This is a detailed bid schedule/pricing template for the Chickamauga Lock Replacement Approach Wall and Decommissioning Project in Chattanooga, TN, with a base contract and three options. The schedule breaks down required work items across multiple construction divisions including general requirements, existing conditions, concrete work, metals, earthwork, electrical systems, and waterway construction.

The base contract focuses on riverside wall construction, spillway demolition, and initial decommissioning work. Option 1 covers landside wall construction. Option 2 includes mooring cell work and cofferdam removal. Option 3 encompasses lock decommissioning, site restoration, utilities installation, and commissioning activities. Key quantities include over 42,000 CY of structural concrete, 835 tons of reinforcing steel, extensive electrical systems work, and comprehensive site preparation. The related pre-solicitation notice indicates this is an unrestricted procurement estimated between $250-500 million, with an anticipated award in Q4 FY2025. A Project Labor Agreement is required, and a pre-proposal site visit is scheduled for February 20, 2025.

View the file

Other files

File Type Posted
US Citizens Security Access Form.pdf PDF
FN Contractor Security Access Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bidding Schedule

BIDDING SCHEDULE
Approach Wall and Lock Decommissioning
Chickamauga Lock Replacement
Ready to Advertise (RTA)
New AWD Bid Sheet
Base Contract
BID ITEMDESCRIPTIONSPECIFICATION NUMBEREST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

