Cal_Township_41st_Ave_RTA_Specifications.pdf

PDF 5 MB Posted

Attached to
Calumet Township Drainage Project Federal contract opportunity
Solicitation number
W912P6-16-B-0009
Issued by
Department of the Army Corps of Engineers Engineering District Chicago

About this file

Solicitation with Specification

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO: W912P6-16-B-0009

or CONTRACT NO:

CHICAGO DISTRICT

LEADERS IN CUSTOMER CARE

41st Avenue Drainage Project

Unincorporated Lake County, Indiana

CONSTRUCTION SOLICITATION

SPECIFICATIONS

Solicitation Set Submittal

August 5, 2016

41st Avenue Drainage Project W912P6-16-B-0009

PROJECT TABLE OF CONTENTS

DIVISION 00 PROCUREMENT & CONTRACTING REQUIREMENTS

00010 SOLICITATION, OFFER AND AWARD (SF 1442) & BIDDING SCHEDULE

00100 INSTRUCTIONS TO BIDDERS

00600 REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

BIDDERS

00700 CONTRACT CLAUSES

00800 SPECIAL CONTRACT REQUIREMENTS

WAGE RATES

DIVISION 00 LEVEL 2 AVAILABLE INFORMATION

00 31 32 13 SUBSURFACE DRILLING AND SAMPLING INFORMATION

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00.00 GENERAL PROVISIONS

01 11 00 SUMMARY OF WORK

01 22 00.00 MEASUREMENT AND PAYMENT

01 33 00 SUBMITTAL PROCEDURES

01 35 26.00 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 USACE QUALITY CONTROL

01 45 00.10 USACE QUALITY CONTROL SYSTEM (QCS)

01 52 02.00 TEMPORARY CONSTRUCTION FACILITIES

01 57 20.02 03 ENVIRONMENTAL PROTECTION FOR INDIANA

01 58 00 PROJECT SIGN AND SAFETY SIGN

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 02 - SITE WORK

02 41 00 SITE DEMOLITION

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 22 GEOTEXTILES USED AS FILTERS

31 11 00 CLEARING AND GRUBBING

31 23 00.00 20 EXCAVATION AND FILL

31 37 16 RIP-RAP FOR EROSION CONTROL

41st Avenue Drainage Project W912P6-16-B-0009

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 15 00 AGGREGATE SURFACE COURSE

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 40 00.00 STORM-DRAINAGE UTILITIES

33 34 01 PUMP STATION ELECTRICAL/MECHANICAL

-- End of Project Table of Contents –-

PROJECT DESCRIPTION

BASE BID: The Base Bid Improvements are as shown in the plan set – full width resurfacing of Chase Street only, with HMA patching all other storm sewer improvement locations, and no alley improvements.

OPTION 1: The Option 1 Improvements include the Base Bid Improvements, plus the alley improvements as shown on the plans.

OPTION 2: The Option 2 Improvements include the Option 1 Improvements, as well as full width resurfacing on Marshall Place and Marshall

Street as shown on the plans.

OPTION 3: The Option 3 Improvements include the Option 2 Improvements, as well as full width resurfacing of all project roadways.

-- End of Project Description –-

Project: CALUMET TOWNSHIP, IN – DRAINAGE PROJECT - Section 219

The project w ill include construction of approximately 5,585 linear feet of new storm sew ers of various diameters from 4 inches to 24 inches.

The new storm sew ers w ill be installed on W. Chase Street both north and south of 41st Ave. and on W 41st Ave. from W. Chase St east to Marshall Place, and then north on Marshall Place to Beverly Drive, W. 40th Place, W. 39th and a few adjacent low areas. These storm sew ers w ill drain into the new W. Chase Street storm sew er and eventually into Cady Marsh Ditch.

The estimated magnitude of construction, in accordance w ith FAR 36.204, is betw een $500K and $1M

Construction Wage Rates: General Decision Number: IN160001, dated 07/22/2016 IN1, is attached

Electronic or faxed bids w ill not be accepted.

COMPETITION FOR THIS ACQUISITION IS 100% SET-ASIDE FOR SMALL BUSINESS CONCERNS

X

THOMAS J. RUSSELL 312-846-5376

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

17-Aug-2016

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________390 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________SECTION 00700

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________19 Sep 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION, CHICAGO DISTRICT

231 SOUTH LASALLE STREETSUITE 1500

CHICAGO IL 60604-1437

W912P6

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 312.846.5371 TEL: FAX:

W912P6-16-B-0009 72

General Decision Number: IN160001 07/22/2016 IN1

Superseded General Decision Number: IN20150001

State: Indiana

Construction Types: Building, Heavy and Highway

Counties: La Porte, Lake, Porter and St Joseph Counties in Indiana.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories, HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/22/2016 2 01/29/2016 3 02/26/2016 4 03/04/2016 5 04/01/2016 6 04/08/2016 7 04/15/2016 8 04/29/2016 9 05/20/2016 10 06/10/2016 11 06/24/2016 12 07/01/2016 13 07/22/2016

ASBE0017-002 06/01/2015

LAKE AND PORTER COUNTIES

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 48.45 24.35

HAZARDOUS MATERIAL HANDLER

(INCLUDES PREPARATION,

WETTING, STRIPPING REMOVAL

SCRAPPING, VACUUMING, BAGGING

AND DISPOSAL OF ALL

8/9/2016http://www.wdol.gov/wdol/scafiles/davisbacon/IN1.dvb?v=13

INSULATION MATERIALS, WHETHER

THEY CONTAIN ASBESTOS OR NOT,

FROM MECHANICAL SYSTEMS).........$ 36.34 23.15

* ASBE0075-001 06/01/2016

REMAINING COUNTIES

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 31.50 20.79

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal, scrapping, vaccuming, bagging, and disposal of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 19.49 10.95

