W38XDD83060640
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make changes to Lake Barkley, Park Attendant Work Schedules and update FAR 52-252-3, Alterations in solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P519T0003
X 9B. DATED (SEE ITEM 11)
15-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jan-2019
CODE
CELRN-RC-N CONTRACTING BRANCH
A405, 110 9TH AVE S
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P519T0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
BAR BUMPUS MILLS CG WORK SCH
LAKE BARKLEY
PARK ATTENDANT SCHEDULE
FY 2019
LAKE BARKLEY, BUMPUS MILLS
1. GENERAL.
Offers for the Bumpus Mills contract will be accepted from an individual bidder or a couple bidding as a two person team.
PROSPECTIVE PARK ATTENDANTS ARE URGED TO INSPECT THE RECREATION AREAS BEFORE
THEY SUBMIT AN OFFER IN ORDER TO BECOME FAMILIAR WITH THE SIZE AND SCOPE OF THE
DIFFERENT AREAS AND THEIR REQUIRED DUTIES. The Resource Manager or his representative will accompany the prospective attendants on this inspection. An appointment for an inspection tour should be arranged with the Resource Manager prior to arrival at the project. For an on-site inspection contact:
Lake Barkley Resource Manager P O Box 218 Grand Rivers KY 42045 Phone: (270) 362-4236 Attn: David Landis David.A.Landis@usace.army.mil
BUMPUS MILLS CAMPGROUND. 764 Forest Trail, Dover TN 37058, Bumpus Mills Campground is located in Stewart County, Tennessee, From Nashville, Take I-24 west to Clarksville, TN. Follow Highway 79 South for 20
mi. to Highway 120. Follow Highway 120 for 10 mi. to Bumpus Mills, turn left onto Tobaccoport Road (Hwy.
1830) for 2.8 mi., turn left onto Oak Hill Road for 9 mi., turn left onto Forest Trail then turn right into the campground.
From I-24 East Cadiz KY: Take 68 west for 6.2mi., turn left on to HWY. 139 south for 15.3mi., continue on to TN.
HWY 120 for 2.7 mi. Turn left onto Tobaccoport Road, Hwy 1830 for 2.8 mi., turn left onto Oak Hill Road for .9 mi., turn left onto Forest Trail then into the campground.
The campground consists of 15 sites equipped with water, electrical hookups, table, grill, and garbage container.
The area also has a wash house, washer/dryer, drinking fountains, launching ramp, and playground facilities. The campground is very popular with family groups and is heavily utilized on weekends.
2. PERIOD OF PERFORMANCE.
The Base year (CY 2019) will be 3 May 2019 through 3 September 2019 (107 scheduled work days). In Option year 1, the number of work days will be a minimum of 107 days, up to a maximum of 122 days during the Period of Performance. Twenty-one (21) days prior to the end of the current contract year, the contractor will be notified, in writing, of the Government’s intent to exercise the next contract year Option. The Period of Performance (open/closing dates and associated number of work days) for the next Option year will be defined in this notification. The Contract modification to exercise the next Option year will be completed prior to the end of the current contract year.
IT IS SOLELY AT THE GOVERNMENT'S DISCRETION WHETHER OR NOT TO EXERCISE THE
"OPTION YEARS". THE CONTRACTOR SHOULD BE AWARE THAT THEY ARE OBLIGATED TO
THE FULL TERM OF THE CONTRACT WHICH INCLUDES THE BASE YEAR AND ANY OPTION
YEARS. CONTRACTORS SHALL NOT SUBMIT A PROPOSAL FOR THIS CONTRACT IF THEY
ARE NOT COMMITTED TO THE FULL TERM - IN THIS CASE 4 YEARS (BASE + 3 OPTIONS).
SCHEDULED HOURS OF OPERATION
MONDAY – THURSDAY 10 A.M. - 6 P.M. 8 Hours
WEDNESDAY DAY OFF
FRIDAY 10 A.M – 8 P.M. 10 Hours SATURDAY 10 A.M. - 7 P.M. 9 Hours SUNDAY 11 AM – 6 P.M. 7 Hours HOLIDAYS FOR ALL CAMPGROUNDS 9 A.M. - 5 P.M. 8 Hours
NOTE**
HOURS INDICATED REFLECT HOURS ENTRANCE STATION WILL BE OPEN. HOURS ARE
SUBJECT TO CHANGE, DEPENDING ON WORK LOAD.