01Div 01 GENERAL REQUIREMENTS
00-0101Formal Partnering Meeting01 00 001JB$$
00-0102Helper Boat01 00 001JB$$
00-0103Mobilization and Demobilization01 22 001JB$$
00-0104Premiums for Performance and Payment Bonds01 22 001JB$$
00-0105Railroad Flagman01 22 001JB$$
00-0106Data Management01 31 001JB$$
00-0107Maintenance and Protection of Traffic01 50 001JB$$
00-0108Maintain QA Testing Lab and QA Field Office01 50 001JB$$
00-0109Diversion and Care of Water01 57 241JB$$
00-0110As-Built Drawings01 78 001JB$$
00-0111Commissioning - Individual System Testing01 91 131JB$$
00-0112Commissioning - Fully Integrated System Testing01 91 131JB$$
02Div 02 EXISTING CONDITIONS
00-0201AAOverburden Drilling02 32 00200LF$$
00-0201ABOverburden Drilling - OVER 200 LF02 32 00100LF
00-0202Overburden - Split Spoon Sampling02 32 00135EA$$
00-0203Verification Core Drilling, Vertical Holes HQ02 32 0072LF$$
00-0204Core Drilling, Vertical Holes02 32 00125LF$$
00-0205Lab Testing- Direct Shear02 32 0020EA$$
00-0206AADownhole Imaging02 32 00290LF$$
00-0206ABDownhole Imaging - OVER 290 LF02 32 00100LF
00-0207Segmental Cofferdam Modifications - Standard Light and Fixture Removal, and instrumentation02 41 13 and 02 41 171JB$$
00-0208Demolition of Spillway Deck and Piers02 41 171JB$$
00-0209Demolition and Disposal of Spillway Gate02 41 171EA$$
00-0210Removal of Spillway Gates (4) and Disposal of Gates (2) to Include Salvaging Components02 41 174EA$$
00-0211Cofferdam Removal - Phase 1 (Drawing 61W510-11)02 41 181JB$$
00-0212Downstream Cofferdam Stability Berm Removal and Downstream approach material removal02 41 181JB$$
03Div 03 CONCRETE
00-0301Waterstop03 15 141JB$$
00-0302Reinforcing Steel - Material03 20 02100Ton$$
00-0303Place Rebar03 20 02100Ton$$
00-0304Drill and Grout #11 Dowels; Monolith M1 Second Placement03 20 0225EA$$
00-0305Cement, Type II, MH - Low Alkali and Moderate Heat03 30 011200Ton$$
00-0306Class F Fly Ash03 30 01900Ton$$
00-0307Tremie Concrete (5ksi)03 31 072000CY$$
00-0308Downstream Government Directed Additional Tremie Concrete03 31 0735CY$$
00-0309Downstream Install Precast Beams and Appurtenances - Riverside Wall03 41 341JB$$
00-0310Upstream Install Precast Beams and Appurtenances03 41 341JB$$
00-0311Upstream Skirt Panels and Appurtenances03 41 341JB$$
00-0312Structural Concrete (5ksi)03 70 002000CY$$
00-0313Pier Concrete (5.5ksi)03 80 002395CY$$
00-0314Precast Beams Non-destructive Testing03 41 341JB$$_____________
00-0315Precast Beams Crack Repair - Riverside Wall03 41 341600LF$$_____________
00-0316Precast Beams Defect Repair - Riverside Wall03 41 341600SF$$_____________
00-0317Precast Beams Surface Coating - Riverside Wall03 41 3436000SF$$_____________
00-0318Block 45 Stairs - Construct Landing and Install Precast Stairs03 70 001JB$$_____________
05Div 05 METALS
00-0501Spillway Operating Deck Access Stairway05 51 001JB$$
00-0502Crane Stops05 50 141JB$$
00-0503Nose Pier and Intermediate Pier Metals - Riverside Wall05 59 201JB$$
00-0504Steel Setting Piles - Riverside Wall05 50 14385LF$$
00-0505Miscellaneous Metal05 50 151JB$$
00-0506Wall Armor05 50 151JB$$
00-0507Prefabricated Guardrail Installation05 50 15450LF$$
09Div 09 FINISHES
00-0901Painting - Upstream Approach Wall Nose Pier Stripes09 97 001JB$$
10Div 10 SPECIALTIES
00-1001Permanent Exterior Signage10 14 03 and 10 14 041JB$$
00-1002Temporary pump for fire protection system1JB$
00-1003Fire Sprinkler System10 44 171JB$$
00-1004Plumbing System10 44 171JB$$
00-1005Operations Building Commissioning10 44 171JB$$
13Div 13 SPECIAL CONSTRUCTION
00-1301Instrumentation Installation and Commissioning13 50 001JB$$
00-1302Instrumentation Monitoring Program13 50 001JB$___________________________$_______________
25Div 25 CYBER SECURITY
00-2501Cyber Security Requirements and Validation25 05 111JB$$
26Div 26 ELECTRICAL
00-2601Replacement Lock Upstream Approach Wall Electrical Systems26 00 001JB$$
00-2602Replacement Lock Downstream Approach Wall Electrical Systems - Riverside Wall26 00 001JB$$
00-2603Post-Spillway Demolition Grounding System Connection26 00 001JB$$
00-2604Post-Spillway Demolition Electrical Systems Repair26 00 001JB$$
00-2605Replacement Lock Exterior Lighting26 56 001JB
28Div 28 ELECTRONIC SAFETY AND SECURITY
00-2801Security CCTV System28 23 231JB$$
31Div 31 EARTHWORK
00-3101Install Downstream Approach Wall Intermediate Piers - Riverside Wall31 32 232EA$$
00-3102Install Downstream Approach Wall Nose Piers - Riverside Wall31 32 231EA$$
00-310348" Downstream Approach Wall Pier Guide Pipe Pile Rock Sockets - Riverside Wall31 63 28145LF$$
00-3104Furnish and Install Post Tensioned Anchors31 68 153040LF$$
00-3105Additional Performance Tests31 68 153EA$$
00-3106Additional Proof Tests31 68 153EA$$
00-3107Additional Watertightness Testing31 68 1516EA$$
00-3108Consolidation Grouting31 68 152337CF$$
00-3109Redrilling Consolidation Grout31 68 151952LF$$
00-3110Government Requested Standby - Consolidation Grouting31 68 1532HR$$
00-3111Supplementary Extended Creep Tests31 68 154EA$$
00-3112Earth Retention System for Thrust Block - Design31 23 051JB$$
32Div 32 EXTERIOR IMPROVEMENTS
00-3201Flagpole ConstructionVarious1JB$$
33Div 33 UTILITIES
00-3301Medium Voltage Distribution - Bay 5 to Lock33 71 021JB$$
00-33022-inch Tempoary Domestic Water Line for Operations Building (routed across channel)33 11 001JB$$
00-33038-inch Temporay Fire Protection Line for Operations Building (routed across channel)33 11 001JB$$
00-3304Temporary sanitary sewer facility for Operations Building (Contractor determined/provided)33 11 001JB$$
35Div 35 WATERWAY AND MARINE CONSTRUCTION
00-3501Tow Haulage Systems - Procurement of all tow haulage components35 01 411JB$$
00-3502Tow Haulage Installation and Acceptance Test - Upstream35 01 411JB$$
00-3503Lock Machinery35 08 401JB$$
00-3504Floating Mooring Bitts35 08 401JB$$
00-3505Compressed Air System35 08 401JB$$
00-3506Miter Gate Spray System35 08 401JB$$
00-3507Service Water System35 08 401JB$$
00-3508Lock Gallery Sump Pump System35 08 401JB$$
00-3509Downstream Pier Excavation35 20 24450CY$$

