W912P6-14-B-0013_Hermits_Lake_Plans.pdf
PDF 14 MB Posted
- Attached to
- HERMITS LAKE PUMP STATION SECTION 219 PROJECT, HERMITS LAKE, UNINCORPORATED, LAKE COUNTY, CROWN POINT, IN
- Solicitation number
- W912P6-14-B-0013
About this file
THIS FILE CONTAINS THE PROJECT PLANS/DRAWING SHEETS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_0003.pdf | ||
| AMEND_0002.pdf | ||
| AMENDMENT_0001.pdf | ||
| W912P6-14-B-0013_Hermits_Lake_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUCK HILL RD
W
I
L
L
I
A
M
S
C
T
W H
I T
E
O
A K
D
R
K I N
G F
I S
H E
R
R
D
H
E
R
M
I
L
N
W
A
L
L
A
E
125TH AVE
K
I
N
G
F
I
S
H
CITY OF CROWN POINT
H
E
R
M
I T
K
E
EXISTING
NATURAL
POND
EXISTING
NATURAL
POND
121st AVE
NEW HERMITS LAKE REGIONAL WASTEWATER PUMP STATION
LAKE COUNTY, INDIANA
US Army Corps of Engineers
US ARMY CORPS OF ENGINEERS
CHICAGO DISTRICT
CHICAGO, ILLINOIS
LAKE COUNTY COMMISSION
PROJECT VICINITY MAP
SCALE: 1" = 200'
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
O
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
F
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
CERTIFIED BY:
I T
H E
E T
DRAWING INDEX
Sheet No. Sheet ID Sheet Title
1 G-001 TITLE SHEET
2 G-002
GENERAL NOTES, LEGEND, & SURVEY INFORMATION
3 C-100 NEW PUMP STATION AND FLOW EQUALIZATION SITE PLAN
4 C-101 EXISTING WASTEWATER TREATMENT PLANT ABANDONMENT SITE PLAN
5 C-200 NEW PUMP STATION AND FLOW EQUALIZATION HYDRAULIC PROFILE
6 C-201 NEW FORCE MAIN PLAN AND PROFILE
7 C-202 NEW FORCE MAIN PLAN AND PROFILE
8 C-203 NEW FORCE MAIN PLAN AND PROFILE
9 C-204 NEW FORCE MAIN PLAN AND PROFILE
10 C-205 NEW FORCE MAIN PLAN AND PROFILE
11 C-206 NEW FORCE MAIN PLAN AND PROFILE
12 C-207 NEW FORCE MAIN PLAN AND PROFILE
13 C-208 NEW FORCE MAIN PLAN AND PROFILE
14 C-300 NEW BASE BID WASTEWATER PUMP STATION PLAN AND SECTIONS
15 C-301 NEW BASE BID WASTEWATER PUMP STATION ELEVATIONS
16 C-302 NEW OPTION 1 WASTEWATER PUMP STATION PLAN AND SECTIONS
17 C-303 NEW OPTION 1 WASTEWATER PUMP STATION ELEVATIONS
18 C-500 FLOW EQUALIZATION DETAILS
19 C-501 STRUCTURE DETAILS
20 C-502 SITE PLAN AND FORCE MAIN DETAILS
21 C-503 NEW OPTION 2 FORCE MAIN METERING STRUCTURE DETAIL
S
W
WS
W
CONIFEROUS TREE
CONTROL POINT
DECIDUOUS TREE
FIBER OPTIC VAULT
GUY LINE
DRAINAGE INLET
POWER POLE
FOUND PROPERTY PIN
SANITARY MANHOLE
WATER METER
WATER SHUT OFF
WATER VALVE
LEGEND
FORCE MAIN
EXISTING SANITARY SEWER
PROPOSED SANITARY SEWER
FENCE
PROPERTY LINE
CULVERT PIPE
EXISTING GAS LINE
OVERHEAD LINE
EXISTING STORM SEWER
EXISTING COMMUNICATION LINE
FM
SS
x
SS
X
PL
CP
G x
OHL
SD
x
C x
POINT TABLE
POINT #
10147
10148
10277
10175
10230
10296
10382
10418
10503
10580
10652
RAW DESCRIPTION
PT C
PT I
PT B
PT E
PT F
TBM 1
TBM 2
PT D
PT A
PT B
PT A
PT H
PT J
PT K
PT L
PT P
PT Q
TBM 3
TBM 4
ELEVATION
713.059
724.550
719.024
737.240
720.361
721.200
739.336
726.513
712.971
719.021
712.968
739.150
739.150
752.550
763.120
760.930
756.269
760.371
756.314
NORTHING
2237753.9385
2238617.4820
2238047.1390
2238857.9660
2238154.8835
2238030.5604
2238967.5850
2238271.9392
2237917.5003
2238047.1360
2237917.4968
2238998.2630
2239251.7800
2239526.3710
2239965.5610
2240438.0940
2240420.1810
2240572.3870
2240417.1220
EASTING
2869347.9340
2869414.0130
2869334.5322
2869443.9530
2869278.9654
2869366.4755
2869446.4220
2869339.5437
2869162.1563
2869334.5300
2869162.1499
2869440.4410
2869247.9740
2869056.0860
2869052.7040
2869024.1270
2869276.2160
2869061.8860
2869564.0180
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
G
N E
R A
L
N
O T
E S
L E
G E
N D
U R
V E
Y
I N
F O
R M
A T
I O
N
GENERAL NOTES
1. ALL CONSTRUCTION ACTIVITIES ARE TO REMAIN WITHIN
THE PUBLIC R.O.W AND EXISTING WASTEWATER
TREATMENT PLANT PROPERTY
2. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES ARE
TO BE RESTORED TO PRE-CONSTRUCTION CONDITION IN
ACCORDANCE WITH RESTORATION DETAILS ON SHEET 20
3. ANY WORK THAT AFFECTS PROPERTY OWNERS SHALL BE
COORDINATED WITH THOSE PROPERTY OWNERS.
4. ALL TREES ARE TO REMAIN UNDISTURBED UNLESS
OTHERWISE NOTED.
5. ALL PRIVATE LANDSCAPING AND MAILBOXES INSTALLED IN
PUBLIC RIGHT OF WAY ARE TO REMAIN UNDISTURBED.
ALERT ENGINEER IF A CONFLICT IS A NECESSITY.
6. NOTWITHSTANDING ANY OTHER CONTRACT
REQUIREMENTS, THE CONTRACTOR WILL NOT BE ENTITLED
TO ANY ADDITIONAL COMPENSATION FOR DELAYS
ASSOCIATED WITH THE COORDINATION OF OTHER
CONTRACTORS HIRED TO PROVIDE UTILITY SERVICES.
SURVEY NOTES
HORIZONTAL COORDINATE SYSTEM: INDIANA STATE PLANE
WEST, NAD83, US FOOT
VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88)
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
40'10'0 20'
E
W
P
U M
P
S
T A
T I O
N
A
O
W
E Q
U A
L I Z
A T
I O
N
S
I T
E
P
L A
N
OPTION 1 PUMP
STATION SITE PLAN
FOR DETAILS SEE
SHEETS 16 & 17
CONCRETE SIDEWALK
(SEE DETAILS SHEET 20)
PIPE BOLLARD, 2 TOTAL,
SEE DETAILS, SHEET 20)
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
X
I S
T I N
G
W
A S
T E
W A
T E
R
T
R E
A T
M E
N T
P L A
M
O V
A L
F
R O
M
S
E R
V I C
E
A
N D
S L U
D G
E
R
E M
O V
A L
S
I T
E
P
L
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
W
P
U M
P
S
T A
T I O
N
A
O
W
E Q
U A
L I Z
A T
I O
N
H
Y D
R A
U L
P
O
F I
-0+60 0+00 1+00 2+00 3+00 3+80
MINIMUM COVER = 5' (TYP.)
