W81G6671708305

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: INVITATION FOR BIDS W912P6-17-B-0009, "CALUMET HARBOR ROCK REMOVAL" - CALUMET HARBOR, IN

A. The Bid Opening date AND time remains unchanged by this Amendment; therefore, Bids are due by 11:00 a.m. (CST) September 29, 2017.

Detailed information regarding bid submission is located at Section 00100 of the Solicitation document.

B. This Amendment revises the Bid Schedule (Solicitation Contract Form) at Section 00010 of the Solicitation; an additional Line Item has been added (see Item #0007) for Water Quality Monitoring. Hereunder is a revised Bid Schedule, w herein shall be used by Bidders w hen providing their pricing.

C. By w ay of this Amendment, an updated Wage Determination, General Decision Number: IN170001 09/08/2017 IN1” hereby replaces the Wage Determination originally issued under the Solicitation set. -This Amendment continues on the follow ing pages -

1. CONTRACT ID CODE PAGE OF PAGES

1 38

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P617B0009

X 9B. DATED (SEE ITEM 11)

29-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2017

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P617B0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT PARTICULARS

D. CHANGES TO SPECIFICATIONS are as follows. The Revised Section pages are attached hereto.

(1) Section 01 57 20.02 03 – Added is the Illinois Environmental Protection Agency Water Pollution Control for the Chicago Area Confined Disposal Facility

(2) Section 35 21 00 – WATER QUALITY MONITORING –This is a new Section added

(3) Section 35 20 23.00 03 – MECHANICAL DREDGING – Para. 3.4.6 DISPOSAL OF EXCAVATED MATERIAL, has been changed to the following:

Provide for safe transportation and disposal of dredged materials. Transport and dispose of dredged materials, to include hard pan, in the areas shown on the plans, inside Calumet CDF. The stationing is shown on the plan sheet. Coordination with USACE Chicago District Operations is required prior to placement of material, as they are resposnible for placing of the material inside of the CDF. Any material placed outside of the identified location, on the plan sheet, will have to be moved to the correct location.

Any material that has to be moved within the CDF, by the contractor, due to incorrect placement will be at no cost to the government. Comply with rules and regulations of local port and harbor governing authorities.

(4) Section 35 20 23.00 03 – MECHANICAL DREDGING - Para. 3.4.6.1 METHOD OF DISPOSAL, has been changed to the following:

Deposit dredged material by mechanical process only.

E. ADDITIONAL SUBMITTALS: As a result of the aforementioned added requirement for “water quality monitoring,” the Contractor will be required to submit the following Submittals, which are in addition to other submittals required by the resulting Contract: Sampler Qualifications, Sampling Quality Control Plan, Field and Laboratory Equipment, Field Logs, Weekly Analytical Result Reporting, Total Suspended Solids and Turbidity, Correlation Report, and Final Report.

F. Point of contact for this Amendment is Kim F. Hubbard at 312.846.5368 or kimberly.f.hubbard@usace.army.mil.

END OF AMENDMENT PARTICULARS (REVISED BID SCHEDULE, UPDATED WAGE

DETERMINATION AND REVISED SPECIFICATION SECTIONS FOLLOW)

mailto:kimberly.f.hubbard@usace.army.mil

Section 00010 Solicitation/Contract Form

AMENDMENT #0002 – REVISED BID SCHEDULE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

DEMONSTRATION WORK

FFP

For the work involved for this Contract Line Item, the Contractor shall refer to the Project Specifications, Section 35 30 00, para 1.5.2.

PURCHASE REQUEST NUMBER: W81G6671708305

NET AMT

0002 1 Job

MOBILIZATION

FFP

Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

0003 1 Job

DEMOBILIZATION

FFP

Under this CLIN, the contractor is required to perform demobilization activities.

The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.

Payment Provisions:

The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.

0004 7,000 Cubic

Yard

ROCK EXCAVATION & DISPOSAL: CALUMET HARBOR

FFP

0005 1 Job

SCOW SILENT INSPECTOR

0006 1 Job

TOP OF ROCK SURVEY

0007 1 Job

WATER QUALITY MONITORING

FFP

Payment at the applicable job price includes all costs for water quality monitoring during all activities that result in material being placed into the CDF. Water quality monitoring must be in accordance with Section 35 21 00 WATER QUALITY MONITORING. Payment constitutes full compensation for all plant, labor, equipment and incidentals associated with performing water quality monitoring.

0008 1 Lot

PERFORMANCE AND PAYMENT BOND

FFP

PERFORMANCE AND PAYMENT BONDS ASSOCIATED WITH LINE

ITEMS 0001 THROUGH 0007

THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

OPTION PRIORITY 1 OPTIONS

FFP

This is a Parent Line Item identifying the option work that relates directly to its Sub-Items 0009AA and the required bond coverage, via 0009AB. Therefore, the Contractor shall provide its pricing separately at Sub-Items 0009AA and 0009AB.

0009AA 1,500 Cubic

OPTION ROCK EXCAVATION & DISPOSAL CALUMET HARBOR

(PRIORITY 1)

0009AB 1 Lot

OPTION PERFORMANCE AND PAYMENT BOND

FFP

PERFORMANCE AND PAYMENT BONDS ASSOCIATED WITH OPTION

LINE ITEM 0009AA

THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

OPTION PRIORITY 2 OPTIONS

FFP

This is a Parent Line Item identifying the option work that relates directly to its Sub-Items 0010AA and the required bond coverage, via 0010AB. Therefore, the Contractor shall provide its pricing separately at Sub-Items 0010AA and 0010AB.

0010AA 1,500 Cubic

(PRIORITY 2)

0010AB 1 Lot

OPTION PEFORMANCE AND PAYMENT BOND (PRIORITY 2)

FFP

PERFORMANCE AND PAYMENT BONDS ASSOCIATED WITH OPTION

LINE ITEM 0010AA

THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

OPTION PRIORITY 3 OPTIONS

FFP

This is a Parent Line Item identifying the option work that relates directly to its Sub-Items 0011AA and the required bond coverage, via 0011AB. Therefore, the Contractor shall provide its pricing separately at Sub-Items 0011AA and 0011AB.

0011AA 1,500 Cubic

(PRIORITY 3)

0011AB 1 Lot

OPTION PERFORMANCE AND PAYMENT BOND

FFP

PERFORMANCE AND PAYMENT BONDS ASSOCIATED WITH OPTION

LINE ITEM 0011AA

THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line tem accordingly.

TOTAL BID PRICING:

TOTAL AMOUNT FOR BASE BID WORK

(ITEMS 0001 THROUGH 0008): $______________________________

TOTAL AMOUNT FOR BIDDABLE LINE ITEMS FOR PRIORITY 1 OPTIONS

(LINE ITEMS 0009AA‐0009AB): $ ______________________________

TOTAL AMOUNT FOR BIDDABLE LINE ITEMS FOR PRIORITY 2 OPTIONS

(LINE ITEMS 0010AA ‐0010AB): $________________________________

TOTAL AMOUNT FOR BIDDABLE LINE ITEMS FOR PRIORITY 3 OPTIONS

(LINE ITEMS 0011AA ‐0011AB): $_______________________________

OVERALL BID AMOUNT (ITEMS 0001 THROUGH 0011AB):

END OF REVISED BID SCHEDULE

General Decision Number: IN170001 09/08/2017 IN1

Superseded General Decision Number: IN20160001

State: Indiana

Construction Types: Building, Heavy and Highway

Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/27/2017 2 03/17/2017 3 03/31/2017 4 04/07/2017 5 04/14/2017 6 05/05/2017 7 05/12/2017 8 06/02/2017 9 06/09/2017 10 06/16/2017 11 06/30/2017 12 07/07/2017 13 07/14/2017 14 07/21/2017 15 07/28/2017 16 08/04/2017 17 08/11/2017 18 08/18/2017 19 08/25/2017 20 09/08/2017

