04_BAR_Lock_Grating_Replacement_TSpecs_-_Final_Submittal.pdf

PDF 326 KB Posted

Attached to
Barkely Lock Grating Federal contract opportunity
Solicitation number
W912P518T0069
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps Of Engineers Nashville District

Grating Replacement

Barkley Lock

Cumberland River Livingston County, Kentucky

Technical Specifications

Final Submittal

August 2018

THIS PAGE INTENTIONALLY LEFT BLANK

FOR DUPLEX PRINTING

Gr at i ng Repl acement Bar kl ey Lock Fi nal Submi t t al Li v i ngst on Count y, Kent ucky

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00 GENERAL REQUI REMENTS

01 33 00 SUBMI TTAL PROCEDURES

01 35 50 PROJECT SI TE SECURI TY AND AT/ OPSEC PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

DI VI SI ON 05 - METALS

05 50 14 STRUCTURAL METAL FABRI CATI ONS

05 50 15 CI VI L WORKS FABRI CATI ONS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 SCOPE

1. 2 I NSPECTI ONS AND ACCEPTANCE

1. 3 SUBMI TTALS

1. 4 DELI VERY OF GRATI NG PANELS

1. 5 NON- DI SCLOSURE OF GOVERNMENT I NFORMATI ON

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 00 00 Page 1

SECTI ON 01 00 00

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 SCOPE

Thi s sect i on of t he Speci f i cat i ons pr ovi des gener al i nf or mat i on and r equi r ement s. The wor k consi st s of f ur ni shi ng al l equi pment , l abor , mat er i al s, and t r anspor t at i on r equi r ed f or t he f abr i cat i on and del i ver y of new Bar kl ey Lock gr at i ng panel s as descr i bed i n t he speci f i cat i ons and drawings.

1. 2 I NSPECTI ONS AND ACCEPTANCE

Not wi t hst andi ng ot her pr ovi s i ons of t hi s cont r act , al l mat er i al s r equi r ed under t hi s cont r act wi l l be i nspect ed and accept ed by t he Cont r act i ng Of f i cer or hi s aut hor i zed r epr esent at i ve( s) . The Cont r act i ng Of f i cer and hi s aut hor i zed r epr esent at i ve ar e t he i ndi v i dual ( s) sol el y aut hor i zed t o r ej ect or appr ove mat er i al s, and or der or di r ect any r evi s i on or change t o t he pl ans and speci f i cat i ons as pr esent l y shown and st at ed.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr e- Fabr i cat i on Submi t t al s

Del i ver y / Shi ppi ng Pl an; G

1. 4 DELI VERY OF GRATI NG PANELS

Al l f abr i cat i ons shal l be del i ver ed t o Bar kl ey Lock, 758 Bar kl ey Dam Road, Gr and Ri ver s, KY 42045- 9802. The Gover nment wi l l i nspect and accept ( or r ej ect ) al l del i ver i es. The Gover nment wi l l of f - l oad and st or e t he gr at i ng panel s. The gr at i ng panel s shal l be ar r anged on t he del i ver y vehi c l es such t hat no damage occur s dur i ng shi ppi ng.

The Cont r act or must submi t a Del i ver y / Shi ppi ng Pl an f or appr oval by t he Cont r act i ng Of f i cer . The pl an shal l descr i be i n det ai l t he pr oposed met hods of del i ver y. The pl an shal l addr ess equi pment , machi ner y and si t e l i mi t at i ons i dent i f i ed i n t he speci f i cat i ons and di scussed at a pr e- del i ver y meet i ng bet ween t he Cont r act or and t he Cont r act i ng Of f i cer .

The pl an shal l be submi t t ed at l east 60 cal endar days pr i or t o pr oposed del i ver y of any i t em. The pl an shal l i ncl ude, but not be l i mi t ed t o t he following:

a. Type and si ze of t r uck and/ or t r ai l er t o be used f or del i ver y.

b. Locat i on and descr i pt i on of i nt er medi at e assembl y or handl i ng ar eas

SECTI ON 01 00 00 Page 2

( i f any) bet ween t he f abr i cat i on l ocat i on and t he del i ver y l ocat i on.

c. Cr anes and ot her l i f t i ng and posi t i oni ng equi pment t hat wi l l be required.

d. Packagi ng of component s.

e. Bl ocki ng.

