MCCOOK GATE SHAFT, MCCOOK, ILLINOIS Federal contract opportunity
Solicitation number
W912P6-09-B-0017
Issued by
Department of the Army Corps of Engineers Engineering District Chicago

About this file

AMENDMENT 0002 IS CONTAINED IN THIS FILE.

View the file

Other files for this federal contract opportunity

Other files attached to MCCOOK GATE SHAFT, MCCOOK, ILLINOIS, newest first.
File Type Posted
AMENDMENT 0004 W912P609B0017 MCCOOK GATE SHAFT.pdf PDF
AMENDMENT 0003 W912P6-09-B-0017.pdf PDF
AMEMDMENT 1 W912P6-09-B-0017.pdf PDF
IFB SPECS W912P609B0017 MCCOOK GATE SHAFT.pdf PDF
2009_08_11_McCook Access Shaft Solicitation Set Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6691533524

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: INVITATION FOR BIDS NUMBER W912P6-09-B-0017, “ MCCOOK GATE SHAFT, MCCOOK, ILLINIOS”

The Government is issuing this Amendment Number 0002 to its previously issued Solicitation W912P6-09-B-0017 for the purpose of addressing contractor’s inquiries and to amend various areas of the Solicitation package as delineated on the follow ing pages of the Amendment.

THIS AMENDMENT CONTINUES ON THE NEXT PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 22

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-09-B-0017

X 9B. DATED (SEE ITEM 11)

11-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Sep-2009

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

111 NORTH CANAL STREET SUITE 600

CHICAGO IL 60606-7206

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-09-B-0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

A. BID OPENING DATE: The bid opening date is NOT EXTENDED by this Amendment;

therefore, the bids are due by 2:00 p.m. CDT on 11 September, 2009. Detailed information regarding the submission of bids is located in Section 00010 of the Solicitation document.

B. AMENDED SOLICITATION SECTIONS:

(1) Section 00010: The following changes were made to the Line Items contained in the Bid Schedule. As a result, a Revised Bid Schedule is incorporated herein and shall be fully completed and submitted by the Bidder in order for it to be considered responsive to the IFB and eligible for a contract award.

CLIN 0007 - The CLIN description has changed from PERMANENT CONCRETE LINER to PERMANENT CONCRETE LINER AND PARAPET.

CLIN 0011 - This CLIN’s description has changed to SHOTCRETE, quantity is 1 and unit price is Lump Sum. “Shotcrete” was originally numbered as 0012 under the original Bid Schedule.

SUBCLINs 0011AA & 0011AB have been deleted.

CLIN 0013 and its SubCLINS have been renumbered to CLIN 0012 and contain quantity changes.

CLIN 0014 and its SubCLINS have been renumbered to CLIN 0013 and contain quantity

CLIN 0015 and its SubCLINS have been renumbered to CLIN 0014 and contain quantity

CLIN 0016 and its SubCLINS have been renumbered to CLIN 0015 and contain quantity

CLIN 0017 has been renumbered to CLIN 0016.

(2) Section 00100 has been revised to delete the following Provision:

(3) Section 00700 has been revised to delete the following Clause:

52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002

(4) Section 00800 has been revised to incorporate the CLINS that are applicable to the Subdivided Items Clauses as shown below.

52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS

Item Nos. 0010, 0012, 0013, 0014, AND 0015 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

(End of clause)

52.211-5001 VARIATIONS IN ESTIMATED QUANTITIES, SUBDIVIDED ITEMS

(MAR 1995)—EFARS

This variation in estimated quantities clause is applicable only to Items Nos. 0010, 0012, 0013, 0014, AND 0015

(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.

(b) Where the actual quantity of work performed for Items Nos. 0010, 0012, 0013, 0014, AND 0015 is less than 85% of the quantity of the first sub-item listed under such item, the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.212- 11, Variation in Estimated Quantities.

(c) If the actual quantity of work performed under Items Nos. 0010, 0012, 0013, 0014, AND 0015 exceeds 115% or is less than 85% of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Items Nos. 0010, 0012, 0013, 0014, AND 0015 exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.

(End of clause)

52.232-15 Progress Payments Not Included APR 1984

C. AMENDED PROJECT SPECIFICATION SECTIONS: The following Specification Section has been amended as delineated below; therefore bidders shall remove the affected page and replace it with the respective page attached hereto.

Section 01 22 00.00 10 page 6 through 12 has been changed. The amended section contains page 6 – 12 only.

Section 31 72 13.00 03 – Page 9 has been changed. The amended section contains page 9 only.

Section 31 72 13.00 03 – Page 6 has been changed. The amended section contains page 6 only.

Section 3175 07 – Page 15 has been changed. The amended section contains page 15 only.

D. AMENDED PROJECT DRAWING SHEETS: One drawing sheet has been amended as delineated below; therefore bidders shall replace the affected sheet of the IFB with the respective sheet attached hereto.

- Drawing sheet C-106, C-107, C-501, C-502, C-503, END OF SUMMARY OF CHANGES

USACE RESPONSES TO CONTRACTOR’S QUESTIONS

Provided below are the USACE’s responses to questions that have been submitted by Contractor’s since the Pre-Bid Meeting.

