W912P522B0002 Amend. 0001 TPlans 2022.02 (1).pdf
PDF 3 MB Posted
- Attached to
- Kentucky Lock Gearbox Heater System
- Solicitation number
- W912P522B0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plans For
Kentucky Lock
Tennessee River Basin
Kentucky Lock
Livingston County, KY
February 2022
Gearbox Heater System
W912P522B0002, Amendment 0001
RTA - Certified Final Documents
Nashville District of Engineers
US Army Corps
68N200-25R0
68N200-22R0
68N200-21R0
68N200-20R0
67N409
65W805R10
65W803R7
61N409
61N312
61N311
61W219R5
61W218R6
DRAWING #
REFERENCE DRAWINGS:
E-601
E-102
E-101
DRAWING #
CONTRACT DRAWINGS:
DETAILS AND SECTIONS, REVISION TO LOCKWALL GRATING
DETAILS SHEET 2, REVISION TO LOCKWALL GRATING
DETAILS SHEET 1, REVISION TO LOCKWALL GRATING
PLANS, REVISION TO LOCKWALL GRATING
AIR AND WATER LINES
ELECTRICAL, CONDUIT & GROUNDING, PLAN & DETAILS, LOWER PORTION
ELECTRICAL, CONDUIT & GROUNDING, PLAN & DETAILS, UPPER PORTION
CONCRETE BLOCKS R4
CONCRETE BLOCKS L-4 AND R-4, SHEET 2
CONCRETE BLOCKS L-4 AND R-4, SHEET 1
PLAN, SHEET 2, STA. 2+56.00B TO STA. 7+06.00B
PLAN, SHEET 1, STA. 6+95.00A TO STA. 2+56.00B
DESCRIPTION
ELECTRICAL, WIRING DIAGRAM, COMBINATION HEATER CONTRACTOR
ELECTRICAL, GATE MACHINERY RECESSES & HEATER CONDUIT PATH, PLANS & SECTIONS
ELECTRICAL, GEARBOX HEATER SYSTEM LAYOUT, PLAN & DETAILS
DESCRIPTION
Submitted:
(2.) The approval signatures appearing in the signature block on this sheet constitute approval of all drawings listed in the sheet index.
designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
(1.) This project was designed by the Nashville District of the U.S. Army Corps of Engineers. The initials or signatures and registration
Note:
Project Engineer
Approval Recommended:
Robert W. Baulsir III, P.E.
Chief, Civil Design Branch
Approved:
Mark P. Evans P.E.
Chief, Electrical/Mechanical Section
Gabriel A. Cabrera
SCALE:
DO NOT ALTER MANUALLY
C.A.D. DRAWING
ISSUED BY:
R
TENNESSEE VALLEY AUTHORITY
FOSSIL AND HYDRO ENGINEERING
AUTOCAD R
DATE
PLOT FACTOR:
REVIEWED BY: APPROVED BY:
AS CONST
EXCEPT AS NOTED
NO.
REV.
DATE
R
R
DRWNDSGN CHKD RVWDSUPV APPD
PROJECT
ISSD
ID
CD
REV
DISCIPLINE
INTERFACE
US Army Corps of Engineers
Nashville District
SUBMITTED BY:
APPROVED BY:
P l o t T i m e
P l o t
D a t e
F i l e N a m e
T im e
D a te
F il e
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF, ENGINEERING CONSTRUCTION DIVISION
H
F
G
E
3 4 5 6
D
C
B
A
2 3 4 5 6
7 8
REV NO.TASK COMPLETED BY:
F
E
7 8 9 10
D
C
B
11 12
A
------JAGGAC02/10/2022
UPDATED NOTE 9
E
E07
W_TVA
---NCBMAM-0
XX
BCS
INITIAL ISSUE
CHIEF, CIVIL DESIGN BRANCH
CELRN
DEC/21
KENTUCKY PROJECT
LOCK
GAC
PLANS & DETAILS
ELECTRICAL
REHABILITATION
NONE
E-101
E-101
ROBERT W. BAULSIR III, P.E.
