Request_for_Information_.pdf
PDF 110 KB Posted
- Attached to
- Turbine Generator, Barkley PP - Request for Information Federal contract opportunity
- Solicitation number
- W912P519B0003
About this file
This document is a Request for Information from the Nashville District of the U.S. Army Corps of Engineers regarding rehabilitation of four turbine generators at the Barkley Power Plant in Kuttawa, Kentucky. The RFI provides details on the scope of work, which includes rewinding three generators to increase maximum output and upgrading support systems while the units are down. Respondents are requested to provide details on relevant past experience by December 20th, 2018, including design and testing of Kaplan runners over 200 inches in diameter, static oil head systems, turbine generator disassembly, salient pole generator design and installation, and generator field coil rehabilitation. The anticipated solicitation is for a firm-fixed price construction contract between $25-100 million to be awarded under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $36.5 million.
Please complete the Request for Information in its entirety.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
The Government is issuing this Request for Information to determine a competitive basis. This is not a solicitation. No reimbursement will be made for any costs associated with providing information in response to this survey. This questionnaire is for market research purposes only.
Only contractors capable of performing this type of work should respond to this Request for Information.
Requirement
The Nashville District U.S. Army Corps of Engineers (USACE) anticipates soliciting a requirement for a firm fixed-price construction contract to rehabilitate four (4) turbine generators at Barkley Power Plant, Kuttawa, KY. The estimated magnitude of this project is between $25,000,000 and $100,000,000.
Summary of work for the Barkley Turbine Generator Rehab Project*:
1. The overall goal of this project is to increase the generator maximum output from 41.52 MW to 46.5 MW. This will be accomplished by rewinding units 2, 3, and 4. Unit 1 was rewound in September 2011. All the mechanical system to support this new load will have to be assessed and refurbished. While the units are down for rehabilitation there will be some efforts to upgrade or replace systems associated with the turbine generators.
2. General Project: The term of the project is estimated for seven (7) years which includes model testing, fabrication and installation of each unit.
3. Electrical Work: The electrical work will primarily include the stator winding, core laminations, rotor poles, and model verification. The stator is expected to be upgraded to epoxy mica insulation. This will allow for better thermal performance. The core will be designed with continuously stacked cores for more physical strength.
4. Turbine Work: Majority of the turbine work will be focused around head covers, wicked gates, turbine shaft, runner, bearings, operating ring, servomotors, and facing plates.
Four (4) new runners will be installed with the implementation of a static oil head. A special item in this contract will be producing a display from the existing runner. The wicked gates will be refurbished and some spares will be fabricated. All turbine bearings will be inspected and converted to a straight fit and rest of the turbine equipment will be inspected and/or replaced to include but not limited to stay ring, stay vane, vacuum breaker, discharge ring, winter-kennedy and heat taps, head covers, bottom ring, and facing plates.
5. Mechanical Work: During the rehab all the mechanical support systems will be inspected or upgraded. This will include but not limited to brake ring, brake cylinders, thrust bearing coolers, float switches, digital relays, oil cleaning skid, governor temperature readout, lift system replacement, surface air cooler replacement, rotor spider inspection, guide bearing pumps, unwater valve, vacuum breakers, wicket gate lubrication system, and rotating exciter will be removed.
6. Transformer Installation: Install government supplied two (2) three phase 13.2 – 13.2 / 161 kV main unit generator step-up (GSU) power transformers. This will required the removal of two (2) previously installed transformers located in the switchyard and disposal. The new equipment must be integrated with the grounding mat, oil containment and fire protection system.
The contractor will be required to provide all plant, labor and materials to construct these features.
*Please note that this description is subject to change.
The anticipated NAICS code is 237990, Other Heavy and Civil Engineering Construction, with a small business size standard of $36.5 million.
Survey
The Government is issuing this to determine a competitive basis. This is not a solicitation and the items listed herein are subject to change or eliminated from the requirement. This questionnaire is for market research purposes only. Only contractors capable of performing this type of work should respond to this Request for Information.
Your response to this survey is requested by 4:00 PM Central Time, December 20, 2018.
Please send by email to lether.e.robinson@usace.army.mil or fax to 615-736-7124.
1) Name of your firm:
2) CAGE:
3) Point of Contact, Phone number and EMAIL address:
4) Please provide responses to the following:
a) Provide a minimum of (3) projects completed within the last (10) years*, or (2) projects completed in the last (10) years* and (1) project that is currently substantially complete*, that were self-performed as a prime or sub-contractor, that demonstrate design and scale model testing of new Kaplan runners with a minimum blade diameter of 200 inches.
i) First Project Name:
ii) Contract Number (if applicable):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
vi) Dollar Amount:
vii) General Description of project:
i) Second Project Name:
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
i) Third Project Name:
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
b) Provide a minimum of (2) projects completed within the last (10) years*, or (1) project completed in the last (10) years* and (1) project that is currently substantially complete*, that were self-performed as a prime or sub-contractor, that demonstrate design of a static oil head system for Kaplan runners with a minimum blade diameter of 200 inches
i) First Project Name:
ii) Contract Number (if applicable):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
c) Provide a minimum of (2) projects completed within the last (10) years*, or (1) project that were self-performed as a prime or sub-contractor, that demonstrate disassembly of a Kaplan turbine generator unit with a minimum blade diameter of 200 inches.
i) First Project Name:
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
d) Provide a minimum of (2) projects completed within the last (10) years*, or (1) project that were self-performed as a prime or sub-contractor, that demonstrate experience designing and installing a new or replacement 13.8KV salient pole generator with a size no less than 30 MW.
i) First Project Name:
ii) Contract Number (if applicable):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
e) Provide a minimum of (2) projects completed within the last (10) years*, or (1) project that were self-performed as a prime or sub-contractor, that demonstrate experience rehabilitating field coils for a salient pole generator with field current rating and synchronous speed no less than 800 amps and 65 (-10/+85) rpm, respectively.
i) First Project Name:
ii) Contract Number (if applicable):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
f) Provide a minimum of (2) projects completed within the last (10) years*, or (1) project that were self-performed as a prime or sub-contractor, that demonstrate experience installing via continuous stacking method a core for a 13.KV salient pole generator of a size no less than 30 MW.
i) First Project Name:
ii) Contract Number (if applicable):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
iii) Year Completed:
iv) Prime Contractor or – Sub-Contractor:
v) Type and percentage of work self-performed (based on contract value):
g) At least one of the submitted projects must have been completed within the last (6) years with a contract value of at least $60 million.
*Define “substantially complete” as at least 50% complete.
*Define “10 years” as 10 years from the date this RFI is posted.
5) Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g. HubZone, 8(a), SDVOSB, WOSB, etc.)?
6) If your company is a small business concern, per FAR 52.219-14, at least 25 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. Can your firm be expected to do this, given your current employee situation?
(Please respond yes or no.)
7) What is your organization’s bonding capacity?
8) Would you be interested in bidding this work if it were solicited?
9) Please provide any additional information you feel is necessary: