SPECIFICATIONS
FOR
AIR WINCH, BLOCK SHEAVES, AND WIRE ROPE
FOR
MIDDLE TENNESSEE RIVER AREA, NASHVILLE DISTRICT, US ARMY
CORPS OF ENGINEERS
1. General: Contractor shall have 90 calendar days from contractor award to supply and deliver two (2) Air
Operated Winches, six (6) Horizontal Lead Blocks w/ 12”
Sheaves, six (6) Vertical Lead Blocks w/ 12” Sheaves, 2400’ of ¾” Wire Rope and twelve (12) Wire Rope Clips as specified herein for:
Pickwick Landing Lock
850 Carolina Lane
Counce, TN 38326
2. Equipment furnished under this specification shall be new and unused and of current model equipped as advertised by the manufacturer and shall equal or exceed the herein specifications. The manufacturer shall have local parts and service facilities capable of complete overhaul of all required items. All items shall be milled and manufactured within the borders of the United States of America. All items shall be factory tested for performance and quality prior to shipment.
3. Air Winch:
a. Winch Gear Type: 1-Stage Planetary, Gears shall be located inside the drum
b. Control Type: Lever Control, Lift-to-shift safety or approved equal
c. Motor Type: Piston Motor
d. (F)NPT Inlet: 1-1/4”
e. Hose Size: 1-1/2”
f. 1st Layer Load Capacity: 13,000 lb.
g. 1st Layer Line Speed: 38.0 fpm
h. Wire Rope Diameter: ¾”
i. Standards: ANSI/ASME B30.16, B30.7
4. Horizontal Lead Block
a. Sheave Diameter: 12”
b. Galvanized Coated
c. Working Load Limit: 8,000 lb.
d. Wire Rope Size: ¾”
e. Self-Lubricated Bronze Bushings
5. Vertical Lead Block
a. Sheave Diameter: 12”
b. Galvanized Coated
c. Working Load Limit: 8,000 lb.
d. Wire Rope Size: ¾”
e. Self-Lubricated Bronze Bushings
6. Wire Rope
a. ¾”, 6x37 IWRC EIP RRL DOM
7. Wire Rope Clips
a. U-Bolt & Saddle Type
b. Zinc Plated
c. Forged Steel
d. Size: ¾” Wire Rope
e. Nut Size/Type: 7/8” Hex
8. Descriptive Literature: The offeror shall provide along with their quote, sufficient descriptive literature to clearly indicate their product meets or exceeds all requirements herein. If multiple items are listed;
highlight or otherwise indicate the specific item being offered. Unclear or ambiguous documentations will be cause for refusal of the offer.
9. Operations and Maintenance Manuals: Two (2) copies of the operations and maintenance manual shall be included with the equipment. The manuals shall include installation instructions, equipment data, operations instructions, detail drawings and maintenance instructions. A list of suggested spares, including quantities and sources shall also be included in the manual.
10. Delivery: All requirements herein shall be fulfilled and delivered within 90 calendar days of notice of contract award. The price quoted shall include transportation and delivery to:
Brian Brewer
Lockmaster
Pickwick Landing Lock
850 Carolina Lane
Counce, TN 38326
731-925-2334
Delivery shall be made Monday – Thursday between the hours of 0700-1500 and scheduled seven (7) calendar days in advance with the lockmaster. Delivery shall not be scheduled on federally observed holidays. All costs associated with uncoordinated delivery shall be at the sellers’ expense.
11. Warranty: All items supplied shall be warranted for a minimum of one (1) year from date of acceptance by the
Government. Any standard manufacturer’s warranty covering a longer period shall also be applicable.
12. Security: All contractors and all associated sub-contractors shall comply with applicable District and local security policies and procedures (provided by the
Government representative). The Contractor shall provide any requested information required for background checks, background investigations and/or to meet facility access requirements (refer to the next paragraph). Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Background Investigation Requirements: In regard to work to be performed in a Government secured area, because this is a contract that requires supply and delivery only there are no investigation requirements. However, the
Contractor(s) will be escorted at all times while inside any restricted area.