(1) Contractor Question: Spec #'s 1.3.1 & 1.3.2 call for payment for Spot-Located Rock Dowels & Rock Bolts as described in SECTION 31 68 13 SOIL AND ROCK ANCHORS. This spec is missing. Please provide the missing spec information.

USACE Response: The reference to 31 68 13 was deleted. SECTION 01 22 00.00 10 Para

1.3.1 has been updated.

(2) Contractor Question: This question is to clarify the difference between bid items 10AA/AB (Spot Rock Dowels) & 11AA/AB (Spot Rock Bolts). Bid item #9 & #10 are for pattern rock dowels and spotted rock dowels. The C-104 refers to the term “anchor bars”, but no separate detail is given for “rock bolts”. Please confirm that item #8 Pattern Anchor Bars and item #11 spot rock bolts are similar. If not, please provide detail for bid item #11 “spot rock bolts”.

USACE Response: Bid Item No. 0011AA/AB has been removed. SECTION 01 22 00.00 10 has been updated.

(3) Contractor Question: Due to the engineering design and review required for this project, we respectfully request a 2 week postponement to the bid date for this project.

USACE Response: The project will remain as posted and will not be postponed or extended.

The Bid Date will remain as posted in Amendment 0001, 11 September 2009 at 2:00 PM.

(4) Contractor Question: Drawing C-503, detail 3 states that the "gate opening length as specified on plan". Drawing C-103 does not show gate location or length. Please specify location of gate for fence, and length.

USACE Response: Note on C-503 has been updated.

(5) Contractor Question: Parapet Wall and handrail are shown in the drawings but are not mentioned under a bid item. Please clarify which bid item should these items are paid under and which spec section this work is incidental to?

USACE Response: The parapet wall shall be incidental to the concrete liner and incidental to the same spec sections. SECTION 01 22 00.00 10 Para 1.2.7 has been updated.

(6) Contractor Question: Welded wire mesh overlap is stated twice in specs, first in section

31.72.13.00.03 (3.3.2) with a minimum overlap of 2x grid spacing on all sides. The second in section 31.75.33.00.03 (3.1.1) requires 1.5 x grids spacing all sides. Please clarify which is the correct overlap requirement.

USACE Response: The minimum overlap shall be 1.5 times the grid spacing. SECTION 31 72

13.00 03 Para 3.3.2 has been updated.

(7) Contractor Question: Bid Form 1442 notes a Bid Date and Time of September 11, 2009 @ 4:00 PM. Amendment No.1, Block 14, Article (3) states….The required response date and time will remain the same; 11 September 2009 at 2:00 PM". Please clarify the Bid Time.

USACE Response: The Bid Opening is at 2:00 PM on 11 September 2009, however Bids are Due Prior to 2:00 PM on 11 September 2009.

(8) Contractor Question: Will the worksite be cleared of bio-solid prior to the start of construction? If not cleared, and The Contractor is required to perform removal of the bio-solid material, where will the contractor be required to dispose of this material?

USACE Response: The worksite will be cleared prior to Contract Award.

(9) Contractor Question: Drawing C-107, Detail 2 shows where the wire mesh is to be installed between layers of shotcrete. Drawing C-502, detail 1 for additional rock support shows additional hardware over the wire mesh. It details 1 on drawing C-502 to be used to support the wire mesh for all the shotcrete wall areas? If not, please provide a connection/support detail for the wire mesh to the wall or dowel prior to shotcrete placement.

USACE Response: See updated details on sheets C-107 and C-501

(10) Contractor Question: Drawing C-502 has a Drain Hole Detail. Please provide a detail showing the required locations or pattern for the drain holes.

USACE Response: Drain Hole Layout added. Sheet C-502 has been updated.

(11) Contractor Question: On drawing G-103 the general notes for rock reinforcement and anchor bar states a minimum size of 6x6x3/4 for the anchor plate and drawing C-106 shows the size of the anchor plate as 10x10x1. Please clarify the size of the anchor plate.

USACE Response: The required anchor plate size is 6x6x3/4. Section A, C106 has been updated.

(12) Contractor Question: Spec Section 31 72 13.00 03, section 2.4 states “Steel Bearing Plates and anchor plates for use with rock dowels shall be steel plates, ASTM A 36/A 36M, with a minimum thickness of 1” or greater as shown on the contract drawings…” Contract drawing C-107 shows a 6x6x3/4 plate for the rock dowel and on drawing G-103 the general notes for rock reinforcement and anchor bar states a minimum size of 6x6x3/4 for the anchor bar rock dowel. Please clarify the minimum thickness for the bearing plate.

USACE Response: The minimum required bearing and anchor plate thickness is 3/4 inch.

SECTION 31 72 13.00 03 has been updated.

(13) Contractor Question: Can the CQC person with 10 years tunnel or deep shaft experience and a PE license be a hired consultant of the contractor on the project full time when the work is progressing or will this person need to be on the contractors staff.

USACE Response: This will be allowed provided that the CQC person is on-site at all times, meets the requirements stated in the specifications, and a letter of designation is provided for this person that includes authorization for this person to stop work for non-conformity.

(14) Contractor Question: Spec section 31-75-07 page 17 states that the soil and rock excavated needs to be disposed of off site or “if available on-site”. Is on-site disposal available and if so how close to the shaft is the disposal site. SEE Specification Section 01 10 00.00 03 para 1.17.

USACE Response: Per Spec Section 31 72 13 All excavated materials shall be disposed of off-site.