BOIL0001-005 01/01/2014

LAKE COUNTY, City of Hammond; North of 114th Street

Rates Fringes

BOILERMAKER......................$ 42.13 25.45

BOIL0374-003 01/01/2013

Rates Fringes

BOILERMAKER......................$ 33.78 25.19

BRIN0004-011 06/01/2015

MERRILLVILLE

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

BRICKLAYER

Bricklayer; Stone Mason;

Pointer, Cleaner, Caulker...$ 36.12 20.20 Marble Finisher; Tile Finisher....................$ 28.29 10.68 Marble Mason; Terrazzo Worker; Tile Layer..........$ 36.80 20.37 Terrazzo Finisher...........$ 29.29 10.68

BRIN0004-018 06/01/2015

SOUTH BEND: ST. JOSEPH COUNTY

Rates Fringes

BRICKLAYER

BRICKLAYER; STONE MASON;

POINTER, CAULKER, CLEANER...$ 28.15 13.21

MARBLE AND TILE FINISHER....$ 28.29 12.04

MARBLE AND TILE LAYER.......$ 29.30 14.59

TERRAZZO FINISHER...........$ 29.29 12.04

TERRAZZO WORKER.............$ 30.30 14.59

CARP0413-002 04/01/2016

St. Joseph County

Rates Fringes

CARPENTER........................$ 26.44 18.84

CARP0765-001 01/01/2016

HEAVY, HIGHWAY AND BUILDING CONSTRUCTION

LAKE, LAPORTE AND PORTER COUNTIES

Rates Fringes

CARPENTER........................$ 37.42 25.78

MILLWRIGHT.......................$ 37.52 25.96

CARP1029-001 06/01/2016

ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD,

HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST.

JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 25.46 21.83

ELEC0153-001 06/06/2016

ST JOSEPH COUNTY

Rates Fringes

Communication Technician.........$ 25.00 14.17

ELECTRICIAN......................$ 32.75 20.87

Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to, sound and voice transmission/transference systems, communication systems that transmit or receive information and/or control systems, television and video systems, micro-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.

ELEC0531-001 02/28/2016

LAPORTE and PORTER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 39.00 24.95

ELEC0697-001 05/30/2016

LAKE COUNTY

Rates Fringes

ELECTRICIAN......................$ 40.34 28.72

ELEC0697-004 08/31/2015

LAKE COUNTY

Rates Fringes

Telecommunication Technician.....$ 30.50 20.80

Work covers low voltage installation, maintenance and removal of telecommunication facilities (voice, sound, data and video) including, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V/SAT, bypass, CATV, WAN (WIDE AREA NETWORKS), LAN (local area networks), and ISDN (integrated system digital network).

Does not cover any work which properly comes under the work description of Inside JW (Journeyman Wireman), but shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC1393-003 12/01/2014

LAKE & PORTER COUNTIES

(Calumet Area, North of U.S. Hwy 30)

Rates Fringes

Line Construction:

EQUIPMENT OPERATOR 1:

(Diggers 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks).....................$ 29.98 13.84

EQUIPMENT OPERATOR 3

(Backhoe over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% of J.L. Rate..$ 36.79 15.82

GROUNDMAN...................$ 17.88 10.34

GROUNDMAN-TRUCK DRIVER......$ 20.87 11.21

LINEMAN.....................$ 39.01 16.46

ELEV0002-005 01/01/2015

ELEVATOR CONSTRUCTION

LAKE AND PORTER COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 50.80 28.39+a+b

FOOTNOTES:

a) Eight Paid Holidays: New Year's Day; Veterans Day, Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day.

b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service, and 6% of regular hourly rate for less than 5 years of service.

ELEV0044-005 01/01/2015

LAPORTE AND ST. JOSEPH COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 44.77 28.39+a+b

a) Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.

b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years service; 6% for less than 5 years' service.

ENGI0150-001 06/01/2016

BUILDING CONSTRUCTION POWER EQUIPMENT OPERATORS:

LAKE, LAPORTE, and PORTER COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.00 31.53

GROUP 2.....................$ 39.20 31.53

GROUP 3.....................$ 34.90 31.53

GROUP 4.....................$ 32.70 31.53

GROUP 5.....................$ 27.25 31.53

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Asphalt Plant; Autograde; Batch Plant); Benoto (requires 2 engineers; Boiler & throttle valve; Boring machine (mining machine); Caisson Rigs; Central redi-mix plant; Combination Backhoe Endloader with backhoe bucket over 1/2 cu. yd. or with attachments; Combination tugger hoist & air compressor; Compressor & throttle; Concrete

Breaker (truck mounted); Concrete conveyor; Concrete conveyor (truck mounted); Concrete paver over 27E cu.ft.;

Concrete paver 27E cu. ft. & under; Concrete placing boom;

Concrete pump/grout pump with boom (truck mounted);

Concrete pump with boom (truck mounted); concrete tower;

Cranes and Backhoes (All Attachments); Cranes, Hammerhead Tower; Creter Crane; Derricks (all); Derricks (traveling);

Forklift lull type; Forklift, 10 ton & over; Gradall, Hoist 1, 2, and 3 drums; Hoist (2 tugger l floor), Hydraulic Boom truck, Laser Screed, Locomotive (all), Motor patrol, Mucking Machine; Pile Driving and Skid rig, Pit machine, Prestress Machines, Pump cretes (and similar types), Rock Drill (self-propelled), Rock Drill Truck mounted; Slip form paver, Straddle buggies, Tractor with boom and side boom, Trenching Mechine; Winch Tractors, Welding machines (6-9), GROUP 2: Air Comporessor (3) (feeding a common receiver);

Asphalt Spreader; boilers; bulldozers; Combination Backhoe end loader with Backhoe bucket 1/2 cu. yd. and under or with attachments; Corboy drilling machine; Grader, Elevating; Grouting machines; Guard rail post driver;

Highlift Shovel or frontend loader; Hoist (automatic), Hoist (all elevators); Hoist (tugger and single drum); Post hole digger; rollers (all); Scoop (tractor drawn); Stone crushers; Tournapull; Winch trucks