ASBE0017-002 06/01/2015

LAKE AND PORTER COUNTIES

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 48.45 24.35

HAZARDOUS MATERIAL HANDLER

(INCLUDES PREPARATION,

WETTING, STRIPPING REMOVAL

SCRAPPING, VACUUMING, BAGGING

AND DISPOSAL OF ALL

INSULATION MATERIALS, WHETHER

THEY CONTAIN ASBESTOS OR NOT,

FROM MECHANICAL SYSTEMS).........$ 36.34 23.15

ASBE0075-001 06/01/2017

REMAINING COUNTIES

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 31.50 20.79

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40

BOIL0001-005 05/01/2017

LAKE COUNTY, City of Hammond; North of 114th Street

Rates Fringes

BOILERMAKER......................$ 46.18 29.58

BOIL0374-003 01/01/2013

Rates Fringes

BOILERMAKER......................$ 33.78 25.19

BRIN0004-011 06/01/2017

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

BRICKLAYER

Bricklayer; Stone Mason;

Pointer, Cleaner, Caulker...$ 37.05 21.64 Marble Finisher; Tile Finisher....................$ 28.29 14.57

Marble Mason; Terrazzo Worker; Tile Layer..........$ 37.05 21.64 Terrazzo Finisher...........$ 29.29 14.57

BRIN0004-018 06/01/2017

SOUTH BEND: ST. JOSEPH COUNTY

Rates Fringes

BRICKLAYER

BRICKLAYER; STONE MASON;

POINTER, CAULKER, CLEANER...$ 28.15 13.21

MARBLE AND TILE FINISHER....$ 28.29 14.57

MARBLE AND TILE LAYER.......$ 30.00 16.91

TERRAZZO FINISHER...........$ 29.29 14.57

TERRAZZO WORKER.............$ 31.00 16.91

CARP0413-002 06/01/2017

St. Joseph County

Rates Fringes

CARPENTER........................$ 26.63 18.86

CARP0765-001 06/01/2017

HEAVY AND HIGHWAY

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

CARPENTER........................$ 37.56 26.42

MILLWRIGHT.......................$ 37.66 26.42

CARP1029-001 06/01/2017

ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,

HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.

JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES

MILLWRIGHT.......................$ 25.91 22.73

ELEC0153-001 06/05/2017

ST JOSEPH COUNTY

Rates Fringes

Communication Technician.........$ 26.00 16.20

ELECTRICIAN......................$ 33.60 21.88

Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.

ELEC0531-001 05/29/2017

LAPORTE and PORTER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 39.00 25.15

ELEC0697-001 03/27/2017

LAKE COUNTY

Rates Fringes

ELECTRICIAN......................$ 40.73 2.12+57.13%

ELEC0697-004 08/29/2016

LAKE COUNTY

Rates Fringes

Telecommunication Technician.....$ 30.50 24.42

Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).

Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC1393-003 01/01/2017

LAKE & PORTER COUNTIES

(Calumet Area, North of U.S. Hwy 30)

Line Construction:

EQUIPMENT OPERATOR 1:

(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 29.51 5.65+29%

EQUIPMENT OPERATOR 3

(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 36.49 5.65+29%

GROUNDMAN...................$ 22.19 5.65+29%

GROUNDMAN-TRUCK DRIVER......$ 21.43 5.65+29%

LINEMAN.....................$ 38.47 5.65+29%

ELEV0002-005 01/01/2017

ELEVATOR CONSTRUCTION

LAKE AND PORTER COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 53.18 31.585+a+b

FOOTNOTES:

a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.

b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.

ELEV0044-002 01/01/2017

Rates Fringes

ELEVATOR MECHANIC................$ 46.72 31.585+a+b

a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.

b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;

6% for less than 5 years' service.

