This solicitation is for a firm fixed-price construction contract between $100,000 and $250,000 to renovate two office trailers at the Kentucky Lock Resident Office in Grand Rivers, KY. The scope of work includes removing existing modular workstations and installing new workstations, kitchenette, and restrooms in one trailer. In the other trailer, work includes adding one workstation, renovating a restroom, and installing a television antenna. The solicitation is 100% set aside for small business and NAICS coded 236220. Quotes are due by 2:00 PM local time on January 25, 2024. The period of performance is 120 calendar days after notice to proceed. A site visit is scheduled for January 17, 2023 at 1000 hrs local time. The solicitation includes terms for bonds, insurance, system for award management registration, and other standard contract clauses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD32777999
PROJECT TITLE: QA & RE OFFICE RENOVATION
TYPE OF CONTRACT: Firm Fixed-Price Construction Contract
DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: Betw een $100,000 and $250,000
NAICS: 236220 - Commercial and Institutional Building Construction
SIZE STANDARD: $45,000,000
TYPE OF SET-ASIDE: 100% Total Small Business
ROBERT T ALLMAN 615-736-2759
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
12-Jan-2024
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________25 Jan 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CELRN-RC-N CONTRACTING BRANCH
110 9TH AVE SOUTH, A405
NASHVILLE TN 37203
W912P5
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(615) 736-7124FAX:TEL: (615) 736-5679 TEL: FAX:
W912P524Q0003 48
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
KY LOCK RESIDENT OFFICE EXPANSION
FFP
See Price Schedule FOB: Destination
MILSTRIP: W38XDD32777999
PURCHASE REQUEST NUMBER: W38XDD32777999
PSC CD: Z2AA
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 120 dys. ANP 1 KENTUCKY LOCK ADDITION RES OFC
EMORY PERKINS
193 TAYLOR PARK ROAD
GRAND RIVERS KY 42045
FOB: Destination
W912P5
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017
CLAUSES INCORPORATED BY FULL TEXT
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- 17 January 2023 at 1000 hrs. Local Time
(c) Participants will meet at-- 193 Taylor Park Road, Grand Rivers, KY 42045
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
The full text of FAR clauses and provisions can be found at https://www.acquisition.gov/
The full text of DFARS clauses and provisions can be found at https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
NONE
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 21 13 - Instructions to Bidders
INSTRUCTIONS TO OFFERORS
SECTION 00 21 00
INSTRUCTIONS TO OFFERORS
1.0 GENERAL REQUIREMENTS
1.1 Intent
This solicitation is to award one (1) construction contract for the QA & RE Office Renovation, Grand Rivers, Kentucky.
1.2 Project Description
The scope of this requirement is the renovation of two existing field offices, including the purchase and installment of new office workstations, located at the Kentucky Lock Resident Office (KLRO) compound at 193 Taylor Park Road, Grand Rivers, KY 42045. Changes are required to maximize efficiency and meet the operational needs of
KLRO.
1.3 Disclosure of Magnitude of Construction Project
The estimated magnitude of this requirement is between $100,000 and $250,000.
1.4 Basis of Award
The award will be made to the lowest priced responsible Offeror whose quote conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government.
Offerors are reminded to include their best technical and price terms in their initial offer and not to assume they will have an opportunity to participate in discussions or be asked to submit a revised offer.
Quotes are intended to be evaluated and an award made without discussions with Offerors unless discussions are determined to be necessary. Additionally, any other than small business Offeror must have an acceptable Small Business Subcontracting Plan to receive an award in accordance with FAR 19.702(a).
Offerors are cautioned that the award may not necessarily be made to the lowest price offered.
1.5 Type of Contract
The Government intends to award one (1) firm fixed-price construction contract.
1.6 Who May Submit
This is 100% Small Business Set-Aside.
1.7 North American Industry Classification System (NAICS) and Small Business Size Standard
The NAICS code for this project is 236220 - Commercial and Institutional Building Construction, which has a Small Business Administration (SBA) size standard of $45 Million.