DRIVE
DRIVE
DRIVE
NEW AIR PRESSURE VALVES & MANHOLE
(SEE DETAILS, SHEET 19)
NEW 6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN;
NORTHWEST
E L
A N D
E N D
O P E N
T R
E N
S T
A L L A
T I O
N
B E
G
D D
I N
S T
A L L A
T I O
N
EXIST. GROUND SURFACE PROFILE
ABOVE NEW FORCE MAIN
EXIST. SAN. MH NO. 21
RIM:724.82
INV IN:715.63 8"
INV OUT:715.63 8"
E X
I S
T
S
A N
M
H
N o
EXIST. SAN. MH NO. 22
RIM:722.60
INV IN:716.71 8"
INV OUT:716.71 8"
E X
I S
T
S
A N
M
H
N o
E
X
I S
T
∅ SAN. SE
WER
EXIST. 8"∅ SAN. SEWER @ 0.47%
E
X
I
S
"∅SAN. SEWER@
EXIST. 8"∅ SAN.
SEWER @ 0.51%
EXIST. SAN. MH NO. 20
RIM:721.20
INV IN:712.62 8"
INV OUT:712.73 8"
INV OUT:712.21 8"
E X
I S
T
S
A N
M
H
N o
EXIST. SAN. MH NO. 22
RIM:722.60
INV IN:716.71 8"
INV OUT:716.71 8"
E X
I S
T
S
A N
M
H
N o
SEWER CROSSING
B E
G
E
N
T
R E
N C
H
I N
S T
A L L A
T I O
N
EASTSW
B E N D
PREFABRICATED
PUMP STATION
WET
WELL
NEW FLOW
METER MANHOLE
F.M. ℄ ELEV. = 711.00
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPLP
L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
PL
PL
PL
PL
PL
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
PL
PL
PL
PL
PL
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S S x
S S x
S
S x
S
S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
M
T
M
T
M
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
S
Sx
S
S x
S
S x
S
S x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
S
S x
S
Sx
S
Sx
S
S x
S
Sx
S
S x
S
Sx
S
Sx
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S
S x
S S x
S S x
S S x
S S x
S S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
FMFM
FM
FM
FM
FM
FM
FM
FM
D
R
I V
E W
A Y
H E
R M
IT
'S
L A
K E
W
W
T P
NEW REGIONAL
WASTEWATER PUMP STATION
6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN
(ASPHALT)
(ASPHALT)
(ASPHALT)
60' STREET
R.O.W.
60' STREET
R.O.W.
W
H
I
I V
E
60' S T
R E
E T
R .O
.W
L
L
TBM 1 IS MAG NAIL SET IN WEST
FACE OF POWER POLE # 807/250.
ELEV. = 721.20
NEW AIR RELEASE VALVES & MANHOLE
(SEE DETAILS, SHEET 19)
L
BEGIN OPEN TRENCH
INSTALLATION
END OPEN TRENCH INSTALLATION / BEING HORIZONTAL
DIRECTIONAL DRILLING (HDD) INSTALLATION
M L
S T
A
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
W
F
O R
A
N
A
O
F I L E
S T
A T
I O
T
O
40'10'0 20'
L
ASSUMED LOCATIONS OF SAN. LATERALS. CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE EACH EXISTING
SAN. LATERAL BEFORE INSTALLING THE FORCE MAIN TO VERIFY ADEQUATE VERTICAL CLEARANCE.
NOTES
1. OPEN TRENCH INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+00 TO 0+39 AND FROM STATION 29+78 TO FLOW METER
STRUCTURE. HORIZONTAL DIRECTIONAL DRILLING INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+39 TO 29+78.
2. CONTRACTOR SHALL CONFINE ALL OF HIS CONSTRUCTION ACTIVITIES TO WITHIN THE STREET R.O.W. FOR THE ENTIRE FORCE MAIN
ROUTE AND SHALL RESTORE ALL AREAS IN THE R.O.W. THAT ARE DISTURBED BY PROJECT CONSTRUCTION ACTIVITIES. REFER TO
SHEET C-502 FOR SURFACE RESTORATION DETAILS.
3. TRACER WIRE ACCESS BOXES SHALL BE INSTALLED AT EACH PIPE CONNECTION POINT.
3+80 4+00 5+00 6+00 7+00 7+80
EXIST. 8"∅ SAN. SEWER @ 0.51%
EXIST. 8"∅ SAN. SEWER @ 0.43%
EXIST. SAN. MH NO. 23
RIM:730.11
INV IN:718.36 8"
INV OUT:718.36 8"
E X
I S
T
S
A N
M
H
N o
EXIST. GROUND SURFACE PROFILE
ABOVE NEW FORCE MAIN
MINIMUM COVER = 5' (TYP.)
EXIST. 8"∅ SAN. SEWER @ 0.51%
DRIVE
DRIVE
DRIVE
WHITE OAK DRIVE
NEW 6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN;
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
P L
PL
P L
P L
P L
P L
P L
P L
PL
PL
P L
P L
P L
PL
PL
PL
PL
PL
PL
P L
P L
P L
P L
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
PL
PL
PL
PL
PL
P L
P L
P L
P L
P
L
PL
P L
PL
PL
P L
P L
P L
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
P L
P L
P L x
S
S x
S
S x
S
S x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
G x
G x
G x
G x
G x
G x
G x
G x G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
Gx
Gx
G x
Gx
S
S x
S
S x
S
S x
S
S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
6" Ø H D P E S D R
IR
O N
P
IP
E S
IZ
E
F
O R
C E
M A
IN
(A S
P H
A
LT
60' S T
R E
E T
R .O
.W
A
S
P
H
A
I
V
E
W
A
Y
W H
IT
E O
AK D
R
IV
E
60' STREET
R.O.W.
(A S
P H
A
LT
C
O
N
C
R
E
I V
E
W
A
Y
A S
P H
A
I V
E W
A Y
L
L
L
L
L
L
2 MAILBOXES
1'Ø ROCK
1'Ø ROCK
1 MAILBOX
I
L
B
O
X
I
L
B
O
X
E
S
S
E
G
M
E
N
T
A
L
R
E
T
A
I
N
I
N
G
W
A
L
L
S
M L
S T
A
S
T
A
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
E
W
F
O R
A
N
A
O
F I L E
S T
A T
I O
N
T
O
L
ASSUMED LOCATIONS OF SAN. LATERALS. CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE EACH EXISTING
SAN. LATERAL BEFORE INSTALLING THE FORCE MAIN TO VERIFY ADEQUATE VERTICAL CLEARANCE.
NOTES
1. OPEN TRENCH INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+00 TO 0+39 AND FROM STATION 29+78 TO FLOW METER
STRUCTURE. HORIZONTAL DIRECTIONAL DRILLING INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+39 TO 29+78.
