W81G6641707790
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RE: INVITATION FOR BIDS W912P6-14-B-0012, INDIANA SHORELINE EROSION CONTROL, LOCATED IN LAPORTE COUNTY, INDIANA
SEE THE FOLLOWING PAGES
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Sep-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-14-B-0012
X 9B. DATED (SEE ITEM 11)
08-Aug-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Sep-2014
CODE
U. S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-14-B-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS:
A. THE BID OPENING FOR THIS SOLICITATION IS UNCHANGED BY THIS AMENDMENT.
THEREFORE, BIDS ARE DUE NO LATER THAN 2PM (CST) ON 8 SEPTEMBER 2014.
CONTRACTOR’S MAY ACKNOWLEDGE THIS AMENDMENT BY EMAILING A SIGNED COPY
TO KIM BEARD AT kim.m.beard@usace.army.mil with a copy furnished to REGINA G. BLAIR regina.g.blair@usace.army.mil.
B. Provided below are the USACE’s Responses to Contractor’s Inquiries:
QUESTION #1: Given that the area typically used for truck turn around at the work zone area has been eroded and washed away, it appears that a different form of hauling the material to the infill site will have to be done. In the past the trucks were able to deliver the materials to the work site and then turn around to exit the work zone. As depicted in the attached photo, there is not enough room to navigate the drop off of material and exit out of the site with the type of dumps used in the past and considered for this project. Our recommendation is to have an off‐site staging area where the materials are stockpiled and then delivered to the work zone via some form of transport such as a front end loader. This does create a rather laborious and cumbersome process but seems to be the only effective way of doing so given the conditions of the erosion. Also, this would require that the staging area be on the NIPSCO property which is another concern as it relates to permission to utilize such. Any suggested response detailing how this can be accommodated is much appreciated.
USACE RESPONSE TO QUESTION #1: Contractor’s shall refer to Specification Section 31 25 10 EROSION PROTECTION ‐ SAND FILL PLACEMENT, para. 3.2.3.1 and Sheet C‐102. The Government does not have any staging/storage areas for the project. It is the responsibility of the contractor to obtain staging or storage areas off‐site. If the Contractor needs a staging area from NIPSCO, the contractor may obtain an area directly from NIPSCO.
QUESTION #2. Given that amendment 001 eliminates the wood bollards and replaces with the snow fencing is the snow fencing to remain as permanent as the roadway or will it come out at the end of the project? Clarification on this matter is appreciated. Our concern is that if it were to remain, maintenance would be required to ensure it remains after the end of the project.
USACE RESPONSE TO QUESTION #2: Contractor’s shall refer to Sheet C‐103, Note #2. The snow fencing must be removed upon construction completion.
C. The Amendment corrects Paragraph 4.a. ( BID OPENING ROOM) under the Bid Notes;
accordingly, it is corrected to read as follows: . The designated Bid Opening Room is located on the 16th floor at 231 South LaSalle Street, Chicago, Illinois 60604.
W912P6-14-B-0012
D. The point of contact for this Amendment is Kim Beard at 312‐846‐5378.
END OF AMENDMENT