TOTAL ESTIMATED AMOUNT $

Page &P of &N

Option 1 Bidding Schedule

BIDDING SCHEDULE
Approach Wall and Lock Decommissioning
Chickamauga Lock Replacement
Ready to Advertise (RTA)
New AWD Bid Sheet
Option 1
BID ITEMDESCRIPTIONSPECIFICATION NUMBEREST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

01Div 01 GENERAL REQUIREMENTS
01-0101Formal Partnering Meeting01 00 001JB$$
01-0102Helper Boat01 00 001JB$$
01-0103Mobilization and Demobilization01 22 001JB$$
01-0104Premiums for Performance and Payment Bonds01 22 001JB$$
01-0105Railroad Flagman01 22 001JB$$
01-0106Data Management01 31 001JB$$
01-0107Maintenance and Protection of Traffic01 50 001JB$$
01-0108Maintain QA Testing Lab and QA Field Office01 50 001JB$$
01-0109As-Built Drawings01 78 001JB$$
01-0110Commissioning - Individual System Testing01 91 131JB$$
01-0111New item Option 1 comissioning, (Tow haulage and electrical on the approach walls)01 91 131JB$$
02Div 02 EXISTING CONDITIONS
01-0201Verification Core Drilling, Vertical Holes HQ02 32 00168LF$$
01-0202Lab Testing- Direct Shear02 32 0020EA$$
01-0203Protection Cell Removal02 41 181JB$$
03Div 03 CONCRETE
01-0301Reinforcing Steel - Material03 20 02115Ton$$
01-0302Place Rebar03 20 02115Ton$$
01-0303Cement, Type II, MH - Low Alkali and Moderate Heat03 30 011500Ton$$
01-0304Class F Fly Ash03 30 011250Ton$$
01-0305Tremie Concrete (5ksi)03 31 074000CY$$
01-0306Downstream Government Directed Additional Tremie Concrete03 31 0765CY$$
01-0307Downstream Install Precast Beams and Appurtenances - Landside Wall03 41 341JB$$
01-0308Pier Concrete (5.5ksi)03 80 004100CY$$
01-0309Precast Beams Crack Repair - Landside Wall03 41 342400LF$$
01-0310Precast Beams Defect Repair - Landside Wall03 41 342400SF$$
01-0311Precast Beams Surface Coating - Landside Wall03 41 3454000SF$$
05Div 05 METALS
01-0501Nose Pier and Intermediate Pier Metals - Landside Wall05 59 201JB$$
01-0502Steel Setting Piles - Landside Wall05 50 14815LF$$
01-0503Miscellaneous Metal05 50 151JB$$
01-0504Wall Armor05 50 151JB$$
10Div 10 SPECIALTIES
01-1001Permanent Exterior Signage10 14 03 and 10 14 041JB$$
13Div 13 SPECIAL CONSTRUCTION
01-1301Instrumentation Monitoring Program13 50 001JB$$
01-1302Instrumentation Installation13 50 501JB$___________________________$_______________
26Div 26 ELECTRICAL
01-2601Replacement Lock Downstream Approach Wall Electrical Systems - Landside Wall26 00 001JB$$
01-2602Replacement Lock Exterior Lighting26 56 001JB$$
28Div 28 ELECTRONIC SAFETY AND SECURITY
01-2801Lock Operations CCTV System28 23 231JB$$
31Div 31 EARTHWORK
01-3101Install Downstream Approach Wall Intermediate Piers - Landside Wall31 32 236EA$$
01-3102Install Downstream Approach Wall Nose Piers - Landside Wall31 32 231EA$$
01-310348" Downstream Approach Wall Pier Guide Pipe Pile Rock Sockets - Landside Wall31 63 28305LF$$
35Div 35 WATERWAY AND MARINE CONSTRUCTION
01-3501Tow Haulage Installation and Acceptance Test - Downstream35 01 411JB$$
01-3502Downstream Pier Excavation35 20 24915CY$$