2. CONTRACTOR SHALL CONFINE ALL OF HIS CONSTRUCTION ACTIVITIES TO WITHIN THE STREET R.O.W. FOR THE ENTIRE FORCE MAIN
ROUTE AND SHALL RESTORE ALL AREAS IN THE R.O.W. THAT ARE DISTURBED BY PROJECT CONSTRUCTION ACTIVITIES. REFER TO
7+80 8+00 9+00 10+00 11+00 11+60
DRIVE
DRIVE
EXIST. 8"∅ SAN. SEWER @ 0.24%
E
X
I S
T
∅ SAN. S
EWER
EXIST. SAN. MH NO. 24
RIM:738.00
INV IN:719.23 8"
INV OUT:727.15 8"
INV OUT:719.23 8"
E X
I S
T
S
A N
M
H
N o
EXIST. SAN. MH NO. 25
RIM:737.57
INV IN:719.51 8"
INV OUT:719.51 8"
INV OUT:719.51 8"
E X
I S
T
S
A N
M
H
N o
MINIMUM COVER = 7'
TO ELIMINATE
HIGH POINT
EXIST. 8"∅ SAN. SEWER @ 0.24%
EXIST. 8"∅ SAN. SEWER @ 0.16%
E
X
I S
T
∅ SAN. S
EWER
EXIST. 8"∅ SAN. SEWER @ 0.43%
SEWER CROSSING
SEWER CROSSING
DRIVE
DRIVE
EXIST. GROUND SURFACE PROFILE
ABOVE NEW FORCE MAIN
NEW 6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN;
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
PL
PL
PL
PL
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
S
S x
S
S x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
Gx
Gx
Gx
Gx
Gx
Gx
Gx
G x
G x
G x
G x
G x
G x
G x
G x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
Sx
S
Sx
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
Sx
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
OHL
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
A
S
P
H
A
I
V
E
W
A
Y
W
H
IT
E O
A K
D R
IV
E
W
H
I
I
V
E
60' STREET
R.O.W.
H
E
R
M
I T
N
E
A
S
P
H
A
L
T
C
O
N
C
R
E
I
V
E
W
A
Y
A
S
P
H
A
I
V
E
W
A
Y
A S
P H
A
I V
E W
A Y
A
S
P
H
A
I V
E
W
A
Y
A
S
P
H
A
I V
E
W
A
Y
A
S
P
H
A
I
V
E
W
A
Y
L
L
6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN
Ø
C
I
L
B
O
X
1 MAILBOX
2 MAILBOXES
LANDSCAPED
AREA WITH
CONCRETE SIGN
LANDSCAPED AREAS
I L
B
O
X
E
I L
B
O
X
SEGMENTAL
RETAINING
WALLS
L
A
N
D
S
C
A
P
E
A
M
R
P
R
I V
A
E
A
R
A
N
C
E
T
T
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
E
W
F
O R
A
N
A
O
F I L E
S T
A T
I O
T
O
PT E
PT H
L
ASSUMED LOCATIONS OF SAN. LATERALS. CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE EACH EXISTING
SAN. LATERAL BEFORE INSTALLING THE FORCE MAIN TO VERIFY ADEQUATE VERTICAL CLEARANCE.
NOTES
1. OPEN TRENCH INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+00 TO 0+39 AND FROM STATION 29+78 TO FLOW METER
STRUCTURE. HORIZONTAL DIRECTIONAL DRILLING INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+39 TO 29+78.
2. CONTRACTOR SHALL CONFINE ALL OF HIS CONSTRUCTION ACTIVITIES TO WITHIN THE STREET R.O.W. FOR THE ENTIRE FORCE MAIN
ROUTE AND SHALL RESTORE ALL AREAS IN THE R.O.W. THAT ARE DISTURBED BY PROJECT CONSTRUCTION ACTIVITIES. REFER TO
11+60 12+00 13+00 14+00 15+00 15+60
DRIVE
DRIVE
DRIVE
MINIMUM COVER = 7'
TO ELIMINATE
HIGH POINT
DRIVE
EXIST. GROUND SURFACE PROFILE
ABOVE NEW FORCE MAIN
NEW 6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN;
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL
PL
PL
PL
PL
PL
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
PL
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL
PL
P L
P L
P L
PL
PL
PL
PL
P L
P L
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
PL
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
PL
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL
PL
PL
PL
PL
PL
PL
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
PL
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
S
S x
S
S x
S
S x
FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
HIT
E O
AK D
RIV
E
S
T
R
E
E
T R
O
W
60' STREET
R.O.W.
(A S
P H
A L T
A S
P H
A
I V
E W
A Y
A S
P H
A
I V
E W
A Y
A S
P H
A L T
D
R
I V
E W
A Y
C O
N C
R E
T E
D R
I V
E W
A Y
C
O
N
C
R
E
I
V
E
W
A
Y
A
S
P
H
A
I
V
E
W
A
Y
R
O
N
P
I
Z
R
I N
6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN
L
A
N
D
S
C
A
P
E
A
S
4 MAILBOXES
1 MAILBOX
LANDSCAPED AREA
2 MAILBOXES
1 MAILBOX
S
E
W
O
S
S
I
N
G
C
O
N
T
R
A
C
T
A
C
A
T
C
A
V
A
T
P
O
S
E
B
E
F
O
S
T
A
L
L
I
R
V
R
I
F
Y
A
D
E
Q
U
A
R
T
I
C
E
A
R
A
N
C
E
18' MAX FOR
PRIVATE WELL CLEARANCE
16' MAX FOR
PRIVATE WELL CLEARANCE
23' MAX FOR
PRIVATE WELL CLEARANCE
M L
S T
A
T
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
E
W
F
O R
A
N
A
O
F I L E
S T
A T
I O
T
O
PT J
L
ASSUMED LOCATIONS OF SAN. LATERALS. CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE EACH EXISTING
SAN. LATERAL BEFORE INSTALLING THE FORCE MAIN TO VERIFY ADEQUATE VERTICAL CLEARANCE.
NOTES
1. OPEN TRENCH INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+00 TO 0+39 AND FROM STATION 29+78 TO FLOW METER
STRUCTURE. HORIZONTAL DIRECTIONAL DRILLING INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+39 TO 29+78.
2. CONTRACTOR SHALL CONFINE ALL OF HIS CONSTRUCTION ACTIVITIES TO WITHIN THE STREET R.O.W. FOR THE ENTIRE FORCE MAIN
ROUTE AND SHALL RESTORE ALL AREAS IN THE R.O.W. THAT ARE DISTURBED BY PROJECT CONSTRUCTION ACTIVITIES. REFER TO
15+60 16+00 17+00 18+00 19+00 19+40
WHITE OAK DRIVE
MINIMUM COVER = 12'
TO ELIMINATE
HIGH POINT
E X
IS
T
∅ SAN. SEWER @
.9
EXIST. GROUND SURFACE PROFILE
ABOVE NEW FORCE MAIN
SEWER CROSSING.
CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE
BEFORE INSTALLING THE FORCE MAIN TO VERIFY
ADEQUATE VERTICAL CLEARANCE.
DRIVE
7.30' OF COVER
TO MISS SANITARY SEWER
NEW 6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL
PL PL
PL
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
PL
PL
PL
PL
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x x
S
S x
S
S x
S
S x
S
S x
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
H
I
I V
E
60' STREET
R.O.W.
S
T
R
E
E
T
R
O
W
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
D
R
I
V
E
W
A
Y
C
O
N
C
R
E
I V
E
W
A
Y
A
S
P
H
A
I V
E
W
A
Y
6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN
I
L
B
O
X
SEWER CROSSING.
CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE
BEFORE INSTALLING THE FORCE MAIN TO VERIFY
ADEQUATE VERTICAL CLEARANCE.
G
R
A
V
I
V
E
W
A
Y
G
R
A
V
I V
E
W
A
Y
G R
A V
E L
D
R I V
E W
A Y
R
P
R
I
V
A
E
A
R
A
N
C
E
M L
S T
A
S
T
A
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
E
W
F
O R
A
N
A
O
F I L E
S T
A T
I O
T
O
L
ASSUMED LOCATIONS OF SAN. LATERALS. CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE EACH EXISTING
SAN. LATERAL BEFORE INSTALLING THE FORCE MAIN TO VERIFY ADEQUATE VERTICAL CLEARANCE.
