Q1A-64704-Plot-000.pdf
PDF 3 MB Posted
- Attached to
- W912P521B0004 - Loyall Ponding Phase 1
- Solicitation number
- W912P521B0004
About this file
This site plan drawing and related federal contract opportunity provide details for the Loyall Ponding Phase 1 project. The site plan drawing depicts the project location near Loyall, Kentucky and includes details such as existing infrastructure, construction access and traffic control requirements, dewatering and sediment removal notes, and drainage structure locations. The related federal contract opportunity is a solicitation issued by the Nashville District of the U.S. Army Corps of Engineers for the Loyall Ponding Phase 1 project, seeking offers from contractors to construct a stone causeway, remove sediment and organic debris, and dewater the site in accordance with the specifications and site plan drawing provided. The response deadline and award date are not specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
P
P
P
P
P
S
S
0 1
S
1290 1290
RCP @
0.0%
35 LF OF 36"
S lo t T im e
P lo t
D a te
F il e N a m e
:5
:3
A
M
/1
/2 c d o c u m e n ts a n d s e tt in g s \h e c x fc m \p w w o rk \c e lr n \d m s \Q
A -6
4̂ .d g n
C
D
E
F
G
H
J
K
13121110987654321
B
A SHEET ID
US Army Corps of Engineers
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F
IL
E N
A M
E
P L
O T S
C A
L E
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E M
A R
K D
E S
C R
IP
T
IO
N D
A T
E
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T E
D B
Y
S
IZ
E
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
N A
S H
V
IL
L E D
IS
T R
IC
T
Q
A -6
4̂ .d g n
64/704
D O
W N
S T
R E
A M S
IT
E
N
60'0 30'
Q1A-
F C
M
R O
B E
R T J F
IT
Z P
A T
R
IC
K
R J F
A R
C H E
SITE ACCESS
C S X R
R
HW
Y
P A R
K H
ILL D
R
C U
M B E
R L A
N D R
IV
E R
S
IT
E P
L A
N
SLOPE = 2H:1V (TYP)
FOR CONSTRUCTION TRAFFIC
SWAMP MATS OR SIMILAR REQUIRED
ACCESS ROAD TO CAUSEWAY
E: 2341130.41
N: 1836640.70
E: 2341152.54
N: 1836789.97
E: 2341097.94
N: 1836786.79
E: 2341104.09
N: 1836862.95
E: 2340778.94
N: 1836858.79
E: 2340795.84
N: 1836555.68
E: 2340721.74
N: 1836363.38
.0 0'
.0 0'
711 FOR WSE DETAILS
SEE DRAWINGS Q1A-64/710 &
USGS WATER GAGE 03401000
A-A
64/708
STONE CAUSEWAY
SHOT ROCK & CRUSHED
GATE
SWING
BARRIER
CONTRACTOR WORK LIMITS
MANHOLE TYPE C
MODIFIED KYTC
Q1A-64/709 (TYP.)
SEE DRAWING
SWING GATE
BARRIER
CAUSEWAY
RAMP FOR EXITING
EASTERN ACCESS
OF COFFERDAM
APPROX. LOCATION
LINE AND POLES
EXISTING OVERHEAD
HEADWALL
CULVERT
KYTC PIPE
E: 2340846.95
N: 1836569.98
POND EXIT
APPROX. WATER LINE
E: 2340990.94
N: 1836647.19
POND ENTRY
APPROX. WATER LINE
FIVE DAYS PRIOR TO ANY CONSTRUCTION ACTIVITIES AFFECTING LOCAL TRAFFIC.
7. CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE CONTRACTING OFFICER
ACCESS PAD WHILE ALLOWING CONTROLLED ACCESS FOR MAINTENANCE.
6. CONTRACTOR SHALL MINIMIZE THE ABILITY FOR PUBLIC TRAFFIC IN THE AREA OF THE
HAUL ROUTE DOWN TO CAUSEWAY.
5. MODERATE CLEARING WILL BE NECESSARY TO ACCESS CULVERT HEADWALLS AND
OF CLOSURE AT THE CULVERT FOR THE ENTIRE LENGTH OF THE PROJECT.
CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST MAINTAIN AT LEAST ONE MEANS
4. THE INLET SHALL NOT BE BLOCKED BY SHOTROCK FILL DURING THE COURSE OF
OFFSITE AND DISPOSED OF BY CONTRACTOR.
SOLID WASTE AND ORGANIC DEBRIS LARGER THAN 6" ANY DIRECTION SHALL BE HAULED
POND CAN BE DRIED BY SPREADING IT ON THE LEVEE SLOPE AND THEN STABILIZED. ANY
ENCOUNTERED BEFORE 2 FEET, STOP DIGGING. ORGANIC DEBRIS REMOVED FROM THE
BENEATH THE CAUSEWAY BEFORE LAYING THE FILTER FABRIC. IF BEDROCK IS
WHICH MAY CONTAIN TRASH AND OTHER SOLID WASTE, FROM BOTTOM OF POND
3. CONTRACTOR SHALL REMOVE TWO FEET OF ORGANIC DEBRIS AND SEDIMENT,
SHALL SUBMIT PROPOSED MEANS AND METHODS FOR DEWATERING TO THE USACE.
NO MORE THAN 3" OF STANDING WATER DURING CONSTRUCTION. THE CONTRACTOR
EVEN AFTER INSTALLATION OF THE COFFER DAM. THE SITE SHALL BE DEWATERED TO
EXPECT SIGNIFICANT SEEPAGE THROUGH MATERIAL FOUND IN BOTTOM OF POND,
PUMPS TO MAINTAIN SUFFICIENTLY DRY CONDITIONS IN AREA. CONTRACTOR SHOULD
LIKELY INCLUDE THE NEED FOR MULTIPLE SUMP LOCATIONS AND MULTIPLE HIGHFLOW
1. CAUSEWAY CONSTRUCTION CAN BE STARTED IN THE POND. DEWATERING EFFORT WILL
GRADING FOR THE CAUSEWAY SHALL STOP SOUTH OF THIS 8" WATER LINE.
CONTRACTOR. THIS SURVEY WILL BE GIVEN TO THE USACE UPON COMPLETION. ALL
OF THE WATER LINE IS GIVEN, BUT MUST BE VERIFIED BY A SURVEY CONDUCTED BY THE
BE OBSERVED NOT TO DISTURB THIS EXISTING 8" WATER LINE. THE APPROX. LOCATION
THIS MUST BE DONE BEFORE BEGINNING CAUSEWAY CONSTRUCTION. ALL CAUTION SHALL
THE POND. DEWATERING SHALL BE DONE TO LOCATE AND SURVEY THIS 8" WATER LINE.
1. A COFFERDAM SHALL BE CONSTRUCTED NORTH OF THE 8" WATER LINE LOCATED IN
NOTES:
K Y
L E C
M C
C U
N E P .E
E=2340740.7151
N=1836268.9525
SEE NOTE 12.
RDM-012-02 NF-2553-105
RDM-011-04 RDM-055
RDM-010-05 RDM-013-03KYTC MANHOLE TYPE C
RDB-106-05
RDH-210-03
RDH-110-02KYTC PIPE HEADWALL
Q1A-64/709MISCELLANEOUS DETAILS
Q1A-64/708DOWNSTEAM SECTION AND PROFILES
REFERENCES:
T H A
V E
N U
E S
O U
T H
N A
S H
V
IL
L E T
N
-3
W P -2
-X -X
X X
X
/2
W P -2
-B -0
U P
P E
R C
U M
B E
R L
A N
D R
IV
E R B
A S
IN
L O
C A
L P
R O
T E
C T
IO
N P
R O J E
C T
C
IT
Y O
F L
O Y
A L L
H A
R L
A N C
O U
N T
Y
K E
N T
U C
K Y
L O
Y A L L P
O N
D
IN
G D
E S
IG
N P
H A
S E I
OF HWY 840.
REQUIRED, TO THE CONTRACTING OFFICER PRIOR TO ACCESSING THE SOUTHERN SHOULDER
IS THE EXCEPTION TO WHAT IS STATED IN THIS NOTE. PROVIDE PROOF OF PERMITS, IF
CONTRACTING OFFICER. THE PORTION OF THE RIGHT OF WAY THAT PARALLELS THE STAIRWAY
SIDE OF THE GUARDRAIL UNLESS OTHERWISE APPROVED BY KYTC PERMIT AND BY THE
CONTRACTOR SHALL REMAIN WITHIN THE GRAVELED AREA AND WITHIN 12' OF THE SOUTH
TO ACCESSING THE SOUTHERN SHOULDER (GRAVELED AREA INDICATED) OF HWY 840. THE
12. CONTRACTOR SHALL BE REQUIRED TO SECURE ALL NECESSARY PERMITS WITH KYTC PRIOR
OFFICER.
11. FINAL LOCATION OF BARRIER SWING GATE SHALL BE DETERMINED BY THE CONTRACTING
EXECUTED BY OTHERS.
IN ANY DIRECTION. THIS IS TO ACCOMMODATE FUTURE WATER PIPE RELOCATION TO BE
10. SHOT ROCK USED FOR THE CONSTRUCTION OF THE CAUSEWAY SHALL NOT EXCEED 8"
LIGHT DUTY VEHICLES ARE ALLOWED ON THE NEIGHBORHOOD ROADS.
VEHICLES IN EXCESS OF 5,000 LBS. SHALL BE ALLOWED ON THE NEIGHBORHOOD ROADS.
9. THE NEIGHBORHOOD ROADS SHALL NOT BE USED FOR HAUL TRAFFIC. NO CONSTRUCTION
AND PIPE SLOPES SHALL BE SUBMITTED TO USACE BY THE CONTRACTOR.
DRAWINGS SHOWING EXACT COORDINATES AND ELEVATIONS OF ALL INVERTS AND RIMS,
AND IN A SIMILAR ORIENTATION AS SHOWN HERE. UPON PROJECT COMPLETION AS-BUILT
8. DRAINAGE STRUCTURES SHOWN SHALL BE INSTALLED TO PROVIDE OPTIMAL DRAINAGE
/1
/2
U P
D A
T E
D W
O R
K L
IM
IT
S
A D
D E
D N
O T
E
A M
D
AMENDMENT
File details come from the government source that posted it. Updated .