TOTAL ESTIMATED AMOUNT $

Option 2 Bidding Schedule

BIDDING SCHEDULE
Approach Wall and Lock Decommissioning
Chickamauga Lock Replacement
Ready to Advertise (RTA)
New AWD Bid Sheet
Option 2
BID ITEMDESCRIPTIONSPECIFICATION NUMBEREST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

01Div 01 GENERAL REQUIREMENTS
02-0101Mobilization and Demobilization01 22 001JB$$
02-0102Premiums for Performance and Payment Bonds01 22 001JB$$
02-0103Data Management01 31 001JB$$
02-0104Maintenance and Protection of Traffic01 50 001JB$$
02-0105Maintain QA Testing Lab and QA Field Office01 50 001JB$$
02-0106As-Built Drawings01 78 001JB$$
02Div 02 EXISTING CONDITIONS
02-0201Demolition of Mooring Cells02 41 174EA$$
02-0202Cofferdam Removal - Phase 2 (Drawing 61W510-11)02 41 181JB$$
03Div 03 CONCRETE
01-0301Cement, Type II, MH - Low Alkali and Moderate Heat03 30 0120Ton$$
01-0302Class F Fly Ash03 30 0120Ton$$
01-0303Tremie Concrete (5ksi)03 31 0790CY$$
09Div 09 FINISHES
02-0901Painting - Mooring Cells09 97 001JB$$
10Div 10 SPECIALTIES
02-1001Permanent Exterior Signage10 14 03 and 10 14 041JB$$
13Div 13 SPECIAL CONSTRUCTION
01-1301Instrumentation Monitoring Program13 50 001JB$$
31Div 31 EARTHWORK
02-3101Mooring Cell Aggregate Fill31 00 001JB$$
02-3102Redrilling Grouted Holes31 32 12575LF$$
02-3103Metal Sheet Piling31 41 161JB$$
02-3104Construction of Mooring Cells31 41 162EA$$

TOTAL ESTIMATED AMOUNT $

Option 3 Bidding Schedule

BIDDING SCHEDULE
Approach Wall and Lock Decommissioning
Chickamauga Lock Replacement
Ready to Advertise (RTA)
New AWD Bid Sheet
Option 3
BID ITEMDESCRIPTIONSPECIFICATION NUMBEREST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