MICHAEL A. MORRISON NICOLE C. BERGERBENJAMIN C. SOLLMAN
S T
A
.0
B
S T
A
.0
B
RIVER WALL
FLOW
N
C E
L E
C T
M
H
S T
A
.3
B
L
S T
A
.0
B
LAND WALL
C E
L E
C T
M
H
S T
A
.0
B
L
C E
L E
C T
M
H
S T
A
.5
B
L
C E
L E
C T
M
H
S T
A
.0
B
L
C E
L E
C T
M
H
S T
A
.5
B
L
S T
A
.0
A
C LOCKL
C E
L E
C T
M
H
S T
A
.3
B
L L
S T
A
.0
B
C L
O W
E R
P
IN
T L
E S
L
(SEE NOTE 4 )
NOT TO SCALE
SHORE POWER STATION EQUIPMENT
(SEE NOTE 5 )
NOT TO SCALE
HEATER CONTROL BOX
L
L L
S T
A
.0
A
B
C U
P P
E R
P
IN
T L
E S
L
C E
L E
C T
M
H
S T
A
.0
B
C E
L E
C T
M
H
S T
A
.5
B
C E
L E
C T
M
H
S T
A
.0
B
C E
L E
C T
M
H
S T
A
.5
B
STATION
UPSTREAM CONTROL
SEE DETAIL A
480 V SAFETY SWITCH
SEE DETAIL A
480 V SAFETY SWITCH
CONDUIT, SEE NOTE 8
NEW EXTERIOR
BUILDING
OPERATIONS
CONTROL STATION
DOWNSTREAM
SEE DETAIL A
480V SAFETY SWITCH
SEE DETAIL B
HEATER PANEL
SEE DETAIL B
HEATER PANEL
SEE DETAIL A
480V SAFETY SWITCH
BUILDING
COMPRESSOR
AIR
SAFETY SWITCH
3 PHASE, NEMA 4X,
EXISTING 480V, 30A ,
SAFETY SWITCH
3 PHASE, NEMA 4X
EXISTING 480V, 200 A,
SAFETY SWITCH
3 PHASE, NEMA 4X,
NEW 480V, 30A,
CONTACTOR
COMBINATION
JDH
JAG
BENJAMIN L. ROHRBACH, P.E.
GAC JDH
LCT
JAG
DETAIL A DETAIL B
PLAN
CONDUIT, SEE NOTE 9
NEW EXTERIOR
RECESS 4
GATE MACHINERY
RECESS 1
GATE MACHINERY
GEARBOX HEATER SYSTEM LAYOUT
3/4" RGS CONDUIT
TO GEARBOX HEATER
1" RGS CONDUIT
3 PHASE SUPPLY
TO 480V, 30A,
CONTACTOR, 1" RGS CONDUIT
TO COMBINATION
RECESS 3, SEE NOTE 3
GATE MACHINERY
RECESS 2, SEE NOTE 3
GATE MACHINERY
RECESS
JOINT
DEC. 2021
PERMIT IS ATTAINED THROUGH TVA.
11. BEFORE THE COMMENCEMENT OF ANY WORK ENSURE A DRILLING AND CHIPPING
OTHER.
WORK AREAS WITH A SECOND CONTRACTOR AND SHALL COORDINATE WITH EACH
OTHER ONGOING CONTRACTS THE CONTRACTOR MAY BE EXPECTED TO SHARE
STORAGE/LAYDOWN AREA SHALL BE COORDINATED WITH COR AS WELL. DUE TO
INTERMITTENT/LIMITED ACCESS THROUGH LANDSIDE WHEN IT IS REQUIRED.
ISLAND). THE CONTRACTOR SHALL COORDINATE WITH THE COR FOR
10. CONTRACTOR WILL BE PERMITTED ACCESS THROUGH RIVERSIDE (POWERHOUSE
NOTES (CONTINUED ):
SEE SPECIFICATIONS FOR DETAILS.
