main_abstract-of-offers-construction-continuation-sheet2.pdf
PDF 567 KB Posted
- Solicitation number
- W912P520B0008
About this file
This document is an abstract of offers for a federal construction contract opportunity to fabricate steel structures called slot liners and slot fillers for locks along the Cumberland River. The Nashville District of the U.S. Army Corps of Engineers seeks to award a firm fixed price contract requiring the fabrication of two slot liners and two slot fillers each for Cheatham Lock and Nickajack Lock, and two slot liners for Wilson Lock, for a total of six slot liners and four slot fillers. The slot liners are approximately 27 feet tall and weigh approximately 14,700 pounds, while the slot fillers are approximately 8 feet tall and weigh around 16,000 pounds including concrete fill. The fabricated structures must be blast cleaned, painted, and delivered to the respective lock locations. Qualified welding, inspection, and coating are required. The anticipated award date is March 08, 2021 for work that is required to commence within ten days of notice to proceed and be completed by that date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| main_abstract-of-offers-construction sheet1(s).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET
1. SOLICITATION NUMBER
PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
2. PROJECT TITLE
NO.:
NO.:
NO.:
NO.:
A. OFFEROR
A. OFFEROR
A. OFFEROR
A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
A. ITEM NO.
B. ESTIMATED QUANTITY
C. UNIT
D. UNIT PRICE
E. ESTIMATED AMOUNT
E. ESTIMATED AMOUNT
D. UNIT PRICE
E. ESTIMATED AMOUNT
D. UNIT PRICE
E. ESTIMATED AMOUNT
D. UNIT PRICE
AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable
OPTIONAL FORM 1419A (11-88)
8.2.1.3144.1.471865.466429
| 1. SOLICITATION NUMBER: W912P520B0008 |
| 2. PROJECT TITLE: CHL, WIL, & NIL for Stoplog Liner Fabrications |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): YES |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): YES |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): NO |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): NO |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: YES |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: YES |
| 4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.: YES |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: YES |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 2.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 3B. ESTIMATED QUANTITY: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: |
| 3B. ESTIMATED QUANTITY: 1.00000000 |
| 3C. CONTRACT ITEMS. UNIT: JOB |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 445230.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 445230.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 377800.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 377800.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 392622.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 392622.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 616700.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 616700.00000000 |
| PAGE OF: 2.00000000 |
| PAGES: 2.00000000 |
| Offeror number. Column 1 of 4.: 3 |
| Offeror number. Column 2 of 4.: 4 |
| Offeror number. Column 3 of 4.: 5 |
| Offeror number. Column 4 of 4.: 6 |
| A. OFFEROR: OCCI Inc. Missouri Fabricator |
| A. OFFEROR: Johnson Machine Works |
| A. OFFEROR: Heartland Fabrications |
| A. OFFEROR: Walter Metal Fabricatin |
File details come from the government source that posted it. Updated .