01Div 01 GENERAL REQUIREMENTS
03-0101Formal Partnering Meeting01 00 001JB$$
03-0102Mobilization and Demobilization01 22 001JB$$
03-0103Premiums for Performance and Payment Bonds01 22 001JB$$
03-0104Data Management01 31 001JB$$
03-0105Maintenance and Protection of Traffic01 50 001JB$$
03-0106Maintain QA Testing Lab and QA Field Office01 50 001JB$$
03-0107Diversion and Care of Water01 57 241JB$$
03-0108As-Built Drawings01 78 001JB$$
03-0109Commissioning - Individual System Testing01 91 131JB$$
02Div 02 EXISTING CONDITIONS
03-0201Verification Core Drilling, Vertical Holes HQ02 32 00455LF$$
03-0202Core Drilling, Vertical Holes02 32 00120LF$$
03-0203Downhole Imaging02 32 00650LF$$
03-0204Concrete Conduit Box Removal02 41 131JB$$
03-0205Existing Pullbox Modifications02 41 131JB$$
03-0206Contractor Access Ramp and Work Bench Restoration02 41 131JB$$
03-0207Maintenance shop existing access demolition02 41 131JB$$
03-0208Maintenance shop parking lot milling for Resurfacing02 41 131JB$$
03-0209Existing 24 inch CMP demolition (61W525-03-AWD)02 41 131JB$$
03-0210Toe Drain & Manhole Demolition (61W525-03-AWD)02 41 131JB$$
03-0211Dam Toe Light Pole Removal (61W525-03-AWD)02 41 131JB$$
03-0212Overhead electrical line removal (61W525-04-AWD)02 41 131JB$$
03-0213Eastern Lake Access Stripping02 41 131JB$$
03-0214Trailhead Parking Lot Milling (61W525-06-AWD)02 41 131JB$$
03-0215Contractor Parking lots Stripping as required (61W525-07-AWD)02 41 131JB$$
03-0216Existing Maintenance BLDG Canopy Shed Demolition02 41 131JB$$
03-0217Demolition of Existing Lock Machinery02 41 171JB$$
03-0218Demolition of Existing Lock Operations Building02 41 171JB$$
03-0219Demolition and Relocation of Existing Lock Upper Guidewall Beams and Piers Above EL 660.002 41 171JB$$
03-0220Place Rock Fill in Existing Lock Recesses02 41 171JB$$
03-0221Salvage of Floating Mooring Bitts02 42 911JB$$
03-0222Salvage of the Culvert Valves02 42 911JB$$
03-0223Remediation and Restoration of the Electrical Service RoomsVarious1JB$$
03-0224Remediation and Restoration of the Hazmat RoomVarious1JB$$
03-0225Strip or Cover of Operations Building and Parking Lot AreaVarious1JB$$
03-0226Catch basin and drain removal (61W525-2-AWD)02 42 911JB$$
03-0227Trailhead Drive Milling, Stripping and Roadbed Preparation02 42 911JB$$
03-0228Trailhead Drive Parking Lot Milling in Preparation for Resurfacing (61W525-04-AWD)02 42 911JB$$
03-0229Trailer Removal X 2 and Foundation Demolition (61W525-04-AWD)Various1JB$$
03-0230Trailer Relocation x 1 and Foundation Demolition (61W525-04-AWD)Various1JB$$
03-0231Future Greenway Area Stripping32 92 191JB$$
03-0232Stripping of area west of Maintenance Shop32 92 191JB$$
03-0233Resident Engineer Office Milling02 41 131JB$$
03-0234Decommisioning and Demolition of Existing Lift StationDrawings1JB$$
03Div 03 CONCRETE
03-0301Waterstop03 15 141JB$$
03-03022" LDPE Foam Expansion Joint03 15 141JB$$
03-0303Reinforcing Steel - Material03 20 02835Ton$$
03-0304Place Rebar03 20 02835Ton$$
03-0305Drill and Grout #6 Dowels; Waterstop Recess03 20 0272EA$$
03-0306Drill and Grout #8 Dowels; Existing Culverts and Cable Tunnel03 20 0226EA$$
03-0307Cement, Type II, MH - Low Alkali and Moderate Heat03 30 018300Ton$$
03-0308Class F Fly Ash03 30 015600Ton$$
03-0309Roughen Concrete Surface in Culverts and Cable Tunnel03 30 048045SF$$
03-0310Tremie Concrete (5ksi)03 31 07450CY$$
03-0311Culvert Valve and Cable Tunnel Plugs03 31 07 and 03 80 001700CY$$
03-0312Inspection Shafts03 41 33 and 03 80 001JB$$
03-0313Contact Grout for Culverts and Cable Tunnel Plugs03 61 00230CF$$