1.8 Availability of Plans (Drawings), Technical Specifications and Additional Documents
There are no Plans and/or specifications included with this solicitation. Please see STATEMENT OF WORK.
1.9 Pre-Quote Site Visit
An organized site visit is scheduled during the solicitation period. Offerors should inspect the job site prior to submitting a quote. Offerors should take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve Offerors from the responsibility for properly estimating the difficulty or cost of successfully performing the work. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents or employees, unless included in the solicitation, the specifications or related documents.
Please refer to FAR 52.236-27 Alt 1, Site Visit (Construction), incorporated by full text in this solicitation, for information pertaining to the scheduled site visit.
This will be the only site visit for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions.
1.10 Requirements to Attend the Site Visit
REGISTRATION: Only registered persons will be permitted to attend the site visit. In addition to the information below, please also provide your firm’s name, firm’s CAGE and/or Unique Entity Identifier (known as DUNS) number, and name and position title of primary point-of-contact and their telephone number and email address.
Only two (2) individuals from each business entity will be permitted to attend.
U.S. CITIZENS: To register, U.S. citizens interested in attending the site visit shall submit a Nashville District Corps of Engineers (LRN) U.S. Citizen Security Access Form to the LRN Point of Contacts (POCs), Contract Specialist Todd Allman. If submitting the document in less than five business (5) days prior, the person may not receive approval for participation. Notification of approval or denial will be provided prior to the date of the site visit. The form and guidance is available as a pdf attachment on http://sam.gov with this solicitation and is titled U.S. Citizen Security Access Form.
FOREIGN NATIONALS (FNs): All non-U.S. Citizens, including permanent residents wishing to attend the site visit must be approved in advance. FNs wishing to attend a site visit shall submit a completed Nashville District Corps of Engineers Foreign National Security Access Form and legible color copies of two (2) of the following documents: Passport (unexpired or expired), Certificate of U.S. Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N-550 or N-570), unexpired foreign Passport with I-551 stamp or attached INS Form I- 94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I- 688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS Form I- 571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN POCs. These documents must be submitted two (2) weeks prior to the site visit. FN requests require approval at the Headquarters U.S. Army Corps of Engineers (HQ USACE) level. Exceptions will be considered on a case-by-case basis but will be limited. The form is available as a pdf attachment on www.sam.gov with this solicitation and is titled Foreign National Security Access Form.
LRN POCs for Registration: For questions and/or concerns regarding the Site Visit and to submit site visit request forms, please contact Todd Allman at robert.t.allman@usace.army.mil.
1.11 POC for Communication: Any communications regarding this procurement must be made in writing to the Nashville Contracting Branch, Attn: Todd Allman at robert.t.allman@usace.army.mil. Inquiries must identify the solicitation number, the requestor’s company name, address, email address, telephone, and facsimile numbers to include area code.
Phone calls or requests to arrange meetings at the Nashville District during the solicitation period to discuss project requirements or company’s capabilities are highly discouraged and will not be scheduled.
1.12 Prospective Offerors’ Questions and Requests for Information
Prospective Offerors should submit questions concerning this Solicitation through the Bidder Inquiry function in ProjNet at http://www.ProjNet.org/ProjNet. This is USACE’s standard platform for receiving and responding to questions and requests for information. As noted below, Offerors shall not submit their quotes via ProjNet. Offerors shall submit their quotes in accordance with the provisions stated in the Solicitation.
To submit and review inquiry items, Offerors will need to be a current registered user or self-register into system.
Instructions to gain access are listed below.
Project: KLRO Office Renovation Solicitation Number: W912P524Q0003 The Bidder Inquiry Key: Will be released with Amendment 1
Instructions for ProjNet Bidder Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for Future ProjNet Bidder Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all inquiries or add an inquiry. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by LRN’s technical team.
