This document provides a schedule of upcoming federal contract opportunities with the U.S. Army Corps of Engineers. Key projects include demolition of residential buildings in Romeoville, Illinois with a target award value of $100,000 to $500,000; maintenance dredging of the federal channel in East Chicago, Indiana with a target award value of $5 million to $10 million; upgrading an electronic security system for dams along the Fox River in Appleton, Wisconsin with a target award value of $100,000 to $500,000; and storm water improvements in Portage, Indiana with a target award value of $1 million to $5 million. The schedule lists various construction, repair, and services projects across several Midwestern states with target solicitation and award dates from October 2023 through March 2024 and estimated contract values ranging from under $100,000 to over $25 million. Additionally, the related opportunity notice announces an open house by the Chicago District on April 4, 2024 to provide information on upcoming aquatic ecosystem restoration, lead remediation, water main replacement, and dredging opportunities with the Department of the Army Corps of Engineers.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name Title Location (City, State) Description Target Solicitation Target Award Estimated Contract Value

CSSC Electric Dispersal Barrier, IL Building Demolition Romeoville, IL Demolition of residential buildings near the barrier facility and removal of everything on site

Oct-23 Nov-23 $100k-$500k

Salamonie Lake, IN Guard Rail Replacement Largo, IN Readvertise FY23 solicitation to replace detrioriated guard rail at Salamonie Lake

Oct-23 Nov-23 $100k-$500k

Indiana Harbor, IN DREDGING East Chicago, IN Maintenance dredging (50k to 100k CY) of Federal channel and placement into the CDF.

Oct-23 Nov-23 $5M-$10M

Fox River, WI Electronic Security System Upgrade Appleton, WI Upgrade to the Electronic Security System (ESS) for the nine (9) dams along the Fox River

Nov-23 Dec-23 $100k-$500k

Calumet Region SEC 219 - Portage, IN STORM WATER IMPROVEMENT Portage, IN

Sewer rehabilitation of the Swanson Interceptor between Stone Avenue and Central Avenue. Up to 1,085 LF of 30-inch sewer and 2,645 LF of 36-inch sewer will be lined with cured in place pipe (CIPP) and up to 13 manholes will be rehabilitated.

Nov-23 Dec-23 $1M-$5M

Algoma Harbor, WI SOUTH BREAKWATER REPAIR Algoma, WI Breakwater repairs (1,620 LF south of the gap). Nov-23 Dec-23 $10M-$25M

CSSC Electric Dispersal Barrier, IL IIJA CSSC BARRIER FENCING AND PAVING Romeoville, IL Installation of non-conductive fencing for entire CSSC Barrier complex; paving access roadway and other areas of the facility.

Nov-23 Dec-23 $5M-$10M

Indiana Habor and Canal, IN Water Treatement East Chicago, IN Service Contract for treatment and discharge of water in the CDF to meeting water quality standard.

Nov-23 Dec-23 $5M-$10M

T. J. O'Brien Lock and Dam, IL Major Rehabilitation SCOUR PROTECTION Chicago, IL In-water placement of stone to fill and protect areas around the lock experiencing scour of the riverbed.

Dec-23 Jan-24 $1M-$5M

Waukegan Harbor, IL DREDGING Waukegan, IL Routine Approach and Advance Maintenance Dredging of 50k-80k CY.

Dec-23 Jan-24 $1M-$5M

Sturgeon Bay and Lake Michigan Ship Canal, WI MAINTENANCE OF COASTAL STRUCTURES FOR NAVIGATION Sturgeon Bay, WI Repair of south and north breakwaters (total of 2,688 LF). Repair will require armor stone placement and concrete repairs.

Jan-24 Feb-24 $1M-$5M

Fox River, WI REPAIR OF GOVERNMENT-OWNED WALL AT UPPER APPLETON DAM Appleton, WI Waterproofing the entire length (~500') of the wall both east and west of the powerhouse for the entire height, top of sidewalk down to bedrock.

Jan-24 Feb-24 $5M-$10M

Kenosha Harbor, WI MAINTENANCE OF COASTAL STRUCTURES FOR NAVIGATION Kenosha, WI Repair outer breakwater through placement of stone.

Jan-24 Feb-24 $5M-$10M

Michigan City Harbor, IN EAST PIER REPAIR Michigan City, IN

Placement of new armor stone and resetting of existing armor stone on the detached breakwater (300 LF); repair of the east pier by encapsulating the lakeward end with new steel sheet pile and replacing the concrete superstructure (30 LF).