03-0314Structural Concrete (5ksi)03 70 0042000CY$$
03-031510in. Paved Portland cement pavement (4 ksi) with dowels03 70 014050SY$$
03-0316Culvert Valve Display Slab (4 ksi)03 70 011JB$$
03-0317Operations Lot 30 x 50 ft Concrete Slab (4 ksi)03 70 011JB$$
03-0318Miscellaneous Concrete (3ksi)03 70 011100CY$$
03-0319Pier Concrete (5.5ksi)03 80 005CY$$
03-0320Concrete Slot Cutting03 81 191JB$$
05Div 05 METALS
03-0501Miscellaneous Metal05 50 151JB$$
03-0502Prefabricated Guardrail Installation05 50 15450LF$$
07Div 07 THERMAL AND MOISTURE PROTECTION
00-0701Operations Building - Waterproofing07 13 531JB$$
09Div 09 FINISHES
03-0901Painting - Hazmat Room09 97 001JB$$
03-0902Painting - Electrical Service Rooms09 97 001JB$$
10Div 10 SPECIALTIES
03-1001Permanent Exterior Signage10 14 03 and 10 14 041JB$$
03-1002Fire Sprinkler System10 44 171JB$$
03-1003Plumbing System10 44 171JB$$
03-1004Operations Building Commissioning10 44 171JB$$
13Div 13 SPECIAL CONSTRUCTION
01-1301Instrumentation Monitoring Program13 50 001JB$$
03-1302Instrumentation Installation13 50 001JB$$
03-1303Instrumentation Maintenance and Modifications - Existing Lock13 50 001JB
03-1304Cylinder Storage Building13 34 19.06 and others1JB$$
03-1305Crane Storage Shed Construction (61W525-24-AWD)Various1JB$$
23Div 23 HEATING, VENTILATIONS, AND AIR CONDITIONING (HVAC)
03-2301Testing, Adjusting, and Balancing (TAB)23 05 951JB$$
03-2302Heating and Ventilation Equipment - Cylinder Storage BuildingDivision 23, Section 08 91 001JB$$
03-2303Heating and Ventilation Equipment - Hazmat RoomDivision 23, Section 08 91 001JB$$
03-2304Heating and Ventilation Equipment - Electrical Service RoomsDivision 23, Section 08 91 001JB$$
25Div 25 CYBER SECURITY
03-2501Cyber Security Requirements and Validation25 05 111JB$$
26Div 26 ELECTRICAL
03-2601HAZMAT Room Electrical Systems/Lighting26 00 00/26 51 00.061JB$$
03-2602Site Exterior Lighting26 56 001JB$$
03-2603Landside Electrical Room Systems/Lighting26 00 00/26 51 00.061JB$$
03-2604Riverside Electrical Room Systems/Lighting26 00 00/26 51 00.061JB$$
03-2605Existing Maintenance Building Interior Electrical Systems26 00 001JB$$
03-2606Cylinder Storage Building Interior Electrical Systems/Lighting26 20 00.00 06/26 51 00.00 061JB$$
03-2607Relocation of Miscellaneous Electrical Systems On Existing Lock26 20 00/33 71 021JB$$
03-2608Repair of Existing Lock Grounding System Post Slot Cutting33 71 021JB$$
27Div 27 COMMUNICATIONS
03-2701Fiber Optic Data Transmission System - Maintenance Building27 21 101JB$$
03-2702Fiber Optic Data Transmission System - Cylinder Storage Building27 21 101JB$$
03-2703Fiber Optic Data Transmission System - Site ESS27 21 101JB$$
03-2704Telecom Cabling System - Maintenance Building27 21 101JB$$
03-2705Telecom Cabling System - Cylinder Storage Building27 21 101JB$$
28Div 28 ELECTRONIC SAFETY AND SECURITY
03-2801ESS/Access Control - Site Perimeter and Buildings28 20 011JB$$
03-2802Security CCTV System28 23 231JB$$
03-2803Fire Detection System - HAZMAT Room28 31 00 / 28 31 641JB$$
03-2804Fire Detection System - Maintenance Building28 31 00 / 28 31 641JB$$
03-2805Fire Detection System - Cylinder Storage Building28 31 00 / 28 31 641JB$$
31Div 31 EARTHWORK
03-3101Manage, and Place Material for New Maintenance Shop Ramp31 00 001JB$$
03-3102Earthwork for Operations Parking Lot Area31 00 001JB$$
03-3103Manage, and Place Material for Maint. Shop lot and Thrust Block access31 00 001JB$$
03-3104Manage, and Place Material for New Operations Building Ramp31 00 001JB$$
03-3105Maintenance Ramp Retaining Wall Construction (61W525-15-AWD)31 00 001JB$$
