This document is an amendment to Solicitation W912P524Q0049 for the purchase of playground equipment for the Lake Barkley Recreation Area. The purpose of the amendment is to provide responses to questions received from industry regarding the solicitation requirements.
The solicitation is for a firm-fixed price supply contract for the supply and installation of playground equipment. The contract will be awarded to the responsible offeror whose quote conforms to the minimum requirements and offers the best overall value based on factors such as compliance, design, equipment quality, and price. The period of performance is 90 calendar days from contract award. The place of delivery is the Cadiz Recreation Area in Cadiz, Kentucky. The amendment addresses questions related to timeline flexibility, surfacing requirements, ADA compliance, and equipment specifications. Notably, the government indicates the period of performance will remain at 90 days, and that excavation and site preparation will be handled prior to the playground installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Playground Site - BAR Playground.pdf | ||
| W912P524Q0049 - BAR Playground Purchase (4 Sep 24).pdf | ||
| Price Schedule - BAR Playground.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD42271399
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT: Martin's Fork Resource Management Complex Custodial Services PURPOSE: the purpose of this Amendment is to:
1) Provide Government responses to questions received from Industry.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Sep-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P524Q0049
X 9B. DATED (SEE ITEM 11)
04-Sep-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2024
CODE
CELRN-CT CONTRACTING BRANCH
110 9TH AVE S STE A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P524Q0049
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND RESPONSES
QUESTIONS AND RESPONSES
1. A 90-day timeframe for completion might be a little quick seeing that manufacturing the equipment can take up to 14 weeks from the time it is ordered plus ship time and installation. Also, that would put the installation in the middle of winter which might affect the install process. Is there a chance that the completion deadline would be extended? Is there flexibility here in the event some parts needed are unavailable and has a period of waiting to arrive from the manufacturer?
Government Response: The period of performance will remain at 90 days. If the main structure is installed within 90 days and a few parts/features are delayed, we could potentially mod the contract to allow a few extra weeks to address these punch list items.
2. How is the surfacing going to meet the existing site? Is the surfacing going to be level with a sidewalk or grass area? If so, does the total price have to include excavation, hauling, removal of the dirt? Or is this part of the surfacing bid?
Government Response: This solicitation does not include any excavation (apart from post holes), hauling, or removal of dirt. Prior to the new playground install, the government will remove the old equipment and the area will be filled and graded to within 6” of final surfacing grade. This will allow the surfacing contactor the ability to place rock and install surfacing material to the appropriate grade to match equipment.
3. If one firm is doing the equipment and one is doing the surfacing, if excavation is needed it would have to happen before the playground equipment can be installed. Would the surfacing firm be able to accommodate that?
Government Response: See answer to question 2. Area will be excavated and graded by the government prior to playground installation.
4. When would the surfacing firm be chosen? Different PIP surfacing especially from different vendors can vary in depth of what is required because of product differences. The correct depth would need to be known prior to installing any equipment so it will meet the surfacing properly. Especially if there are ADA ramps that do not allow for any variations up or down.
Government Response: See answer to question 2.
5. Given the elements on the bid for the play equipment, I feel this is going to be a custom design. Is there a chance for a little more time on the bid date to accommodate designing and completing renderings for a custom structure?
Government Response: Submission date remain 18 September.
6. My main manufacturer uses a 4.5-inch OD post for the main structures, they use a 5-inch OD post for the one post swings, but I prefer the Arch Post Swings which have two supports per swing beam leg, but they are 3.5 OD. Would these post sizes meet the requirements?
Government Response: Refer to solicitation. 5” OD posts are not a minimum requirement, but larger diameter and thicker gauge posts will be evaluated more favorably.
7. Is the ADA compliance for the first level only or will it apply to the entire playground design?
Government Response: ADA compliance applies to the ground level features and the first level of the playground structure. The 2nd and 3rd levels (if included in the design) are not required to be wheelchair accessible.
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
W912P524Q0049
CLIN 0001
The CLIN extended description has changed from:
Partnership Funds
To:
Partnership Funds NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent..
(End of Summary of Changes)
File details come from the government source that posted it. Updated .