Jan-24 Feb-24 $5M-$10M

Lockport Lock, IL Vertical Lift Gate Seal Procurement Lockport, IL Procure new gate seals for vertical lift gate Jan-24 Feb-24 $100k-$500k

Calumet Harbor and Milwaukee Harbor FY24 Annual Stone Procurement Chicago, IL & Milwaukee, WI

Stone procurement for Calumet and Milwaukee Harbor breakwater repairs by Lake Michigan Floating Plant

Feb-24 Mar-24 $2.5M-$5M

Mississinewa Lake, IN Replace Windows in Control Tower Peru, IN Remove and replace windows in main floor of control tower at Mississienwa Dam

Feb-24 Mar-24 <$100K

J. Edward Roush Lake, IN FY24-FY26 Mowing, Cleaning, and Herbicide Service IDIQ Huntington, IN Base plus two options years of mowing, recreation cleaning, office janitorial, and herbicide application

Feb-24 Mar-24 $100k-$500k

CHICAGO DISTRICT CONTRACT OPPORTUNITIES

1 of 3 10/25/2023

Project Name Title Location (City, State) Description Target Solicitation Target Award Estimated Contract Value

Mississinewa Lake, IN FY24-FY26 Mowing, Cleaning, and Herbicide Service IDIQ Peru, IN Base plus two options years of mowing, recreation cleaning, office janitorial, and herbicide application

Feb-24 Mar-24 $100k-$500k

Salamonie Lake, IN FY24-FY26 Mowing, Cleaning, and Herbicide Service IDIQ Lagro, IN Base plus two options years of mowing, recreation cleaning, office janitorial, and herbicide application

Feb-24 Mar-24 $100k-$500k

McCook Levee, Summit, IL (Sec 205) SHEET PILE FIX Summit, IL Structural repair of damaged steel sheetpile Feb-24 Mar-24 $1M-$5M

Green Bay Harbor, WI DREDGING Green Bay, WI

Dredging of deep draft commercial harbor.

Dredged material is currently placed in either the Bay Port disposal facility or in the Cat Island Dredged Material Disposal Facility.

Feb-24 Mar-24 $1M-$5M

Lockport Lock, IL Upper Machinery Pit Sealing Lockport, IL Waterproof and seal the 4 vertical lift gate machinery pits

Feb-24 Mar-24 $100k-$500k

J. Edward Roush Lake, Mississinewa, and Salamonie Lakes FY24-26 Asphalt Sealing IDIQ Huntington, IN, Peru, I Crack filling, sealing and stipe painting asphalt at offices and recreation areas, Mar-24 Apr-24 $100k-$500k

Lake Michigan Floating Plant Dry Dock Inspection of Floating Plant Kewaunee, WI Dry dock inspection of Lake Michigan Floating Plant Mar-24 Apr-24 $500K-$1M

Port Washington Harbor, WI NORTH BREAKWATER REPAIRS Port Washington, WI Adding stone to the existing breakwater. Mar-24 Apr-24 $500K-$1M

Salamonie Lake, IN NEW UPPER WABASH PROJECT OFFICE Lagro, IN Construction of new Wabash Project Office and Visitors Center; demolition of existing project office

Mar-24 Apr-24 $1M-$5M

J. Edward Roush Lake, IN Replace Exaust Fan at Markle Pump Plant Markle, IN Replace Exaust Fan at Markle Pump Plant Apr-24 May-24 <$100K Fox River, WI - Depere Depere - West Walkway repair DePere, WI Steel walkway and pier repairs Apr-24 May-24 $1M-$5M

Mississinewa Lake, IN Replace Deteriorating Gutters on Abutments Peru, IN Remove and replace deteriorating gutters along dam abutment

May-24 Jun-24 $100k-$500k

Mississinewa Lake, IN Repair Crest Road on Mississinewa Dam Peru, IN Mill and repave damaged portion of crest road along Mississinewa Dam

May-24 Jun-24 $100k-$500k

Honey Creek, WI (Sec 206) AQUATIC ECOSYSTEM RESTORATION Milwaukee, WI Ecosystem restoration of Honey Creek, including removal of existing concrete lining, stream meandering and native plantings

May-24 Jun-24 $10M-$25M

Lockport Lock, IL Vertical Lift Gate Supply & Material Lockport, IL Procure materials needed to reassemble buildings after gate replacement

May-24 Jun-24 $100k-$500k

Parcel J - Kaukauna, WI Lead Remediation Kaukauna, WI Contaminated soil removal Jun-24 Jul-24 $1M-$5M

Cook County SEC 219 - Matteson, IL WATERMAIN REPLACEMENT PHASE II Matteson, IL

Watermain replacement along Violet Lane beginning on Lindenwood Drive to cul-de-sac replacing 1,000 feet of 6-inch diameter water main, and replacing 500 feet of 6-inch diameter water main from the cul-de-sac to Carnation Lane.