Al l del i ver i es must be made Monday t hr ough Thur sday, f r om 06: 30 t o 16: 00 hours.

1. 5 NON- DI SCLOSURE OF GOVERNMENT I NFORMATI ON

Nei t her t he Cont r act or , nor Cont r act or per sonnel , shal l di vul ge or r el ease dat a or i nf or mat i on devel oped or obt ai ned under per f or mance of t hi s wor k st at ement , except t o aut hor i zed Gover nment per sonnel or upon wr i t t en appr oval of t he Cont r act i ng Of f i cer . The Cont r act or shal l not use, di scl ose, or r epr oduce pr opr i et ar y dat a whi ch bear s a r est r i ct i ve l egend, ot her t han as speci f i ed i n t hi s wor k st at ement .

Nei t her t he Cont r act or nor t he Cont r act or ' s empl oyees shal l di scl ose or cause t o be di ssemi nat ed, any i nf or mat i on concer ni ng t he oper at i ons of t he act i v i t y whi ch coul d r esul t i n, or i ncr ease t he l i kel i hood of , t he possi bi l i t y of a br each of t he act i v i t i es, secur i t y or i nt er r upt t he cont i nui t y of i t s oper at i on.

Al l i nqui r i es r ecei ved by t he Cont r act or f or i nf or mat i on concer ni ng wor k per f or med under t hi s cont r act shal l be r ef er r ed t o t he Gover nment f or eval uat i on under t he Fr eedom of I nf or mat i on Act of 1975, Publ i c Law 93- 502, 5 U. S. C. , Sect i on 552. The det er mi nat i on of whet her r ecor ds wi l l be r el eased wi l l r emai n wi t h t he Gover nment . The Cont r act or shal l assi st t he COR i n compi l i ng i nf or mat i on or r ecor ds f or submi ssi on upon r equest by t he Gover nment .

The Cont r act or shal l not r el ease any i nf or mat i on ( i ncl udi ng phot ogr aphs, f i l es, publ i c announcement s, st at ement s, deni al s, or conf i r mat i ons) on any por t i on of t he subj ect mat t er of t hi s cont r act or any phase of any pr ogr am her eunder wi t hout t he pr i or wr i t t en appr oval of t he COR. Al l document at i on showi ng i ndi v i dual s, names or ot her per sonal i nf or mat i on wi l l be cont r ol l ed and pr ot ect ed. The pr ovi s i ons of t he Pr i vacy Act of 1974, Publ i c Law 93- 579, 5 U. S. C. , Sect i on 552a, shal l appl y.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on - -

SECTI ON 01 00 00 Page 3

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 33 00

SUBMI TTAL PROCEDURES

PART 1 GENERAL

1. 1 SCOPE

1. 2 SUMMARY

1. 3 DEFI NI TI ONS

1. 3. 1 Submi t t al Descr i pt i ons ( SD)

1. 3. 2 Appr ovi ng Aut hor i t y

1. 3. 3 Wor k

1. 4 SUBMI TTALS

1. 5 SUBMI TTAL CLASSI FI CATI ON

1. 5. 1 Gover nment Appr oved ( G)

1. 5. 2 I nf or mat i on Onl y

1. 6 PREPARATI ON

1. 6. 1 Tr ansmi t t al For m

1. 7 QUANTI TY OF SUBMI TTALS

1. 7. 1 Number of Copi es of SD- 02 Shop Dr awi ngs

1. 7. 2 Number of Copi es of SD- 03 Pr oduct Dat a and SD- 08

Manuf act ur er ' s I nst r uct i ons

1. 7. 3 Number of Copi es SD- 05 Desi gn Dat a and SD- 07 Cer t i f i cat es

1. 7. 4 Number of Copi es SD- 06 Test Repor t s and SD- 09 Manuf act ur er ' s

Fi el d Repor t s

1. 7. 5 Number of Copi es of SD- 10 Oper at i on and Mai nt enance Dat a

1. 7. 6 Number of Copi es of SD- 01 Pr e- Fabr i cat i on Submi t t al s and SD- 11