GROUP 3: Air compressor - small 210 and under (1 to 5 not to exceed a total of 300 feet); Air compressor - large over 210; Air compressor (2) feeding a common receiver;

Combination - small equipment operator; Concrete mixer (two bag & over); Conveyor, portable; Forklift-under 10 ton;

Generator; Pumps (1 to 3 not to exceed a total of 300 feet); Pumps, well points; Steam generators; Tractors, farm & similar type; Welding machines (2 thru 5); Winches, 4 electric drillo winches

GROUP 4: Bull gang (crane erection crew); Heaters, mechanical (1 to 5); Oilers; Switchmen

GROUP 5: Fork lifts (Housing and commercial only)

ENGI0150-012 06/01/2016

BUILDING CONSTRUCTION

ST. JOSEPH COUNTY

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 28.65 25.95

GROUP 2.....................$ 27.30 25.95

GROUP 3.....................$ 26.50 25.95

GROUP 4.....................$ 25.70 25.95

GROUP 5.....................$ 23.10 25.95

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Mechanic, Asphalt Plant, Asphalt Spreader, Auto

Grader; Batch Plant, Benoto (requires 2 Engineers), Boiler and Throttle Valve, Boring Machine (road), Bulldozers (with engines of 140 net horse power or more) Caisson Rigs, Central Redi-mix Plant, Concrete Conveyor Systems, Concrete Power (over 27E cu. ft.), Concrete Paver (27E cu. ft. and under), Concrete Pumps/Grout cncrete placer (Truck Mounted), Concrete Tower, Cranes and backhoes (all), Cranes, Hammerhead Tower, Creter Crane, Derricks (all), Forklift (capble of hoisting and mechanically moving forks horizontally), Grader, Elevating, Highlift Shovels or Front End Loaders (over 3 yd bucket), Hoists (2 or more drums), Locomotives (all), Laser screed, Motor Patrol, Pile Drivers and Skid Rig, Pre-Stress Machines, Pump Cretes & Similar Types, Rock Drill (Self-Propelled), Rock Drill (self propelled Truck Mounted), Scoops (tractor drawn), Slip-Form Paver, Tournapull, Tractor with Boom & Side Boom, Trenching Machine (12 or more inches in width), Combination Backhoe Front End Loader Machine with backhoe 1/2 yd bucket or attachments.

GROUP 2: Air Compressor (600 cu. ft. and over), Bob Cat (over 3/4 cu. yd.), Boilers, Broom (all powered propelled), Bull Dozers with engines of less than 140 net horsepower, combination backhoe front end loader 1/2 yf bskhhoe or under, Compressor and Throttle Valve, Concrete Breaker (truck mounted), Concrete Mixer (of moore than 21 cu. ft.

capacity), Forklift (with fixed or tilt mast), Greaser Engineer, Highlift shovel or front endloader 3 yd bucket and under, Hoists (1 drum), Hydrulic Boom Truck, Post Hole Digger (vehicle mounted), Pump Cretes (squeze crete type pumps, Gypsum, bulker , Rollers(all), Steam Generators, Stone Crushers, Stradddle Buggies, Tractors, Winch Trucks (with "a" frame.

GROUP 3: Buck Hoist, Combination (small equipment operator), .Conveyor (portable), Grouting Machine, Hoist Elevators (material and personnel), Hydraulic Power Units, Grouting and Pile Driving, Stud Welder, Trenching Machines less than 12 inches in width, Welding Machines (8 through 15).

GROUP 4: Bobcat (up to and including 3/4 cu. yd.).

Compressor (over 210 cu. ft. and less than 600 cu. ft.), Generator (over 50 kw.), Heaters, Mechanical, Hoists (all elevator, permanent installation), Hoist (automatic), Hoist (tugger single drum), Oilers, Pumps, Well Points and electric submersible, Small Rubber Tired End Loaders (1/4

cu. yd. and under), Tractors (farm type) Welding Machines (2 through 8).

GROUP 5: Bobcats and forklifts (commercial or residential).

ENGI0150-014 05/01/2016

POWER EQUIPMENT OPERATOR HEAVY/HIGHWAY

LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.00 30.80

GROUP 2.....................$ 39.55 30.80

GROUP 3.....................$ 39.10 30.80

GROUP 4.....................$ 37.90 30.80

GROUP 5.....................$ 36.85 30.80

POWER EQUITMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt plants (construction), Asphalt plant (permanent), Auto Patrol (Maintainer), Automatic Dry Batch Plant, Automated Concrete Placer, Automated Sub-Grader, Automated Slip Form Paver, Automated Finish Machine, Combination Backhoe Front, End Loader Machine (1/2 cu. yd.), Backhoe bucket or over or with attachments), Combination backhoe 1 cu yd, Backhoe bucket or over or with attachments, Ballast Regulator (RR), Belt Loader (stationary), Boring Machine (road), Bulldozer, Concrete Mixer(27 cu. ft. or over), Concrete Pump (truck mounted), Concrete Breaker (truck mounted and self-propelled), Core Drilling Machine, Cranes and Backhoes (all attachments), Cranes, Hammerhead, Creter Crane, Crushers (concrete, rock, recycling, etc.), Derricks , Derricks (traveling), Dredge Operator, Formless Curb and Gutter Machine (36 inches and over), Formless Curb and Gutter Machine under 36 inches, Gradall and Machines (of a like nature), Guardrail Post Driver (truck mounted), Lead Greaser, Helicopter, Highlift Shovel (3 yd. and over), Hoist (1 drum), Hoist (2, and 3 drums), Hydraulic Power Units (grouting, piledriving and extracting) Hydro or water blaster (self-propelled), Locomotive Operators, Mechanic, Welder, Mucking Machine, Panelboard Concrete Plant (central mix type), Paver (Hetherington), Pile Driver (Skid or Crawler), Road Paving Mixer, Rock Drill Crawler or Skid Rig, Rock Drill (truck Mounted), Ross Carrier, Roto Mill Grinder (36" and over), Roto mill grinder (less than 36"), Throttle Valve and Compressor or Clever Brooks Type Combination, Throttle Valve and Fireman Combination or Horizontal or Upright Boiler, Tournapull or similar type equipment, Tractor (boom), Tractor Drawn Belt Loader with attached Pusher (requires two engineers), Trench Machine, Tug Boat Operator, Wheel Excavator, Winch Tractor with "a" frame, Scoops, Turnapull or similar types machine used in Tandem (add $1.00 to class l hourly rate for each machine attached there to).

