W912P520Q0045 0001.pdf
PDF 126 KB Posted
- Attached to
- Gate Fender Fabrication Federal contract opportunity
- Solicitation number
- W912P520Q0045
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 07_NIL-64N525.pdf | ||
| 08_PIL-64E201-24.pdf | ||
| 09_PIL-FenderDetail.pdf | ||
| W912P520Q0045.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT: Pickw ick Landing and Nickajack Lock Gate Fender Fabrication PURPOSE: Post Questions and Answ ers received from the industry.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P520Q0045
X 9B. DATED (SEE ITEM 11)
01-Sep-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2020
CODE
CELRN-RC-N CONTRACTING BRANCH
110 9TH AVE SOUTH, A405
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P520Q0045
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS
QUESTION: Is the 1/16th deviation over the 60’?
ANSWER: No. Each ~60’ fender shall be delivered in up to 4 sections. The total (stacked) deviation in the overall length should not exceed + or - 1 inch of the design length when any two end sections are combined with any two middle sections.
QUESTION: There is not enough information on drawing #08_PIL64E201-24 or drawing #09_PIL-fender detail to define the location for coping fender MKS 24-186 to clear the diagonals, can you please clarify or provide additional information.
ANSWER: Coping to clear fenders is not required. Supply fenders without coping
QUESTION: There is not enough information on drawing #07_PIL-64E201-24 or drawing #09_PIL-fender detail to define the location for coping fender MKS 24-186 to clear the diagonals, can you please clarify or provide additional information.
ANSWER: Coping to clear fenders is not required. Supply fenders without coping
QUESTION: Can you please provide more information on “Braze Tight” detail on drawing # 07_PIL-64E201-24?
What exactly does “Braze Tight” mean?
ANSWER: In previous fabrications a nut was brazed on the fender metal to aid in forming the shape of the end section. Should the fabricator require attachments to form/shape the fender; the base metal shall not be damaged in the attaching process. The note on the detail indicates that brazing and not welding should be used to prevent damage to the work piece.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .