W912P519T0012_TSpecs_RTA_2019_03_20.pdf
PDF 396 KB Posted
- Solicitation number
- W912P519T0012
About this file
TSPECS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P519T0012_Solicitation_Am_0003.pdf | ||
| W912P519T0012_TSpecs_Amendment_0003_2019_04_24.pdf | ||
| W912P519T0012-0002.pdf | ||
| W912P519T0012-0001.pdf | ||
| W912P519T0012_Final.pdf | ||
| W912P519T0012_TPlans_RTA_2019_01_29.pdf | ||
| Presolicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912P519T0012
US Army Corps Of Engineers Nashville District
AIR SEAL REPLACEMENT
Kentucky Lock Tennessee River
Livingston County, Kentucky
Technical Specifications
Ready to Advertise (RTA) Certified Final
March 2019
THIS PAGE INTENTIONALLY LEFT BLANK
FOR DUPLEX PRINTING
Air Seal Replacement Kentucky Lock W912P519T0012 Livingston County, Kentucky
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 78 00 AS-BUILT SUBMITTALS
DIVISION 05 - METALS
05 59 13 FABRICATION OF HYDRAULIC STEEL STRUCTURES
DIVISION 09 - FINISHES
09 97 02 PAINTING: HYDRAULIC STRUCTURES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SCOPE
1.2 SUMMARY
1.3 DEFINITIONS
1.3.1 Submittal Descriptions (SD)
1.3.2 Approving Authority
1.3.3 Work
1.4 SUBMITTALS
1.5 SUBMITTAL CLASSIFICATION
1.5.1 Government Approved G
1.5.2 Information Only
1.6 PREPARATION
1.6.1 Transmittal Form
1.6.2 Electronic File Format
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings
1.7.2 Number of Copies of SD-03 Product Data and SD-08
Manufacturer's Instructions
1.7.3 Number of Copies SD-05 Design Data and SD-07 Certificates
1.7.4 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's
Field Reports
1.7.5 Number of Copies of SD-10 Operation and Maintenance Data
1.7.6 Number of Copies of SD-01 Pre-Fabrication Submittals and SD-11
Closeout Submittals
1.8 INFORMATION ONLY SUBMITTALS
1.9 VARIATIONS
1.9.1 Considering Variations
1.9.2 Proposing Variations
1.9.3 Warranting That Variations Are Compatible
1.9.4 Review Schedule Is Modified
1.10 SUBMITTAL REGISTER
1.10.1 Use of Submittal Register
1.10.2 Contractor Use of Submittal Register
1.10.3 Approving Authority Use of Submittal Register
1.10.4 Copies Delivered to the Government
1.11 SCHEDULING
1.12 GOVERNMENT APPROVING AUTHORITY
1.12.1 Review Notations
1.13 DISAPPROVED OR REJECTED SUBMITTALS
1.14 APPROVED/ACCEPTED SUBMITTALS
1.15 APPROVED SAMPLES
1.16 WITHHOLDING OF PAYMENT
1.17 STAMPS
PART 2 PRODUCTS
SECTION 01 33 00 Page 1
PART 3 EXECUTION
ATTACHMENTS:
ENG Form 4025
SUBMITTAL REGISTER
-- End of Section Table of Contents --
SECTION 01 33 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SCOPE
The scope of this Section covers the submittal procedures required by this contract. All required submittals shall be provided in both hard copy and electronic format (PDF). Electronic submittals shall be sent to the Contracting Officer or designated representative via E-Mail to the extent possible.
1.2 SUMMARY
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's material Safety Data Sheets (SDS) and in compliance with existing laws and regulations.
1.3 DEFINITIONS
1.3.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Pre-Fabrication Submittals
Submittals which are required prior to or the start of the next major phase of the fabrication on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, SECTION 01 33 00 Page 3 or components to be used in the work.
List of proposed Subcontractors
List of proposed products
Progress schedule
Submittal register
Schedule of prices
Work plan
Quality Control(QC) plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SECTION 01 33 00 Page 4
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of work on a multi-phase contract.
1.3.2 Approving Authority
Office or designated person authorized to approve submittal.