SAWCUT IN LIEU OF CORE DRILLING OF THE CONCRETE IS ACCEPTABLE.
REQUIRED. LEAVE 2 INCH OF THE STUB-UP LENGTH IN MACHINERY RECESS.
FROM POWER STATION UP TO MACHINERY RECESS USING STRAPS WHERE
REQUIRED UNTIL GATE MACHINERY RECESS 1 IS REACHED. INSTALL NEW CONDUIT
9. CONDUIT SHALL RUN ON OUTSIDE FACE OF LOCK WALL. CORE DRILLING SHALL BE
CONNECT NEW CONDUIT TO EXISTING EMPTY CONDUIT.
8. CONDUIT ON UPSTREAM LANDWALL SHALL CORE DRILL UP TO JOINT RECESS.
NEW TRENCHES MUST NOT CROSS EXISTING TRENCHES.
CONCRETE PLACEMENT PLAN, MIXES, AND ETC TO GOVERNMENT FOR APPROVAL.
4000 PSI CONCRETE MATERIAL. CONTRACTOR SHALL PROVIDE A SUBMITTAL OF
DEPTH OF 6 INCHES (MINIMUM). BACKFILL TRENCHES AND PENETRATIONS INTO RECESS WITH
PENETRATE INTO MACHINERY RECESS. TRENCHING SHALL BE BELOW GRADE A
MINIMAL LENGTH ENTERING MACHINERY RECESSES SHALL BE TRENCHED AND
FOLLOW LOCK FENCING AT GRADE LEVEL AND BE SECURED USING STRAPS. A
7. NEW CONDUIT SHALL RUN FROM POWER STATIONS TO GEARBOXES. RUN SHALL
6. HEATER CONTROL BOX INSTALLED WITHIN GATE MACHINERY RECESSES 2 & 3 ONLY.
PLACEMENT.
ON FENCE. CONTRACTOR SHALL COORDINATE WITH COR ON EXACT LOCATION OF
SHOWN IN DETAIL A. PLACEMENT SHALL BE DETERMINED BY SPACE AVAILABILITY
PLACEMENT OF NEW SAFETY SWITCH MAY NOT RESULT IN EXACT PLACEMENT AS
5. NEW 30 AMP SAFETY SWITCH SHALL BE SUPPLIED OFF 200 AMP ENCLOSURE.
DETERMINING EXACT PLACEMENT OF NEW MATERIALS AND EQUIPMENT.
ARE APPROXIMATIONS. CONTRACTOR SHALL COORDINATE WITH COR IN
4. LOCATIONS OF GATES MACHINERY RECESSES AND POWER SHORE STATIONS
REPRESENTATIVE (COR).
3. GRATING REMOVAL SHALL BE COORDINATED WITH CONTRACTING OFFICER
REPRESENTED BY SOLID LINES, EMBEDDED BY DASHED LINES
2. NEW CONDUIT SHALL BE RIGID GALVANIZED STEEL. EXTERIOR CONDUIT IS
OF ALL NEW WORK.
1. THIS DRAWING SHALL BE USED WITH DRAWINGS E-102 & E-601 FOR INSTALLATION
NOTES:
EMBEDDED CONDUIT
EMBEDDED CONDUIT
EMBEDDED CONDUIT
EMBEDDED CONDUIT
CONDUIT
NEW EXTERIOR
CONDUIT
NEW EXTERIOR
| Cover Sheet, Amendment 0001 |
| E-101- Gearbox Heater System Layout Rev 1, 2022-02-10 |
| 61N311 - Concrete Blocks L-4 and R4 Sheet 1 |
| 61N312 - Concrete Blocks L-4 and R4 Sheet 2 |
| 61N409 - Concrete Blocks R4 |
| 67N409- Air and Water Lines |
File details come from the government source that posted it. Updated .