GROUP 2: Combination Backhoe Front End Loader Machine with less than 1/2 cu. yd., Backhoe Bucket or with attachments, Bituminous Mixer, Bituminous Paver, Bridge Deck Finisher, Concrete Mixer (less than 27 cu. ft.), Compressor and throttle valve, Compressor (common receiver 3), Greaser, Highlift Shovels (under 3 cu. yds.), Jersey Spreader or Base Paver, Pavement Bump Grinder (self-propelled), Roller (Asphalt, waterbound, Macadam, Bituminous Macadam, Brick Surface, Sheepfoot Roller (self- propelled with blade), Surface Heater and Planer, Tamper (mutiple vibrating, asphalt waterbound macadam, bituminouus macadam, brick surface), Tractor (push), Tractor with scoop, Widener, Apsco or similar type.

GROUP 3: Back Filler, Bituminous Distributor, Broom and Belt Machine, Bull Float, Compressor (common receiver 2), Concrete cutter wheel type (rockwell), Concrete Finishing Machine, Concrete Spreader (power driven), Digger, Post Hole (power driven), Finishing Machine and Bull Float, Forklift, Form Grader, Form Tamper (motor driven), Hydraulic (boom truck) when used for hauling materials, Laser screed, Mutiple Tamping Machine, Paving Breaker, Roller (earth and subbase material), Roller sheepfoot (self-propelled), Sub-grader, Tamper, Mutipile Vibrating (earth and subbase material), Tractaire with Drill, Tractor (with all drawn attachements except backhoe and including Highlift, Endloader of 1 cu. yd. capacity and less.

GROUP 4: Air Compressors, Conveyor (all), Fireman on Boiler, Generator, Grout Machine, Power curing Spraying Machine (self-propelled), Broom (self-propelled), Seaman Tiller, Skid steer loaders, Spike Machine (RR), Stripping Machine (paint, self-propelled), Throttle Valve, Welding Machine, Well Points System.

GROUP 5: Deck Hand, Hetherington Driver, Mechanical Heater (1 to 5), Outboard or Inboard Motor Boat, Oiler, Power Saw (Concrete Power Driven), Water Pump, Grasscutter.

* IRON0292-001 06/01/2016

ST. JOSEPH and LAPORTE (Remainder of County) COUNTIES

Rates Fringes

IRONWORKER.......................$ 28.81 20.16

IRON0395-001 06/01/2015

LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50

MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE

ON W. TO 3 MILES E. OF IN. COUNTIES

Rates Fringes

IRONWORKER

SHEETER.....................$ 39.75 27.77

STRUCTURAL & ORNAMENTAL.....$ 39.50 27.77

LABO0041-001 06/01/2015

BUILDING CONSTRUCTION

LAKE COUNTY (Western Half)

Rates Fringes

Laborers:

CAISSON AND TUNNEL WORK

(Compressed & Free Air).....$ 37.33 18.10

GROUP 1.....................$ 35.83 18.10

GROUP 2.....................$ 36.58 18.10

GROUP 3.....................$ 36.83 18.10

LABORER CLASSIFICATIONS:

GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Railroad Workers, Masonry Wall Workers, (interior & exterior);

Portable Water, Pumps with discharge up to 3 indches;

Handling of Creosote Lumber or Like Treated Material (excluding railroad material); Asphalt Rakers and Lutemen;

Earth compactors; Jackmen and Sheetmen Working Ditches Deeper than Six (6) Feet in Depth; Laborers Working Ditches Six (6) Feet in Depth or Deeper; Assembly of Unicrete Pump;

Tile Layers (sewer or field) and Sewer Pipe Layers (metallic or non-metallic); Motor Driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers;

Core Drill Operators; Cement, Lime or Silica Clay Handler (bulk or bag); Handling of Toxic Materail Damaging to Clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain Saw and Demolition Saw Operators; Concrete Saw; Concrete Conveyor Assemblers; Applying of Curing Compound; Sinking of Wellpoints; Dewatering Header Systems

GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;

Welders (acetylene or electric); Cutting Torch or Burner;

Cement Nozzle Laborers; Cement Gun Operators; Scaffold Builders for Plasterers; Scaffold Builders for Masons;

Water Blast Machine Operators; Air Tool Operators and all Pneumatic Tool Operators, Air and Electric Vibrators and Chpping Hammer Operators; Asbestos Removal; Hazardous Waste Removal; All Boiler Setters Laborers, including expediters, bottom men, bell men, and Mason Tenders

GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives.

CAISSON AND TUNNEL WORK (Compressed & Free Air)

GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men, Concrete Repairmen, Motor Men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Sttl Setters, Tuggers, Switchmen, Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine, Dynamite Men, Drillers-air track or wagon drilling for explosives.