BAR CANAL A WORK SCH
LAKE BARKLEY
PARK ATTENDANT SCHEDULE
LAKE BARKLEY, Canal A
PROSPECTIVE PARK ATTENDANTS ARE URGED TO INSPECT THE RECREATION AREAS BEFORE
THEY SUBMIT AN OFFER IN ORDER TO BECOME FAMILIAR WITH THE SIZE AND SCOPE OF THE
DIFFERENT AREAS AND THEIR REQUIRED DUTIES. The Resource Manager or his representative will accompany the prospective attendants on this inspection. An appointment for an inspection tour should be arranged with the Resource Manager prior to arrival at the project. For an on-site inspection contact:
Lake Barkley Resource Manager P O Box 218 Grand Rivers KY 42045 Phone: (270) 362-4236 Attn: David Landis David.A.Landis@usace.army.mil
CANAL CAMPGROUND. 1010 Campground Road, Grand River, KY 42045. Canal Campground is located in Livingston County, Kentucky, on Hwy 453, approximately five miles from I-24. The campground consists of 112 sites. All sites are equipped with water, electric hookups, table, grill and centrally located garbage bins. The area also has four wash houses, washers/dryers, drinking fountains, launching ramp, beach, and playground, ADA accessible courtesy / fishing float, short-term courtesy boat dock and large shelter facilities. The campground is very popular and has a high occupancy rate.
2. PERIOD OF PERFORMANCE. The Base year (CY 2019) will be 29 March 2019 through 28 October 2019 (110 scheduled work days). Twenty-one (21) days prior to the end of the current contract year, the contractor will be notified, in writing, of the Government’s intent to exercise the next contract year Option. The Period of Performance (open/closing dates and associated number of work days) for the next Option years will be defined in this notification. The Contract modification to exercise the next Option year will be completed prior to the end of the current contract year.
IT IS SOLELY AT THE GOVERNMENT'S DISCRETION WHETHER OR NOT TO EXERCISE THE
"OPTION YEARS". THE CONTRACTOR SHOULD BE AWARE THAT THEY ARE OBLIGATED TO
THE FULL TERM OF THE CONTRACT WHICH INCLUDES THE BASE YEAR AND ANY OPTION
YEARS. CONTRACTORS SHALL NOT SUBMIT A PROPOSAL FOR THIS CONTRACT IF THEY ARE
NOT COMMITTED TO THE FULL TERM - IN THIS CASE 4 YEARS (BASE + 3 OPTIONS).
SCHEDULED HOURS OF OPERATION
(TWO SEPARATE PARK ATTENDANT POSITIONS CALLED “CANAL A” AND “CANAL B” WILL
ALTERNATE WORKING FOUR DAYS ON FOUR DAYS OFF)
CANAL CAMPGROUND # Hours
MONDAY – THURSDAY 10 A.M. - 6 P.M. 8
FRIDAY 10 A.M. - 8 P.M. 10
SATURDAY 10 A.M. - 7 P.M. 9
SUNDAY 11 A.M. - 6 P.M. 7
HOLIDAYS FOR ALL CAMPGROUNDS 9 A.M. - 5 P.M. 8 Hours
Days to be worked
March 29-31
April 1, 6-9, 14-17, 22-25, 30 May 1-3, 8-11, 16-19, 24-27 June 1-4, 9-12, 17-20, 25-28, July 3-6, 11-14, 19-22, 27-30 August 4-7, 12-15, 20-23, 28-31 September 5-8, 13-16, 21-24, 29,30 October 1,2, 7-10, 15-18, 23-26, NOTE**
BAR CANAL B WORK SCH
PARK ATTENDANT SCHEDULE
LAKE BARKLEY, Canal B
THEY SUBMIT AN OFFER IN ORDER TO BECOME FAMILIAR WITH THE SIZE AND SCOPE OF THE
DIFFERENT AREAS AND THEIR REQUIRED DUTIES. The Resource Manager or his representative will accompany the prospective attendants on this inspection. An appointment for an inspection tour should be arranged with the Resource Manager prior to arrival at the project. For an on-site inspection contact:
Lake Barkley Resource Manager P O Box 218 Grand Rivers KY 42045 Phone: (270) 362-4236 Attn: David Landis David.A.Landis@usace.army.mil
CANAL CAMPGROUND. 1010 Campground Road, Grand River, KY 42045. Canal Campground is located in Livingston County, Kentucky, on Hwy 453, approximately five miles from I-24. The campground consists of 112 sites. All sites are equipped with water, electric hookups, table, grill and centrally located garbage bins. The area also has four wash houses, washers/dryers, drinking fountains, launching ramp, beach, and playground, ADA accessible courtesy / fishing float, short-term courtesy boat dock and large shelter facilities. The campground is very popular and has a high occupancy rate.
2. PERIOD OF PERFORMANCE. The Base year (CY 2019) will be 29 March 2019 through 28 October 2019 (104 scheduled work days). Twenty-one (21) days prior to the end of the current contract year, the contract will be notified, in writing, of the Government’s intent to exercise the next contract year Option. The Period of Performance (open/closing dates and associated number of work days) for the next Option year will be defined in this notification. The Contract modification to exercise the next Option year will be completed prior to the end of the current contract year.
IT IS SOLELY AT THE GOVERNMENT'S DISCRETION WHETHER OR NOT TO EXERCISE THE
"OPTION YEARS". THE CONTRACTOR SHOULD BE AWARE THAT THEY ARE OBLIGATED TO
THE FULL TERM OF THE CONTRACT WHICH INCLUDES THE BASE YEAR AND ANY OPTION
YEARS. CONTRACTORS SHALL NOT SUBMIT A PROPOSAL FOR THIS CONTRACT IF THEY ARE
NOT COMMITTED TO THE FULL TERM - IN THIS CASE 4 YEARS (BASE + 3 OPTIONS).
SCHEDULED HOURS OF OPERATION
(TWO SEPARATE PARK ATTENDANT POSITIONS CALLED “CANAL A” AND “CANAL B” WILL
ALTERNATE WORKING FOUR DAYS ON FOUR DAYS OFF)
CANAL CAMPGROUND # Hours
MONDAY – THURSDAY 10 A.M. - 6 P.M. 8
FRIDAY 10 A.M. - 8 P.M. 10
SATURDAY 10 A.M. - 7 P.M. 9
SUNDAY 11 A.M. - 6 P.M. 7
HOLIDAYS FOR ALL CAMPGROUNDS 9 A.M. - 5 P.M. 8 Hours
Days to be worked
April 2-5, 10-13, 18-21, 26-29
May 4-7, 12-15, 20-23, 28-31 June 5-8, 13-16, 21-24, 29,30 July 1,2, 7-10, 15-18, 23-26, 31 August 1-3, 8-11, 16-19, 24-27 September 1-4, 9-12, 17-20, 25-28 October 3-6, 11-14, 19-22, 27,28
NOTE**
BAR EUREKA WORK SCH
PARK ATTENDANT SCHEDULE
LAKE BARKLEY, EUREKA
THEY SUBMIT AN OFFER IN ORDER TO BECOME FAMILIAR WITH THE SIZE AND SCOPE OF THE
DIFFERENT AREAS AND THEIR REQUIRED DUTIES. The Resource Manager or his representative will accompany the prospective attendants on this inspection. An appointment for an inspection tour should be arranged with the Resource Manager prior to arrival at the project. For an on-site inspection contact:
Lake Barkley Resource Manager P O Box 218 Grand Rivers KY 42045 Phone: (270) 362-4236 Attn: David Landis David.A.Landis@usace.army.mil
EUREKA CAMPGROUND. 1802 State Route 1271, Kuttawa KY 42055, Eureka Campground is located Lyon County KY. Take I-24 to Exit 40. Turn left onto Highway 62 West for 2.9 miles then turn left onto Highway 810.
Go 0.7 miles then turn right onto State Route 1271. Continue onto 1271 for 1.8 miles. The road leads directly into the campground.
The campground consists of 26 sites equipped with water, electrical hookups, table, grill, and garbage container. The area also has a wash house, washer/dryer, drinking fountains, launching ramp, and playground facilities. The campground is very popular with family groups and is heavily utilized on weekends.
2. PERIOD OF PERFORMANCE.
The Base year (CY 2019) will be 26 April 2019 through 3 September 2019 (112 scheduled work days). In Option year 1, the number of work days will be a minimum of 112 days, up to a maximum of 127 days during the Period of Performance. Twenty-one (21) days prior to the end of the current contract year, the contractor will be notified, in writing, of the Government’s intent to exercise the next contract year Option. The Period of Performance (open/closing dates and associated number of work days) for the next Option year will be defined in this notification. The Contract modification to exercise the next Option year will be completed prior to the end of the current contract year.