NOTES
1. OPEN TRENCH INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+00 TO 0+39 AND FROM STATION 29+78 TO FLOW METER
STRUCTURE. HORIZONTAL DIRECTIONAL DRILLING INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+39 TO 29+78.
2. CONTRACTOR SHALL CONFINE ALL OF HIS CONSTRUCTION ACTIVITIES TO WITHIN THE STREET R.O.W. FOR THE ENTIRE FORCE MAIN
ROUTE AND SHALL RESTORE ALL AREAS IN THE R.O.W. THAT ARE DISTURBED BY PROJECT CONSTRUCTION ACTIVITIES. REFER TO
19+40 20+00 21+00 22+00 23+00 23+20
MINIMUM COVER = 5' (TYP.)
EXIST. GROUND SURFACE PROFILE
ABOVE NEW FORCE MAIN
NEW 6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN;
PL PL PL PL
P
L
P
L
P L
P L
P L
P L
P
L
P
L
PL PL PL PL PL PL PL
P
L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
PLPLPLPL
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PLPLPLPLPLPLPLPLPLPLPL
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
P L
P L
PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL
P L
P L
P
L
P
L
PL PL PL PL PL PL
P
L
P
L
P L
P L
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL
P L
P L
P
L
P
L
PL PL PL PL PL PL PL PL
P L
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
G x G x G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x G x G x G x G x G x
G x
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
WHITE OAK DRIVE
WHITE OAK DRIVE
S
T
R
E
E
T
R
O
W
60' STREET
R.O.W.
R
E
E
T
R
O
W
(ASPHALT)
6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN
R
O
N
P
I
Z
R
I
N
G R
A V
E L
D
R I V
E W
A Y
A S
P H
A
I V
E W
A Y
A S
P H
A
I V
E W
A Y
A S
P H
A
I V
E W
A Y
M L
S T
A
M L
S T
A
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
E
W
F
O R
A
N
A
O
F I L E
S T
A T
I O
T
O
L
ASSUMED LOCATIONS OF SAN. LATERALS. CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE EACH EXISTING
SAN. LATERAL BEFORE INSTALLING THE FORCE MAIN TO VERIFY ADEQUATE VERTICAL CLEARANCE.
NOTES
1. OPEN TRENCH INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+00 TO 0+39 AND FROM STATION 29+78 TO FLOW METER
STRUCTURE. HORIZONTAL DIRECTIONAL DRILLING INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+39 TO 29+78.
2. CONTRACTOR SHALL CONFINE ALL OF HIS CONSTRUCTION ACTIVITIES TO WITHIN THE STREET R.O.W. FOR THE ENTIRE FORCE MAIN
ROUTE AND SHALL RESTORE ALL AREAS IN THE R.O.W. THAT ARE DISTURBED BY PROJECT CONSTRUCTION ACTIVITIES. REFER TO
23+20 24+00 25+00 26+00 26+80
WHITE
OAK
DRIVE
MINIMUM COVER = 5' (TYP.)
EASTSOUTH
E L
EXIST. GROUND SURFACE PROFILE
ABOVE NEW FORCE MAIN
NEW 6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN;
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P L
PL
PL
P L
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
H
I
I
V
E
E
N
U
E
60' STREET
R.O.W.
70' STREET
R.O.W.
A
S
P
H
A
L
T
A
S
P
H
A
L
T
6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN
V
E
G
TBM 3 (NOT SHOWN) IS SE FIRE
HYDRANT HAT BOLT ON WEST SIDE
OF MARY ELLEN ST. APPROX. 100'
NORTH OF 121ST AVE.
ELEV. = 760.40
A
S
P
H
A
I
V
E
W
A
Y
T
T
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
E
W
F
O R
A
N
A
O
F I L E
S T
A T
I O
T
O
L
ASSUMED LOCATIONS OF SAN. LATERALS. CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE EACH EXISTING
SAN. LATERAL BEFORE INSTALLING THE FORCE MAIN TO VERIFY ADEQUATE VERTICAL CLEARANCE.
NOTES
1. OPEN TRENCH INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+00 TO 0+39 AND FROM STATION 29+78 TO FLOW METER
STRUCTURE. HORIZONTAL DIRECTIONAL DRILLING INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+39 TO 29+78.
2. CONTRACTOR SHALL CONFINE ALL OF HIS CONSTRUCTION ACTIVITIES TO WITHIN THE STREET R.O.W. FOR THE ENTIRE FORCE MAIN
ROUTE AND SHALL RESTORE ALL AREAS IN THE R.O.W. THAT ARE DISTURBED BY PROJECT CONSTRUCTION ACTIVITIES. REFER TO
STATIONS 26+80 TO 31+40
26+80 27+00 28+00 29+00 30+00 31+00 31+40
121ST
AVENUE
MINIMUM COVER = 5' (TYP.)
NORTHWEST
E L
EASTSOUTH
E L
EXIST. SAN. MH NO. 28
RIM:754.33
INV OUT:748.00 12"
E X
I S
T
S
A N
M
H
N o
DEPTH AS REQUIRED TO
DISCHARGE FORCE
MAIN AT SAME
ELEVATION AS CENTERLINE
OF EXISTING 12" SANITARY SEWER
EXIST. 12" SAN.
SEWER TO NORTH
PROVIDE 90° EL ON END OF FORCE MAIN TO DIRECT
DISCHARGE TOWARD THE OUTLET SEWER
(SEE SHEET 21 FOR FURTHER DETAILS)
DRIVE
EXIST. GROUND SURFACE PROFILE
ABOVE NEW FORCE MAIN
E N
D
H
B
E G
I N
O P
E
N C
H
I N
S T
A L L A
T I O
N
E N
D
O
P E
N
T
R E
N C
H
I N
S T
A L L A
T I O
N
DRIVE
DRIVE
NEW 6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN;
DRIVE
N E
W
F
L O
W
M
E T
R
U C
T U
R E
S
T
A I L S
S
H E
S
P L
P L
P L
PL
PL
PL
PL
PL
PL
P L
P L
P L
P L
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
P L
P L
P L
PL
PL
PL
PL
PL
PL
PL
P
L
P
L
P
L
P L
P L
P L
PL
PL
PL
PL
PL
PL
PL
P L
P L
P L
P
L
P
L
P
L
P
L
PL
PL
PL
PL
PL
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
P L
P L
P L
P L
P L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
PL
PL
PL
PL
PL
P
L
P
L
P
L
P
L
P
L
P
L
P L
P L
P L
PL
P L
P L
P L
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x
G x G x G x
G x
G x
G x
G x
G x
G x
G x
S S x
S S x
S S x
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM
FM
FM
FM FM FM FM
121ST AVENUE
121ST AVENUE
R
E
E
T
R
O
W
70' STREET
R.O.W.
(ASPHALT)
(ASPHALT)
R
I
N
TBM 4 IS MAG NAIL SET IN SOUTH
FACE OF POWER POLE # 825/173.