Offerors are requested to review the specification in its entirety and to review the “Bidder Inquiry System” for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
NOTES:
1. Offerors shall not submit their quotes via ProjNet, but in accordance with the provisions stated in the solicitation.
Any questions regarding acceptable means of submitting quotes shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to questions from prospective Offerors concerning the Solicitation that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the Solicitation governs. Any changes or revisions to the Solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the Solicitation; or (c) Notice that a response is not necessary.
3. The ability for prospective Offerors to enter questions in reference to the Solicitation will be disabled ten (10) calendar days prior to the closing date stated in the Solicitation. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the closing date stated in the Solicitation.
1.13 Amendments Prior to Date Submission for Request for Ouote (RFQ). The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for submission of quotes. Such revisions and amendments, if any will be announced by an amendment or amendments to this RFQ. If the revisions and amendments are of a nature which requires material changes in quantities or prices proposed or both, the date set for receipt of quotes may be postponed by such number of days as in the opinion of the issuing Contracting Officer will enable Offerors to revise their quote. In such cases, the amendment will include an announcement of the new date for receipt of quote.
1.14 Notice to Offeror: Use of Class I Ozone-Depleting Substances
a. In accordance with Section 326 of P.L. 102-484, the Government is prohibited from awarding any contract which includes a specification or standard that requires the use of a Class I ozone depleting substance (ODS) identified in Section 601(a) of the Clean Air Act, (42 U.S.C 767a(a)), or that can be met only through the use of such a substance unless such use has been approved, on an individual basis, by a senior acquisitions official who determines that there is no suitable substitute available.
b. To comply with this statute, the Government has conducted a best effort screening of the specifications and standards associated with this acquisition to determine whether they contain any ODS requirements. This requirement has no relationship to ODSs.
c. If the Offeror possesses any special knowledge about any other ODSs required directly or indirectly at any level of contract performance, the U.S. Army would appreciate if such information were surfaced to the Contracting Officer for appropriate action. To preclude delay to the procurement, the Offeror should provide any information as soon as possible after release of this RFQ and prior to the submission of quotes to the extent practicable. It should be understood that there is no obligation on the Offeror to comply with the request and that no compensation can be provided for doing so.
2.0 BONDS AND INSURANCE
2.1 BID GUARANTEE. All Offerors shall furnish a bid guarantee. In accordance with FAR 52.228-1, Bid Guarantee, the bidder (or Offeror for this solicitation) shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond (use Standard Form 24) supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3,000,000.00. If using a Bid Bond, it must be submitted on SF 24. The SF 24 can be found at the GSA Forms Library at https://www.gsa.gov/forms.
2.2 INSURANCE. Contractor shall carry Liability and Insurance. See FAR 52.228-5, Insurance – Liability to Third Persons.
2.3 The successful Offeror will, within the time established in the RFQ, furnish performance and payment bonds in the amounts indicated in the RFQ or the specifications.
a. PERFORMANCE BONDS (Standard Form (SF) 25). Pursuant to FAR 52.228-15, Performance and Payment Bonds—Construction (DEVIATION 2020-O0016), the penal amount of the performance bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received on a SF 25A within ten (10) calendar days after receipt of contract award. The SF 25A can be found at the GSA Forms Library at https://www.gsa.gov/forms.
b. PAYMENT BONDS (SF 25A). Pursuant to FAR 52.228-15, Performance and Payment Bonds— Construction (DEVIATION 2020-O0016), the penal amount of the payment bond shall equal one hundred percent
(100%) of the contract price. Bonds shall be received on a SF 25A within ten (10) calendar days after receipt of contract award. The SF 25A can be found at the GSA Forms Library at https://www.gsa.gov/forms.
3.0 SYSTEM FOR AWARD MANAGEMENT (SAM)
In accordance with FAR 52.204-7, System for Award Management, registration is required in the System for Award Management (SAM) database located at www.sam.gov. More specifically, "An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation." (See FAR 52.204-7(b)(1)).