ENGI0150-001 06/01/2017

BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:

LAKE, LAPORTE, and PORTER COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.50 32.88

GROUP 2.....................$ 39.70 32.88

GROUP 3.....................$ 35.40 32.88

GROUP 4.....................$ 33.20 32.88

GROUP 5.....................$ 27.75 32.88

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;

Concrete paver 27E cu. ft. & under; Concrete placing boom;

Concrete pump/grout pump with boom (truck mounted);

Concrete pump with boom (truck mounted); concrete tower;

Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);

Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);

Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;

Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks

GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over 210; Air compressor (2) feeding a common receiver;

Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;

Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm

& similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches

GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen

GROUP 5: Fork lifts (Housing and commercial only)

ENGI0150-012 06/01/2017

BUILDING CONSTRUCTION

ST. JOSEPH COUNTY

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 29.05 27.15

GROUP 2.....................$ 27.70 27.15

GROUP 3.....................$ 26.90 27.15

GROUP 4.....................$ 26.10 27.15

GROUP 5.....................$ 23.50 27.15

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.

GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat (over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.

capacity), Forklift (with fixed or tilt mast), Greaser Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole

Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with "a" frame.

GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than 12 inches in width, Welding Machines (8 through 15).

GROUP 4: Bobcat (up to and including 3/4 cu. yd.).

Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4

cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8).

GROUP 5: Bobcats and forklifts (commercial or residential).

* ENGI0150-014 05/01/2017

POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY

LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.50 32.00

GROUP 2.....................$ 40.05 32.00

GROUP 3.....................$ 39.60 32.00

GROUP 4.....................$ 38.40 32.00

GROUP 5.....................$ 37.35 32.00

POWER EQUITMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt plants (construction), Asphalt plant (permanent), Auto Patrol (Maintainer), Automatic Dry Batch Plant, Automated Concrete Placer, Automated Sub-Grader, Automated Slip Form Paver, Automated Finish Machine, Combination Backhoe Front, End Loader Machine (1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader (stationary), Boring Machine (road), Bulldozer, Concrete Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post Driver (truck mounted), Lead Greaser, Helicopter, Highlift Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver (Hetherington), Pile Driver (Skid or Crawler), Road Paving Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck Mounted), Ross Carrier, Roto Mill Grinder (36" and over), Roto mill grinder (less than 36"), Throttle Valve and Compressor or Clever Brooks Type Combination, Throttle Valve and Fireman Combination or Horizontal or Upright Boiler, Tournapull or similar type equipment, Tractor (boom), Tractor Drawn Belt Loader with attached Pusher (requires two engineers), Trench Machine, Tug Boat Operator, Wheel Excavator, Winch Tractor with "a" frame, Scoops, Turnapull or similar types machine used in Tandem (add $1.00 to class l hourly rate for each machine attached there to).

GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or Base Paver, Pavement Bump Grinder (self-propelled), Roller (Asphalt, waterbound, Macadam, Bituminous Macadam, Brick Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.

GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing Machine, Concrete Spreader (power driven), Digger, Post Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot (self-propelled), Sub-grader, Tamper, Mutipile Vibrating (earth and subbase material), Tractaire with Drill, Tractor (with all drawn attachements except backhoe and including Highlift, Endloader of 1 cu. yd. capacity and less.

GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine (self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine (paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.

GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater (1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw (Concrete Power Driven), Water Pump, Grasscutter.

IRON0292-001 06/01/2017

ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES

Rates Fringes

IRONWORKER.......................$ 29.30 21.11

IRON0395-001 06/01/2017

LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50

MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE

ON W. TO 3 MILES E. OF IN. COUNTIES

IRONWORKER

SHEETER.....................$ 39.80 30.32

STRUCTURAL & ORNAMENTAL.....$ 39.55 30.32

LABO0041-001 06/01/2015

BUILDING CONSTRUCTION

LAKE COUNTY (Western Half)

Rates Fringes

Laborers:

CAISSON AND TUNNEL WORK

(Compressed & Free Air).....$ 37.33 18.10

GROUP 1.....................$ 35.83 18.10

GROUP 2.....................$ 36.58 18.10

GROUP 3.....................$ 36.83 18.10

LABORER CLASSIFICATIONS:

GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Railroad Workers, Masonry Wall Workers, (interior & exterior);

Portable Water, Pumps with discharge up to 3 indches;

Handling of Creosote Lumber or Like Treated Material (excluding railroad material); Asphalt Rakers and Lutemen;

Earth compactors; Jackmen and Sheetmen Working Ditches Deeper than Six (6) Feet in Depth; Laborers Working Ditches Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;

Tile Layers (sewer or field) and Sewer Pipe Layers (metallic or non-metallic); Motor Driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers;

Core Drill Operators; Cement, Lime or Silica Clay Handler

(bulk or bag); Handling of Toxic Materail Damaging to Clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain Saw and Demolition Saw Operators; Concrete Saw; Concrete Conveyor Assemblers; Applying of Curing Compound; Sinking of Wellpoints; Dewatering Header Systems

GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;

Welders (acetylene or electric); Cutting Torch or Burner;

Cement Nozzle Laborers; Cement Gun Operators; Scaffold Builders for Plasterers; Scaffold Builders for Masons;

Water Blast Machine Operators; Air Tool Operators and all Pneumatic Tool Operators, Air and Electric Vibrators and Chpping Hammer Operators; Asbestos Removal; Hazardous Waste Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders

GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.

CAISSON AND TUNNEL WORK (Compressed & Free Air)

GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.

Premium for all employees working in compressed air shall be as follows:

0 - 15 lbs. $1.00 per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour

LABO0041-004 04/01/2017

UTILITY CONSTRUCTION

LAKE COUNTY

Rates Fringes

LABORERS

Group 1.....................$ 31.07 15.63 Group 2.....................$ 31.37 15.63

Group 3.....................$ 32.07 15.63

LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)

GROUP 1: Construction Laborer, Carpenter Tender, Fence Erector, Grade Checker, Guard Rail Erector, Continuous Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man (Mortar, Mastic, and all other types), Lighting Installer (Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road Marking and Delineation Laborer, Setting and Placing of all Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing Compound, or Like Material, Flagperson, Air Tool, Power Tool Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete Saw Operator, Core Drill Operator, Eye Level, Hand Blade Operator Hydro Seeder Man, Motor Driven Georgia Buggy Operator, Power Driven Compactor or Taper Operator, Power Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and Sheetman, Pipe Greade Man, Winch and Windless Operator Conduit Installer, Sod Layer

GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole Erector, Sewer Pipe Layer, Water Line Installer, Temporary or Permanent Welders (electric or Oxy Acetylene)

GROUP 3: Air Track and Wagon Drillman, Dynamite and Powder Man, Concrete Barrier Rail Form Setter, Concrete Saw Joint Control Cutting

LABO0081-001 04/01/2017

HEAVY and HIGHWAY CONSTRUCTION:

LAKE, LA PORTE, and PORTER COUNTIES

Rates Fringes

Laborers:

GROUP 1.....................$ 30.24 15.63

GROUP 2.....................$ 30.54 15.63

GROUP 3.....................$ 31.24 15.63

LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)

GROUP 1: Construction Laborer; Carpenter Tender; Fence Erector; Grade Checker; Guard Rail Erector; Continuous Steel Rod or Mat Installer; Wire Mesh Layer; Joint Man (Mortar, Mastic, and all other types); Lighting Installer (Permanent or Temporary); Lineman for Automatic Grade Maker on Paving Machines; Mortar Man; Multi-Plant Erector;

Rip-rap Installer (all Products and Materials); Road Marking and Delineation Laborer; Setting and Placeing of all Precast Concrete Products; Sing Installation including Supporting Structure; Spraying of all Epoxy, Curing Compound, or Like Material; Flagperson; Air Tool, Power Tool Operator; Asphalt Raker Man; Batch Truck Dumper;

Bridge Hand Rail Erector; Handler (bulk or bag cement);

Chain Saw Man; Concrete Puddler; Concrete Rubber; Concrete Saw Operator; Core Drill Operator, Eye Level; Hand Blade Operator Hydro Seeder Man; Motor Driven Georgia Buggy Operator; Power Driven Compactor or Tamper Operator; Power Saw Operator; Pump Crete Assembly Man; Screed Man or Screw Man on Asphalt Paver; Rebar Installer; Sandblaster Man;

Sealer Applicator for Asphalt (toxic); Setting and Placeing Prestressed on Precast Concrete Structural Members; Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement); Spreader Box Tender (manual or power driven);

Straw Blower Man; Subsurface Drain and Culvert Pipe Layer;

Concrete Conveyor; Horizonial Boring and Jackman and Sheetman; Pipe Grade Man; Winch and Windlass Operator Conduit Installer, Sod Layer.

GROUP 2: Cutting Torch Burner: Laser Beam Aligner; Manhole Erector; Sewer Pipe Layer; Water Line Installer, Temporary or Permanent; Welders (electric or Oxy-Acetylene).

GROUP 3: Air Track and Wagon Drillman; Dynamite and Powder Man; Concrete Barrier Rail Form Setter; General Laborer;

concrete saw, joint control cutting

LABO0081-002 04/01/2017

UTILITY CONSTRUCTION

LA PORTE & PORTER COUNTIES

Rates Fringes

Laborers:

GROUP 1.....................$ 30.72 15.63

GROUP 2.....................$ 31.02 15.63

GROUP 3.....................$ 31.72 15.63

LABORERS CLASSIFICATIONS (UTILITY CONSTRUCTION)

GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plate erector;

Rip-rap installer (all products and materials); Road marking and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man;

Asphalt raker man; Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man;

concrete puddler; concrete rubber; Concrete saw operator;

Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator;

Power-driven compactor or tamper operator; Power saw operator; Pumpcrete assembly man; Screed man or screw man on asphalt paver; Rebar installer; Sandblaster man; Sealer applicator for asphalt (toxic); Setting and placing prestressed or precast concrete structural memebers; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven);

Straw blower man; Subsurface drain and culvert pipe layer;

Transverse and longitudinal hand bull float man; Concrete conveyor assembly man; Horizontal boring and jacking man;

Jackman and sheetman; Pipe grade man; Winch and windlass operator

GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines

GROUP 3: Air track and wagon drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;

Concrete Saw Joint Control cutting

LABO0081-004 06/01/2015

LAKE (Eastern Half), LA PORTE, and PORTER COUNTIES

Rates Fringes

Laborers

GROUP 1.....................$ 35.83 18.10

GROUP 2.....................$ 36.58 18.10

GROUP 3.....................$ 36.83 18.10

LABORER CLASSIFICATIONS (Building Construction)

GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Mechanic Tenders; Rodmen and Chainmen, Railroad Workers, Masonry Wall Workers, (interior & exterior); Roofer Tenders, Cement Finisher Tenders, Carpenter Tenders, Portable Water, Pumps with discharge up to 3 inches; Waterproofing; Hauling of

Creosote Lumber or Lutemen; Asphalt Rakers; Kettlem, Earth Compactors; Jackman and Sheetmen in Ditches more than 6 ft.

deep; Laborers in ditches 6' deep or deeper; Assembly of Uncrete Pump; Tile Layers (sewer or field); Sewer Pipe Layers; Motor driven Wheelbarrows and Concrete Buggies;

Hyster Operator; Pump Crete Assemblers; Core Drill Operator; Cement, Line or Silica Clay Handers; Handling of Toxic Materials damaging to clothing; Pneumatic Spikers;

Deck Engine and Winch Operator; Water Main and Cable Ducking; Screed Man or Screw Operator on Asphalt Paver;

Chain Saw and Demolition Saw Operator; Concrete Conveyor Assembler

GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;

Welders (acetylene or electric); Cutting Torch or Burner;

Cement Nozzle; Cement Gun; Scaffold Builders when working for Plasterers, and Mason; Water Blast Machine Operator;