Premium for all employees working in compressed air shall be as follows:

0 - 15 lbs. $1.00 per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour

LABO0041-004 04/01/2016

LAKE COUNTY (WESTERN HALF)

Rates Fringes

LABORERS

Group 1.....................$ 30.24 13.55 Group 2.....................$ 30.54 13.55 Group 3.....................$ 31.24 13.55

LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)

GROUP 1: Construction Laborer, Carpenter Tender, Fence Erector, Grade Checker, Guard Rail Erector, Continuous Steel Rod or Mat Installer, Wire Mesh Layer, Joint Man (Mortar, Mastic, and all other types), Lighting Installer (Permanent or Temporary), Lineman for Automatic Grade Maker on Paving Machines, Mortar Man, Multi-Plant Erector, Rip-rap Installer (all Products and Materials), Road Marking and Delineation Laborer, Setting and Placing of all Precast Concrete Products, Sing Installation including supporting structure, Spraying of all Epoxy, Curing Compound, or Like Material, Flagperson, Air Tool, Power Tool Operator, Asphalt Raker Man, Batch Truck Dumper, Bridge Hand Rail ERector, Handler (bulk or bag cement), Chain Saw Man, Concrete Puddler, Concrete Rubber, Concrete Saw Operator, Core Drill Operator, Eye Level, Hand Blade Operator Hydro Seeder Man, Motor Driven Georgia Buggy Operator, Power Driven Compactor or Taper Operator, Power Saw Operator, Pump Crete Assembly Man, Sreed Man or Screw Man on Asphalt Paver, Regar Installer, Sandblaster Man, Sealer Applicator for Asphalt (toxic), Setting and Placing pre-stressed on Pre-cast Concrete Structural Members, Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement), Spreader Box Tender (manua or power driven), Straw Blower Man, Subsureface Drain and Culvert Pipe Layer, Concrete Conveyor, Horizonal Boring and Jackman and Sheetman, Pipe Greade Man, Winch and Windless Operator Conduit Installer, Sod Layer

GROUP 2: Cutting Torch Burner, Laser Beam Aligner, Manhole Erector, Sewer Pipe Layer, Water Line Installer, Temporary or Permanent Welders (electric or Oxy Acetylene)

GROUP 3: Air Track and Wagon Drillman, Dynamite and Powder Man, Concrete Barrier Rail Form Setter, Concrete Saw Joint Control Cutting

LABO0081-001 04/01/2016

HEAVY and HIGHWAY CONSTRUCTION:

LAKE (Eastern Half), LA PORTE, and PORTER COUNTIES

Rates Fringes

Laborers:

GROUP 1.....................$ 30.24 13.80

GROUP 2.....................$ 30.54 13.80

GROUP 3.....................$ 31.24 13.80

LABORERS CLASSIFICATIONS (HEAVY AND HIGHWAY)

GROUP 1: Construction Laborer; Carpenter Tender; Fence Erector; Grade Checker; Guard Rail Erector; Continuous Steel Rod or Mat Installer; Wire Mesh Layer; Joint Man (Mortar, Mastic, and all other types); Lighting Installer (Permanent or Temporary); Lineman for Automatic Grade Maker on Paving Machines; Mortar Man; Multi-Plant Erector;

Rip-rap Installer (all Products and Materials); Road Marking and Delineation Laborer; Setting and Placeing of all Precast Concrete Products; Sing Installation including Supporting Structure; Spraying of all Epoxy, Curing Compound, or Like Material; Flagperson; Air Tool, Power Tool Operator; Asphalt Raker Man; Batch Truck Dumper;

Bridge Hand Rail Erector; Handler (bulk or bag cement);

Chain Saw Man; Concrete Puddler; Concrete Rubber; Concrete Saw Operator; Core Drill Operator, Eye Level; Hand Blade Operator Hydro Seeder Man; Motor Driven Georgia Buggy Operator; Power Driven Compactor or Tamper Operator; Power Saw Operator; Pump Crete Assembly Man; Screed Man or Screw Man on Asphalt Paver; Rebar Installer; Sandblaster Man;

Sealer Applicator for Asphalt (toxic); Setting and Placeing Prestressed on Precast Concrete Structural Members; Side Rail Setters (for Sidewalk, Side Ditches, Radii, and Pavement); Spreader Box Tender (manual or power driven);

Straw Blower Man; Subsurface Drain and Culvert Pipe Layer;

Concrete Conveyor; Horizonial Boring and Jackman and Sheetman; Pipe Grade Man; Winch and Windlass Operator Conduit Installer, Sod Layer.

GROUP 2: Cutting Torch Burner: Laser Beam Aligner; Manhole Erector; Sewer Pipe Layer; Water Line Installer, Temporary or Permanent; Welders (electric or Oxy-Acetylene).

GROUP 3: Air Track and Wagon Drillman; Dynamite and Powder Man; Concrete Barrier Rail Form Setter; General Laborer;

concrete saw, joint control cutting

LABO0081-004 06/01/2015

LAKE (Eastern Half), LA PORTE, and PORTER COUNTIES

Rates Fringes

Laborers

GROUP 1.....................$ 35.83 18.10

GROUP 2.....................$ 36.58 18.10

GROUP 3.....................$ 36.83 18.10

LABORER CLASSIFICATIONS (Building Construction)

GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Mason or Plasterers); Mechanic Tenders; Rodmen and Chainmen, Railroad Workers, Masonry

Wall Workers, (interior & exterior); Roofer Tenders, Cement Finisher Tenders, Carpenter Tenders, Portable Water, Pumps with discharge up to 3 inches; Waterproofing; Hauling of Creosote Lumber or Lutemen; Asphalt Rakers; Kettlem, Earth Compactors; Jackman and Sheetmen in Ditches more than 6 ft.

deep; Laborers in ditches 6' deep or deeper; Assembly of Uncrete Pump; Tile Layers (sewer or field); Sewer Pipe Layers; Motor driven Wheelbarrows and Concrete Buggies;

Hyster Operator; Pump Crete Assemblers; Core Drill Operator; Cement, Line or Silica Clay Handers; Handling of Toxic Materials damaging to clothing; Pneumatic Spikers;

Deck Engine and Winch Operator; Water Main and Cable Ducking; Screed Man or Screw Operator on Asphalt Paver;

Chain Saw and Demolition Saw Operator; Concrete Conveyor Assembler

GROUP 2: Plaster Tenders, Masons Tenders; Mortar Mixers;

Welders (acetylene or electric); Cutting Torch or Burner;

Cement Nozzle; Cement Gun; Scaffold Builders when working for Plasterers, and Mason; Water Blast Machine Operator;

Air Tool Operators and all Pheumatic Tool Operators; Air and Electric Vibrators and Chipping Hammer Operators;

Asbestos Removal; Hazardous Waste Removal

GROUP 3: Dynamite Men; Drillers, Air Track or Wagon Drilling for explosives; Laborer Specialist

LABO0645-001 06/01/2016

BUILDING CONSTRUCTION

ST JOSEPH COUNTY

Rates Fringes

Laborers:

GROUP 1.....................$ 21.08 13.80

GROUP 2.....................$ 21.58 13.80

GROUP 3.....................$ 22.08 13.80

BUILDING CONSTRUCTION

GROUP 1: Building and Construction Laborers; Scaffold Builders (other than for Plasterers); Mechanic Tenders;

Window Washers and cleaners; Waterboys and Toolhousemen;

Roofers Tenders; Railroad Workers; Masonry Wall Washers (interior and exterior); Cement Finisher Tenders; Carpenter Tenders; All Portable Water pumps with discharge up to (3) inches; Plaster Tenders; Mason Tenders; Flag & Signal Person.

GROUP 2: Waterproofing; Handling of Creosot Lumber or like treated material (excluding railroad material); Asphalt Rakers and Lutemen; Kettlemen; Air Tool Operators and all Pneumatic Tool Operators; Air and Electric Vibrators and Chipping Hammer Operators; Earth Compactors Jackmen and Sheetmen working Ditches deeper than (6) ft.in depth;

Laborers working in ditches (6) ft.in depth or deeper;

Assembly of Unicrete Pump; Tile Layers (sewer or field) and

Sewer Pipe Layer (metallic or non-metallic); Motor driven Wheelbarrows and Concrete Buggies; Hyster Operators; Pump Crete Assemblers; Core Drill Operators; Cement, Lime or Silica Clay Handlers (bulk or bag); Handling of Toxic Materials damaging to clothing; Pneumatic Spikers; Deck Engine and Winch Operators; Water Main and Cable Ducking (metallic and non-metallic); Screed Man or Screw Operator on Asphalt Paver; Chain and Demolition Saw Operators;

Concrete Conveyor Assemblers.

GROUP 3: Water Blast Machine Operator; Mortar Mixers; Welders (Acetylene or electric); Cutting Torch or Burner; Cement Nozzle. Laborers; Cement Gun Operator; Scaffold Builders when Working for Plasterers. Dynamite Men; Drillers - Air Track or Wagon Drilling for explosives Hazardous and Toxic material handler, asbestos removal or handler.

LABO0645-002 04/01/2015

(UTILITY CONSTRUCTION)

ST JOSEPH COUNTY

Rates Fringes

Laborers:

GROUP 1.....................$ 22.82 13.30

GROUP 2.....................$ 23.12 13.30

GROUP 3.....................$ 23.82 13.30

LABORER CLASSIFICATIONS (UTILITY CONSTRUCTION)

GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;

Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;

Screed man or screw man or asphalt paver; Rebar installer;

Sandblaster man; Sealer applicator for asphalt (toxic);

Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;

Horizontal boring and jacking man; Jackman and sheetman;

Pipe grade man; winch and windlass operator.

GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines.

GROUP 3: Air track and wage drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;

Concrete Saw Joint Cutting.

LABO0645-004 04/01/2016

ST. JOSEPH COUNTY

Rates Fringes

LABORERS

GROUP 1.....................$ 22.62 13.55

GROUP 2.....................$ 22.92 13.55

GROUP 3.....................$ 23.62 13.55

LABORER CLASSIFICATIONS (HEAVY AND HIGHWAY CONSTRUCTION)

GROUP 1: Construction laborer; Fence erector; Flagger; Grade checker; Guard rail erector; Wire mesh layer; Joint man (mortar, mastic and all other types); Lighting installer (permanent or temporary); Lineman for automatic grade maker on paving machines; Mortar man; Multi-plateerector; Rip-rap installer (all products and materials); Road markin and delineation laborer; Setting and placing of all precast concrete products; Sign installation including supporting structure; Spraying of all epoxy, curing compound, or like material; sod layer; Air tool, power tool, and power equipment operator; Asphalt lute man; Asphalt raker man;

Batch truck dumper; Bridge handrail erector; Handler (bulk or bag cement); Chain saw man; concrete puddler; concrete rubber; Concrete saw operator; Core drill operator, eye level; Hand blade operator; Hydro seeder man; Motor-driven Georgia buggy operator; Power-driven cmpactor or tamper operator; Power saw operator; Pumpcrete assembly man;

Screed man or screw man or asphalt paver; Rebar installer;

Sandblaster man; Sealer applicator for asphalt (toxic);

Setting and placing prestressed or precast concrete structural members; Side rail setter (for sidewalks, side ditches, radii, and pavements); Spreader box tender (manual or power-driven); Straw blower man; Subsurface drain and culvert pipe layer; Concrete conveyor assembly man;

Horizontal boring and jacking man; Jackman and sheetman;

Pipe grade man; winch and windlass operator

GROUP 2: Cutting torch burner; Laser beam aligner; Manhole erector; Sewer pipe layer; Water line installer, temporary or permanent; Welder (electric or exy-acetylene) in connection with waterline and sewer work, Hod Carrier (tending bricklayers); TVing and associated grouting of utility lines.