Cl oseout Submi t t al s

1. 8 I NFORMATI ON ONLY SUBMI TTALS

1. 9 SUBMI TTAL REGI STER

1. 10 VARI ATI ONS

1. 10. 1 Consi der i ng Var i at i ons

1. 10. 2 Pr oposi ng Var i at i ons

1. 10. 3 War r ant i ng t hat Var i at i ons ar e Compat i bl e

1. 10. 4 Revi ew Schedul e Ext ensi on

1. 11 SCHEDULI NG

1. 12 GOVERNMENT APPROVI NG AUTHORI TY

1. 12. 1 Revi ew Not at i ons

1. 13 DI SAPPROVED SUBMI TTALS

1. 14 APPROVED/ ACCEPTED SUBMI TTALS

1. 15 APPROVED SAMPLES

1. 16 WI THHOLDI NG OF PAYMENT

1. 17 STAMPS

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 33 00 Page 1

ATTACHMENTS:

Submi t t al Regi st er

ENG For m 4025- R

SECTI ON 01 33 00 Page 2

SECTI ON 01 33 00

SUBMI TTAL PROCEDURES

PART 1 GENERAL

1. 1 SCOPE

The scope of t hi s sect i on cover s t he submi t t al pr ocedur es r equi r ed by t hi s cont r act . Al l r equi r ed submi t t al s shal l be pr ovi ded i n bot h har d copy and el ect r oni c f or mat ( PDF) . El ect r oni c submi t t al s shal l be sent t o t he Cont r act i ng Of f i cer or desi gnat ed r epr esent at i ve v i a E_mai l t o t he ext ent possible.

1. 2 SUMMARY

The Cont r act i ng of f i cer may r equest submi t t al s i n addi t i on t o t hose speci f i ed when deemed necessar y t o adequat el y descr i be t he wor k cover ed i n t he r espect i ve sect i ons.

Uni t s of wei ght s and measur es used on al l submi t t al s ar e t o be t he same as t hose used i n cont r act dr awi ngs.

Each submi t t al i s t o be compl et ed and i n suf f i c i ent det ai l t o al l ow r eady det er mi nat i on of compl i ance wi t h cont r act r equi r ement s.

Cont r act or ' s Qual i t y Cont r ol ( CQC) Syst em Manager t o check and appr ove al l i t ems pr i or t o submi t t al and st amp, s i gn, and dat e i ndi cat i ng act i on t aken. Pr oposed devi at i ons f r om t he cont r act r equi r ement s ar e t o be cl ear l y i dent i f i ed. I ncl ude wi t hi n submi t t al s i t ems such as: cont r act or ' s, manuf act ur er ' s, or f abr i cat or ' s dr awi ngs; descr i pt i ve l i t er at ur e i ncl udi ng ( but not l i mi t ed t o) cat al og cut s, di agr ams, oper at i ng char t s or cur ves;

t est r epor t s; t est cyl i nder s; sampl es; O&M manual s ( i ncl udi ng par t s l i s t ) ;

cer t i f i cat i ons, ; war r ant i es; and ot her such r equi r ed submi t t al s.

Submi t t al s r equi r i ng Gover nment appr oval ar e t o be schedul ed and made pr i or t o t he acqui s i t i on of t he mat er i al or equi pment cover ed t her eby.

Pi ck up and di spose of sampl es not i ncor por at ed i nt o t he wor k i n accor dance wi t h manuf act ur er ' s Mat er i al Saf et y Dat a Sheet s ( MSDS) and i n compl i ance wi t h exi st i ng l aws and r egul at i ons.

A Submi t t al Regi st er showi ng i t ems of equi pment and mat er i al s r equi r ed by t he speci f i cat i ons i s at t ached t o t hi s sect i on.

1. 3 DEFINITIONS

1. 3. 1 Submi t t al Descr i pt i ons ( SD)

Submi t t al s r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons.

Submi t t al s ar e i dent i f i ed by Submi t t al Descr i pt i on ( SD) number s and t i t l es as f ol l ows:

SD- 01 Pr e- Fabr i cat i on Submi t t al s

Submi t t al s whi ch ar e r equi r ed pr i or t o or t he st ar t of t he next maj or phase of t he const r uct i on on a mul t i - phase cont r act , i ncl udes

SECTI ON 01 33 00 Page 3 schedul es, t abul ar l i s t of dat a, or t abul ar l i s t i ncl udi ng l ocat i on, f eat ur es, or ot her per t i nent i nf or mat i on r egar di ng pr oduct s, mat er i al s, equi pment , or component s t o be used i n t he wor k.