03-3106Manage, and Place Downstream Lock Chamber Fill31 00 001JB$$
03-3107Manage, and Place Upstream Lock Chamber Fill31 00 001JB$$
03-3108Geotextile Installations31 05 2213000SY$$
03-3109Rock Excavation31 23 056034CY$$
03-3110Dental Excavation (15% surface area)31 23 05247CY$$
03-3111Line Drilling (6" Spacing)31 23 05844SY$$
03-3112Thrust Block Overburden Excavation31 23 0518325CY$$
03-3113Redrilling Grouted Holes31 32 12575LF$$
03-3114Drill Grout Holes in Rock31 32 238,068LF$$
03-3115Pressure Washing (Hydraulic)31 32 2372HR$$
03-3116Pressure Testing (Hydraulic)31 32 23884EA$$
03-3117Grout Mixes31 32 231,195CY$$
03-3118Placing Grout31 32 231,195CY$$
03-3119Government Requested Standby - Grouting31 32 2324HR$$
03-3120Dental Concrete31 60 00247CY$$
03-3121Foundation Preparation31 60 001645SY$$
03-3122Impervious Liner (Seepage Barrier)31 00 001JB$$
03-3123Earth Retention System for Thrust Block - Construction31 23 051JB$$
32Div 32 EXTERIOR IMPROVEMENTS
03-3201Aggregate Base Course Grade D32 11 233175Ton$$
03-3202TDOT Crushed stone32 11 233000Ton$$
03-3203TDOT #57 Stone32 11 231350Ton$$
03-3204TDOT #2 Stone32 11 233715Ton$$
03-3205Asphalt Pavement - Binder Course AC (PG64-22) GR "B-M2"32 12 163550Ton$$
03-3206Asphalt Pavement - Wearing Course ACS (PG64-22) GR "D"32 12 161680Ton$$
03-3207Pavement Markings32 17 241JB$$
03-3208Final Security Fencing32 31 131JB$$
03-3209Main Access Gate Installation32 31 131EA$$
03-32106-Foot Personnel Gate Installation32 31 131EA$$
03-321112-Foot Personnel Gate Installation32 31 131EA$$
03-3212Double Swing Gate Installation32 31 131EA$$
03-3213Barrier Swing Gate Installation32 31 131EA$$
03-3214Greenway (Contractor Laydown Area) Temp, and Perm, Seeding32 92 191JB$$
03-3215Designated Disposal Area Temp. and Permanent Seeding32 92 191JB$$
03-3216Operations Parking Lot Area Temp, and Permanent Seeding32 92 191JB$$
03-3217Contractor Parking Lot North of RE Office Temp, and Permanent Seeding32 92 191JB$$
03-3218Topsoil32 92 1919000TN$$
03-3219Tree Plantings32 93 0030EA$$
03-3220Shrub Plantings32 93 00400EA$$
33Div 33 UTILITIES
03-33012-inch Domestic Water Line for Operations Building33 11 001JB$$
03-3302FDC Connection for Ops Building33 11 001EA$$
03-33038-inch Fire Protection Line for Operations Building33 11 001JB$$
03-33046-inch Fire Protection Line for the Operations Building33 11 001JB$$
03-3305Fire hydrant assemblies33 11 002EA$$
03-33068-inch Fire Protection Line for Maintenance Building33 11 001JB$$
03-33072 in. Force Main Sewer from Operations Building33 30 001JB$$
03-3308Site Electrical Distribution - Maintenance Building33 71 021JB$$
03-3309Site Electrical Distribution - Cylinder Storage Building33 71 021JB$$
03-3310Site Electrical Distribution - Landside Electrical Room33 71 021JB$$
03-3311Site Electrical Distribution - Site ESS/Perimeter33 71 021JB$$
03-331230 in. Class IV RCP33 11 0070LF$$
03-331324 in. Class IV RCP33 11 00779LF$$
03-331424 in. Class III RCP33 11 00100LF$$
03-331512 in. Smooth Wall HDPE (toe drain)33 11 00560LF$$
03-3316Construction and Commissioning of New Lift Station33 30 001JB$$
34Div 34 TRANSPORTATION
03-3401Curb Construction34 71 13325LF$$
03-3402Guardrail Installation34 71 131200LF$$
03-3403Parking Bumpers34 71 1335EA$$
03-3404Bollards34 71 1320EA$$
35Div 35 WATERWAY AND MARINE CONSTRUCTION
03-3501Furnish, Manage, and Place TDOT Class C RiprapVarious2500TN$$
03-3502Furnish, Manage, and Place TDOT Class B RiprapVarious1600TN$$
03-3503Furnish, Manage, and Place TDOT Class A RiprapVarious1500TN$$
46Div 46 WATER AND WASTEWATER EQUIPMENT
03-4601Aerating Fountain Construction46 51 00.00 101JB$$