Air Tool Operators and all Pheumatic Tool Operators; Air and Electric Vibrators and Chipping Hammer Operators;

Asbestos Removal; Hazardous Waste Removal

GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives; Laborer Specialist

LABO0645-002 04/01/2017

UTILITY CONSTRUCTION

ST JOSEPH COUNTY

Rates Fringes

Laborers:

GROUP 1.....................$ 23.42 14.30

GROUP 2.....................$ 23.72 14.30

GROUP 3.....................$ 24.42 14.30

LABORER CLASSIFICATIONS (UTILITY CONSTRUCTION)

GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;

Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;

Screed man or screw man or asphalt paver; Rebar installer;

Sandblaster man; Sealer applicator for asphalt (toxic);

Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;

Horizontal boring and jacking man; Jackman and sheetman;

Pipe grade man; winch and windlass operator.

GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines.

GROUP 3: Air track and wage drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;

Concrete Saw Joint Cutting.

LABO0645-004 04/01/2017

HEAVY AND HIGHWAY

ST. JOSEPH COUNTY

Rates Fringes

LABORERS

GROUP 1.....................$ 23.22 14.30

GROUP 2.....................$ 23.52 14.30

GROUP 3.....................$ 24.22 14.30

LABORER CLASSIFICATIONS (HEAVY AND HIGHWAY CONSTRUCTION)

GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;

Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;

Screed man or screw man or asphalt paver; Rebar installer;

Sandblaster man; Sealer applicator for asphalt (toxic);

Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;

Horizontal boring and jacking man; Jackman and sheetman;

Pipe grade man; winch and windlass operator

GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines.

GROUP 3: Air track and wage drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;

Concrete Saw Joint Cutting

PAIN0027-004 06/01/2017

LAKE COUNTY, West of Highway #41, including HAMMOND area

Rates Fringes

GLAZIER..........................$ 42.45 34.18

PAIN0091-004 06/01/2014

LA PORTE (Everything East of Hwy 39 and North of Hwy 20, including the Cities of LaPorte and Michigan City); ST. JOSEPH

COUNTIES

PAINTER

Brush & Roller, Drywall Taping & Finishing, Vinyl/Paper Hanging.........$ 26.32 12.75 Spray.......................$ 26.82 12.75

PAIN0460-003 06/01/2017

PORTER, LAKE and the remainder of LA PORTE COUNTY)

Rates Fringes

Painters:

DRYWALL FINISHING..........$ 34.80 22.76

PAINTER.....................$ 34.00 22.76

PAIN1165-005 07/01/2017

LAKE (EAST OF HIGHWAY #41 EXCLUDING HAMMOND AREA), LAPORTE and

PORTER COUNTIES

GLAZIER..........................$ 34.85 21.62

PAIN1165-009 07/01/2017

ST. JOSEPH COUNTY

Rates Fringes

GLAZIER..........................$ 27.66 16.38

PLAS0101-006 06/01/2014

HEAVY/HIGHWAY

ST. JOSEPH COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 30.57 11.50

PLAS0101-007 06/01/2014

BUILDING CONSTRUCTION

ST. JOSEPH COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 26.44 12.20

PLASTERER........................$ 26.81 12.40

PLAS0165-001 06/01/2012

LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF

CROWN POINT AND EAST OF GRIFFITH)

CEMENT MASON/CONCRETE FINISHER

BUILDING CONSTRUCTION.......$ 37.28 18.53

HEAVY & HIGHWAY

CONSTRUCTION................$ 33.94 13.80

PLASTERER........................$ 31.30 15.10

PLAS0406-001 06/01/2012

LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE

CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT)