Jul-24 Aug-24 $1M-$5M

Cook County SEC 219 - Glenwood, IL GLENWOOD WATER MAIN Glenwood, IL Additional infrastructure to support the redevelopment of the Halsted Street corridor

Jul-24 Aug-24 $1M-$5M

Fox River, WI - Little Kaukauna LIttle Kaukauna Gate and Trunnion repair Kaukauna, WI Replacement of gates and trunnions assemblies at Little Kaukauna dam

Jul-24 Aug-24 $1M-$5M

2 of 3 10/25/2023

Project Name Title Location (City, State) Description Target Solicitation Target Award Estimated Contract Value

Calumet Region SEC 219 - Gary Airport Authority, IN STORM WATER IMPROVEMENT Gary, IN Additional sewer capacity for new cargo logistics center and deicing apron east of the existing at the Gary Chicagi International Airport

Jul-24 Aug-24 $1M-$5M

Cook County SEC 219 - East Hazel Crest, IL WATER MAIN IMPROVEMENTS East Hazel Crest, IL Replacement of lead lines and installation of a segment of watermain

Aug-24 Sep-24 $500K-$1M

Cook County SEC 219 - Lemont, IL WATER MAIN IMPROVEMENTS Lemont, IL Replacement of existing 8" water main with 8" ductile iron water main and construction of 9 fire hydrants and 8 valves

Aug-24 Sep-24 $1M-$5M

Big Suamico River, WI HARBOR CHANNEL MAINTENANCE Suamico, WI Dredging 25,000 to 30,000 CY of material Aug-24 Sep-24 $500K-$1M

Calumet Region SEC 219 - Hebron, IN STORM WATER IMPROVEMENT Hebron, IN

Replacement of approximately 9,320 linear feet of 4-inch cast and ductile watermain with new 5,510 linear feet of 6-inch and 3,810 linear feet of 8-inch PVC water main pipes; replacement of 27 gate valves, 10 hydrants, service reconnects and surface restoration.

Aug-24 Sep-24 $1M-$5M

Cook County SEC 219 - Cicero, IL WATER MAIN IMPROVEMENTS Cicero, IL

Construction of a new 8" ductile iron water main on 31st Street from Laramie Avenue to the west, to 49th Avenue to the east, with a water main reconnection to the 16" feeder main on 53rd Avenue

Aug-24 Sep-24 $1M-$5M

CSSC Electric Dispersal Barrier, IL IIB Isolation Switches Romeoville, IL Installation of isolation switches for the IIB electrodes

Aug-24 Sep-24 $1M-$5M

CSSC Electric Dispersal Barrier, IL Railing Repair/Replacement Romeoville, IL Repair/Replacement of the railings along the canal Aug-24 Sep-24 $100k-$500k

Burns Waterway Harbor , IN DREDGING Portage, IN Routine Approach Channel Maintenance Dredging of 40k-80k CY.

Aug-24 Sep-24 $500K-$1M

Manitowoc Harbor, WI Manitowoc North & South Breakwater Repair Manitowoc , WI Breakwater grouting and Stone placement Aug-24 Sep-24 $5M-$10M

Michigan City Harbor, IN DREDGING & BREAKWATER REPAIR Michigan City, IN Routine Approach Channel Maintenance Dredging of 40k-80k CY.

Aug-24 Sep-24 $1M-$5M

T. J. O'Brien Lock and Dam East/West embankment raising Chicago, IL Raise embankments to design elevation; place rip rap on small section of shoreline

Aug-24 Sep-24 $1M-$5M

T. J. O'Brien Lock and Dam, IL Major Rehabilitation Septic system replacement Chicago, IL Replace exisitng septic system and storm water management from CCS

Aug-24 Sep-24 $500K-$1M

Fox River, WI - Depere DePere - Right Abutment repair DePere, WI Abutment wall repair Fall 2024 Fall 2024 $1M-$5M Fox River, WI - Kaukauna Kaukauna - Right Abutment repair Kaukauna, WI Abutment wall repair Fall 2024 Fall 2024 $1M-$5M

South Branch Pike River, WI (Sec 206) RESTORATION Kenosha, WI Ecosystem restoration of Pike River, including stream meandering and native plantings

Fall 2024 Fall 2024 $10M-$25M

Horlick Dam, WI (Sec 506 - GLFER) DAM REMOVAL Racine, WI Removal of Horlick Dam and re-establishment of hydrology

Summer 2025 Summer 2025 $1M-$5M