1.3.3 Work
As used in this section, off-site fabrication required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Fabrication Submittals noted above, fabrication, materials, products, equipment, and systems incorporated or to be incorporated in such fabrication.
SECTION 01 33 00 Page 5
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.
SD-01 Pre-Fabrication Submittals
Submittal Register; G
1.5 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.5.1 Government Approved G
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.
Within the terms of the contract, they are considered to be "shop drawings."
1.5.2 Information Only
Submittals not requiring Government approval will be for information only.
They are not considered to be "shop drawings" within the terms of the contract.
1.6 PREPARATION
1.6.1 Transmittal Form
Use the attached sample transmittal form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.6.2 Electronic File Format
Provide submittals other than material samples in both hard copy (paper) and electronic formats. The electronic submittal file must be compiled as a single, complete document, to include the Transmittal Form described in paragraph 1.6.1 Transmittal Form. The electronic submittal file must be named specifically according to its contents (e.g. 01 45 01-1.2_Quality Control Plan.pdf).
Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer's Representative (COR).
Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the
SECTION 01 33 00 Page 6 electronic file must include a valid electronic signature, or scan of a signature.
Email electronic submittal documents fewer than 10MB to an email address as directed by the COR. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:
https://safe.amrdec.army.mil/safe/
Provide hard copies of submittals as specified in this or other specification sections.
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings
Submit one electronic (PDF format) and two hard copies of submittals of shop drawings requiring review and approval only by QC organization and one electronic (PDF format) and two hard copies of shop drawings requiring review and approval by Contracting Officer.
1.7.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions
Submit in compliance with quantity requirements specified for shop drawings.
1.7.3 Number of Copies SD-05 Design Data and SD-07 Certificates
Submit in compliance with quantity requirements specified for shop drawings.
1.7.4 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports
Submit in compliance with quantity and quality requirements specified for shop drawings other than field test results that will be submitted with QC reports.
1.7.5 Number of Copies of SD-10 Operation and Maintenance Data
Submit one electronic (PDF format) and two hard copies of O&M Data to the Contracting Officer for review and approval.
1.7.6 Number of Copies of SD-01 Pre-Fabrication Submittals and SD-11 Closeout Submittals
Unless otherwise specified, submit one electronic (PDF format) and two hard sets of administrative submittals.
1.8 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples
SECTION 01 33 00 Page 7 for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.9 VARIATIONS
Variations from contract requirements will be considered where advantageous to the Government and require both Designer of Record (DOR) and Government approval.
1.9.1 Considering Variations
Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals.
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.9.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.
Clearly mark the proposed variation in all documentation.
Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.
The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.9.3 Warranting That Variations Are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.9.4 Review Schedule Is Modified
In addition to the normal submittal review period, a period of 5 additional calendar days will be allowed for consideration by the Government of submittals with variations.
1.10 SUBMITTAL REGISTER
Prepare and maintain SUBMITTAL REGISTER, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. The Government will provide the
SECTION 01 33 00 Page 8 initial submittal register with the following fields completed, to the extent that will be required by the Government during subsequent usage.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.10.1 Use of Submittal Register
Submit submittal register. Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register:
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.10.2 Contractor Use of Submittal Register
Update the following fields in the Government-furnished submittal register or equivalent fields in program utilized by Contractor with each submittal throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.10.3 Approving Authority Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
SECTION 01 33 00 Page 9
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.10.4 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government.
1.11 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
e. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 30 calendar days for Contracting Officer approval. Period of review for submittals with Contracting Officer approval begins when Government receives submittal from Contractor.
f. Period of review for each resubmittal is the same as for initial submittal.
1.12 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.
SECTION 01 33 00 Page 10
Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. One copy of the approved submittal will be retained by the Contracting Officer and one copy of the submittal will be returned to the Contractor. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.
1.12.1 Review Notations
Contracting Officer review will be completed within 30 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" "or approved except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
1.13 DISAPPROVED OR REJECTED SUBMITTALS
Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, Contract Terms and Conditions-Commercial Items, is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and execution of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.14 APPROVED/ACCEPTED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of fabrication, materials, detailing and other information are satisfactory.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the
SECTION 01 33 00 Page 11
Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory fabrication of all work.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.15 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.
Contractor to replace such materials or equipment to meet contract requirements.
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.
1.16 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.17 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:
SECTION 01 33 00 Page 12
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 33 00 Page 13
F H
UW
LI
WK
D W
WK
H D E R Y H V X E P
LW
WH
G
LW
H P V K D Y H E H H Q
UH
Y
LH
Z H G
LQ
G H
WD
LO
D Q G D
UH
F R
UU
H F W D Q G
LQ
V
WU
LF
W F R Q
IR
UP
D Q F H Z
LW
K
WK
H
F R Q
WU
D F W G
UD
Z
LQ
J V D Q G V S H F
LI
LF
D
WL
R Q V H F H S W D V R
WK
H U Z
LV
H
V
WD
WH
G
,6 ,6
,7
,6 ,6 ,7
,7
,2 R Y H U R Q O\
R Q H V H F
WL
R Q Z
LW
K
H D F K
WU
D Q V P
LW
WD
O�
,7 ,2
LV
W E ,W H P
R
,7 ,1 ,3
�5 H D G
LQ
V
WU
X F
WL
R Q V R Q
WK
H
UH
Y H
UV
H V
LG
H S
UL
R U
WR
LQ
LW
LD
WL
Q J
WK
LV
IR
UP
,2 ,1 ,7
�7 K
LV
V H F
WL
R Q Z
LO
O E H
LQ
LW
LD
WH
G E
WK
H F R Q
WU
D F
WR
U�
,7
,7 ,1 ,7
,2 ,2
,7
D
,3 ,2 ,7 ,7
�7 S H V L] H P R G H O Q X P E H U� H
WF
E
,1
�6 H H
LQ
V
WU
X F
WL
R Q Q R
F
G
H
,1
I�
J
,2
�6 H H
LQ
V
WU
X F
WL
R Q
R
K
L�
�5
�3
UR
S R Q H Q W�
,7 ,2 ,6
,6
,7 ,6
,2
,1 ,2
H F
WL
R Q Z
LO
O E H
LQ
LW
LD
WH
G E
WK
H R Q
WU
D F
WR
U
LQ
WK
H
UH
T X
LU
H G Q X P E H U R I F R S
LH
V
D F K
WU
D Q V P
LW
WD
O V K D
OO
E H Q X P E H
UH
G F R Q V H F X
WL
Y H O\
LQ
WK
H V S D F H S
UR
Y
LG
H G
IR
U
UD
Q V P
LW
WD
O R K
LV
Q X P E H U�
LQ
D G G
LW
LR
Q
WR
WK
H F R Q
WU
D F W Q X P E H U� Z
LO
O
IR
UP
D V H
UL
D O
Q X P E H U
IR
U
LG
H Q
WL
I\
LQ
J H D F K V X E P
LW
WD
O�
R U Q H Z
V X E P
LW
WD
OV
R U
UH
V X E P
LW
WD
OV
P D
UN
WK
H D S S
UR
S
UL
D
WH
E R R Q
UH
V X E P
LW
WD
OV
LQ
V H
UW
WU
D Q V P
LW
WD
O Q X P E H U R I
OD
V W V X E P
LV
V
LR
Q D V
Z H
OO
D V
WK
H Q H Z
V X E P
LW
WD
O Q X P E H U�
K H ,W H P
R Z
LO
O E H
WK
H V D P H ,W H P
R D V
LQ
G
LF
D
WH
G R Q
�5
IR
U H D F K H Q
WU
R Q
WK
LV
IR
UP
X E P
LW
WD
OV
UH
T X
LU
LQ
J H S H G
LW
LR
X V K D Q G
OL
Q J Z
LO
O E H V X E P
LW
WH
G R Q D V H S D
UD
WH
IR
UP
H S D
UD
WH
WU
D Q V P
LW
WD
O
IR
UP
Z
LO
O E H X V H G
IR
U V X E P
LW
WD
OV
X Q G H U V H S D
UD
WH
V H F
WL
R Q V R I
WK
H V S H F
LI
LF
D
WL
R Q V
F K H F N V K D