IT IS SOLELY AT THE GOVERNMENT'S DISCRETION WHETHER OR NOT TO EXERCISE THE
"OPTION YEARS". THE CONTRACTOR SHOULD BE AWARE THAT THEY ARE OBLIGATED TO
THE FULL TERM OF THE CONTRACT WHICH INCLUDES THE BASE YEAR AND ANY OPTION
YEARS. CONTRACTORS SHALL NOT SUBMIT A PROPOSAL FOR THIS CONTRACT IF THEY
ARE NOT COMMITTED TO THE FULL TERM - IN THIS CASE 4 YEARS (BASE + 3 OPTIONS).
SCHEDULED HOURS OF OPERATION
MONDAY – THURSDAY 10 A.M. - 6 P.M. 8 Hours
WEDNESDAY DAY OFF
FRIDAY 10 A.M – 8 P.M. 10 Hours SATURDAY 10 A.M. - 7 P.M. 9 Hours SUNDAY 11 AM – 6 P.M. 7 Hours HOLIDAYS FOR ALL CAMPGROUNDS 9 A.M. - 5 P.M. 8 Hours
NOTE**
BAR HURRICANE CG WORK SCH
PARK ATTENDANT SCHEDULE
LAKE BARKLEY, HURRICANE CREEK
THEY SUBMIT AN OFFER IN ORDER TO BECOME FAMILIAR WITH THE SIZE AND SCOPE OF THE
DIFFERENT AREAS AND THEIR REQUIRED DUTIES. The Resource Manager or his representative will accompany the prospective attendants on this inspection. An appointment for an inspection tour should be arranged with the Resource Manager prior to arrival at the project. For an on-site inspection contact:
Lake Barkley Resource Manager P O Box 218 Grand Rivers KY 42045 Phone: (270) 362-4236 Attn: David Landis David.A.Landis@usace.army.mil
HURRICANE CREEK CAMPGROUND. 25 Hurricane Campground Road, Eddyville Ky. 42038. Hurricane Creek Campground is located in Trigg County, Kentucky, on Hwy 274, approximately eight miles North of Cadiz, Kentucky. The campground consists of 51 sites equipped with water, electrical hookups, table, grill, and garbage container. The area also has a wash house, washer/dryer, drinking fountains, launching ramp, and playground facilities. The campground is very popular with family groups and is heavily utilized on weekends.
2. PERIOD OF PERFORMANCE.
The Base year (CY 2019) will be 26 April 2019through 28 October 2019 (160 scheduled work days). Twenty-one
(21) days prior to the end of the current contract year, the contractor will be notified, in writing, of the Government’s intent to exercise the next contract year Option. The Period of Performance (open/closing dates and associated number of work days) for the next Option year will be defined in this notification. The Contract modification to exercise the next Option year will be completed prior to the end of the current contract year.
IT IS SOLELY AT THE GOVERNMENT'S DISCRETION WHETHER OR NOT TO EXERCISE THE
"OPTION YEARS". THE CONTRACTOR SHOULD BE AWARE THAT THEY ARE OBLIGATED TO
THE FULL TERM OF THE CONTRACT WHICH INCLUDES THE BASE YEAR AND ANY OPTION
YEARS. CONTRACTORS SHALL NOT SUBMIT A PROPOSAL FOR THIS CONTRACT IF THEY
ARE NOT COMMITTED TO THE FULL TERM - IN THIS CASE 4 YEARS (BASE + 3 OPTIONS).
SCHEDULED HOURS OF OPERATION
MONDAY – THURSDAY 10 A.M. - 6 P.M. 8 Hours
TUESDAY DAY OFF
FRIDAY 10 A.M – 8 P.M. 10 Hours SATURDAY 10 A.M. - 7 P.M. 9 Hours SUNDAY 11 AM – 6 P.M. 7 Hours HOLIDAYS FOR ALL CAMPGROUNDS 9 A.M. - 5 P.M. 8 Hours
NOTE**
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
The purpose of this amendment is to make changes to Lake Barkley Park Attendant Work Schedules and update FAR 52-252-3, Alterations in solicitation.
(End of Summary of Changes)