ELEV. = 756.34
6"Ø HDPE SDR 9 (IRON
PIPE SIZE) FORCE MAIN
30+00
END HORIZONTAL DIRECTIONAL DRILLING
INSTALLATION / BEGIN OPEN TRENCH INSTALLATION
C O
N C
R E
I V
E W
A Y
A S
P H
A
I V
E W
A Y
A S
P H
A
I V
E W
A Y
A S
P H
A
I V
E W
A Y
C O
N C
R E
I V
E W
A Y
C O
N C
R E
I V
E W
A Y
A S
P H
A
I V
E W
A Y
E
UNDERGROUND ELECTRIC
SERVICE BY NIPSCO
ELECTRICAL AND
INSTRUMENTATION PANEL
NEW FLOW METER STRUCTURE
( SEE DETAILS, SHEET 21)
EXISTING SANITARY
MANHOLE
EXIST. 12"Ø
SAN. SEWER
22.00'
12.00'
GRAVEL DRIVE (SEE
DETAILS, SHEET 20)
R8.00'
PIPE BOLLARD, 5 TOTAL,
SEE DETAILS, SHEET 20)
EXISTING PAVEMENT REMOVAL AND
REPLACEMENT. (SEE SHEET 20 FOR DETAILS)
OPTION 2
BASE BID
M L
S T
A
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
ASSUMED LOCATIONS OF SAN. LATERALS. CONTRACTOR SHALL LOCATE, EXCAVATE, AND EXPOSE EACH EXISTING
SAN. LATERAL BEFORE INSTALLING THE FORCE MAIN TO VERIFY ADEQUATE VERTICAL CLEARANCE.
NOTES
1. OPEN TRENCH INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+00 TO 0+39 AND FROM STATION 29+78 TO FLOW METER
STRUCTURE. HORIZONTAL DIRECTIONAL DRILLING INSTALLATION OF FORCE MAIN REQUIRED FROM STATION 0+39 TO 29+78.
2. CONTRACTOR SHALL CONFINE ALL OF HIS CONSTRUCTION ACTIVITIES TO WITHIN THE STREET R.O.W. FOR THE ENTIRE FORCE MAIN
ROUTE AND SHALL RESTORE ALL AREAS IN THE R.O.W. THAT ARE DISTURBED BY PROJECT CONSTRUCTION ACTIVITIES. REFER TO
SHEET C-502 FOR SURFACE RESTORATION DETAILS.
3. TRACER WIRE ACCESS BOXES SHALL BE INSTALLED AT EACH PIPE CONNECTION POINT.
40'10'0 20'
N E
W
F
O R
A
N
A
O
F I L E
S T
A T
I O
T
O
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
W
B
A S
E
B
S
T E
W A
T E
R
P
U M
P
S T
A T
I O
N
P
L A
N
A
C
T I O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
W
B
A S
E
B
S
T E
W A
T E
R
P
U M
P
S T
A T
I O
N
E
L E
V A
T I O
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
W
O
P T
I O
N
W
A S
T E
W A
T E
R
P
U M
P
S T
A T
I O
N
P
L A
N
A
C
T I O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
W
O
P T
I O
N
W
A S
T E
W A
T E
R
P
U M
P
S T
A T
I O
N
E
L E
V A
T I O
PIPE LINER PENETRATION AND PIPE SUPPORT DETAIL
SCALE: NONE
12" MIN.
12" MIN.
4' 3' MAX. 4'
PIPE PENETRATION PROCEDURES:
1. CUT PIPE SIZE HOLE IN LINER.
2. INSTALL PIPE THRU LINER.
3. INSTALL LINER SLEEVE AROUND PIPE AND THERMAL WELD IT TO THE LINER, AFTER CLEANING THE LINER.
4. PROVIDE STAINLESS STEEL BAND TIGHTLY AROUND LINER SLEEVE AND PIPE.
3" MIN.
POURED-IN-PLACE CONCRETE BUTTRESS:
CONCRETE SHALL EXTEND AT LEAST 12" ABOVE AND 12" BELOW
THE PIPE AND 12" ON EACH SIDE OF THE PIPE.
EXISTING OR NEW
LINER
SCH 80 PVC FLANGE SHALL BE SOLVENT WELDED
ONTO PIPE AND LOCATED IN CONCRETE SUPPORT.
LINER 'SLEEVE'
END OF PIPE OR EDGE OF RISER
PIPE, AS APPLICABLE
POURED-IN-PLACE CONCRETE BASE;
CONCRETE SHALL EXTEND FROM AT LEAST 12" BELOW PIPE
TO THE CENTERLINE AND AT LEAST 12" ON EACH SIDE OF
PIPE. PROVIDE BUTTRESS FOR EVERY NEW PIPE INTO OR OUT
OF A FLOW EQUALIZATION BASIN. 6 TOTAL WITH LINERS AND 3
TOTAL WITHOUT LINERS. SEE PLAN SHEET C-100 FOR PIPE
LOCATIONS AND SIZES.
12" SCH 80
PVC 90° EL
12" SCH
80 PVC
12" SDR 35 PVC PIPE
FERNCO-TYPE PIPE COUPLING FOR JOINING SDR 35 AND
SCHO 80 PVC PIPE AND LOCATED IN CONCRETE SUPPORT
RISER PIPE ON BASIN OUTLET PIPES SHALL BE
FURNISHED AND INSTALLED BY THE PROJECT
CONTRACTOR. REFER TO PLAN SHEET C-100
FOR THE LOCATIONS OF THE RISER PIPES AND
THE ELEVATIONS OF THE TOPS OF THE RISER
PIPES AND THE ELEVATIONS OF THE 90° ELS
BELOW THE RISER PIPES.
WETLAND TREATMENT (46' +/-) POLISHING POND (56'+/-)
FLOW EQUALIZATION HIGH WATER LEVEL EL 712.50
EXISTING OPERATING WATER LEVEL EL 710.75
EL 708.4
FLOW EQUALIZATION LOW WATER LEVEL EL 708.00
EL 706.0
EL 713.2
POLISHING AND WETLAND TREATMENT POND CONVERSION DETAIL TO FLOW EQUALIZATION POND
SCALE: NONE
CONSTRUCTION PROCEDURES:
AFTER THE EXISTING WASTEWATER TREATMENT PLANT HAS BEEN PERMANENTLY TAKEN OUT OF SERVICE, CONTRACTOR SHALL,
1. COORDINATE THE REMOVAL OF THE VEGETATION AND BOTTOM SLUDGE, A SLUDGE REMOVAL CONTRACTOR HIRED DIRECTLY BY LAKE COUNTY, BY EXCAVATION, PUMPING, HAULING AND
SATISFACTORY OFF-SITE DISPOSAL,
2. COMPLETELY DE-WATER THE POND BY PUMPING INTO THE NEW WASTEWATER PUMP STATION AT A RATE THAT THE STATION CAN HANDLE,
3. REMOVE THE POND INLET AND OUTLET PIPE EXTENSIONS INTO THE POND AND PLUG THE ENDS OF THE REMOVED PIPES WITH NON-SHRINK GROUT AT THE INSIDE SLOPES OF THE POND
DIKES,
4. REVISE THE BOTTOM AND INSIDE SLOPES OF THE BASIN ON ALL FOUR SIDES, AS INDICATED, WITH EXISTING, ON-SITE MATERIAL. IF ADDITIONAL MATERIAL IS REQUIRED, IT SHALL BE FIRST
APPROVED BY THE ENGINEER.