For SAM Customer Service, contact:
Federal Service Desk URL: www.fsd.gov Hours: 8am – 8pm (Eastern Time) U.S. Calls: 866-606-8220 International Calls: 334-206-7828
DSN: 866-606-8220
IMPORTANT NOTICE: Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 calendar days of activation, or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (transitioned from DUNS Number).
The registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
4.0 WHERE TO SUBMIT & SUBMITTAL DEADLINE
Offerors shall submit their quotes no later than the time and date specified in Block 13 of SF 1442 of this solicitation as follows:
The Offeror’s quote shall be submitted electronically, via Procurement Integrated Enterprise Environment (PIEE), as described below. The RFQ will provide quote submission instructions and receipt date for quote submittal. The Offeror’s quote shall not contain classified data. The use of hyperlinks in quotes is prohibited.
The Offeror’s quote must be received by the Government by the date/time specified in the Solicitation.
4.1 QUOTE SUBMISSION: ALL SUBMISSIONS TO THIS RFQ SHALL BE SUBMITTED
ELECTRONICALLY THROUGH PIEE. No paper copies, CD-ROMs or facsimile submissions will be accepted.
Electronic Proposal Submissions is required through the Army’s Electronic File Sharing Service in PIEE (https://piee.eb.mil/). The PIEE Application is used to send large files to individuals that would normally be too large to send via email. Information regarding how to set up a vendor registration is included in this link:
https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. On this page, click on the “Vendor User Registration” Doc and it will take you through the process of registering as a vendor.
If you plan on submitting a quote, be sure to select “SOL-Solicitation” in the drop-down list and choose the “Proposal Manager” role to be given the proper permissions.
Further training is available at the following links:
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml - This link shows information regarding the Solicitation application in PIEE and the different roles available.
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml - This link is for Offerors regarding the Proposal Manager function and instruction on submitting a Proposal.
a. File Size Limitations: Offerors are advised to follow the PIEE instructions for uploading files. PIEE supports delivery of up to 1.9GB per file, with no limit on the number of files, as well as multiple file formats. If needed, Offerors are advised to break the files down into smaller sections in order to upload them into the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
b. File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
- W912P524Q0003 – (FIRM NAME) – VOLUME I
- W912P524Q0003 – (FIRM NAME) – VOLUME II
Each file name shall begin with the Solicitation number followed by the firm’s name, and a brief file description.
Please see the examples above.
c. File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be the size listed in the submission requirements for each factor.
d. Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the Solicitation document. The time and date of quote receipt will be the upload completion/delivery time and date recorded within the PIEE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g.
10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
e. Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Section 00 30 00 - Available Information
STATEMENT OF WORK
STATEMENT OF WORK
Construction Office Renovation Project (CORP) Kentucky Lock Resident Office (KLRO)
1.0 INTRODUCTION
The purpose of this Statement of Work (SOW) is to define the renovation of two existing field offices, including the purchase and installment of new office workstations, located at the Kentucky Lock Resident Office (KLRO) compound at 193 Taylor Park Road, Grand Rivers, KY 42045. The QA office trailer will include removing eight (8) existing office workstations and replacing with twelve (12) new office workstations, adding a kitchenette and second restroom, and adding additional miscellaneous items. The Resident office trailer will include adding one (1) stand-alone office workstation, renovating one (1) restroom, and adding additional miscellaneous items. Changes are required to maximize efficiency and meet the operational needs of KLRO.
Products stated herein are to be considered the “Basis of Design” to establish the quality, physical properties, appearance, and performance characteristics desired by the Government.
The delivery schedule requires that installation be completed no later than 120 calendar days after Notice to Proceed. Restroom renovations in QA office trailer must be completed prior to workstation removal and replacement. QA office trailer workstation removal and replacement shall be completed in no more than five (5) consecutive days between move out and move in to minimize interruption of use by Government employees.
NOTE: It is strongly encouraged for interested parties to visit the site prior to bidding on this project. Failure to do so does not alleviate the responsibility of removal of existing office workstations and installation of new office workstations while maintaining ADA compliant clearances, as well as the extent of work required for the electrical and data installation component to the new cubicles. Vendor is responsible for matching, as closely as possible, existing workstation layout and colors in the Resident office trailer (Ref. Appendix A).