(15) Contractor Question: On the rock dowels. Is the design to have 20’ of embedment with an anchor which is 21’ long or use a 20’ long anchor with slightly less embedment? See C106 which states the 1” rods are 20 OL. Where C107 states 20’ embedment on the #8 dowels.

Please clarify.

USACE Response: The requirement is for 20-feet of embedment.

(16) Contractor Question: Drawing Sheet C-502 illustrates what to do if a clay seam is encountered. Are the rock dowels paid under item 10? Where will the mine straps be paid?

USACE Response: The use of mine straps is not anticipated, and this will be removed from the plans. Sheet C-502 has been updated.

(17) Contractor Question: Where will spot located rock bolts be used and is a rock bolt the same as a rock anchor.

USACE Response: Spot located rock bolts will be located as directed by the COR based on observation of the rock mass characteristics. Line Item 0011 (Spot Located Rock Bolts) has been removed.

(18) Contractor Question: Will rock bolts/rock anchors or rock dowels be plain steel or galvanized. Will plates and bolts be plain or galvanized?

USACE Response: Rock dowels and anchors shall be plain steel as described in Specification Section 31 72 13.00 03.

(19) Contractor Question: Can earth spoils be deposited on site location? If so where?

USACE Response: All excavated materials shall be disposed of off-site in accordance with Specification Section 01 10 00.00 03 para 1.17.

(20) Contractor Question: Is it expected that spoils generated from the excavation would be a classified waste by IEPA such as Hazardous, Special or Non-Special waste?

USACE Response: No. It is not expected waste generated during excavation will be classified by IEPA as Hazardous or Special.

(21) Contractor Question: Can rock spoils generated be taken to an on-site location?

USACE Response: All excavated materials shall be disposed of off-site in accordance with Specification Section 01 10 00.00 03 para 1.17.

(22) Contractor Question: At the pre-bid meeting it was mentioned that electrical and water facilities are available at the site. Would usage of these utilities be metered and would there be cost associated with their use?

USACE Response: The Contractor shall be responsible for obtaining utilities required to perform the work. The costs of any utilities used shall be incidental to the work performed as described in Specification Section 01 22 00.00 10.

(23) Contractor Question: What is the intended purpose of the 23 grout holes indicated on drawing C-103?

USACE Response: The intent is ground water infiltration control – SEE Specification Section 31 75 07.

(24) Contractor Question: At the prebid meeting it was stated that the Corps will not require a dewatering system to be left in place at the completion of the shaft excavation work and that any dewatering system will be considered as means and methods for the sole purpose of the contractors shaft excavation work. Please confirm.

USACE Response: Pumps and dewatering equipment is not a permanent requirement for this Contract. Dewatering for this contract is only required for the duration of the work. SEE Specification Section 31 00 00.

(25) Contractor Question: Where will dewatering effluent be discharged to after it has passed thru the temporary settling tanks?

USACE Response: Handling, managing and disposal of the groundwater infiltrate are the Contractor's responsibility. All appropriate mining or other permits involved shall be obtained by the Contractor as part of this work. SEE Specification Section 01 57 20 01 05.

(26) Contractor Question: Hours of blasting states that “No blasting operations shall commence before 8:00 a.m. on any work day and all blasting operations (including the detonation of any placed charges) shall be completed prior to 7:00 p.m. of that same day”.

Please confirm that this restriction only applies to the detonation of placed charges. For example could a charge be loaded prior to 8am the day of a blast?

USACE Response: Preparations for blasting may be performed prior to the stipulated time.

The time for blasting itself is stipulated. SEE Specification Section 31 75 07.

(27) Contractor Question: Sheet C-502 shows the “Typical Support Detail for Clay Seam or Fracture Zone”. What bid item is this paid under and how is it paid for?

USACE Response: This part of the work is not anticipated and has been removed from the plans. Sheet C-502 has been updated.

(28) Contractor Question: Specification 31 75 07 section 3.5 states “Pre-excavation grouting of a minimum 25-ft deep zone of bedrock immediately below the top of the rock at the Access Shaft shall be performed prior to any shaft excavation to reduce groundwater infiltration in the shafts.” Drawing C-103 states “Grout 20 ft into rock”. Spec 31 73 00 section 3.2.2 states "It is anticipated that the required depth of ring grout holes will not exceed 150 feet…” Please clarify the depth of the grout hole.

USACE Response: Grout holes shall be a minimum of 25 feet into bedrock. Additional depth and additional holes may be necessary to control inflow. SEE Specification Section 31 75 07.

(29) Contractor Question: Are there any existing utilities available onsite for Contractor use for this project? If so, what are the size, capacity, and location of utilities?

USACE Response: The Contractor shall be responsible for obtaining utilities required to perform the work. The costs of any utilities used shall be incidental to the work performed as described in Specification Section 01 22 00.00 10.

(30) Contractor Question: Specification 01 35 26.00 03, section 3.1.3 Unforeseen Hazardous Material states that, "if material is hazardous and handling of the material is necessary to accomplish the work, the government will issue a modification pursuant to FAR…" If hazardous or special waste material is found during excavation and Contractor is directed to proceed with the work, is the USACE to be signatory as the "Generator of Waste"?