OO
E H S
OD
F H G
LQ
WK
H D
UL
D
WL
R Q F R
OX
P Q Z K H Q D V X E P
LW
WD
O
LV
Q R W
LQ
D F F R
UG
D Q F H Z
LW
K
WK
H S
OD
Q V D Q G V S H F
LI
LF
D
WL
R Q V D
OV
R D Z
UL
WW
H Q V
WD
WH
P H Q W
WR
WK
D W H
II
H F W
V K D
OO
E H
LQ
F
OX
G H G
LQ
WK
H V S D F H S
UR
Y
LG
H G
IR
U H P D
UN
V
R
UP
LV
V H
OI
�W
UD
Q V P
LW
WD
O�
OH
WW
H U R I
WU
D Q V P
LW
WD
O
LV
Q R W
UH
T X
LU
H G
K H Q D V D P S
OH
R I P D
WH
UL
D O R U D Q X
ID
F
WX
UH
U
V H
UW
LI
LF
D
WH
R I R P S
OL
D Q F H
LV
WU
D Q V P
LW
WH
G
LQ
G
LF
D
WH
D P S
OH
R U H
UW
LI
LF
D
WH
LQ
F R
OX
P Q F H F
WL
R Q
�6
UP
R
US
V R I Q J
LQ
H H
UV
D S S
UR
Y
LQ
J D X
WK
R
UL
W\
Z
LO
O D V V
LJ
Q D F
WL
R Q F R G H V D V
LQ
G
LF
D
WH
G E H
OR
Z
LQ
V S D F H S
UR
Y
LG
H G
LQ
H F
WL
R Q F R
OX
P Q L
WR
H D F K
LW
H P
V X E P
LW
WH
G ,Q
D G G
LW
LR
Q
WK
H Z
LO
O H Q V X
UH
H Q F
OR
V X
UH
V D
UH
LQ
G
LF
D
WH
G D Q G D
WW
D F K H G
WR
WK
H
IR
UP
S
UL
R U
WR
UH
WX
UQ
WR
WK
H F R Q
WU
D F
WR
U�
K H R Q
WU
D F
WR
U Z
LO
O D V V
LJ
Q D F
WL
R Q F R G H V D V
LQ
G
LF
D
WH
G E H
OR
Z
LQ
H F
WL
R Q F R
OX
P Q J
WR
H D F K
LW
H P
V X E P
LW
WH
G
,1 ,2 ,9 ,7 ,7
S S
UR
Y H G D V V X E P
LW
WH
G
S S
UR
Y H G H F H S W D V Q R
WH
G R Q G
UD
Z
LQ
J V
S S
UR
Y H G H F H S W D V Q R
WH
G R Q G
UD
Z
LQ
J V
H
IH
U
WR
D
WW
D F K H G V K H H W
UH
V X E P
LV
V
LR
Q
UH
T X
LU
H G
LO
O E H
UH
WX
UQ
H G E V H S D
UD
WH
F R
UU
H V S R Q G H Q F H
S S
UR
Y D O R I
LW
H P V G R H V Q R W
UH
OL
H Y H
WK
H F R Q
WU
D F
WR
U
IU
R P
F R P S O\
LQ
J Z
LW
K D
OO
WK
H
UH
T X
LU
H P H Q
WV
R I
WK
H F R Q
WU
D F W S
OD
Q V D Q G V S H F
LI
LF
D
WL
R Q V
�5 H Y H
UV
H R I R
UP
�5
LV
D S S
UR
Y H G �6 H H D
WW
D F K H G
H F H
LS
W D F N Q R Z
OH
G J H G
H F H
LS
W D F N Q R Z
OH
G J H G G R H V Q R W F R P S O\
D V Q R
WH
G Z
LW
K F R Q
WU
D F W
UH
T X
LU
H P H Q
WV
WK
H U �6
S H F
LI
SU
BM
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
PA
G
ES
KY
L oc k
Ai r S ea ls
SD
-0
Pr ec on st ru ct io n Su bm itt al s
1.
G Su bm itt al R eg is te r
SD
-1
C lo se ou t S ub m itt al s 3.
G
As -B ui lt
D ra w in gs
SD
-0
Sh op
D ra w in gs 1.
3.
G D et ai l D ra w in gs
SD
-0
Pr od uc t D at a
2.
1.
G
El bo w s
2.
1.