Contracting Officer will have final determination of the acceptability of submitted materials.
The Primary and Alternate POC’s for this project will be: Kentucky
Lock Resident Office POC:
Gabrial Reed US Army Corp of Engineers 193 Taylor Park Road Grand Rivers, KY 42045 Cell: (270) 362-1372 Email: Gabrial.P.Reed@usace.army.mil
Nashville District Office Alternate POC:
Emory Perkins Jr US Army Corp of Engineers 110 9th Ave S. Room#A550 Nashville, TN 37203-3817 Desk: (615) 736-5612 / Cell: (615) 853-4700 Email: Emory.Perkins@usace.army.mil
2.0 SPECIFICATIONS
2023 National Electrical Code 2021 International Plumbing Code Americans with Disabilities Act Buy American Act Sign Designs Standard EP-310-1-6a
3.0 CONTRACT TYPE
This will be a Firm Fixed-Price (FFP) Construction contract fully funded. Office location and floor plans for this project are enclosed (Ref. Appendix B).
4.0 DELIVERY/INSTALLATION
The delivery schedule requires that installation be completed no later than 9 days after Notice to Proceed.
5.0 DESCRIPTION/FEATURES OF WORK
1) QA OFFICE TRAILER
a. Removal of QTY. 8 existing modular workstations. Existing workstations
(Ref. Photo 1a.) shall be disassembled and organized into individual package units with all associated hardware and components. The units shall be covered and packaged in a manner to facilitate long term storage.
Packaged units shall be removed from QA office trailer and stored in an adjacent nearby Conex storage container (Ref. Photo 2a.). Remove all remaining furniture and filing cabinets from QA office trailer and temporarily store in adjacent materials lab building while construction is occurring.
b. Replace up to approximately QTY. 50 damaged floor tiles with tiles supplied by Government. COR to determine floor tiles to be replaced.
c. Coordinate with Government cleaning contractor to deep clean and wax QA trailer floor while empty of furniture. Removal of existing workstations, floor cleaning, and installation of new workstations shall be completed within a five (5) day time frame, preferably to include a weekend, to minimize disruption of Government employees currently using specified office workstation spaces.
d. Supply, delivery, and installation of QTY. 12 new commercial off-the-shelf modular office workstations, to include QTY. 12 new task chairs.
(Ref. Appendix C).
e. Remove and dispose of any existing CAT5/power cables connected to the existing QTY. 8 modular workstations.
f. Solid interior door to IT closet to be replaced with or fitted with a louvered metal ventilation grille sufficient in size to provide adequate cooling and ventilation to IT equipment located inside closet (Ref. Photo 3a.).
g. Remove existing mop sink in IT closet, including basin and fixture. Hot and cold-water supply lines to be cut and capped/plugged with a 3” stub protruding from wall (Ref. Photo 3b.).
h. Supply and install QTY. 1 outdoor HD digital television antenna on roof of trailer (Ref. Photo 4a.). Antenna is to be located on South end of trailer roof, near location inside trailer at television (Ref. Photo 4b.). Conduit shall be used on exterior for routing antenna cable. Supply appropriate style and length antenna wire and route from antenna on roof to television located inside of trailer. Wall penetration shall be properly sealed from water, air, and pest intrusion.
i. Modify existing single corner restroom into two separate single restrooms (Ref. Appendix B).
i. Demo and remove QTY. 1 existing interior wall (Ref. Photo 5a.).
ii. Construct QTY. 3 new sections of interior framed walls. New walls shall be covered with paneling and constructed to match existing paneling, trim, and finish of existing walls.
iii. Remove and dispose of existing QTY. 1 toilet and QTY. 1 wall-mounted sink in existing single corner restroom (Ref. Photo 5b.).