GROUP 3: Air track and wage drillman; Concrete barrier rail form setter; Dynamite and powder man; General leadman;

Concrete Saw Joint Cutting

* PAIN0027-004 06/01/2016

LAKE COUNTY, West of Highway #41, including HAMMOND area

Rates Fringes

GLAZIER..........................$ 41.70 33.87

PAIN0091-004 06/01/2014

LA PORTE (Everything East of Hwy 39 and North of Hwy 20, including the Cities of LaPorte and Michigan City); ST. JOSEPH

COUNTIES

Rates Fringes

PAINTER

Brush & Roller, Drywall Taping & Finishing, Vinyl/Paper Hanging.........$ 26.32 12.75 Spray.......................$ 26.82 12.75

PAIN0460-003 06/01/2014

PORTER, LAKE and the remainder of LA PORTE COUNTY)

Rates Fringes

Painters:

DRYWALL FINISHING..........$ 34.79 21.28

PAINTER.....................$ 33.99 21.28

PAIN1165-005 07/01/2015

LAKE (EAST OF HIGHWAY #41 EXCLUDING HAMMOND AREA), LAPORTE and

PORTER COUNTIES

Rates Fringes

GLAZIER..........................$ 33.25 19.84

PAIN1165-009 07/01/2015

ST. JOSEPH COUNTY

Rates Fringes

GLAZIER..........................$ 25.66 14.40

PLAS0101-006 06/01/2014

HEAVY/HIGHWAY

ST. JOSEPH COUNTY

CEMENT MASON/CONCRETE FINISHER...$ 30.57 11.50

PLAS0101-007 06/01/2014

BUILDING CONSTRUCTION

ST. JOSEPH COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 26.44 12.20

PLASTERER........................$ 26.81 12.40

PLAS0165-001 06/01/2012

LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF

CROWN POINT AND EAST OF GRIFFITH)

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

BUILDING CONSTRUCTION.......$ 37.28 18.53

HEAVY & HIGHWAY

CONSTRUCTION................$ 33.94 13.80

PLASTERER........................$ 31.30 15.10

PLAS0406-001 06/01/2012

LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE

CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT)

and PORTER COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

BUILDING CONSTRUCTION.......$ 35.48 21.68

HEAVY & HIGHWAY

CONSTRUCTION................$ 32.00 15.74

PLASTERER........................$ 31.68 14.72

PLAS0438-001 06/01/2014

LAPORTE COUNTY, EASTERN PORTION OF PORTER COUNTY WEST TO BUT

NOT INCLUDING CHESTERTON IN THE NORTH AND WEST TO AND INCLUDING

KOUTS IN THE SOUTH

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

BUILDING CONSTRUCTION

Cement Mason...............$ 36.01 22.15

HEAVY & HIGHWAY

CONSTRUCTION

Cement Mason...............$ 30.89 17.34

PLUM0172-006 06/03/2013

LA PORTE COUNTY (CITY OF LAPORTE) and ST. JOSEPH COUNTIES

Rates Fringes

Plumber, Pipefitter, Steamfitter......................$ 30.50 17.53

PLUM0210-001 06/01/2016

LAKE, LAPORTE (Excluding the City of LaPorte) and PORTER

COUNTIES

Rates Fringes

PLUMBER..........................$ 38.87 22.61

PLUM0597-003 06/01/2015

LAKE (Entire County), LA PORTE (Excluding the city of La Porte), PORTER (Entire County)

Rates Fringes

PIPEFITTER.......................$ 47.00 28.19

ROOF0023-006 06/01/2016

LA PORTE and ST. JOSEPH COUNTIES

Rates Fringes

ROOFER

COMPOSITION.................$ 27.86 14.07

SLATE & TILE................$ 28.36 14.07

ROOF0026-003 06/01/2015

LAKE AND PORTER COUNTIES

Rates Fringes

ROOFER...........................$ 35.30 18.53

SFIN0281-001 06/01/2015

PORTER COUNTY (North of U.S. Route 30)

Rates Fringes

Sprinkler Fitters................$ 47.10 23.05

SFIN0669-001 04/01/2014

LAKE AND PORTER COUNTIES

SPRINKLER FITTER.................$ 35.41 18.53

SFIN0669-002 04/01/2014

Rates Fringes

SPRINKLER FITTER.................$ 35.41 18.53

SHEE0020-013 07/01/2016

ST. JOSEPH COUNTY

Rates Fringes

Sheet metal worker...............$ 29.74 23.82

SHEE0020-015 07/01/2015

LAKE, LAPORTE, and PORTER COUNTIES

Rates Fringes

Sheet metal worker...............$ 42.30 21.56

TEAM0135-004 04/01/2013

LA PORTE COUNTY

Rates Fringes

TRUCK DRIVER (BUILDING

CONSTRUCTION ONLY)

GROUP 1.....................$ 26.75 344.80/WK+A

GROUP 2.....................$ 27.25 344.80/WK+A

GROUP 3.....................$ 27.45 344.80/WK+A

GROUP 4.....................$ 27.60 344.80/WK+A

GROUP 5.....................$ 28.75 344.80/WK+A

A: $27.70 PER DAY.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Single Axle Trucks, seven (7) cu. yds. or less than ten and one-half (10 1/2) tons, dupsters, scoop-mobiles five (5) cu.yds. and under or less than seven and one-half (7 1/2) tons, mixer trucks three (3) cu.yds. and under, air compressors and welding machines, including those pulled by separate units, batch trucks-wet or dry- 2"34-E" batches or less, truck driver helpers, warehousemen, mechanic's helpers, greasers and tiremen, all pick-up trucks and other vehicles. Drivers on dumpsters or similar dumpsters, mounted on four (4) wheel truck rated two (2) cu.yds. or less, and small pallet type fork-lift operator and drivers on pallet jacks or similar type equipment.

GROUP 2: Drivers on tandem axle eighteen (18) cu.yds. or twenty- four (24) tons gross, six (6) wheel trucks, Koehring or similar dumpsters, tract trucks, Euclids, hug bottom dumps, tournapulls, trounatrailers, tournarockers, or similar equipment when used for transportation purposes under nine (9) cu.yds. or less than thirteen and one-half (13 1/2) tons, tandems and semi-trailer service trucks, mixer trucks over three (3) cu.yds. and including six and one-half (6 1/2) cu.yds., fork lift, four (4) wheel A-frame trucks when used for transportation purposes, four

(4) wheel winch trucks, pavement breakers, batch trucks-wet or dry- over 2 up to and including 4-"34-E" batches two (2) men oil distributors, fork-lift under four (4) ton and vacuum trucks.

