This is an amendment to a solicitation for the supply of GSU transformers at the Old Hickory Power Plant. The amendment revises technical specification sections to reflect previous changes, updates the list of documents, and combines amendments to specification pages. The U.S. Army Corps of Engineers Engineering District Nashville seeks a contractor to supply Class II GSU power transformers in accordance with revised specification documents. The response due date was extended by previous amendments and the work involves replacing existing transformers at the Old Hickory Power Plant. Relevant details are provided on the transformer specifications, drawings being replaced or added, clauses being updated, and agencies involved.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING BRANCH (EJC)

EUGENIA.J.CORDER@USACE.ARMY.MIL

110 NINTH AVE SOUTH, ROOM A405

NASHVILLE TN 37203-3817

W38XDD91919314

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: Old Hickory Pow er Plant, GSU Transformers The purpose of this amendment is to:

1. Revise Technical Specification Section 48 19 23.04 26 to reflect combined Amendment 0002 and Amendment 0003 changes (replace Technical Specification pages 15 and 16 w ith attached document, Section 48 19 23.04 26 Paragraph 2.1.5 - Amendment 4.pdf);

2. Update List of Documents; and

3. Update FAR Clause 52.252-3.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P519R0004

X 9B. DATED (SEE ITEM 11)

10-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-May-2020

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, RM A680

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912P5

FACILITY CODECODE

EMAIL:TEL:

W912P519R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF DOCUMENTS

Specifications and Drawings will be provided as separate files and are available on https://beta.sam.gov/ . The following Specifications and Drawings are part of the solicitation/contract and shall be considered in that respect.

The work shall conform to the specifications identified below:

W912P519R0004_Solicitation.pdf W912P519R0004_ReferenceDrawings.pdf W912P519R0004_Tplans.pdf W912P519R0004_Tspecs.pdf

Documents added with Amendment 0002:

OLD HICKORY GSU PREPROPOSAL PRESENTATION.pdf Site Visit Attendees.pdf Drawing G-003.pdf (Technical Plans)(Replace G-003 Drawing) Section 48 19 23_04 26 Page 16.pdf (Class II GSU Power Transformer)(Technical Specifications)(Remove Section 48 19 23.04 26 page 16 and replace with revised Section 48 19 23.04 26 page 16.)

Documents added with Amendment 0003:

REV Drawing G-003.pdf (Technical Plans)(Replace G-003 Drawing) Section 48 19 23.04 Page 15 and 16 (Technical Specifications)(Replace pages 15 and 16 with Section 48 19 23.04 26 Paragraph 2.1.5 - Amendment 3.pdf.)

Document added with Amendment 0004:

Section 48 19 23.04 26 Page 15 and 16 (Combined Amendment 0002 and Amendment 0003 changes) (Replace Technical Specification pages 15 and 16 with Section 48 19 23.04 26 Paragraph 2.1.5 - Amendment 4.pdf)

W912P519R0004

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR QUOTERS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001 The purpose of this amendment is to:

1. Revise CLIN 0001, CLIN 0002 and CLIN 0003 descriptions;

2. Add CLIN 0004 and CLIN 0005;

3. Update FAR Clause 52.252-3.

Amendment 0002 The purpose of this amendment is to:

1. Post Questions and Answers;

2. Post Site Visit Presentation (OLD HICKORY GSU PREPROPOSAL PRESENTATION.pdf);

3. Post List of Site Visit Attendees (Site Visit Attendees.pdf);

4. Revise Technical Plans, Drawing G-003 (Drawing G-003.pdf);

5. Revise Technical Specifications, Section 48 19 23_04 26 Page 16 (Section 48 19 23_04 26 Page 16.pdf)

6. Add DFAR Clauses 252.225-7001, Buy American Act and Balance of Payments Program and 252.225-7002, Qualifying Country Sources as Subcontractors;

7. Extend due date from 14 May 2020 to 22 May 2020; and

8. Update FAR Clause 52.252-3.

Amendment 0003 The purpose of this amendment is to:

1. Revise Technical Specification Section 48 19 23.04 26, Paragraph 2.1.5, items k., l., and m. listed as text change in this Amendment, by replacing pages 15 and 16 of the previous Technical Specification with the attached document (Section 48 19 23.04 26 Paragraph 2.1.5 - Amendment 3.pdf);

2. Revise Section M. Proposal Content and Evaluation, Section 7.1, with listed changes marked in bold red in this Amendment;

3. Revise Drawing G-003 (REV Drawing G-003.pdf);

4. Extend due date from 22 May 2020 to 29 May 2020;

5. SAFE Upload Codes will be sent on 26 May 2020, and

6. Update FAR Clause 52.252-3.

Amendment 0004 The purpose of this amendment is to:

1. Revise Technical Specification Section 48 19 23.04 26 to reflect combined Amendment 0002 and Amendment 0003 changes (replace Technical Specification pages 15 and 16 with the attached document, Section 48 19 23.04 26, Paragraph 2.1.5 - Amendment 4.pdf);

2. Update List of Documents; and

3. Update FAR Clause 52.252-3.

(End of Summary of Changes)