and PORTER COUNTIES

BUILDING CONSTRUCTION.......$ 35.48 21.68

HEAVY & HIGHWAY

CONSTRUCTION................$ 32.00 15.74

PLASTERER........................$ 31.68 14.72

PLAS0438-001 06/01/2014

LAPORTE COUNTY, EASTERN PORTION OF PORTER COUNTY WEST TO BUT

NOT INCLUDING CHESTERTON IN THE NORTH AND WEST TO AND INCLUDING

KOUTS IN THE SOUTH

BUILDING CONSTRUCTION

Cement Mason...............$ 36.01 22.15

HEAVY & HIGHWAY

CONSTRUCTION

Cement Mason...............$ 30.89 17.34

PLUM0172-006 05/29/2017

LA PORTE COUNTY (CITY OF LAPORTE) and ST. JOSEPH COUNTIES

Rates Fringes

Plumber, Pipefitter, Steamfitter......................$ 32.81 19.80

PLUM0210-001 06/01/2017

LAKE, LAPORTE (Excluding the City of LaPorte) and PORTER

COUNTIES

PLUMBER..........................$ 39.32 23.41

PLUM0597-003 06/01/2017

LAKE (Entire County), LA PORTE (Excluding the city of La Porte), PORTER (Entire County)

PIPEFITTER.......................$ 47.50 30.02

ROOF0023-006 06/01/2017

LA PORTE and ST. JOSEPH COUNTIES

ROOFER

COMPOSITION.................$ 28.76 14.50

SLATE & TILE................$ 29.76 14.50

ROOF0026-003 06/01/2017

LAKE AND PORTER COUNTIES

Rates Fringes

ROOFER...........................$ 35.44 19.89

SFIN0281-001 06/01/2015

PORTER COUNTY (North of U.S. Route 30)

Rates Fringes

Sprinkler Fitters................$ 47.10 23.05

SFIN0669-002 04/01/2017

Rates Fringes

SPRINKLER FITTER.................$ 37.96 19.25

SHEE0020-013 07/01/2017

ST. JOSEPH COUNTY

Rates Fringes

Sheet metal worker...............$ 30.02 25.29

SHEE0020-015 07/01/2017

LAKE, LAPORTE, and PORTER COUNTIES

Rates Fringes

Sheet metal worker...............$ 42.98 23.41

TEAM0135-004 04/01/2017

LA PORTE COUNTY

Rates Fringes

TRUCK DRIVER (BUILDING

CONSTRUCTION ONLY)

GROUP 1.....................$ 28.49 A

GROUP 2.....................$ 28.99 A

GROUP 3.....................$ 29.19 A

GROUP 4.....................$ 29.34 A

GROUP 5.....................$ 29.84 A

A: $33.70 PER DAY & 426.80 PER WEEK.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Single Axle Trucks, seven (7) cu. yds. or less than ten and one-half (10 1/2) tons, dupsters, scoop-mobiles five (5) cu.yds. and under or less than seven and one-half (7 1/2) tons, mixer trucks three (3) cu.yds. and under, air compressors and welding machines, including those pulled by separate units, batch trucks-wet or dry- 2"34-E" batches or less, truck driver helpers, warehousemen, mechanic's helpers, greasers and tiremen, all pick-up trucks and other vehicles. Drivers on dumpsters or similar dumpsters, mounted on four (4) wheel truck rated two (2) cu.yds. or less, and small pallet type fork-lift operator and drivers on pallet jacks or similar type equipment.

GROUP 2: Drivers on tandem axle eighteen (18) cu.yds. or twenty- four (24) tons gross, six (6) wheel trucks, Koehring or similar dumpsters, tract trucks, Euclids, hug bottom dumps, tournapulls, trounatrailers, tournarockers, or similar equipment when used for transportation purposes under nine (9) cu.yds. or less than thirteen and one-half (13 1/2) tons, tandems and semi-trailer service trucks, mixer trucks over three (3) cu.yds. and including six and one-half (6 1/2) cu.yds., fork lift, four (4) wheel A-frame trucks when used for transportation purposes, four

(4) wheel winch trucks, pavement breakers, batch trucks-wet or dry- over 2 up to and including 4-"34-E" batches two (2) men oil distributors, fork-lift under four (4) ton and vacuum trucks.

GROUP 3: Koehring or similar…