5. PREPARE THE BOTTOM AND SIDE SLOPES AND INSTALL THE NEW LINER, ALL IN ACCORDANCE WITH THE LINER MANUFACTURER'S RECOMMENDATIONS,
6. INSTALL THE PIPES INTO AND OUT OF THE POND AND SUPPORT THE PIPES AND PENETRATE THE LINER AS DETAILED ON THIS DRAWING,
7. FILL THE CONVERTED FLOW EQUALIZATION BASIN TO WATER LEVEL EL 708.00 BY PUMPING WATER FROM THE ADJACENT NATURAL POND,
8. INSTALL THE EXISTING FLOATING AERATOR IN THE MIDDLE OF THE POND AND 'TETHER' IT WITH STAINLESS STEEL CABLE TO AN ANCHOR IN THE TOP OF DIKE, ON EACH SIDE OF THE BASIN, ALL IN ACCORDANCE WITH THE EXISTING "TETHER" SYSTEM.
REVISED INSIDE DIKE SLOPE (ON
ALL 4 SIDES)
EXISTING INSIDE DIKE SLOPE
COMPACTED MATERIAL EXCAVTED
FROM BOTTOM OF BASIN, ON ALL 4
SIDES
NEW LINER ON BOTTOM AND INSIDE
SLOPES OF BASIN
2.5
2.5
TWO SIDES OF THE EXISTING FLOW EQUALIZATION BASIN
SCALE: NONE
NOTES:
1. EXCAVATE AND 'FREE' THE EDGE OF EXISTING LINER.
2. CUT THE 'PORTION' OF THE LINER ON TOP OF THE DIKE TO CREATE 'WORKABLE' LENGTHS ON LINER.
3. WITH THE EDGE OF EACH 'CUT' LENGTH OF LINER LIFTED, SCARIFY THE TOP OF DIKE AND PLACE AND MECHANICALLY
COMPACT COHESIVE MATERIAL FROM BORROW ON TOP OF THE DIKE.
4. PLACE EACH CUT LENGTH OF LINER ON THE COMPACTED MATERIAL, EXCAVATE A NOTCH, INSERT THE EDGE OF THE
LINER IN THE NOTCH AND SECURE BY COMPACTING THE NOTCH.
5. REJOIN THE CUT EDGES OF ALL ADJACENT LENGTHS OF LINER BY THERMAL WELDING A PATCH STRIP OF NEW IDENTICAL
LINER MATERIAL TO THE EXISTING LINER, AFTER CLEANING THE EXISTING LINER.
6. RAISE TOP OF BANK TO ELEV. 714.40 BY EXCAVATING AND LIFTING EDGE OF EXISTING LINER, FILLING BENEATH LINER, LAYING LINER BACK DOWN, AND RE-SURRING LINER.
VARIES BETWEEN 6" AND 21"
(SEE SITE PLAN FOR FURTHER DETAILS)
DETAIL FOR RAISING THE TOP OF DIKE AND THE LINER ON
4'
EXISTING LINER
EXISTING FLOW EQUALIZATION BASIN
TOP ELEVATION =
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
ST'D PRECAST ECCENTRIC CONE
MANHOLE FRAME & LID
SEE STRUCTURE SPECIFICATION
LIST, THIS SHEET
STANDARD MANHOLE DETAIL
NEOPRENE OR RUBBER
SEAL, PER ASTM C-923
SCALE : 1" = 2'-0"
SEE PLAN
AND PROFILE
SHEETS
MH JOINT TO HAVE "O"
RING OR DOUBLE ROW
OF BUTYL ROPE,
TYPICAL ALL JOINTS
REINFORCED NON-METALLIC MH
STEPS (REFER TO
SPECIFICATIONS)
ST'D PRECAST SECTIONS
ASTM C-478
12", TYP.
PROVIDE 12" MIN. COMPACTED
AGGREGATE BASE, INDOT #53,
UNDER ALL MANHOLES, TYPICAL
APPLY ADHESIVE PER RISER RING
MANUFACTURER'S
RECOMMENDATIONS (TYP.)
MONOLITHIC PRECAST BOTTOM
SECTION INCL. AT LEAST 3' MH
WALL SECTION WITH PIPE
OPENINGS AND EXTENDED BASE.
6", TYP.
6", TYP.
AIR RELEASE VALVE STRUCTURE DETAIL
12" GRAVEL LEVELING
AND SUPPORT PAD
12"
SCALE : NONE
P I P E
C O V E R
DISCHARGE HOSE
FLATTOP MANHOLE WITH ECCENTRIC OPENING;
SEE FLATTOP MANHOLE DETAIL, THIS SHEET
2'-0" OPENING
2" ADJUSTING RING
ACCESS FRAME AND LID WITH
SELF SEALING GASKET, TYPE 4 (SEE
STANDARD MANHOLE DETAIL)
EXISTING GRADE
2" CORPORATION STOP
CONNECTED TO DI FORCE
MAIN w/THREADED TAP
SEWAGE AIR RELEASE VALVE, APCO MODEL 400 OR
EQUAL W/ 2" INLET AND
" OUTLET
POURED CONCRETE BENCH
6'Ø PRECAST CONCRETE
STRUCTURE, PER ASTM C-478
INTEGRAL PRECAST CONCRETE BASE AND WALL
SECTION AS PER ASTM C-478, WITH 3' MINIMUM OF
WALL WITH PIPE OPENINGS
COIL AND SECURE 4 FEET OF
TRACER WIRE (2 TOTAL)
TRACER WIRE FOR FORCE MAIN
(2 WIRES TOTAL)
REINFORCED NON-METALIC STEPS @ 12" VERTICAL
SPACING, FULL DEPTH OF STRUCTURE (REFER TO
SPECIFICATONS)
1'-6"
STRUCTURE TYPE:
FRAME & LID TYPE:
NOTES:
1. ALL STORM WATER CASTINGS SHALL HAVE "DUMP NO
WASTE!" LETTERING AND FISH IMAGE WHEN AVAILABLE
2. ALL PRECAST STRUCTURES SHALL BE STEEL
REINFORCED
FRAME & GRATE TYPE
STRUCTURE I.D.
MANHOLE TYPE A-4
LEGEND
STRUCTURE TYPE
MANHOLE TYPE "C" - 48" I.D.
MANHOLE TYPE "D" - 60" I.D.
MANHOLE TYPE "E" - 72" I.D.
MANHOLE TYPE "F" - 84" I.D.
INLET TYPE A = SEE INDOT STD. DWG.
INLET TYPE B = 36" I.D.
INLET TYPE J = SEE INDOT STD. DWG.
INLET TYPE M = SEE INDOT STD. DWG.
INLET TYPE R = SEE INDOT STD. DWG.
CATCH BASIN TYPE A = 24" I.D.
CATCH BASIN TYPE B = 36" I.D.
TYPE 2 - E.J.I.W. 1120-M OR 5105-M3
TYPE 3 - E.J.I.W. 2850-01
TYPE 4 - E.J.I.W. 1045-A
TYPE 8 - E.J.I.W. 7045-M1
TYPE 10 - E.J.I.W. 7360, WITH T1 BACK
TYPE 13 - E.J.I.W. 5335
OR APPROVED EQUAL
CONCRETE PAVEMENT
ST'D PRECAST
ECCENTRIC CONE
6" MAX. ADJUSTMENT RING
MANHOLE FRAME & LID
SEE NOTE THIS SHEET FOR TYPE SPECIFICATION LIST
SCALE : 1" = 2'-0"
CLASS A CONCRETE FOR PIPE
OPENING, CHANNEL AND BENCH
4'-0"Ø
3"
MH JOINT TO HAVE "O"
RING, TYPICAL ALL JOINTS
ST'D PRECAST SECTIONS
ASTM C-478
DOUBLE ROW OF
BUTYL ROPE
EXISTING 10"Ø
SANITARY SEWER PIPE
ANNULAR OPENING TO BE FILLED
WITH NON-SHRINK GROUT
POURED IN PLACE CLASS A
CONCRETE BOTTOM SECTION
REINFORCED POLYPROPYLENE MH
STEPS, PARSONS ENVIRONMENTAL
MODEL P-14938, OR APPROVED
EQUAL
12"
6", TYP.