USACE Response: No. The site owner is the Generator of Waste. Based upon the past HTRW investigations, we do not think there should be any hazardous materials. However, if any hazardous material is found it will be handled on a case by case basis. SEE Specification Section 01 35 26.00 03.

(31) Contractor Question: The Contract includes FAR 52.232-15, which provides that a progress payment clause will not be included in the Contract. This appears to conflict with the payments clause at FAR 52.232-5(b), which calls for monthly progress payments. Please clarify the expected frequency of payments.

USACE Response: These two clauses are hereby deleted from the solicitation.

(32) Contractor Question: Clause FAR 52.232-5003 is included in this contract and states that only $500,000 is available to fund the Project for the current fiscal year. If no work occurs during this fiscal year, will the current reserved funds ($500,000) be applied to this project? Is there any further information with respect to funding for this project?

USACE Response: Yes; if no work is performed during this current fiscal year, the reserved amount of $500,000.00 will remain on the contract to be carried forward/and or used during the next fiscal year. The funding aspect of this project is captured in the EFARS Clause 52.232- 5003, which is incorporated into Section 00800 of the Solicitation (See page 53 of 55 of the Solicitation document).

(33) Contractor Question: Spec 31 75 07 section 2.4 states that wood will only be allowed for initial shaft ground support that is to be covered later by sheet piling unless otherwise approved by the COR. Section 3.41 states that initial shaft ground support systems for shaft excavation in soil may consist of steel ribs and lagging. Please clarify if wood lagging is acceptable to use in the initial shaft ground support system, and if used, is it required to be covered by sheet pile as stated in section 2.4?

USACE Response: Wood lagging is acceptable as a part of initial support and is not required to be covered by sheet piling provided the design is by a registered Professional Engineer or Professional Structural Engineer. SECTION 31 75 07 Para 2.4 has been updated.

END OF QUESTIONS AND RESPONSES

Section 00010 – Solicitation Contract Form

REVISED BID SCHEDULE

(AMENDMENT 0002)

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum

MOBILIZATION & DEMOBILIZATION

Firm-Fixed-Price (FFP)

PURCHASE REQUEST NUMBER: W81G6691533524

NET AMT

0002 1 Lump Sum

SITE PREPARATION

FFP

0003 1 Lump Sum

DEWATERING

0004 1 Lump Sum

OVERBURDEN EXCAVATION

0005 1 Lump Sum

ROCK EXCAVATION

0006 1 Lump Sum

TEMPORARY OVERBURDEN SUPPORT

0007 1 Lump Sum

PERMANENT CONCRETE LINER AND PARAPET

0008 1 Lump Sum

PATTERN ANCHOR BARS

0009 1 Lump Sum

PATTERN ROCK DOWELS

ITEM NO SUPPLIES/SERVICES

SPOT LOCATED ROCK DOWELS

This Line Item identifies the work description that relates directly to Sub-line Items 0010AA AND 0010AB. The Sub-line Items themselves identify the quantities required to execute the work associated with this item. Therefore, the Contractor shall provide its pricing separately at Sub-line Items 0010AA AND 0010AB.

0010AA 1,000 Linear

Foot

INITIAL 1,000 LF

0010AB 1,000 Linear

OVER 1,000 LF

0011 1 Lump Sum

SHOTCRETE

OVERBURDEN DRILLING AND CASING FOR GROUTING

This Line Item identifies the work description that relates directly to Sub-line Items 0012AA AND 0012AB. The Sub-line Items themselves identify the quantities required to execute the work associated with this line item. Therefore, the Contractor shall provide its pricing separately at Sub-line Items 0012AA AND

0012AB.

0012AA 828 Linear

INITIAL 828 LF

0012AB 100 Linear

OVER 828 LF

ROCK DRILLING FOR GROUTING

This Line Item identifies the work description that relates directly to Sub-line Items 0013AA AND 0013AB. The Sub-line Items themselves identify the quantities required to execute the work associated with this line item. Therefore, the Contractor shall provide its pricing separately at Sub-line Items 0013AA AND

0013AB.

0013AA 345 Linear

INITIAL 345 LF

0013AB 345 Linear

OVER 345 LF

GROUTING TIME

001AA AND 0014AB. The Sub-line Items themselves identify the quantities required to execute the work associated with this line item. Therefore, the Contractor shall provide its pricing separately at Sub-line Items 0014AA AND

0014AB.

0014AA 35 Hours

INITIAL 35 HRS

0014AB 35 Hours

OVER 35 HRS

LH

GROUT MIX

0015AA AND 0015AB. The Sub-line Items themselves identify the quantities required to execute the work associated with this line item. Therefore, the Contractor shall provide its pricing separately at Sub-line Items 0015AA AND

0015AB.

0015AA 2,875 Gallon

INITIAL 2875 GALLONGS

0015AB 2,500 Gallon

OVER 2875 GALLONS

0016 1 Lump Sum

PERFORMANCE AND PAYMENT BOND

THIS IS A COST-REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payments bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.

Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.

NOT TO EXCEED

TOTAL BID PRICE (ITEMS 0001 THROUGH 0016): $_______________

Important Notes Regarding this Acquisition:

1. BID CONDITIONS:

a. Bidders are required to provide pricing for all Bid Items (0001 through 0016) to be considered responsive to the solicitation and eligible for the resultant contract award.

b. The Government intends to award the BASE BID ITEMS to the successful lowest bidder at the bid prices provided under its winning bid schedule.

c. Split awards or multiple award contracts will not result from this Solicitation.

