fibre optic and wireless equipment, appliances and systems used for the transmission and reception of signals of any nature, business, domestic, commercial, education, entertainment and residential purposes, including but not limited to communication and telephone, electronic and sound equipment, fibre optic and data communication systems, and the performance of any task directly related to such installation or service whether at new or existing sites, such tasks to include the placing of wire and cable and electrical power conduit or other raceway work within the equipment room and pulling wire and/or cable through conduit and the installation of any incidential conduit.
ELEV0002-001 01/01/2017
Rates Fringes
ELEVATOR MECHANIC................$ 53.18 31.585+a+b
FOOTNOTES:
a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.
b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service
* ENGI0150-006 06/01/2017
Building and Residential Construction
OPERATOR: Power Equipment
GROUP 1....................$ 50.10 36.45
GROUP 2....................$ 48.80 36.45
GROUP 3....................$ 46.25 36.45
GROUP 4....................$ 44.50 36.45
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;
Autograde*; Backhoes with Caisson attachment*:Batch Plant*;
Benoto(Requires two Engineers); Boiler and Throttle Valve;
Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;
Concrete Breaker (Truck Mounted)*; Concrete Conveyor;
Concrete Conveyor, Truck Mounted; Concrete Paver over 27E
cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;
Cranes, (GCI and similar type Requires two operators only);
Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;
Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36" and Over)*; Roto Mill Grinder (Less Than 36")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.
GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over);
Conveyor, Portable; Forklift Trucks; Greaser Engineer;
Highlift Shovels or Front End loaders under 2 1/4 cu yd;
Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed;
Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*;
Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour);
Winch Trucks with "A" Frame.
GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;
Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;
Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)
GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers
*-Requires Oiler
* ENGI0150-025 06/01/2017
Heavy and Highway Construction
Rates Fringes
OPERATOR: Power Equipment
GROUP 1.....................$ 48.30 36.45
GROUP 2.....................$ 47.75 36.45
GROUP 3.....................$ 45.70 36.45
GROUP 4.....................$ 44.30 36.45
GROUP 5.....................$ 43.10 36.45
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*, Asphalt Spreader;
Autograder/ GOMACO or similar; ABG Paver*, Backhoes with Caisson attachment*, Ballast Regulator, Belt Loader*;
Caisson Rigs*Car Dumper, Central Redi-Mix Plant*, Combination Backhoe; Front End Loader Machine (1 cu yd or over Backhoe bucket or with attachments); Concrete Breaker (truck mounted); Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float; Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone; All Derricks; Derrick Boats; Derricks, traveling*; Dowell Machine with Air Compressor ($1.00 above Class 1);
Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine*; Gradall and machines of a like nature*; Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail Post Driver mounted*; Hoists, one, two, and three Drum; Hydraulic Backhoes*; Backhoes with Shear attachments*; Mucking Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine;
Pump Cretes Dual Ram (requires frequent lubrication and water)*; Rock Drill- Crawler or Skid Rig*; Rock Drill truck mounted*; Rock/ Track Tamper; Roto Mill Grinder, (36" and over)*; Slip-Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachment; Traffic Barrier Transfer Machine*; Trenching Machine; Truck Mounted Concrete Pump with boom*; Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Wheel Excavator* & Widener (Apsco); Raised or Blind Hoe Drill, Tunnel & Shaft*
GROUP 2: Batch Plant*; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;