Cer t i f i cat es of i nsur ance

Sur et y bonds

Li st of pr oposed Subcont r act or s

Li st of pr oposed pr oduct s

Const r uct i on pr ogr ess schedul e

Net wor k Anal ysi s Schedul e ( NAS)

Submi t t al r egi st er

Schedul e of pr i ces

Wor k pl an

Qual i t y Cont r ol ( QC) pl an

SD- 02 Shop Dr awi ngs

Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e some por t i on of t he wor k.

Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .

Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.

SD- 03 Pr oduct Dat a

Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.

Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.

SD- 06 Test Repor t s

Repor t s i gned by aut hor i zed of f i c i al of t est i ng l abor at or y t hat a mat er i al , pr oduct or syst em i dent i cal t o t he mat er i al , pr oduct or syst em t o be pr ovi ded has been t est ed i n accor d wi t h speci f i ed r equi r ement s. Unl ess speci f i ed i n anot her sect i on, t est i ng must have been wi t hi n t hr ee year s of dat e of cont r act awar d f or t he pr oj ect .

Repor t whi ch i ncl udes f i ndi ngs of a t est r equi r ed t o be per f or med by t he Cont r act or on an act ual por t i on of t he wor k or pr ot ot ype pr epar ed f or t he pr oj ect bef or e shi pment t o j ob s i t e.

Repor t whi ch i ncl udes f i ndi ng of a t est made at t he j ob s i t e or on

SECTI ON 01 33 00 Page 4 sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er installation.

I nvest i gat i on r epor t s.

Dai l y l ogs and checkl i st s.

Fi nal accept ance t est and oper at i onal t est pr ocedur e.

SD- 07 Cer t i f i cat es

St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat t he pr oduct , syst em, or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .

Document r equi r ed of Cont r act or , or of a manuf act ur er , suppl i er , i nst al l er or Subcont r act or t hr ough Cont r act or . The document pur pose i s t o f ur t her pr omot e t he or der l y pr ogr essi on of a por t i on of t he wor k by document i ng pr ocedur es, accept abi l i t y of met hods, or per sonnel qualifications.

Conf i ned space ent r y per mi t s.

Text of post ed oper at i ng i nst r uct i ons.

1. 3. 2 Appr ovi ng Aut hor i t y

Of f i ce or desi gnat ed per son aut hor i zed t o appr ove submi t t al .

1. 3. 3 Work

As used i n t hi s sect i on, on- and of f - s i t e f abr i cat i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s, except t hose SD- 01 Pr e- Const r uct i on Submi t t al s not ed above, except t hose SD- 01 Pr e- Fabr i cat i on Submi t t al s not ed above, f abr i cat i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such fabrication.

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar ef or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h t hi s sect i on.

SD- 01 Pr e- Fabr i cat i on Submi t t al s

Submi t t al Regi st er ; G

1. 5 SUBMI TTAL CLASSI FI CATI ON

Submi t t al s ar e c l assi f i ed as f ol l ows:

1. 5. 1 Gover nment Appr oved ( G)

Gover nment appr oval i s r equi r ed f or ext ensi ons of desi gn, cr i t i cal

SECTI ON 01 33 00 Page 5 mat er i al s, devi at i ons, equi pment whose compat i bi l i t y wi t h t he ent i r e syst em must be checked, and ot her i t ems as desi gnat ed by t he Cont r act i ng Of f i cer . Wi t hi n t he t er ms of Cont r act Cl ause 52. 236- 21 SPECI FI CATI ONS AND DRAWI NGS FOR FABRI CATI ON, t hey ar e consi der ed t o be " shop dr awi ngs. "

1. 5. 2 I nf or mat i on Onl y

Submi t t al s not r equi r i ng Gover nment appr oval wi l l be f or i nf or mat i on onl y.

They ar e not consi der ed t o be " shop dr awi ngs" wi t hi n t he t er ms of t he Cont r at Cl ause r ef er r ed t o above.