2. COMPETITION: Competition for this acquisition is UNRESTRICTED TO BUSINESS

SIZE.

3. SUBMISSION OF BIDS:

a. BIDS OR MODIFICATIONS TO BIDS THAT ARE RECEIVED BY FACSIMILE OR TELETYPE WILL NOT BE CONSIDERED. All sealed Bids must be submitted in accordance with the procedures set forth in BLOCK NO. 13 of PAGE 1 of this Solicitation Document.

b. Bidders are required to acknowledge the receipt of all amendments to the Solicitation on the Standard Form 1442 in the space provided, by completing Blocks 8 and 15 of the Amendment (Standard Form 30), by separate letter, or by telegram prior to opening of bids.

Failure to acknowledge all amendments may cause rejection of the bid.

c. SF 1442 BACK (Page 2 of the Solicitation): Bidders shall fully complete all the required areas located under the section designated as “OFFER” (refer to Items 14. through 20C.)

d. SECTION 00600 (REPRESENTATIONS AND CERTIFICATIONS): The bidder must fully complete Section 00600 of this Solicitation and submit it along with all other documents required by this Solicitation. Bids received without this Section fully completed may be rejected, considered non-responsive and ineligible for award.

e. BID GUARANTEE: The bidder is required to submit a Bid Guarantee for this procurement. Any bidder failing to submit an authentic Bid Guarantee will be considered non-responsive to the Solicitation and ineligible for award. The Bid Guarantee shall be in the amount of 20% percent of the bidder’s bid price or $3,000,000.00, whichever is less.

f. DELIVERY OF BIDS:

(1) Sealed Bids: Regardless of the method of delivery (mailed or hand-carried), Bids and all other documents called out in the Solicitation shall be enclosed and sealed in an envelope that is clearly marked “Bid” and shall include the assigned Solicitation Number, and the Bid Opening Date and Time.

(2) Mailed Bids: It is the responsibility of each bidder to ensure that its Sealed Bid is received by the Chicago District’s – USACE Contracting Branch, located at 111 North Canal Street, Suite 600, Chicago, IL 60606 prior to the date and time set of the opening of bids – See Block 13A of Page 1 of the Solicitation.

(3) Hand-carried Bids Delivered on the Day of the Bid Opening: For bids being hand-carried after 12:NOON on the date of the bid opening, the bidder shall deliver its sealed bid directly to the Bid Opening Room, which is located at 111 North Canal Street, the 1st Floor Lobby Conference Room, Chicago, IL 60606. Prior to 12:NOON on the date of the bid opening, it is the responsibility of each bidder to ensure that its Bid is received by the Chicago District’s – USACE Contracting Branch, located at 111 North Canal Street, Suite 600, Chicago, IL 60606 prior to the date and time set of the opening of bids.

- BID OPENING ROOM: The designated Bid Opening Room is the Lobby Conference Room which is located on the first floor at 111 North Canal Street, Chicago, IL 60606.

4. CONTRACTOR PERFORMANCE EVALUATIONS. In accordance with the provisions of Subpart 36.201(Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor’s performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $100,000.00, the USACE will evaluate contractor’s performance and prepare a performance report using the Construction Contractor Appraisal Support System (CCASS), which is now a web-based system. After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using CCASS requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site: http://www.cpars.navy.mil/. If the Contractor wishes to participate in the performance evaluation process, access to CCASS and PKI certification is the sole responsibility of the Contractor.

CUP - McCook Reservoir, Main Tunnel Access Shaft W912P6-09-B-0017 complete the work associated with rock excavation, including but not limited to rock excavation both wet and dry; removing and disposing of all loose and excavated materials; furnishing and installing initial (not permanent) rock supports (including, among others, rock reinforcement, welded wire fabric and shotcrete) to suit the particular methods of construction; rock surface preparation including scaling, removal of loosened rock and detached blocks, and washing/cleaning of the shaft rock surfaces; shaft alignment and control surveys; geologic record mapping;

and Contracting Officer access.

1.2.5.2 Measurement

Rock excavation will be measured for progress payments on the basis of the actual number of linear feet completed as measured vertically along the centerline of the shaft as shown on the Contract Drawings, but no separate measurement for any works associated with this Bid Item shall be the basis for payment.

1.2.5.3 Unit of measure

Unit of measure: Lump Sum (LS)

1.2.6 Temporary Overburden Support

1.2.6.1 Payment

Payment will be made for Temporary Overburden Support as described in SECTION 31 75 07 SHAFT EXCAVATION at the Contract lump sum price for Bidding Schedule Item No. 0006. Payment shall constitute full compensation for all labor, materials, equipment, tools, supplies, and incidentals necessary to complete the work including but not limited to installation, maintenance, and removal of initial support of the soil excavation.

1.2.6.2 Measurement

No separate measurement will be made for any work items within this Bid Item.