G
Ba ll
Va lv es 2.
1.
G St ai nl es s
St ee l B ol ts 2.
1.
G An ch or
B ol ts 2.
1.
G M ag ne si um
A no de s
2.
1.
G
R ub be r S ea ls
SD
-0
Te st R ep or ts 2.
3.
G N dt R ep or ts
SD
-0
C er tif ic at es
2.
2.
3.
G W el de r P er fo rm an ce
Q ua lif ic at io n O f W el de rs
A nd
W el di ng
O pe ra to rs
SD
-0
M an uf ac tu re r’s In st ru ct io ns 1.
G
D el iv er y/ Sh ip pi ng P la n
SD
-0
Pr od uc t D at a Pa rt
G M an uf ac tu re r's
P ro du ct
D at a Sh ee t
SD
-0
Sa m pl es Pa rt
G Pr od uc t S am pl es
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
SU
BM
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
PA
G
ES
KY
L oc k
Ai r S ea ls
SD
-0
Te st R ep or ts 3.
G
In sp ec tio n R ep or ts
SD
-0
C er tif ic at es
1.
5.
G
SS
PC
Q P
C er tif ic at e
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 42 00 Page 1
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
6666 West Quincy Avenue Denver, CO 80235-3098 Ph: 303-794-7711 E-mail: distribution@awwa.org Internet: http://www.awwa.org
AMERICAN WELDING SOCIETY (AWS)
13301 NW 47 Ave Miami, FL 33054
Ph: 888-WELDING, 305-824-1177, 305-826-6192 Fax: 305-826-6195 E-mail: customer.service@awspubs.com Internet: http://www.aws.org
ASME INTERNATIONAL (ASME)
Two Park Avenue, M/S 10E New York, NY 10016-5990 Ph: 800-843-2763 Fax: 973-882-1717 E-mail: customercare@asme.org Internet: http://www.asme.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 877-909-2786 Internet: http://www.astm.org
SECTION 01 42 00 Page 2
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
127 Park Street, NE Vienna, VA 22180-4602 Ph: 703-281-6613 E-mail: info@mss-hq.com Internet: http://mss-hq.org/Store/index.cfm
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
40 24th Street, 6th Floor Pittsburgh, PA 15222 Ph: 412-281-2331 Fax: 412-281-9992 E-mail: info@sspc.org Internet: http://www.sspc.org
U.S. ARMY CORPS OF ENGINEERS (USACE)
CRD-C DOCUMENTS available on Internet:
http://www.wbdg.org/ccb/browse_cat.php?c=68 Order Other Documents from:
USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.publications.usace.army.mil/ or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
General Services Administration 1275 First St. NE Washington, DC 20417 Ph: 202-501-1231 Internet: http://www.gsaelibrary.gsa.gov/ElibMain/home.do Obtain documents from:
Acquisition Streamlining and Standardization Information System
(ASSIST)
Internet: https://assist.dla.mil/online/start/; account registration required
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used
SECTION 01 42 00 Page 3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 78 00
AS-BUILT SUBMITTALS
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 As-Built Drawings
1.2.2 Record Drawings
1.3 SOURCE DRAWING FILES
1.3.1 Terms and Conditions
1.4 SUBMITTALS
1.5 QUALITY CONTROL
PART 2 PRODUCTS
2.1 GOVERNMENT FURNISHED MATERIALS
2.2 SYSTEM DESCRIPTION
2.2.1 Additional Drawings
2.2.1.1 Sheet Numbers and File Names
PART 3 EXECUTION
3.1 AS-BUILT DRAWINGS
3.1.1 Markup Guidelines
3.1.2 As-Built Drawings Content
SECTION 01 78 00 Page 1
SECTION 01 78 00
AS-BUILT SUBMITTALS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
ERDC/ITL TR-12-1 (2015) A/E/C Graphics Standard, Release 2.0
ERDC/ITL TR-12-6 (2015) A/E/C CAD Standard - Release 6.0
1.2 DEFINITIONS
1.2.1 As-Built Drawings
As-built drawings are developed and maintained by the Contractor and depict actual conditions, including deviations from the Contract Documents. These deviations and additions may result from coordination required by, but not limited to: contract modifications; official responses to Contractor submitted Requests for Information; direction from the Contracting Officer;
designs which are the responsibility of the Contractor, and differing site conditions. Maintain the as-builts throughout fabrication as red-lined hard copies in the shop. These files serve as the basis for the creation of the record drawings.
1.2.2 Record Drawings
The record drawings are the final compilation of actual conditions reflected in the as-built drawings.
1.3 SOURCE DRAWING FILES
Request the full set of electronic drawings, in the source format, for Record Drawing preparation, after award and at least 30 calendar days prior to required use.
1.3.1 Terms and Conditions
Data contained on these electronic files must not be used for any purpose other than as a convenience in the preparation of fabrication drawings and data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor must make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable
SECTION 01 78 00 Page 2 attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
These electronic CAD drawing files are not construction documents.
Differences may exist between the CAD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CAD files, nor does it make representation to the compatibility of these files with the Contractor hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished Source drawing files, the signed and sealed construction documents govern. The Contractor is responsible for determining if any conflict exists. Use of these Source Drawing files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project. If the Contractor uses, duplicates or modifies these electronic source drawing files for use in producing construction drawings and data related to this contract, remove all previous indicia of ownership seals, logos, signatures, initials and dates.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-11 Closeout Submittals
As-Built Drawings; G
1.5 QUALITY CONTROL
Additions and corrections to the contract drawings must be equal in quality and detail to that of the originals. Line colors, line weights, lettering, layering conventions, and symbols must be the same as the original line colors, line weights, lettering, layering conventions, and symbols.
PART 2 PRODUCTS
2.1 GOVERNMENT FURNISHED MATERIALS
The Government will provide an optical disc (CD or DVD) at the preconstruction conference that contains the following:
a. One set of "as-designed" electronic CAD files in the specified software and format revised to reflect all amendments and the final contract PDF drawings. The CAD files are provided to enable preparation of as-built or as-constructed drawings. If discrepancies exist between the CAD files and the contract PDF drawings, correct the CAD files to show the contract PDF drawings.
2.2 SYSTEM DESCRIPTION
Prepare the CAD drawing files in MicroStation V8 format compatible with a Windows 10 operating system.
SECTION 01 78 00 Page 3
2.2.1 Additional Drawings
If additional drawings are required, prepare them using the specified electronic file format applying the same graphic standards specified for original drawings. The title block and drawing border to be used for any new final record drawings must be identical to that used on the contract drawings.
2.2.1.1 Sheet Numbers and File Names
If a sheet needs to be added between two sequential sheets, append a Supplemental Drawing Designator in accordance with ERDC/ITL TR-12-6 Adding a drawing sheet, and ERDC/ITL TR-12-1 Adding or deleting drawing sheets and index sheet procedures.
PART 3 EXECUTION
3.1 AS-BUILT DRAWINGS
Provide and maintain two black line print copies of the PDF contract drawings for As-Built Drawings. Submit as-built drawings 15 calendar days prior to delivery.
3.1.1 Markup Guidelines
Make comments and markup the drawings complete without reference to letters, memos, or materials that are not part of the As-Built drawing.
Show what was changed, how it was changed, where item(s) were relocated and change related details. These working as-built markup prints must be neat, legible and accurate as follows:
a. Use base colors of red, green, and blue. Color code for changes as follows:
(1) Special (Blue) - Items requiring special information, coordination, or special detailing or detailing notes.
(2) Deletions (Red) - Over-strike deleted graphic items (lines), lettering in notes and leaders.
(3) Additions (Green) - Added items, lettering in notes and leaders.
b. Provide a legend if colors other than the "base" colors of red, green, and blue are used.
c. Add and denote any additional equipment or material facilities, service lines, incorporated under As-Built Revisions if not already shown in legend.
d. Use frequent written explanations on markup drawings to describe changes. Do not totally rely on graphic means to convey the revision.
e. Use legible lettering and precise and clear digital values when marking prints. Clarify ambiguities concerning the nature and application of change involved.
f. Wherever a revision is made, also make changes to related section views, details, legend, profiles, plans and elevation views, schedules, notes and call out designations, and mark accordingly to avoid
SECTION 01 78 00 Page 4 conflicting data on all other sheets.
g. For deletions, cross out all features, data and captions that relate to that revision.
h. For changes on small-scale drawings and in restricted areas, provide large-scale inserts, with leaders to the applicable location.
i. Indicate one of the following when attaching a print or sketch to a markup print:
1) Add an entire drawing to contract drawings
2) Change the contract drawing to show
3) Provided for reference only to further detail the initial design.
j. Incorporate all shop and fabrication drawings into the markup drawings.