1. 6 PREPARATION

1. 6. 1 Tr ansmi t t al For m

Use t he at t ached sampl e t r ansmi t t al ENG For m 4025- R f or submi t t i ng bot h Gover nment appr oved and i nf or mat i on onl y submi t t al s i n accor dance wi t h t he i nst r uct i ons on t he r ever se si de of t he f or m. These f or ms wi l l be f ur ni shed t o t he Cont r act o. Pr oper l y compl et e t hi s f or m by f i l l i ng out al l t he headi ng bl ank spaces and i dent i f y i ng each i t em submi t t ed.

Exer ci se speci al car e t o ensur e pr oper l i s t i ng of t he speci f i cat i on par agr aph and sheet number of t he cont r act dr awi ngs per t i nent t o t he dat a submi t t ed f or each i t em.

1. 7 QUANTI TY OF SUBMI TTALS

1. 7. 1 Number of Copi es of SD- 02 Shop Dr awi ngs

Submi t one el ect r oni c ( PDF f or mat ) and t wo har d copi es of submi t t al s of shop dr awi ngs r equi r i ng r evi ew and appr oval onl y by QC or gani zat i on and one el ect r oni c ( PDF f or mat ) and t wo har d copi es of shop dr awi ngs r equi r i ng r evi ew and appr oval by Cont r act i ng Of f i cer .

1. 7. 2 Number of Copi es of SD- 03 Pr oduct Dat a and SD- 08 Manuf act ur er ' s Instructions

Submi t i n compl i ance wi t h quant i t y r equi r ement s speci f i ed f or shop drawings.

1. 7. 3 Number of Copi es SD- 05 Desi gn Dat a and SD- 07 Cer t i f i cat es

Submi t i n compl i ance wi t h quant i t y r equi r ement s speci f i ed f or shop drawings.

1. 7. 4 Number of Copi es SD- 06 Test Repor t s and SD- 09 Manuf act ur er ' s Fi el d Reports

Submi t i n compl i ance wi t h quant i t y and qual i t y r equi r ement s speci f i ed f or shop dr awi ngs ot her t han f i el d t est r esul t s t hat wi l l be submi t t ed wi t h QC reports.

1. 7. 5 Number of Copi es of SD- 10 Oper at i on and Mai nt enance Dat a

Submi t one el ect r oni c ( PDF f or mat ) and t wo har d copi es of O&M Dat a t o t he Cont r act i ng Of f i cer f or r evi ew and appr oval .

SECTI ON 01 33 00 Page 6

1. 7. 6 Number of Copi es of SD- 01 Pr e- Fabr i cat i on Submi t t al s and SD- 11 Cl oseout Submi t t al s

Unl ess ot her wi se speci f i ed, submi t one el ect r oni c ( PDF f or mat ) and t wo har d set s of admi ni st r at i ve submi t t al s.

1. 8 I NFORMATI ON ONLY SUBMI TTALS

Nor mal l y submi t t al s f or i nf or mat i on onl y wi l l not be r et ur ned. Appr oval of t he Cont r act i ng Of f i cer i s not r equi r ed on i nf or mat i on onl y submi t t al s. The Gover nment r eser ves t he r i ght t o r equi r e t he Cont r act or t o r esubmi t any i t em f ound not t o compl y wi t h t he cont r act . Thi s does not r el i eve t he Cont r act or f r om t he obl i gat i on t o f ur ni sh mat er i al conf or mi ng t o t he pl ans and speci f i cat i ons; wi l l not pr event t he Cont r act i ng Of f i cer f r om r equi r i ng r emoval and r epl acement of nonconf or mi ng mat er i al i ncor por at ed i n t he wor k; and does not r el i eve t he Cont r act or of t he r equi r ement t o f ur ni sh sampl es f or t est i ng by t he Gover nment l abor at or y or f or check t est i ng by t he Gover nment i n t hose i nst ances wher e t he t echni cal speci f i cat i ons so pr escr i be.