Combination Backkhoe Front End Loader Machine, (less than 1 cu yd Backhoe Bucket with attachments); Compressor and Throttle Valve; Compressor, common receiver (3); Concrete
Breaker or Hydro Hammer; Concrete Grinding Machine;
Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine; Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);
Drills (all); Finishing Machine-Concrete; Greaser Engineer;
Highlift Shovels or Front End Loader; Hoist- Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments;
Hydro-Blaster (requires two operators); Laser Screed*;
Locomotives, Dinky; Off-Road Hauling Units (including articulating); Pump Cretes; Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, self-Propelled; Scoops-Tractor Drawn; Self- propelled Compactor; Spreader-Chip-Stone;
Scraper; Scraper-Prime Mover in Tandem regardless of size (add $1.00 to Group 2 hourly rate for each hour and for each machine attached thereto add $1.00 to Group 2 hourly rate for each hour); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, or Compactor, etc; Tug Boats
GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats; Tamper-Form motor driven
GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;
Combination - Small Equipment Operator; Directional Boring Machine; Generators - Small 50 kw and under; Generators - Large , over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Light Plants (1 to 5); Pumps, over 3" (1 to 3, not to exceed a total of 300 ft); Pumps, Well Points; Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches;
GROUP 5: Bobcats (All); Brick Forklifts; Oilers; Directional Boring
*Requires Oiler
IRON0001-026 06/01/2017
Rates Fringes
IRONWORKER
Sheeter.....................$ 47.58 37.34 Structural and Reinforcing..$ 47.33 37.34
IRON0063-001 06/01/2017
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 46.75 34.44
IRON0063-002 06/01/2017
Rates Fringes
IRONWORKER
Fence Erector...............$ 39.58 27.70
IRON0136-001 07/01/2017
Rates Fringes
IRONWORKER
Machinery Movers; Riggers;
Macinery Erectors...........$ 40.17 33.04 Master Riggers..............$ 42.67 33.04
LABO0002-006 06/01/2017
Rates Fringes
LABORER (BUILDING &
RESIDENTIAL)
GROUP 1....................$ 41.20 27.47
GROUP 2....................$ 41.20 27.47
GROUP 3....................$ 41.28 27.47
GROUP 4....................$ 41.30 27.47
GROUP 5....................$ 41.40 27.47
GROUP 6....................$ 41.40 27.47
GROUP 7....................$ 41.43 27.47
GROUP 8....................$ 41.53 27.47
GROUP 9....................$ 41.55 27.47
GROUP 10....................$ 41.75 27.47
GROUP 11....................$ 41.78 27.47
GROUP 12....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1: Building Laborers; Plasterer Tenders; Pumps for Dewatering; and other unclassified laborers.
GROUP 2: Fireproofing and Fire Shop laborers.
GROUP 3: Cement Gun.
GROUP 4: Chimney over 40 ft.; Scaffold Laborers.
GROUP 5: Cement Gun Nozzle Laborers (Gunite); Windlass and capstan person.
GROUP 6: Stone Derrickmen & Handlers.
GROUP 7: Jackhammermen; Power driven concrete saws; and other power tools.
GROUP 8: Firebrick & Boiler Laborers.
GROUP 9: Chimney on fire brick; Caisson diggers; & Well Point System men.
GROUP 10: Boiler Setter Plastic Laborers.
GROUP 11: Jackhammermen on fire brick work only.
GROUP 12: Dosimeter use (any device) monitoring nuclear exposure); Asbestos Abatement Laborer; Toxic and Hazardous Waste Removal Laborers.
LABO0002-007 06/01/2017
Rates Fringes
LABORER (HEAVY & HIGHWAY)
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.28 27.47
GROUP 3.....................$ 41.40 27.47
GROUP 4.....................$ 41.43 27.47
GROUP 5.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1: Common laborer; Tenders; Material expeditor (asphalt plant); Street paving, Grade separation, sidewalk, curb & gutter, strippers & All laborers not otherwise mentioned
GROUP 2: Ashpalt tampers & smoothers; Cement gun laborers
GROUP 3: Cement Gun Nozzle (laborers), Gunite
GROUP 4: Rakers, Lutemen; Machine-Screwmen; Kettlemen;
Mixermen; Drun-men; Jackhammermen (asphalt); Paintmen;
Mitre box spreaders; Laborers on birch, overman and similar spreader equipment; Laborers on APSCO; Laborers on air compressor; Paving Form Setter; Jackhammermen (concrete);
Power drive concrete saws; other power tools.
GROUP 5: Asbestos Abatement Laborers; Toxic and Hazardous Waste Removal Laborers, Dosimeter (any device) monitoring nuclear exposure
LABO0002-008 06/01/2017
Rates Fringes
LABORER (Compressed Air)
0 - 15 POUNDS...............$ 42.20 27.47
16 - 20 POUNDS..............$ 42.70 27.47
21 - 26 POUNDS..............$ 43.20 27.47
27 - 33 POUNDS..............$ 44.20 27.47
34 - AND OVER...............$ 45.20 27.47
LABORER (Tunnel and Sewer)
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.33 27.47
GROUP 3.....................$ 41.43 27.47
GROUP 4.....................$ 41.55 27.47
GROUP 5.....................$ 41.20 27.47
LABORER CLASSIFICATIONS (TUNNEL)
GROUP 1: Cage tenders; Dumpmen; Flagmen; Signalmen; Top laborers
GROUP 2: Air hoist operator; Key board operator; concrete laborer; Grout; Lock tenders (Free Air Side); Steel setters; Tuggers; Switchmen; Car pusher
GROUP 3: Concrete repairmen; Lock tenders (pressure side);
Mortar men; Muckers; Grout machine operators; Track layers
GROUP 4: Air trac drill operator; Miner; Bricklayer tenders;
Concrete blower operator; Drillers; Dynamiters; Erector operator; Form men; Jackhammermen; Powerpac; Mining machine operators; Mucking machine operator; Laser beam operator;
Liner plate and ring setters; Shield drivers; Power knife operator; Welder- burners; Pipe jacking machine operator;
skinners; Maintenance technician
GROUP 5: Asbestos abatement laborer; Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABORER CLASSIFICATIONS (SEWER)
GROUP 1: Signalmen; Top laborers and All other laborers
GROUP 2: Concrete laborers and Steel setters
GROUP 3: Cement carriers; Cement mixers; Concrete repairmen;
Mortar men; Scaffold men; Second Bottom men
GROUP 4: Air trac drill operator; Bottom men;
Bracers-bracing; Bricklayer tenders; Catch basin diggers;
Drainlayers; dynamiters; Form men; Jackhammermen; Powerpac;
Pipelayers; Rodders; Welder-burners; Well point systems men
GROUP 5: Asbestos abatement laborer, Toxic and hazardous waste removal laborer; Dosimeter (any device) monitoring nuclear exposure
LABO0225-001 06/01/2017
Rates Fringes
LABORER (DEMOLITION/WRECKING)
GROUP 1.....................$ 36.00 27.47
GROUP 2.....................$ 41.40 27.47
GROUP 3.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1 - Complete Demolition
GROUP 2 - Interior Wrecking and Strip Out Work
GROUP 3 - Asbestos Work with Complete Demolition/Wrecking or
Strip Out Work
PAIN0014-001 06/01/2017
Rates Fringes
PAINTER (including taper)........$ 44.55 26.49
PAIN0027-001 06/01/2017
Rates Fringes
GLAZIER..........................$ 42.45 34.18
PLAS0005-002 07/01/2015
Rates Fringes
PLASTERER........................$ 42.25 26.65
PLAS0502-001 06/01/2017
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 44.25 32.18
PLUM0130-001 06/01/2017
Rates Fringes
PLUMBER..........................$ 49.25 28.97
PLUM0597-002 06/01/2017
Rates Fringes
PIPEFITTER.......................$ 47.50 30.02
ROOF0011-001 06/01/2017
Rates Fringes
ROOFER...........................$ 42.30 21.80
SFIL0281-001 06/01/2017
Rates Fringes
SPRINKLER FITTER.................$ 48.30 26.85
SHEE0073-001 07/01/2017
Rates Fringes
Sheet Metal Worker...............$ 43.50 35.42
SHEE0073-002 07/01/2017
Rates Fringes
Sheet Metal Worker
ALUMINUM GUTTER WORK........$ 30.57 35.42
TEAM0731-001 06/01/2017
COOK COUNTY - HEAVY AND HIGHWAY
Rates Fringes
TRUCK DRIVER
2 or 3 Axles................$ 35.60 22.10 4 Axles.....................$ 35.85 22.10 5 Axles.....................$ 36.05 22.10 6 Axles.....................$ 36.25 22.10
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
B. 900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
C. An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
TEAM0731-002 03/01/2012
Rates Fringes
Traffic Control Device Monitor
TRAFFIC SAFETY WORKER:
Primary duties include but are not limited to the delivery, maintenance and pick-up of traffic control devices, the set-up and installation of traffic signs, pavement markings, barricades, crash barrels and glare screens, traffic control surveillance, the repair and maintenance trucks, cars, arrow boards, message signs, barricade and sign fabrication equipment.......$ 28.25 9.08
TEAM0786-001 06/01/2017
COOK COUNTY - BUILDING AND RESIDENTIAL
Rates Fringes
TRUCK DRIVER
2 & 3 Axles.................$ 39.942 0.25+a 4 Axles.....................$ 39.75 0.25+a 5 Axles.....................$ 39.967 0.25+a 6 Axles.....................$ 40.184 0.25+a
FOOTNOTES:
a. $719.00 per week.
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION