Amendment 0001

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING DIVISION (DAB)

110 9TH AVENUE SOUTH, RM A680

NASHVILLE TN 37203

W38XDD83180919

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: Barkley Lock Emergency Gate Rehabilitation The purpose of this amendment is to:

1. Add Site Visit Minutes from the Pre-Bid Site Visit held 29 August 2019.

2. Provide an update to the Technical Plans.

3. Update DFARS 252.236-7001, Contract Draw ings and Specif ications and FAR 52.252-3, Alterations in Solicitation.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P519B0015

X 9B. DATED (SEE ITEM 11)

23-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Sep-2019

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, RM A405

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912P5

FACILITY CODECODE

EMAIL:TEL:

W912P519B0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

PRE-BID SITE VISIT MINUTES

CELRN-RC-N 3 September 2019

MEMORANDUM FOR RECORD

SUBJECT: Minutes for Barkley Lock Emergency Gate Rehabilitation Pre-Bid Meeting and Site Visit (W912P519B0015)

1. Purpose: To summarize the Pre-Bid Meeting and Site Visit held on 29 August 2019.

2. Attendees:

Government:

Mr. Jason Johnson, CELRN-OPS-N Mr. Zachary Griffin, CELRN-ECD-C Mr. Karzan Mohamad-Ali, CELRN-ECD-E Mr. Justin Tabor, CELRN-ECE-T Mr. Chris Marshall, CELRN-OPW-KWA Mr. Barry Arnett, CELRN-ECC-W Mr. Ross Cunningham, CELRN-OP-BAL Mrs. Debra Barlow, CELRN-RC-N

Contractors:

Mr. Raymond Toppass, Abhe & Svoboda, Inc.

Mr. Leon Hatzipetros, Atlas Painting & Sheeting Mr. Anthony Langum, Drax, Inc.

Mr. Dennis Cramer, Hartman Walsh Mr. Bill Wood, International Systems, Inc.

Mr. Joel Birket, J. Birket, Inc.

Mr. Dustin Wilson, Moran Environmental Recovery Mr. Christopher Stamas, Paragon Construction Mr. Matt Barker, TTL, Inc.

3. Summary of Discussions: Mrs. Debra Barlow started the meeting at 9:00 a.m. Central Time with a brief overview of the project.

a. INTRODUCTIONS: Government employees were introduced.

b. AGENDA: The Pre-Bid Meeting consisted of the following agenda items: Introductions, Contracting Information, and Safety Concerns. After the meeting, a site visit was scheduled to tour the emergency gate at Barkley Lock.

(1) Mrs. Debra Barlow presented an overview of the Gate Rehabilitation project.

(2) Contracting Requirements Overview: The scope of this project is to repair deficiencies to the Upstream Emergency Gate at Barkley Lock. The Government will stage and restrain the structure against wind loading prior to the Contractor beginning work. The Contractor will be responsible for furnishing all equipment, supplies, and labor to complete the rehabilitation of the structure. Work Items to be performed include removing the existing grating and cathodic protection system, blasting (including lead paint remediation), a visual inspection of the structure and associated mechanical components, weld repair, reinforcement of known structurally deficient members, replacement of grating, and recoating the structure. Barkley Lock is located on the Cumberland River in Livingston County, Kentucky.

a. Solicitation W912P519B0015 for Rehabilitation of the Emergency Gate at Barkley Lock in Grand Rivers, KY is a firm fixed-price construction contract with a base and four (4) options. This is a Full and Open Competition procurement.

NOTE: Since this is a Full and Open Competition procurement if the apparent low bidder is a large business, a subcontracting plan is required. In accordance with FAR 19.702, any large business must agree that small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns will have the maximum practicable opportunity to participate in contract performance consistent with its efficient performance.

It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business, veteran-owned small business, service disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.

If the apparent low at the bid opening is a large business, a subcontracting plan must be submitted within two (2) calendar days of request. A subcontracting plan may be submitted with the bid; however, it is not required. Small businesses will not need to submit a subcontracting plan.

b. Basis for Selection of Award: Award shall be made to the lowest priced bidder who is determined to be responsive and responsible. See Federal Acquisition Regulation (FAR) 52.214-19, Contract Award— Sealed Bidding—Construction, for more information. In accordance with FAR 52.217-5, Evaluation of Options, the Government intends to evaluate bids for award purposes by adding the total price for all options to the total price for the basic requirement.

c. Options and Commencement: The solicitation has base and option line items in the bid schedule.

As stated in FAR 52.211-10, Commencement, Prosecution, and Completion of Work, the base line items must be completed not later than 375 calendar days from Notice to Proceed.

The options shall be exercised in accordance with the following schedule to prevent any delays to the Contractor or time impacts to the overall duration:

If Option 1 is exercised, the Contract Completion Date (CCD) shall be extended by twenty-eight

(28) calendar days.

If Option 2 is exercised, the CCD shall be extended by seventy (70) calendar days.

If Option 3 is exercised, the CCD shall be extended by sixty-three (63) calendar days.

If Option 4 is exercised, the CCD shall be extended by five (5) calendar days.

The Contractor shall not mobilize equipment, materials, office trailers or any other items to the site until the site has been released to the Contractor. The Contracting Officer anticipates releasing the site to the Contractor by March 1, 2020 as listed in the technical specifications and contract drawings.

d. Disclosure of Magnitude of the project: Between $1 and $5 Million dollars.

e. Bids are due on: September 23, 2019 by 1:00 pm CST (If you want, you can attend the bid opening in Nashville. Any bid submitted late will not be considered for award. See FAR 52.214.-7.)

Electronic or facsimile bids will NOT be accepted. If you choose to send your bid by FedEx or other carriers, and it is late, it will not be accepted.

f. This solicitation contains Definitive Responsibility Criteria as precondition to award. See Section 00 21 00 - Instructions (paragraph 1.12) for the criteria and details.

The Contracting Officer will verify the submitted projects meet the definitive responsibility criteria as part of the responsibility determination.

Note: Bidders may submit the experience of a technically qualified subcontractor to satisfy one (1) or more of the definitive responsibility criteria except for criteria 5. Bidders relying on the technical experience of a subcontractor will be required to provide evidence of a firm commitment (i.e., signed agreement or letter of commitment) from the subcontractor to perform if the bidder is awarded the contract.

Bidders are encouraged to provide the supporting documentation related to the definitive responsibility criteria with their bid submission. If this information is not submitted with their bid, the Government will request the apparent low bidder to provide this information within two (2) business days after the bid opening date.

g. Reference Section 00 21 00 – Instructions on what, how and where to submit your bid.

h. This contract will be a firm fixed-price procurement which means all costs, including administrative, need to be figured in the line items and annotated on the Bid Schedule.

i. This solicitation includes Department of Labor wage rates under Section 00 73 00 – Supplementary Conditions. At a minimum you shall be required to pay your employees these rates plus fringe benefits for performance under this contract.

j. The Contractor is required to show proof of insurance after award and to maintain it for the duration of the contract. Requirements are stated in Section 00 73 00 – Supplementary Conditions;

under Item 1; Schedule of Insurance, and contractors are encouraged to check with their insurance company prior to submitting a certificate.

k. Section 00 21 00 – Instructions (paragraph 3), Ensure that; in accordance with FAR 52.228-1, Bid Guarantee, a bid guarantee is furnished in the proper form and amount, by the time set for the opening of bids. Failure to do so may be cause for rejection of the bid. Please utilize Standard Form 24 for your bid guarantee.

l. Section 00 21 00 – Instructions (paragraph 4), To be awarded this contract; your company will have to be registered at SAM (System for Award Management, www.sam.gov) website.

Contractors MUST include in their bid a signed copy of the SF 1442.

Contractors also MUST acknowledge all amendments by returning a signed amendment copy.

Failure to acknowledge amendments could make you non-responsive and no longer considered for award.

m. Please do not submit information that is not requested. Follow the guidelines in the solicitation.

Section 00 21 00 – Instructions (paragraph 6) provides a Bidders Checklist to assist you in submitting a proper bid.

n. REMINDER: If there is a discrepancy between what is said here today and what is written in the solicitation, the document governs. All questions shall be in writing and sent to Specialist Debra Barlow via email at debra.a.barlow@usace.army.mil no later than the deadline specified in the solicitation; Sep 5, 2019 at 10:00 am CST. Questions received after this deadline will not be addressed.

(3) Mr. Ross Cunningham presented the safety rules of the tour and led the tour.

(4) Messrs. Zachary Griffin and Karzan Mohamad-Ali provided Plans and Specifications for review.

(5) Contractors were reminded all official questions must be presented in writing to Debra Barlow at email address debra.a.barlow@usace.army.mil no later than 5 September 2019 at 10:00 AM central time.

4. Site visit tour ended approximately at 12:00 p.m. Central Time.

T PLANS - SUMMARY OF CHANGES

W912P519B0015 – BARKLEY EMERGENCY GATE REHABILITATION

TECHNICAL PLANS

The following changes are incorporated into the technical plans for solicitation W912P519B0015 for the Emergency Gate Rehabilitation at Barkley Lock.

1. Page 13 of 20 – Drawing number Q9-30/5.3: Upstream Emergency Gate Truss Rollers.

Changes include: Removal of “Option 3” and addition of “Truss Roller Option”.

2. Page 20 of 20 – Drawing number Q9-31/13: Upstream Emergency Gate Hoist Wire Rope Assembly Replacement.

Changes include: Removal of arrow pointing to wire rope in Hoist Rope Assembly – MK. 31/13-2.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

AMENDMENT 0001:

Project: Barkley Lock Emergency Gate Rehabilitation

The purpose of this amendment is to:

1. Add Site Visit Minutes from the Pre-Bid Site Visit held 29 August 2019.

2. Provide an update to the Technical Plans.

3. Update DFARS 252.236-7001, Contract Drawings and Specifications.

All other terms and conditions remain the same.

(End of Provision)

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

W912P519B0015 RTA TSpecs.pdf W912P519B0015 RTA Tplans Amendment 0001.pdf

(End of clause)

(End of Summary of Changes)