1. 9 SUBMI TTAL REGI STER

Pr epar e and mai nt ai n submi t t al r egi st er , as t he wor k pr ogr esses. Do not change dat a whi ch i s out put i n col umns ( c) , ( d) , ( e) , and ( f ) as del i ver ed by Gover nment ; r et ai n dat a whi ch i s out put i n col umns ( a) , ( g) , ( h) , and ( i ) as appr oved. A submi t t al r egi st er showi ng i t ems of equi pment and mat er i al s f or whi ch submi t t al s ar e r equi r ed by t he speci f i cat i ons i s pr ovi ded as an at t achment . Thi s l i s t may not be al l i ncl usi ve and addi t i onal submi t t al s may be r equi r ed. The Gover nment wi l l pr ovi de t he i ni t i al submi t t al r egi st er wi t h t he f ol l owi ng f i el ds compl et ed, t o t he ext ent t hat wi l l be r equi r ed by t he Gover nment dur i ng subsequent usage.

Col umn ( c) : Li st s speci f i cat i on sect i on i n whi ch submi t t al i s required.

Col umn ( d) : Li st s each submi t t al descr i pt i on ( SD No. and t ype,

e. g. SD- 02 Shop Dr awi ngs) r equi r ed i n each speci f i cat i on sect i on.

Col umn ( e) : Li st s one pr i nci pal par agr aph i n speci f i cat i on sect i on wher e a mat er i al or pr oduct i s speci f i ed. Thi s l i s t i ng i s onl y t o f aci l i t at e l ocat i ng submi t t ed r equi r ement s. Do not consi der ent r i es i n col umn ( e) as l i mi t i ng pr oj ect r equi r ement s.

Ther eaf t er , t he Cont r act or i s t o t r ack al l submi t t al s by mai nt ai ni ng a compl et e l i s t , i ncl udi ng compl et i on of al l dat a col umns, i ncl udi ng dat es on whi ch submi t t al s ar e r ecei ved and r et ur ned by t he Gover nment .

1. 10 VARIATIONS

Var i at i ons f r om cont r act r equi r ement s r equi r e bot h Desi gner of Recor d ( DOR) and Gover nment appr oval pur suant t o Cont r act Cl ause FAR 52. 236- 21 SPECI FI CATI ONS AND DRAWI NGS and wi l l be consi der ed wher e advant ageous t o Government.

1. 10. 1 Consi der i ng Var i at i ons

Di scussi on wi t h Cont r act i ng Of f i cer pr i or t o submi ssi on, af t er consul t i ng wi t h t he DOR, wi l l hel p ensur e f unct i onal and qual i t y r equi r ement s ar e met and mi ni mi ze r ej ect i ons and r e- submi t t al s.

SECTI ON 01 33 00 Page 7

Speci f i cal l y poi nt out var i at i ons f r om cont r act r equi r ement s i n t r ansmi t t al l et t er s. Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at no addi t i onal cost t o t he Gover nment .

1. 10. 2 Pr oposi ng Var i at i ons

When pr oposi ng var i at i on, del i ver wr i t t en r equest t o t he Cont r act i ng Of f i cer , wi t h document at i on of t he nat ur e and f eat ur es of t he var i at i on and why t he var i at i on i s desi r abl e and benef i c i al t o Gover nment , i ncl udi ng t he DOR' s wr i t t en anal ysi s and appr oval . I f l ower cost i s a benef i t , al so i ncl ude an est i mat e of t he cost savi ngs. I n addi t i on t o document at i on r equi r ed f or var i at i on, i ncl ude t he submi t t al s r equi r ed f or t he i t em.

Cl ear l y mar k t he pr oposed var i at i on i n al l document at i on.

Check t he col umn " var i at i on" of ENG For m 4025 f or submi t t al s whi ch i ncl ude pr oposed devi at i ons r equest ed by t he Cont r act or . Set f or t h i n wr i t i ng t he r eason f or any devi at i ons and annot at e such devi at i ons on t he submi t t al .

The Gover nment r eser ves t he r i ght t o r esci nd i nadver t ent appr oval of submi t t al s cont ai ni ng unnot ed devi at i ons.

1. 10. 3 War r ant i ng t hat Var i at i ons ar e Compat i bl e

When del i ver i ng a var i at i on f or appr oval , Cont r act or , i ncl udi ng i t s Desi gner ( s) of Recor d, war r ant s t hat t hi s cont r act has been r evi ewed t o est abl i sh t hat t he var i at i on, i f i ncor por at ed, wi l l be compat i bl e wi t h ot her el ement s of wor k.