3.1.2 As-Built Drawings Content
Revise As-Built Drawings in accordance with ERDC/ITL TR-12-1 and ERDC/ITL TR-12-6. Provide 2 sets of paper copies from PDF drawings to show the as-built conditions by red-line process during the execution of the project. Show on the as-built drawings, but not limited to, the following information:
Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor; including but not limited to shop drawings, fabrication, erection, etc.
SECTION 01 78 00 Page 5
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 59 13
FABRICATION OF HYDRAULIC STEEL STRUCTURES
PART 1 GENERAL
1.1 SCOPE
1.1.1 General
1.1.2 Base Contract
1.1.2.1 Air Seal Assemblies - Required 4
1.1.2.2 6" dia. Ball Valves - Required 4
1.1.2.3 Valve Stem Assemblies - Required 4
1.2 REFERENCES
1.3 QUALITY ASSURANCE
1.3.1 Detail Drawings
1.3.2 Structural Members
1.3.2.1 Certification and Qualification
1.3.2.2 Material Handling
1.3.2.3 Tack Welds and Temporary Welds
1.3.2.4 Welding Processes
1.3.2.5 Weld Inspection
1.3.2.6 Repair Welding
1.4 SUBMITTALS
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Structural steel
2.1.2 Stainless Steel Plates, Pipe and Bolts
2.1.3 Ball Valves
2.1.3.1 General
2.1.3.2 Valve Stem
2.1.3.3 Valve Stem Supports
2.1.4 Flanged Elbows
2.1.5 Anchor Bolts
2.1.6 U Bolts
2.1.7 Rubber Seals
2.1.8 Magnesium Anodes
2.2 FABRICATION
2.2.1 Structural Fabrication
2.2.1.1 Dimensional Tolerances for Structural Work
2.2.1.2 Structural Steel Fabrication
2.2.2 Assembly
2.2.3 Welded Connections
2.2.3.1 Welding Procedure
2.2.3.2 Welder Performance Qualification of Welders and Welding
Operators
SECTION 05 59 13 Page 1
2.2.3.3 Welding Process
2.2.3.4 Welding Technique
2.2.3.4.1 Filler Metal
2.2.3.4.2 Preheat and Interpass Temperature
2.2.3.4.3 Stress-Relief Heat Treatment
2.2.3.5 Workmanship
2.2.3.5.1 Preparation of Base Metal
2.2.3.5.2 Tack and Temporary Welds
2.2.3.5.3 Tack Welds
2.2.3.5.4 Weld Access Holes
2.2.3.5.5 Weld Backing Removal
2.2.3.5.6 Weld Backing Material Other Than Steel
2.2.4 Bolted Connections
2.2.4.1 Bolts, Nuts, and Washers
2.2.4.2 Bolt Holes
2.2.5 Miscellaneous Provisions
2.2.5.1 Weldments
2.2.5.2 Drain Holes
2.2.6 Shop Assembly
2.2.7 Seals
2.3 TESTS, INSPECTIONS, AND VERIFICATIONS
2.3.1 Nondestructive Testing (NDT)
2.3.2 Inspection of Structural Steel Welding
2.3.2.1 Visual Examination
2.3.2.2 Nondestructive Examination
2.3.2.2.1 Testing Agency
2.3.2.2.2 Examination Procedure
2.3.2.2.3 Acceptability of Welds
2.3.2.2.4 Examination Procedures
2.3.2.2.4.1 Ultrasonic Testing (UT)
2.3.2.2.4.2 Magnetic Particle Inspection (MT)
2.3.2.2.4.3 Dye Penetrant Inspection (PT)
2.3.3 Welds to be Subject to Nondestructive Examination
2.3.3.1 Structural Steel Members
2.3.3.2 Structural Steel Member Fillet Welds and Partial
Penetration Welds
2.3.4 Test Coupons
2.3.5 Supplemental Examination
2.3.6 Structural Steel Welding Repairs
2.3.7 Control Dimensions
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Cleaning
3.1.2 Alignment and Setting
3.1.3 Field Installation
3.2 PROTECTION OF FINISHED WORK
3.3 PAINTING
3.4 SHOP INSPECTION
SECTION 05 59 13 Page 2
SECTION 05 59 13
FABRICATION OF HYDRAULIC STEEL STRUCTURES
PART 1 GENERAL
1.1 SCOPE
1.1.1 General
The work covered by this section consists of furnishing all labor, materials and equipment, and performing all work necessary and required to complete the air seal assemblies and valve stem assemblies as specified herein and on the drawings. All work shall be performed in strict accordance with this section of the specifications and the applicable drawings, and shall be subject to the terms and conditions of the contract.