iv. Supply and install QTY. 1 new toilet and QTY. 1 new vanity cabinet with sinks and fixtures, in each new restroom. Vanity cabinets shall be wood, with two cabinet doors at base, and be 24” wide. Sink fixtures shall be contractor-grade. Supply and install new handicap railing, toilet paper holder, paper towel holder, and mirror in each restroom.
v. Remove and dispose of QTY. 1 existing interior door leading to existing corner restroom. Supply and install QTY. 2 new 36” wide interior contractor-grade doors. Door handles shall have interior locks at each restroom entry. Includes supply and installation of matching trim on both sides of the doors.
vi. Remove and dispose of existing vinyl floor tiles in each restroom floor space. Supply and install new vinyl floor sheeting with floor transition strip at door to each restroom. Include supply and installation of baseboards to match existing style, color, and size inside and outside of restroom.
vii. Remove and dispose of existing restroom ceiling light and ceiling tiles (Ref. Photo 5c.). Supply and install QTY. 1 new combination light/exhaust fan in each restroom ceiling.
viii. Supply new ceiling tiles and tile framing, to include QTY. 1 new HVAC ductwork with vent, in each restroom.
j. Supply and install new kitchenette (Ref. Appendix B floor plan) (Ref.
Appendix C).
i. Supply and install 6-foot-long base cabinet section that includes a kitchen sink with contractor-grade faucet fixture. Fixture is to include a removeable hose sprayer attachment. Include laminated wood countertop with integrated backsplash. Base cabinets shall include upper drawers with cabinet doors underneath.
ii. Hot and cold supply water shall be routed to fixture in kitchenette location. Include an additional cold-water branch to supply a drinking water system (USACE supplied).
2) RESIDENT OFFICE TRAILER
a. Supply and install QTY. 1 outdoor HD digital television antenna on roof of trailer. Supply appropriate style and length antenna wire and route from antenna on roof (Ref. Photo 6a.) to television located inside of trailer (Ref. Photo 6b.). Antenna is to be located on east side, near location inside trailer at television. Conduit shall be used on exterior for routing antenna cable. Wall penetration shall be properly sealed from water, air, and pest intrusion.
b. Removal of QTY. 1 existing solid wood conference table. Existing conference table (Ref. Photo 7a.) shall be disassembled and organized into two individual package units with all associated hardware and components. The units shall be covered and packaged in a manner to facilitate long term storage. Packaged units shall be removed from Resident office and stored in an adjacent nearby Conex storage container (Ref. Photo 2a.).
c. Supply and install QTY. 1 new power conference table in conference room. Conference table shall be 18-foot by 4-foot and include multiple integrated power outlets and USB ports. Troughs shall be located under table for communication cable and wire management. Include multiple accessible boxes located in table for wire storage (Ref. Photo 7b. and 7c.).
Tough laminate surface shall resist scratches and stains. Smaller tables designed to be pushed together to form a large conference table may be substituted for one (1) single table.
d. Move (8) eight lockers currently located in Resident office to QA office trailer (Ref. Photo 8a.).
e. Supply, delivery, and installation of QTY. 1 new commercial off-the-shelf modular office workstation, to include QTY. 1 new task chair, to new workstation location (Ref. Photo 9a.) (Ref. Appendix C).
f. Supply, delivery, and installation of QTY. 12 task chairs for existing office workstations.
g. Modify existing men’s restroom (Ref. Photo 10a.) (Ref. Appendix B for desired floor plan layout).
h. Remove and dispose of existing shower stall unit and toilet in men’s restroom.
i. Remove and dispose of existing vinyl floor tiles (Ref. Photo 10b.).
Inspect existing wood sub-floor and support joists and patch and/or repair, as needed, if determined to be warped or water damaged. Supply and install new vinyl floor sheeting. Includes supply and installation of baseboards to match existing style, color, and size inside of restroom.
j. Supply and install new paneling on walls where shower stall unit is to be removed. Wall paneling shall be constructed to match existing paneling, trim, and finish of existing walls. Move existing vanity and sink to previous shower location. Hot and cold supply water shall be routed to new sink location.
k. Install commercial off-the-shelf restroom partition walls to create new separate stall. Stall shall have an in-swing door. Replace existing toilet with QTY. 1 new toilet.
l. Supply and install QTY. 1 new wall-mounted urinal in second stall area.
Supply and install new handicap railing. Cold supply water shall be routed to new urinal location.
m. Move restroom entry door to wall where sink is currently located (Ref.
Photo 10c.). Includes supply and installation of matching trim on both sides of the door. Construct new framed wall where entry door was removed. New wall shall be covered with paneling and constructed to match existing paneling, trim, and finish of existing walls. Include supply and installation of baseboards to match existing style, color, and size inside and outside of restroom.
3) SIGNAGE
a. Each sign to include the Corps Mark castle (Ref. Photo 11a.).
b. Signs are to be displayed and mounted for reading by passing viewers.
Exact placement locations will be designated by the Contracting Officer.
Panel sizes and graphic formats have been standardized for visual consistency throughout all Corps operations, per Sign Design Standards EP 310-1-6a. Panels shall be fabricated using aluminum. Legends are to be die-cut or computer-cut in white Helvetica Medium typeface with upper- and lower-case letters, applied to a red panel background.
c. Supply 4-foot by 4-foot aluminum signs and mount to exterior wall of trailers.
Sign 1: KLRO Main Office Sign 2: KLRO QA Annex Sign 3: KLRO Materials Lab Sign 4: US Army Corps of Engineers Nashville District
d. Supply 2-foot by 2-foot aluminum signs and mount to exterior of storm shelters.
Sign 5: Storm Shelter
Sign 6: Storm Shelter
e. Supply and replace existing 6-foot by 2-foot aluminum sight sign and mount to exterior of perimeter fence (Ref. Photo 11b.).
Sign 7: US Army Corps of Engineers Nashville District Kentucky Lock Resident Office 193 Taylor Park Road
f. Supply 5-foot x 3-foot interior sign and mount to foyer wall of KLRO Resident office.
Sign 8: US Army Corps of Engineers Nashville District Kentucky Lock Resident Office
6.0 TRANSPORTATION
The contractor/vendor will transport materials and supply staff who will complete the installation of all required equipment and materials. In addition, the contractor/vendor will haul away all debris associated with the completion of the project.
7.0 SYSTEMS FURNITURE
The systems furniture is designed to maximize flexibility of the interior spaces and must be installed in accordance with ADA requirements. The dimensions listed may not be exact in all locations, and manufacturers are encouraged to field measure the space before bidding.
In the QA trailer, ten (10) workstations shall be approximate 6-feet by 6-feet. Two (2) workstations shall be approximately 7-feet by 9-feet. In the Resident office trailer, one
(1) workstation shall be approximately 6-feet by 9-feet (Ref. Appendix B) (Ref. Appendix C).
All systems products shall be of a design, material, and workmanship to withstand hard daily usage over an extended life with a minimum of maintenance and repair. Components shall have the same modularity and interchangeability so that components in one workstation will also fit in another workstation. All panels and components must comply with applicable ANSI/BIFMA standards. The system shall include panels, storage, and filing. Panels may be monolithic (standard) or segmented/stackable.
Panels
Panels will be secured together. Panel and frame connections will be secured so that light is not transmitted through the connections. The panels will have power and voice/data connections. Assembled panel height shall be no less than 67-inches for the 6- foot by 6-foot workstations. Assembled panel height shall be no less than 85-inches for the 7-foot by 9-foot workstations and the 6-foot by 9-foot workstation. Outside panels may be non-powered but must be convertible to power.
Panel construction shall be a metal frame construction and shall be capable of supporting cantilevered work-surfaces, shelves, files, and other components in the configurations shown without special modifications to the panels.
Spine panels are preferred to be stackable for maximum flexibility, with a maximum width of 4-feet. The number of stacking panels may be reduced for economy and structural integrity.