6", TYP.
8" OF #53 COMPACTED
AGGREGATE LEVELING
COURSE
3"
NOTE: STANDARD FLAT TOP MANHOLE SHALL BE USED
FOR METER VAULT, VALVE VAULT AND BACKWATER
VALVE STRUCTURES
FINISH GRADE
CLEAR
S A
T Y
M
H
1"
4'-0", OR AS INDICATED
2'-0"
Ø
O
P
E
N
I
R
C
A
S
T
I
N
G
REINF. CONC. TOP
DESIGNED FOR HIGHWAY
LOADINGS (H-20)
PRECAST CONC. MH. RISER
(ASTM C478)
4" MAX. CASTING
ADJUSTMENT
NOTES FOR FLAT TOP MANHOLE DETAIL:
1. STANDARD FLAT TOP MANHOLE SHALL BE USED FOR
METER VAULT, VALVE VAULT AND BACKWATER VALVE
STRUCTURES.
2. ALL COLLAR
JOINT
SHALL BE
FLAT TOP REINFORCING AS
REQUIRED FOR H-20
HIGHWAY LOADINGS
SCALE : NONE
6"Ø HDPE SDR 9 (IRON PIPE SIZE)
PIPE ADAPTER FROM PVC TO DI
FLEXIBLE "BOOT" CONNECTION FOR WATERTIGHT
PENETRATION OF PIPE THRU STRUCTURE WALL, TYP.
6"Ø CL 50 DIP
6"Ø HDPE SDR 9 (IRON PIPE SIZE)
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
NOTE: USE THIS DETAIL ONLY IF MANUFACTURED PLUG
FITTING IS NOT AVAILABLE.
UNDISTURBED EARTH
GRAVEL OR SAND
COMPACTED BACKFILL
GRAVEL OR SAND
EXISTING GRADE
UNDISTURBED
EARTH
O.D.
SCALE: NONE
M
I N
F
L E
X
P
I P
E
M
I N
R
I G
P
E
M
I N
O.D.
SCALE: NONE
I G
P
E
M
I N
F
L E
X
P
I P
E
BEDDING DETAIL THRU UNSTABLE SOIL
TRENCH DETAIL
NOTE: FOR TRENCH IN STREET REFER TO
HMA PAVEMENT REPLACEMENT DETAIL,
THIS SHEET. FOR TRENCH IN GRASS
AREAS, SEE SODDING DETAIL, THIS SHEET.
TRENCH BACKFILL: APPROVED
COMPACTED GRANULAR BACKFILL
FROM BORROW BENEATH ALL
PROJECT AREAS.
PIPE PLUG DETAIL
SCALE: NONE
10" MIN.
EXISTING PIPE
TO BE ABANDONED
CONCRETE BLOCK AND
NON-SHRINK GROUT PLUG
UNDISTURBED EDGE OF TRENCH
SCALE: NONE
1.5D
SCALE: NONE
BUILDING PAPER
1.5D
1.75D
BUILDING PAPER
UNDISTURBED EDGE OF TRENCH
SCALE: NONE
UNDISTURBED EDGE OF TRENCH
BUILDING PAPER
2.75D
SIZE OF WATER MAIN OR FORCE MAIN
TYPE OF FITTING
16"
13.5
13.5
19.1
5.3
2.7
10.4
10.4
12" 14"
7.5
7.5
10.7
10.1
10.1
14.3
8" 10"
3.3
3.3
4.7
5.2
5.2
7.4
2.9
1.5
5.8
4.0
2.0
7.8
1.9
1.3
2.6
2.0
1.0
4.0
2.6 4.0 5.8 7.8
1.9
1.9
2.7
4"-6"
PLUG
TEE
90°
1.0
1.0
1.4WYE
22-1/2°
REDUCER
11-1/4°
45° 1.4
SPECIAL
* BASED ON SOIL BEARING CAPACITY OF 3000 POUNDS PER SQUARE
FOOT AND INTERNAL PRESSURE OF 200 PSI.
1. BLOCK WIDTH SHOULD BE EQUAL TO OR LESS THAN ONE HALF
(1/2) THE TOTAL DEPTH FROM THE FINISHED GRADE TO THE BOTTOM
OF THE BLOCK, BUT NOT LESS THAN THE PIPE DIAMETER.
2. BLOCK HEIGHT SHOULD BE BETWEEN ONE (1) AND ONE HALF (1/2)
THE WIDTH OF THE BLOCK.
SANITARY SEWER, SANITARY
LATERAL OR FORCE MAIN
1/6 O.D. GRAVEL, SAND OR STONE
1/8 O.D. 4" MIN. GRAVEL, SAND OR
STONE
SANITARY SEWER, SANITARY
LATERAL OR FORCE MAIN
1/6 O.D. GRAVEL, SAND OR
STONE
1/8 O.D. 4" MIN. GRAVEL,
SAND OR STONE
NO. 2 STONE (DEPTH AS DIRECTED
BY THE ENGINEER) *
* GRAVEL FILL COMPACTED TO 95% MIN. OF PROCTOR IN ACCORDANCE WITH THE
REQUIREMENTS OF THE INDIANA DEPARTMENT OF TRANSPORTATION.
SCALE: NONE
SLOPE 1/4 INCH/FT
MATCH EXISTING
CONCRETE SIDEWALK
4" MIN. OR
MATCH EXISTING
COMPACTED GRANULAR FILL TO
100% DENSITY (ST'D PROCTOR)
UNDISTURBED EARTH OR COMPACTED
GRANULAR TRENCH BACKFILL
BENEATH REPLACEMENT SIDEWALK
SCALE: NONE
SLOPE TO DRAIN
LIMITS OF REPLACEMENT
4"
8" MIN., OR
MATCH EXISTING
COMPACTED GRANULAR
FILL TO 100% DENSITY
(ST'D PROCTOR)
6"x6"x10x10 WWF, PULL UP 2" INTO
CONCRETE PAVEMENT, TYPICAL
UNDISTURBED EARTH OR COMPACTED
GRANULAR TRENCH BACKFILL
BENEATH REPLACEMENT SIDEWALK
SAW-CUT EXISTING
PAVEMENT TO PROVIDE
STRAIGHT, SMOOTH JOINT,
TYPICAL ALL SIDES
4" SCH 40 PVC PIPE
(REFER TO PLAN AND PROFILE DRAWINGS
FOR LOCATIONS OF TRACER WIRE ACCESS
BOXES)
FORCE MAIN
6" OF COMPACTED PIPE
BEDDING MATERIAL
NO SCALE
NOTE: TRACER WIRE ACCESS BOX SHALL BE
INSTALLED AT EACH PIPE CONNECTION POINT.
FORCE MAIN INSTALLATION AND
TRACER WIRE AND ACCESS BOX DETAIL
5' MINIMUM
SCALE: NONE
EX. BASE
EX. PAVM'T
UNDISTURBED EARTH
SAW CUT
HMA, PG 64-22, SURFACE, TYPE B, 12.0mm, 165#/SY (1 1/2")
HMA, PG 64-22, INTERMEDIATE, TYPE B, 19.0mm, 330#/SY
(3"), OR MATCH EXISTING PAVEMENT SECTION,
WHICHEVER IS GREATER.
10" MIN., INDOT NO. 53 LIMESTONE
APPROVED COMPACTED GRANULAR
BACKFILL
2' MIN.