Contractor shall also deliver the equipment to Kentucky Lock Project.
Installation shall be performed by others.
1.1.2 Base Contract
All air seals shall be assembled in shop by the Contractor.
1.1.2.1 Air Seal Assemblies - Required 4
Provide four air seal assemblies. Each air seal assembly shall include structural plates, rubber seals, jack screws, jack arms, jack pins, magnesium anodes, steel blocks, steel block cover plants, hardware, 2" dia.
ball valves, 90 degree elbows (2" dia. elbow and 6" dia. elbow) with 2 gaskets for each elbows, and all required accessories for a complete air seal assembly.
Spare parts - Contractor shall also provide the following spare parts:
a. 16 magnesium anode assemblies that include anodes, studs, nuts, washers, etc.
b. 16 steel blocks MK 64274-4-1.
c. 16 cover plates MK 64274-4-2.
1.1.2.2 6" dia. Ball Valves - Required 4
Provide four 6" dia. ball valves along with stainless steel bolts for flanged connection, 12" dia. hand wheel and hand wheel connection bolt.
Flanged gaskets are covered in air seal assemblies.
1.1.2.3 Valve Stem Assemblies - Required 4
Provide four valve stem assemblies that include valve stem supports, valve stem extensions, wrench extensions (required 2), stainless steel U-bolts, stainless steel anchor bolts and other required accessories.
SECTION 05 59 13 Page 3
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASME INTERNATIONAL (ASME)
ASME B16.34 (2017) Valves - Flanged, Threaded and Welding End
ASTM INTERNATIONAL (ASTM)
ASTM A193/A193M (2016) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A240/A240M (2017) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications
ASTM A276/A276M (2017) Standard Specification for Stainless Steel Bars and Shapes
ASTM A312/A312M (2017) Standard Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes
ASTM A325 (2014) Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
ASTM A351/A351M (2016) Standard Specification for Castings, Austenitic, for Pressure-Containing Parts
ASTM A490 (2014a) Standard Specification for Structural Bolts, Alloy Steel, Heat Treated, 150 ksi Minimum Tensile Strength
ASTM A514/A514M (2014) Standard Specification for High-Yield-Strength, Quenched and Tempered Alloy Steel Plate, Suitable for Welding
ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings
SECTION 05 59 13 Page 4
ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A709/A709M (2017) Standard Specification for Structural Steel for Bridges
ASTM D2000 (2012; R 2017) Standard Classification System for Rubber Products in Automotive Applications
ASTM E165/E165M (2012) Standard Practice for Liquid Penetrant Examination for General Industry
ASTM E709 (2015) Standard Guide for Magnetic Particle Examination
ASTM F3125/F3125M (2015a) Standard Specification for High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength, Inch and Metric Dimensions
ASTM F436 (2011) Hardened Steel Washers
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-72 (2010a) Ball Valves with Flanged or Butt-Welding Ends for General Service
1.3 QUALITY ASSURANCE
1.3.1 Detail Drawings
If Contractor deviates from the contract drawings, then they shall need to submit detail drawings for metalwork and machine work, prior to fabrication, include within the detail drawings catalog cuts, templates, fabrication and assembly details and type, grade and class of material as appropriate.
1.3.2 Structural Members
Structural steel shall be…