bid schedule_w912p522b0006_bar_spillway machinery rehab_rta-certified final_14jun2022.pdf
PDF 114 KB Posted
- Solicitation number
- W912P522B0006
About this file
This document contains a bid schedule and related federal contract opportunity notice for the Barkley Spillway Gates Mechanical and Electrical Rehabilitation project. The bid schedule outlines estimated costs for base requirements and six options to rehabilitate the mechanical and electrical components of twelve spillway gates at Barkley Dam in Grand Rivers, Kentucky. Work includes replacing motors, gears, controls, lighting, and other aged equipment, with rehabilitation of one gate at a time to maintain flood control capabilities. The total project cost is estimated between $5-10 million. The solicitation will be a 100% small business set-aside released on or around May 31, 2022. The NAICS code is 237990 and size standard is $39.5 million. Interested parties should monitor the SAM website for solicitation details and amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM
NO.
DESCRIPTION
EST.
QTY.
UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
BASE CONTRACT - GATES 12-7
0001 Performance and Payment Bond 1 JOB $ $
0002 Mobilization and Demobilization 1 JOB $ $
0003 Demolition 1 JOB $ $
0004 Electrical Feeders 1 JOB $ $
Spillway Gate Control Panels, Circuit Breakers, and Selector Switches
1 JOB $ $
0006 Spillway Gate Lighting Replacement 1 JOB $ $
0007 Asbestos Abatement Work 1 JOB $ $
Lead Paint Removal and Painting - Hydraulic Structures
1 JOB $ $
Motors, Primary Reducers, Brakes, Shafts, Couplings, Drive Machinery Bases, Limit Switches, and Analog Position Indicators
1 JOB $ $
0010 Idle Pinion on Gate 2L 1 JOB $ $
Reconditioning Equipment (Secondary Reducers, Open Gears, Bearings, Couplings, and Shafts)
1 JOB $ $
Modification of Chain Guards and Racks and Replacement of Gate 9L Chain Guard and Rack
1 JOB $ $
0013 Machinery Split Bushings Replacement 1 JOB $ $
0014 Crossover Shaft Step Ladder 1 JOB $ $
0015 Machinery Pit Stairs 1 JOB $ $
W912P5-22-B0006 Barkley Dam Spillway Gate Machinery Rehab
Grand Rivers, KY
BID SCHEDULE
TOTAL ESTIMATED BASE AMOUNT
Page 1 of 8 Bidding Schedule
DESCRIPTION
EST.
QTY.
UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
Barkley Dam Spillway Gate Machinery Rehab Grand Rivers, KY
BID SCHEDULE
OPTION 1 - SPILLWAY GATE
MACHINERY REHAB - GATE 6
1001 Performance and Payment Bond 1 JOB $ $
1002 Demolition 1 JOB $ $
1003 Electrical Feeders 1 JOB $ $
1004 Spillway Gate Control Panels 1 JOB $ $
1005 Spillway Gate Lighting Replacement 1 JOB $ $
1006 Asbestos Abatement Work 1 JOB $ $
Lead Paint Removal and Painting - Hydraulic Structures
1 JOB $ $
Motors, Primary Reducers, Brakes, Shafts, Couplings, Drive Machinery Bases, Limit Switches, and Analog Position Indicators
1 JOB $ $
Reconditioning Equipment (Secondary Reducers, Open Gears, Bearings, Couplings, and Shafts)
1 JOB $ $
1010 Modification of Chain Guards and Racks 1 JOB $ $
1011 Machinery Split Bushings Replacement 1 JOB $ $
1012 Crossover Shaft Step Ladder 1 JOB $ $
1013 Machinery Pit Stairs 1 JOB $ $
$TOTAL ESTIMATED OPTION 1 AMOUNT
Page 2 of 8 Bidding Schedule
DESCRIPTION
EST.
QTY.
UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
Barkley Dam Spillway Gate Machinery Rehab Grand Rivers, KY
BID SCHEDULE
OPTION 2 - SPILLWAY GATE
MACHINERY REHAB - GATE 5
2001 Performance and Payment Bond 1 JOB $ $
2002 Demolition 1 JOB $ $
2003 Electrical Feeders 1 JOB $ $
2004 Spillway Gate Control Panels 1 JOB $ $
2005 Spillway Gate Lighting Replacement 1 JOB $ $
2006 Asbestos Abatement Work 1 JOB $ $
Lead Paint Removal and Painting - Hydraulic Structures
1 JOB $ $
Motors, Primary Reducers, Brakes, Shafts, Couplings, Drive Machinery Bases, Limit Switches, and Analog Position Indicators
1 JOB $ $
Reconditioning Equipment (Secondary Reducers, Open Gears, Bearings, Couplings, and Shafts)
1 JOB $ $
2010 Modification of Chain Guards and Racks 1 JOB $ $
2011 Machinery Split Bushings Replacement 1 JOB $ $
2012 Crossover Shaft Step Ladder 1 JOB $ $
2013 Machinery Pit Stairs 1 JOB $ $
$TOTAL ESTIMATED OPTION 2 AMOUNT
Page 3 of 8 Bidding Schedule
DESCRIPTION
EST.
QTY.
UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
Barkley Dam Spillway Gate Machinery Rehab Grand Rivers, KY
BID SCHEDULE
OPTION 3 - SPILLWAY GATE
MACHINERY REHAB - GATE 4
3001 Performance and Payment Bond 1 JOB $ $
3002 Demolition 1 JOB $ $
3003 Electrical Feeders 1 JOB $ $
3004 Spillway Gate Control Panels 1 JOB $ $
3005 Spillway Gate Lighting Replacement 1 JOB $ $
3006 Asbestos Abatement Work 1 JOB $ $
Lead Paint Removal and Painting - Hydraulic Structures
1 JOB $ $
Motors, Primary Reducers, Brakes, Shafts, Couplings, Drive Machinery Bases, Limit Switches, and Analog Position Indicators
1 JOB $ $
Reconditioning Equipment (Secondary Reducers, Open Gears, Bearings, Couplings, and Shafts)
1 JOB $ $
3010 Modification of Chain Guards and Racks 1 JOB $ $
3011 Machinery Split Bushings Replacement 1 JOB $ $
3012 Crossover Shaft Step Ladder 1 JOB $ $
3013 Machinery Pit Stairs 1 JOB $ $
$TOTAL ESTIMATED OPTION 3 AMOUNT
Page 4 of 8 Bidding Schedule
DESCRIPTION
EST.
QTY.
UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
Barkley Dam Spillway Gate Machinery Rehab Grand Rivers, KY
BID SCHEDULE
OPTION 4 - SPILLWAY GATE
MACHINERY REHAB - GATE 3
4001 Performance and Payment Bond 1 JOB $ $
4002 Demolition 1 JOB $ $
4003 Electrical Feeders 1 JOB $ $
4004 Spillway Gate Control Panels 1 JOB $ $
4005 Spillway Gate Lighting Replacement 1 JOB $ $
4006 Asbestos Abatement Work 1 JOB $ $
Lead Paint Removal and Painting - Hydraulic Structures
1 JOB $ $
Motors, Primary Reducers, Brakes, Shafts, Couplings, Drive Machinery Bases, Limit Switches, and Analog Position Indicators
1 JOB $ $
Reconditioning Equipment (Secondary Reducers, Open Gears, Bearings, Couplings, and Shafts)
1 JOB $ $
4010 Modification of Chain Guards and Racks 1 JOB $ $
4011 Machinery Split Bushings Replacement 1 JOB $ $
4012 Crossover Shaft Step Ladder 1 JOB $ $
4013 Machinery Pit Stairs 1 JOB $ $
$TOTAL ESTIMATED OPTION 4 AMOUNT
Page 5 of 8 Bidding Schedule
DESCRIPTION
EST.
QTY.
UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
Barkley Dam Spillway Gate Machinery Rehab Grand Rivers, KY
BID SCHEDULE
OPTION 5 - SPILLWAY GATE
MACHINERY REHAB - GATE 2
5001 Performance and Payment Bond 1 JOB $ $
5002 Demolition 1 JOB $ $
5003 Electrical Feeders 1 JOB $ $
5004 Spillway Gate Control Panels 1 JOB $ $
5005 Spillway Gate Lighting Replacement 1 JOB $ $
5006 Asbestos Abatement Work 1 JOB $ $
Lead Paint Removal and Painting - Hydraulic Structures
1 JOB $ $
Motors, Primary Reducers, Brakes, Shafts, Couplings, Drive Machinery Bases, Limit Switches, and Analog Position Indicators
1 JOB $ $
Reconditioning Equipment (Secondary Reducers, Open Gears, Bearings, Couplings, and Shafts)
1 JOB $ $
5010 Modification of Chain Guards and Racks 1 JOB $ $
5011 Machinery Split Bushings Replacement 1 JOB $ $
5012 Crossover Shaft Step Ladder 1 JOB $ $
5013 Machinery Pit Stairs 1 JOB $ $
$TOTAL ESTIMATED OPTION 5 AMOUNT
Page 6 of 8 Bidding Schedule
DESCRIPTION
EST.
QTY.
UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
Barkley Dam Spillway Gate Machinery Rehab Grand Rivers, KY
BID SCHEDULE
OPTION 6 - SPILLWAY GATE
MACHINERY REHAB - GATE 1
6001 Performance and Payment Bond 1 JOB $ $
6002 Demolition 1 JOB $ $
6003 Electrical Feeders 1 JOB $ $
6004 Spillway Gate Control Panels 1 JOB $ $
6005 Spillway Gate Lighting Replacement 1 JOB $ $
6006 Asbestos Abatement Work 1 JOB $ $
Lead Paint Removal and Painting - Hydraulic Structures
1 JOB $ $
Motors, Primary Reducers, Brakes, Shafts, Couplings, Drive Machinery Bases, Limit Switches, and Analog Position Indicators
1 JOB $ $
Reconditioning Equipment (Secondary Reducers, Open Gears, Bearings, Couplings, and Shafts)
1 JOB $ $
6010 Modification of Chain Guards and Racks 1 JOB $ $
6011 Machinery Split Bushings Replacement 1 JOB $ $
6012 Crossover Shaft Step Ladder 1 JOB $ $
6013 Machinery Pit Stairs 1 JOB $ $
$TOTAL ESTIMATED OPTION 6 AMOUNT
Page 7 of 8 Bidding Schedule
DESCRIPTION
EST.
QTY.
UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
Barkley Dam Spillway Gate Machinery Rehab Grand Rivers, KY
BID SCHEDULE
OPTION 7 - FABRICATION OF LIFTING
CHAINS - TWO GATES
7001 Performance and Payment Bond 1 JOB $ $
7002 Fabrication of Lifting Chains - Two Gates 4 EA $ $
OPTION 8 - GATE 5R TRUNNION PIN
AND BUSHINGS
8001 Performance and Payment Bond 1 JOB $ $
Trunnion Pin and Split Bushings Replacement for Gate 5R
1 JOB $ $
TOTAL ESTIMATED AMOUNT
(Base + Options 1-8)
TOTAL ESTIMATED OPTION 7 AMOUNT
TOTAL ESTIMATED OPTION 8 AMOUNT
Page 8 of 8 Bidding Schedule