1.2.6.3 Unit of measure

Unit of measure: Lump Sum (LS)

1.2.7 Permanent Concrete Liner and Parapet

1.2.7.1 Payment

Payment will be made for the Permanent Concrete Liner and Parapet as described in SECTION 03 11 14.00 10 FORMWORK FOR CONCRETE, SECTION

03 15 14.00 10 EXPANSION, CONTRACTION AND CONSTRUCTION JOINTS IN CONCRETE

FOR CIVIL WORKS, SECTION 03 20 02 STEEL BARS AND WELDED WIRE FABRIC FOR

CONCRETE REIFORCEMENT FOR CIVIL WORKS, and SECTION 03 31 04.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS, and SECTION

05 50 04.00 10 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED

ITEMS FOR CIVIL WORKS STRUCTURES at the Contract lump sum price for Bidding Schedule Item No. 0007. Payment shall constitute full compensation for all labor, materials, equipment, tools, supplies, and incidentals necessary to complete the work associated with the permanent concrete liner and parapet, including but not limited to the control of water; surface preparation;

cast-in-place concrete; falsework and formwork; reinforcing steel and

SECTION 01 22 00.00 10 - Page 6

AMD0002

welded wire fabric; construction joint treatment; waterstops; steel handrail; and all other collateral work required by the Contract Documents or by the nature of the work.

1.2.7.2 Measurement

Concrete lining will be measured for progress payments on the basis of the actual number of linear feet completed as measured vertically along the centerline of the shaft as shown on the Contract Drawings, but no separate measurement for any works associated with this Bid Item shall be the basis for payment.

1.2.7.3 Unit of measure

Unit of measure: Lump Sum (LS)

1.2.8 Pattern Anchor Bars

1.2.8.1 Payment

Payment will be made for the Pattern Anchor Bars as described in SECTION 31 72 13.00 03 ROCK REINFORCEMENT AND INITIAL SUPPORT at the Contract lump sum price for Bidding Schedule Item No. 0008. Payment shall constitute full compensation for all labor, materials, equipment, tools, supplies, and incidentals necessary to complete the work including but not limited to furnishing and installation of additional permanent anchor bars, beyond those shown on the Contract Drawings or increasing the length of permanent rock anchors beyond the lengths called for on the Contract Drawings, which price shall include the cost of installing anchor bars complete with plates, washers, nuts, grout tubes and other accessories; grouting of the anchor bars, including all grout materials and/or furnishing and placing complete resin encapsulation; initial tensioning of rock anchors, all pull testing of supplemental anchor bars and all other items incidental to the work.

1.2.8.2 Measurement

No separate measurement will be made for any work items within this Bid Item.

1.2.8.3 Unit of measure

Unit of measure: Lump Sum (LS)

1.2.9 Pattern Rock Dowels

1.2.9.1 Payment

Payment will be made for the Pattern Rock Dowels as described in SECTION 31 72 13.00 03 ROCK REINFORCEMENT AND INITIAL SUPPORT at the Contract lump sum price for Bidding Schedule Item No. 0009. Payment shall constitute full compensation for all labor, materials, equipment, tools, supplies, and incidentals necessary to complete the work including but not limited to furnishing and installation of additional permanent rock dowels, beyond those shown on the Contract Drawings or increasing the length of permanent rock anchors beyond the lengths called for on the Contract Drawings, which price shall include the cost of installing rock dowels complete with plates, washers, nuts, grout tubes and other accessories; grouting of the rock dowels, including all grout materials and/or furnishing and placing

SECTION 01 22 00.00 10 - Page 7 complete resin encapsulation; initial tensioning of rock dowels, all pull testing of supplemental rock dowels and all other items incidental to the work.

1.2.9.2 Measurement

No separate measurement will be made for any work items within this Bid Item.

1.2.9.3 Unit of measure

Unit of measure: Lump Sum (LS)

1.2.10 Shotcrete

1.2.10.1 Payment

Payment will be made for furnishing, delivering, and placing Shotcrete as described in SECTION 31 75 33.00 03 SHOTCRETE, at the Contract lump sum price for Bidding Schedule Item No. 00120011. Payment shall constitute full compensation for all labor, materials, equipment, tools, supplies, and incidentals necessary to complete the work including but not limited to the cost of development of approved shotcrete mixes; all testing, including laboratory and field testing and test panels required to develop and obtain approval of the shotcrete mixes; certification of nozzlemen; cleaning surfaces to receive shotcrete, including previously shotcreted surfaces;

materials required for shotcrete mixes, including aggregates, cements, admixtures, accelerators, and water; all materials and equipment required for storage, transportation, batching, mixing, pumping, application and curing of shotcrete; any measuring pins or other devices necessary to verify the thickness of shotcrete applied; removal and disposal of rebound;

and removal and disposal of defective, drummy, or improperly adhered shotcrete.

1.2.10.2 Measurement

No separate measurement will be made for any work items within this Bid Item.

1.2.10.3 Unit of measure

Unit of measure: Lump Sum (LS)

1.2.11 Performance and Payment Bonds

1.2.11.1 Payment

Payment will be made for the costs associated with Performance and Payment Bonds at the Contract lump sum price and shall constitute full compensation for the cost of premiums for performance and payment bonds, at the Contract lump sum price for Bidding Schedule Item No. 00170016. Upon presentation of evidence of full payment, the Government will reimburse the Contractor the cost of premiums for performance and payment bonds. The Government will pay either the actual cost of the performance and payment bonds or the Contractor's bid price, whichever is less.

1.2.11.2 Measurement

No separate measurement will be made for any work items within this Bid

SECTION 01 22 00.00 10 - Page 8

Item.

1.2.11.3 Unit of Measure

Unit of measure: Lump Sum (LS)

1.3 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.3.1 Spot-Located Rock Dowels

1.3.1.1 Payment

Payment will be made for Spot-Located Rock Dowels as described in SECTION

31 68 13 SOIL AND ROCK ANCHORSSECTION 31 72 13.00 03 ROCK REINFORCEMENT AND

INITIAL SUPPORT at the contract unit price for Bidding Schedule Item Nos.

0010AA and 0010AB. Payment constitutes full compensation for all labor, materials, equipment, tools and incidentals necessary to complete the work including but not limited to setup, drilling holes, washing holes, supplying and installing polyester resin, supplying and installing rock dowels and rock bolts to the designated depths into rock, complete with necessary hardware, grout materials and tensioning of rock bolts and all testing of rock dowels and rock bolts. No payment will be made for anchors which do not meet the criteria. The payment for this item will be subdivided into initial and over initial quantity. The price for "over initial quantity" must be equal to or less than the price for "initial quantity".

1.3.1.2 Measurement

Measurement for payment of rock dowels will be based on the number of linear feet of furnished and installed rock support as directed or approved by the COR. The measurement will include the embedded length. No measurement will be made for any equipment or accessories and materials required for installing rock dowels, including but not limited to resin, grout, bearing plates, washers, nuts or any other materials used in the installation and protection of rock dowels.

1.3.1.3 Unit of Measure

Unit of measure: linear foot (LF)

1.3.2 Spot-Located Rock Bolts

1.3.2.1 Payment

Payment will be made for Spot-Located Rock Bolts as described in SECTION 31 68 13 SOIL AND ROCK ANCHORS at the contract unit price for Bidding Schedule Item Nos. 0011AA and 0011AB. Payment constitutes full compensation for all labor, materials, equipment, tools and incidentals necessary to complete the work including but not limited to setup, drilling

SECTION 01 22 00.00 10 - Page 9 holes, washing holes, supplying and installing polyester resin, supplying and installing rock dowels and rock bolts to the designated depths into rock, complete with necessary hardware, grout materials and tensioning of rock bolts and all testing of rock dowels and rock bolts. No payment will be made for anchors which do not meet the criteria. The payment for this item will be subdivided into initial and over initial quantity. The price for "over initial quantity" must be equal to or less than the price for "initial quantity".

1.3.2.1 Measurement

Measurement for payment of rock bolts will be based on the number of linear feet of furnished and installed rock support as directed or approved by the COR. The measurement will include the embedded length. No measurement will be made for any equipment or accessories and materials required for installing rock bolts, including but not limited to resin, grout, bearing plates, washers, nuts or any other materials used in the installation and protection of rock bolts.

1.3.2.2 Unit of Measure

Unit of measure: linear foot (LF)

1.3.2 Overburden Drilling and Casing for Grouting

1.3.2.1 Payment

Payment will be made for costs associated with drilling, re-drilling, and placing casing for grout holes through overburden and for furnishing all labor and supplies incidental to the work as described in SECTION 31 73 00 TUNNEL AND SHAFT GROUTING at the contract unit price for Bidding Schedule Item Nos. 0013AA and 0013AB0012AA and 0012AB. Linear feet drilled will be subdivided into initial and over initial quantity. The price for "over initial quantity" must be equal to or less than the price for "initial quantity". Material, equipment and labor costs associated with installation and grouting of temporary steel or Schedule 40 PVC or other casing pipe directed by the COR through overburden into the top of rock shall be included in this item. Any casing or standpipe left in the ground shall be cut down 2 feet below grade and covered following the completion of grouting and backfilling of the hole. The payment for this item will be subdivided into initial and over initial quantity. The price for "over initial quantity" must be equal to or less than the price for "initial quantity".

1.3.2.2 Measurement

Drilling of holes and placement of casing in overburden will be measured for payment on the basis of the linear feet, as shown or as directed and accepted by the COR.

1.3.2.3 Unit of Measure

Unit of measure: Linear Foot (LF)

1.3.3 Rock Drilling for Grouting

1.3.3.1 Payment

Payment will be made for costs associated with drilling and re-drilling

SECTION 01 22 00.00 10 - Page 10 grout holes in rock using diamond rotary or percussion drilling techniques with water flush; care and disposal of waste water and cuttings; clean-up of the site; furnishing, handling, transporting and storing of materials;

and furnishing all labor and supplies incidental to the work as specified in the applicable portions as described in SECTION 31 73 00 TUNNEL AND SHAFT GROUTING and associated with the ring curtain grouting at the contract unit price for Bidding Schedule Item Nos. 0014AA and 0014AB0013AA and 0013AB. Where required or directed to drill through previously set grout in any grout hole, payment for drilling through hardened grout will be made at 100% of the contract price for drilling holes in rock. The payment for this item will be subdivided into initial and over initial quantity. The price for "over initial quantity" must be equal to or less than the price for "initial quantity".

1.3.3.2 Measurement

Drilling of grout holes will be measured for payment on the basis of the linear feet, as shown or as directed and accepted by the COR.