GROUP 3: Koehring or similar dumpsters, tract trucks, semi-trailer water trucks, Euclids, hug bottom dumps, tournapulls, tournatrailers, tournarockers, tractor trailers, tandems, Q- frame winch trucks, hydrolift turcks or similar equipment when used for transportation purposes, mixer trucks over six and one- half (6 1/2) cu.yds, batch trucks wet or dry over 4 - "34-E" batches single equipment operated by employees withing this Bargaining unit. Six

(6) wheel pole trailers and one (1) man oil distributors, fork-lift over four (4) ton and mobile mixers.

GROUP 4: Drivers on heavy equipment over sixteen (16) cu.yds.

or twenty-four (24) ton, such as Koehring or similar dumpsters, tract trucks, Euclids, hug bottom dumps, tournapulls, tournarockers or similar equipment when used for transportation purposes, pole trailers over six (6) wheels, water pulls, low-boy trailers tandem axles, quad axle or more no-weight limitation, diesel and/or heavy equipment mechanics.

GROUP 5: Mechanic furnishing his own tools.

TEAM0135-011 04/01/2016

Rates Fringes

TRUCK DRIVER (HEAVY AND

HIGHWAY CONSTRUCTION (LaPorte & St. Joseph Counties))

GROUP 1.....................$ 27.41 14.74

GROUP 2.....................$ 27.46 14.74

GROUP 3.....................$ 27.51 14.74

GROUP 4.....................$ 27.56 14.74

GROUP 5.....................$ 27.61 14.74

GROUP 6.....................$ 27.66 14.74

GROUP 7.....................$ 27.71 14.74

GROUP 8.....................$ 27.76 14.74

GROUP 9.....................$ 27.81 14.74

GROUP10.....................$ 27.26 14.74

GROUP11.....................$ 27.81 14.74

GROUP12.....................$ 27.91 14.74

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Single/batches axle straight trucks; Batch trucks, wet or dry 3 (34E) axle or less; Single axle Grease and maintenance truck

GROUP 2: Single axle fuel and water trucks

GROUP 3: Single axle "dog-legs", and tandem truck or dog-legs; Winch trucks or A-frames when used for transportation purposes; Drivers on batch trucks, wet or dry over 3 (34E) batches and tandem axle grease and maintenance truck

GROUP 4: Tandem axle fuel trucks; tandem axle water trucks;

butuminous distributors (two-man)

GROUP 5: Tandem trucks over 15 tons payload; Single axle semi trucks; Farm tractors hauling material; Mixer trucks (all types); Trucks pulling tilt-top trailer single axle; Single axle low- boys; Truck-mounted pavement breakers

GROUP 6: Tandem trucks or "dog-legs"; Semi-water Truck;

Sprinkler Truck; Heavy equipment-type water wagons, 5,000 gallons and under; butuminous distributors (one-man)

GROUP 7: Tri-axle trucks; Tandem axle semi trucks; Equipment when not self-loaded or pusher loaded, such as Koehring or similar dumpsters, track trucks, Euclid bottom dump and hug bottom dump, tournatrailers, tournarockers, Acey wagons or for similar equipment (12 cu yds or less); Mobile mixer truck; Tandem Axle trucks pulling tilt-top trailer; Tandem

- Axle lowboy; Tri- Axle batch Truck; Tri-Axle grease and maintenance truck

GROUP 8: Tandem-tandem semi trucks; Truck mechanics and welders; Heavy equipment-type water wagon over 5,000 gallons; Tri-Axle Trucks pulling tilt-top trailer;

Low-boys, tandem-tandem axle

GROUP 9: Low-boys, tandem tri-axle; Acey wagons up to and including 3 buckets; Equipment when not self-loaded or pusher loaded, such as koehring or similar dumpsters, Track Trucks, Euclid bottom dump and hug bottom dump, Tournatrailers, Tournarockers, Acey wagons or for similar equipment (over 12 cu yds.)

GROUP 10: Pick-up trucks

GROUP 11: Helpers; Greasers; Tire men; Batch board tenders;

Warehouseman

GROUP 12: Acey wagon (over 3 buckets); Quad Axle Trucks;

Articulating Dump

TEAM0142-002 06/01/2015

Rates Fringes

TRUCK DRIVER (BUILDING, HEAVY

AND HIGHWAY CONSTRUCTION

(INCLUDING ASPHALT PAVING

WORK))

LAKE AND PORTER COUNTIES

GROUP 1....................$ 32.29 22.98

GROUP 2....................$ 32.49 22.98

GROUP 3....................$ 32.69 22.98

GROUP 4....................$ 32.89 22.98

GROUP 5....................$ 33.24 22.98

GROUP 6....................$ 34.54 22.98

BUILDING, HEAVY & HIGHWAY AND ASPHALT PAVING

LAKE AND PORTER COUNTIES

GROUP 1: 2 and 3 Axle GROUP 2: 4 Axle GROUP 3: 5 Axle GROUP 4: 6 Axle GROUP 5: Over 6 Axles GROUP 6: Articulated Dumps

TEAM0364-004 06/01/2015

Rates Fringes

TRUCK DRIVER

BUILDING CONSTRUCTION (St.

Joseph County) GROUP 1....................$ 25.66 a+b GROUP 2....................$ 25.87 a+b GROUP 3....................$ 25.95 a+b GROUP 4....................$ 26.53 a+b

FOOTNOTE:

a. HEALTH & WELFARE: $316.50 per week for each employee.

PENSION: $64.90 per week for each employee.

b. HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.

TRUCK DRIVERS BUILDING CLASSIFICATIONS

GROUP 1: Pickup Trucks GROUP 2: Single Axle Trucks GROUP 3: Tandem, Triaxle and Fuel Trucks GROUP 4: Semi Trailer Trucks

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for…