The minimum panel thickness shall be 2-inches (fully assembled) and the maximum panel thickness shall be 3 ½ inches (fully assembled). Frames are required in a variety of widths and shall allow for component height adjustability. Panel material may include options such as painted and perforated metal, fabric covered, tackable and/or acoustical, marker board, glass, cable and power access, and accessory tiles. Panel materials must match frame widths.
All types of panels shall be able to connect to each other for future reconfigurations.
A non-powered panel shall have the capability to be retrofitted in the field to be powered panel (and also powered to non-powered).
Frames shall allow for multiple levels of electrical and/or voice and data cables.
Telecommunications, data, and power cabling will be fed to the frames/panels through the base of the systems furniture. All cabling should be able to feed along the base and beltline of the systems furniture.
Systems furniture may be freestanding without physical attachment to any building components.
Work Surfaces
All work surfaces shall be available in high-pressure laminate with PVC (polyvinyl chloride) or vinyl molding edge. Work surfaces shall be provided in accordance with sizes and locations, as shown on the drawings (which are approximate).
There will be two 48-inch by 24-inch work surfaces in each workspace that is approximately 6-feet by 6-feet. There will be one 24-inch by 24-inch work surface and one 24-inch by 60-inch work surface in each workspace that is approximately 7-feet by 9- feet. There will be one 48-inch by 24-inch work surface and one 54-inch by 24-inch work surface in the workspace that is approximately 6-feet by 9-feet. The work surfaces will have grommets installed for cable management.
Include electric height adjustable base for one work surface in each workspace.
Overhead Storage Cabinets and Storage Wardrobes
One closed overhead storage unit shall be in each workstation and hung from the panels, approximately 48-inch wide.
Overhead storage units (OSU) shall be constructed of epoxy powder painted metal with end panels.
The door of each OSU shall provide the maximum usable interior storage and each OSU door front shall include a lock and key standard with options of key-alike and master-keyed. OSU shelf pan shall be constructed of painted metal.
In each workstation, there shall be one 48-inch by 15-inch fabric covered, tackable board mounted below each overhead storage cabinet.
In each workstation, there shall be a 24-inch by 24-inch by 54-inch metal wardrobe/storage tower. Each shall be mounted at the end of the overhead storage unit. Government to provide eight (8) wardrobe/storage towers (Ref. Photo 8a.). Vendor to provide five (5) additional wardrobe/storage towers and match existing style and color of provided wardrobe/storage tower units as closely as possible.
Pedestal Filing Cabinets
Each 7-foot by 9-foot workstation shall have one pedestal filing cabinet located under the desk surface. The 6-foot by 9-foot workstation shall have one pedestal filing cabinet located under the desk surface.
Drawers shall be in a 2 box/box/file configuration or the manufacturer’s equivalent of this configuration.
Pedestals may be mobile with four casters or leveling guides.
Pedestals shall be manufacturer’s standard dimensions and must fit underneath the work surface.
Locks shall be standard. Lock options shall include keyed-alike and master-keyed. Keyways of pedestals shall match those of the overhead file in each workstation.
Pedestals shall have steel, ball-bearing slides. File drawers shall have full extension slides. It is preferred that box drawers also have full extension slides.
Pedestals shall be epoxying powder painted metal finish.
Task Lighting
Task lights shall be provided for each workstation mounted under each overhead storage cabinet.
Task lights shall have structurally sound mounting devices that will prevent accidental displacement but will allow easy removal and replacement when necessary. Fixtures shall be UL approved for use in the configurations indicated on the drawings.
Task lights shall use T-5 bulbs or T-8 bulbs. LED Lamps may be approved if it is more economical and provides costs savings to the Government. All coverings shall be easily removable to permit cleaning and re-lamping. Fixtures shall be provided with energy efficient ballasts and lamps.
Power Requirements
The furniture must be compatible with 1 phase building wiring.
The vendor will furnish all parts required to connect the cubicle wiring to the building wiring, with runs to the panel underfloor (crawlspace) area.
Each workstation will have multiple receptacles in the open area…