1.3.3.3 Unit of Measure

Unit of measure: Linear Foot (LF)

1.3.4 Grouting Time

1.3.4.1 Payment

Payment will be made at the contract unit price for labor and equipment costs associated with satisfactorily placing grout mixture as described in SECTION 31 73 00 TUNNEL AND SHAFT GROUTING at the contract unit price for Bidding Schedule Item Nos. 0015AA and 0015AB0014AA and 0014AB. The price includes but is not limited to proportioning the mix and mixing and injecting the grout. Time for placing grout per pump will be subdivided into initial and over initial quantity. The price for "over initial quantity" must be equal to or less than the price for "initial quantity".

Payment will be based upon the total amount of time required per pump for placing grout, determined by reducing the accumulative total number of minutes of operation. No payment will be made for grout, or the material constituents thereof, wasted due to improper anchorage of grout pipe or connections, or which is wasted due to negligence on the part of the Contractor, nor for grout which is rejected by the Contracting Officer because of improper mixing. Payment constitutes full compensation for all labor, equipment, tools and incidentals necessary to complete the work.

The payment for this item will be subdivided into initial and over initial quantity. The price for "over initial quantity" must be equal to or less than the price for "initial quantity".

1.3.4.2 Measurement

The operation of placing grout will be measured for payment on the basis of the actual time for grout placement. Measurement for payment shall begin with the injection of grout, and end when grout injection ceases, except where intermittent grouting is ordered by the Contracting Officer. When intermittent grouting is ordered, measurement will stop when intermittent injection ceases. Placing grout mixture will be measured for payment on the actual time the pump is running for placement of grout in the formation. Time will be measured cumulatively to the next whole minute of operation.

SECTION 01 22 00.00 10 - Page 11

1.3.4.3 Unit of Measure

Unit of measure: hours (HRS)

1.3.5 Grout Mix

1.3.5.1 Payment

Payment will be made at the contract unit price for labor and equipment costs associated with producing a satisfactory grout mixture as described in SECTION 31 73 00 TUNNEL AND SHAFT GROUTING at the contract unit price for Bidding Schedule Item Nos. 0016AA and 0016AB0015AA and 0015AB. The price includes but is not limited to all components of grout mix, including admixtures. Payment constitutes full compensation for all labor, equipment, tools and incidentals necessary to produce the grout mixture. The payment for this item will be subdivided into initial and over initial quantity.

The price for "over initial quantity" must be equal to or less than the price for "initial quantity".

1.3.5.2 Measurement

Grout Mix will be measured for payment on the basis of the total number of gallons of grout mix satisfactorily placed in grout holes.

1.3.5.3 Unit of Measure

Unit of measure: gallons

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 22 00.00 10 - Page 12

2.4 STEEL BEARING PLATES AND ANCHOR PLATES

Steel Bearing Plates and anchor plates for use with rock dowels shall be steel plates, ASTM A 36/A 36M, with a minimum thickness of 1 inch 3/4 inch or greater as shown on the Contract Drawings, and they shall have a minimum bearing surface of 36 square inches or greater as shown on the Contract Drawings, and shall have a center hole for the dowel or as shown on the Contract Drawings. Plates with a formed hemispherical cavity and used with a hemispherical bearing nut may be used as approved by the Contracting Officer in lieu of a flat plate with wedge washers and flat nut. The dowel hole shall be of sufficient size to accommodate the dowel.

2.5 NUTS

Nuts shall be hexagon head heavy duty bearing type conforming to the requirements of ASTM A 325 for rock dowels and ASTM A 29/A 29M, Grade C-1045 for anchor bars. Nuts with hemispherical heads may be used with appropriately shaped bearing plates as approved by the Contracting Officer.

2.6 WASHERS

2.6.1 Beveled or wedge washers

Beveled or wedge washers shall conform to ASTM A 47/A 47M, Grade 32510, with round center hole a minimum of 1/16 inch larger in diameter than the dowel with which the washers are to be used. The maximum angle subtended by the two faces of the washer shall not exceed 10 degrees.

2.6.2 Hardened steel washers

Hardened steel washers shall conform to ASTM F 436, Type 1, with a minimum diameter of 2 inches and minimum thickness of 1/8 inch unless otherwise approved by the Contracting Officer.

2.7 COUPLINGS

Couplings shall be mechanical stop-type couplings capable of developing 125 percent of the ultimate tensile strength of the rock dowel or anchor bar and conforming to the requirements of the rock dowel or anchor bar manufacturer. Couplings shall not be used without the approval of the Contracting Officer.

2.8 MINE STRAPS AND MISCELLANEOUS ACCESSORIES

Steel mine straps and other miscellaneous steel accessories shall be products of a recognized manufacturer. They shall comprise steel mine straps, mine ties, roof channels, roof mats, among others, in various gauges and hot or cold rolled shapes with punched or cut bolt holes, which are attached to the rock surface by means of rock dowels.

SECTION 31 72 13.00 03 - Page 6

3.3 MISCELLANEOUS SUPPORT ELEMENTS

3.3.1 Steel Mine Straps

Steel mine strap supports for permanent rock support shall be furnished and installed at locations as directed or approved by the Contracting Officer.

Steel mine straps shall be field bent as necessary to conform to the rock surface and attached to the rock using rock dowels. The locations of permanent rock dowels may be adjusted as approved by the Contracting Officer for use in anchoring the straps. Installation of additional rock dowels, specifically for anchoring mine straps, may be as directed or approved by the Contracting Officer.