CONCRETE SIDEWALK DETAIL
CONCRETE PAVEMENT DETAIL
HMA PAVEMENT REPLACEMENT DETAIL
SCALE: NONE
GRAVEL DRIVE DETAIL
UNDISTURBED
EARTH
10" MIN. COMPACTED
INDOT #53 LIMESTONE
SCALE: 1/2" = 1'-0"
FINISH GRADE
MOUND CONC. CAP
ABOVE STEEL POST
6" DIA. SCH 40 STEEL POST.
PAINTED YELLOW, FILLED WITH
3000 PSI CONCRETE
SET IN
CY (MIN.) CONC.
FOOTING
SLOPE AWAY FROM POST
M
I N
3" SPACER
UNDISTURBED SUBGRADE
14" MIN.
PIPE BOLLARD DETAIL
LAY SOD w/ TIGHT JOINTS
2" TOPSOIL
2" TOPSOIL TO BE MIXED W/ SUBSOIL
4" SUBSOIL TO BE LOOSENED
SODDING DETAIL
SCALE: NONE
NOTE: ALL GRASSED AREAS WITHIN THE PUBLIC R.O.W. SHALL BE
RESTORED TO PRE-CONSTRUCTION CONDITION PER THIS SODDING
DETAIL.
CONCRETE PAVEMENT
G
GENERATOR SOUND ATTENUATED
HOUSING WITH EXHAUST MUFFLER
EXHAUST PIPE
UNDISTURBED EARTH OR 12" MINIMUM DEPTH OF
COMPACTED CRUSHED LIMESTONE INDOT NO. 53 GRADATION
UNDISTURBED
EARTH
READY MIX CONCRETE
SUPPORT PAD W/ 4000 PSI
MINIMUM 28 DAY STRENGTH
#8 REBAR @
12" EACH WAY
AND 2" MIN.
CLEAR COVER
AIR FLOW
A
C
C
E
O
R
E
A
D
E
AIR INLET
SHROUD
(EACH
SIDE)
RADIATOR
EXHAUST
SILENCER
A
C
C
E
O
R
E
A
D
E
L O
C A
T I O
N
O
F
P
R E
S S
U R
E
R E
G U
L A
T O
R
B
Y
C
O N
T R
A C
T O
R
L O
C A
T I O
N
O
F
G
A S
M E
T E
R
B
Y
N
I P
S C
O
L O
C A
T I O
N
O
F
P
R E
S S
U R
E
R E
G U
L A
T O
R
B
Y
N
I P
S C
O
NATURAL GAS SERVICE
PIPE, BY NIPSCO.
NATURAL GAS SERVICE
PIPE, BY CONTRACTOR.
6" ALL
AROUND
12"
NEW BASE BID ELECTRICAL GENERATOR AND SUPPORT PAD
10'-0" x 6'-0" FOR SPECIFIED GENERATOR
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
4" CL 250 DI 90°
EL w/ RESTR MJS
4" CL 250 DI TEE
w/ RESTR MJS
4" CL 250 DI 90°
EL w/ RESTR MJS
4" CL 250 DI TEE
w/ RESTR MJS
CL 250 DI PIPE TRANSITION
COUPLING w/ MJS
E X
I S
T
S A
N
S
E W
E R
A
EXIST 4' ID PRECAST
CONCRETE MANHOLE
4" CL 250 DI TEE
w/ RESTR MJS
4" CL 250 DI TEE
w/ RESTR MJS
CL 250 DI PIPE TRANSITION
COUPLING w/ MJS
NOTES:
1. ALL 4" PIPE SHALL BE CL 50 DI.
2. PROVIDE FIELD TYPE FLANGES FOR CONNECTION OF 4" PIPE TO VALVE AND METER FLANGES.
3. CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE INSTALLATION BY NIPSCO AND PROVIDE CONDUIT
FROM DISCONNECT SWITCH TO A DISTANCE OF NOT LESS THAN 3 FT. FROM PANEL ALONG SHOWN ALIGNMENT.
M
UNDERGROUND 115V ELECTRICAL SERVICE
CONDUIT AND CONDUCTORS BY NIPSCO
LOCATION OF ELECTRIC SERVICE AND METER INSTRUMENTATION
PANEL (SEE DETAIL THIS SHEET) (PART OF OPTION 2)
2' x 2' ALUMINUM
ACCESS HATCH
LOCATION
CONDUIT AND WIRES FROM EACH FLOW METER
TO EACH INSTRUMENTATION PANEL
EXISTING 6" HDPE SDR 9 IRON
PIPE SIZE FORCE MAIN
PRECAST OR CORE OPENINGS IN STRUCTURE WALL AND
PROVIDE NON-SHRINK GROUT ALL AROUND BETWEEN PIPE
AND OPENING, AS INDICATED (TYP.)
2 4" PLUG VALVE w/ FL MJS
4" MAG METER w/ FL MJS. TO BE SAME MAKE AND MODEL AS
METER USED IN NEW PUMP STATION FLOW METER MANHOLE.
CONCRETE PIPE SUPPORT: 12"Ø WITH 44 #4 VERTICAL REBAR WHICH ARE DRILLED
AND EPOXY-SET 6" INTO STRUCTURE BASE SLAB. ALSO PROVIDE #4 HORIZONTAL
REBAR, ALL AROUND, AT TWO (2) ELEVATIONS (TYP.)
5 PIPE SPOOLS
2 2
EXISTING 6" HDPE SDR 9 IRON
PIPE SIZE FORCE MAIN
A
4" CL 250 DI 90° EL WITH FL. JTS. ROTATE
FIELD FLANGE ON PIPE SPOOL TO DIRECT
FLOW DISCHARGE TOWARD OUTLET SEWER
PRECAST CONCRETE TOP
SLAB AS PER ASTM C-478
PRECAST CONCRETE BARREL
SECTION AS PER ASTM C-478
PRECAST CONCRETE BASE WITH EXTENDED
DIAMETER AS INDICATED FOR ANTI-FLOATATION
AS PER ASTM C-478
4" CL 250 DI 11
w/ RESTR MJS
EXISTING
MANHOLE
WALL STEPS (SEE STANDARD
MANHOLE DETAIL, SHEET 19)
CONDUIT AND WIRES FROM EACH FLOW
METER TO INSTRUMENT PANEL SUPPORT
FROM UNDERSIDE OF TOP SLAB.
SECTION A-A
SCALE: 1" = 2'
PLAN
ELECTRICAL SERVICE AND METER INSTRUMENTATION PANEL DETAILS
SCALE: 1" = 2'
OPTION 2BASE BID
NOTES
1. THIS PANEL IS PART OF OPTION 2.
2. ALL ITEMS FURNISHED AND INSTALLED BY CONTRACTOR UNLESS NOTED OTHERWISE BY NIPSCO.
ON
OFF
M
ON
OFF
M
OPTION 2BASE BID
CORE OR SAW-CUT OPENING IN STRUCTURE WALL AND PROVIDE
NON-SHRINK GROUT ALL AROUND BETWEEN PIPE AND OPENING
2' x 2' ALUMINUM ACCESS HATCH (HALLIDAY
PRODUCTS MODEL NO. S1R2424 OR EQUAL)
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
F I L
E
N
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L
A
L E
I S
S U
E
D
A T
E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
N E
W
R
E G
I O
N A
L
W
A S
T E
W A
T E
R
P
U M
P
S
T A
T I
R
I N
H E
R M
I T
S
L A
K E
L A
U
N T
Y
I N
D I A
N
W
O
P T
I O
N
F
O R
T
E R
I N
G
S T
R U
C T
U R
E
D
E T