1. 10. 4 Revi ew Schedul e Ext ensi on

I n addi t i on t o nor mal submi t t al r evi ew per i od, a per i od of 10 cal endar days wi l l be al l owed f or consi der at i on by t he Gover nment of submi t t al s wi t h var i at i ons.

1. 11 SCHEDULING

Schedul e and submi t concur r ent l y submi t t al s cover i ng component i t ems f or mi ng a syst em or i t ems t hat ar e i nt er r el at ed. I ncl ude cer t i f i cat i ons t o be submi t t ed wi t h t he per t i nent dr awi ngs at t he same t i me. No del ay damages or t i me ext ensi ons wi l l be al l owed f or t i me l ost i n l at e submittals.

a. Coor di nat e schedul i ng, sequenci ng, pr epar i ng and pr ocessi ng of submi t t al s wi t h per f or mance of wor k so t hat wor k wi l l not be del ayed by submi t t al pr ocessi ng. Al l ow f or pot ent i al r esubmi t t al of requirements.

b. Submi t t al s cal l ed f or by t he cont r act document s wi l l be l i s t ed on t he r egi st er . I f a submi t t al i s cal l ed f or but does not per t ai n t o t he cont r act wor k, t he Cont r act or i s t o i ncl ude t he submi t t al i n t he r egi st er and annot at e i t " N/ A" wi t h a br i ef expl anat i on. Appr oval by t he Cont r act i ng Of f i cer does not r el i eve t he Cont r act or of suppl y i ng submi t t al s r equi r ed by t he cont r act document s but whi ch have been omi t t ed f r om t he r egi st er or mar ked " N/ A. "

c. Re- submi t r egi st er and annot at e mont hl y by t he Cont r act or wi t h act ual submi ssi on and appr oval dat es. When al l i t ems on t he r egi st er have been f ul l y appr oved, no f ur t her r e- submi t t al i s r equi r ed.

SECTI ON 01 33 00 Page 8

Grating Replacement Barkley Lock Final Submittal Livingston County, Kentucky

d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

1.12 GOVERNMENT APPROVING AUTHORITY

When approving authority is Contracting Officer, the Government will:

a. Note date on which submittal was received.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, stamp and date submittals. one copies of the approved submittal will be retained by the Contracting Officer and one copies of the submittal will be returned to the Contractor. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.

1.12.1 Review Notations

Contracting Officer review will be completed within 30 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

1.13 DISAPPROVED SUBMITTALS

Make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under Contract Clause FAR 52.243-4 CHANGES, is to be given to the

SECTION 01 33 00 Page 9

Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.14 APPROVED/ACCEPTED SUBMITTALS

The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work .

After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.15 APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. Contractor to replace such materials or equipment to meet contract requirements.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.

SECTION 01 33 00 Page 10

1.16 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained.

1.17 STAMPS

Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:

| CONTRACTOR |

| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |

| SIGNATURE: __________________________________________________________ |

| TITLE: ______________________________________________________________ |

| DATE: _______________________________________________________________ |

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 33 00 Page 11

S U

B M

IT

T

A L

F O

R M

,J a n

P

R E

V

IO

U S

E D

IT

IO

N I

S O

B S

O L

E T

E P

A G

E

O F

P

A G

E S

F in a l S u b m it ta l

B A

R L o c k G ra ti n g R e p la c e m e n t

S u p p ly

S D

-0

P re -F ab ric at io n

S u b m it ta ls

.4

G D e liv e ry

S h ip p in g P la n

S D

-0

P re -F ab ric at io n

S u b m it ta ls

.9

G S u b m it ta l R e g is te r

S D

-0

S h o p

D ra w in g s

.4

.1 G

D e ta il

D ra w in g s

.1

.2 .1

W e ld in g o f S tr u c tu ra l S te e l

.2

.4 S tr u c tu ra l S te e l W e ld in g

R e p a ir s

S D

-0

P ro d u c t

D a ta

.1

.2 .1

.3 .1

F ill e r

M e ta l

L u b ri c a n t

S D

-0

T e s t

R e p o rt s

.2

T e s ts

In s p e c ti o n s a n d

V e ri fi c a ti o n s

S D

-0

C e rt if ic a te s

.4

.2 W e ld in g

Q u a lif ic a ti o n s

G A p p lic a ti o n Q u a lif ic a ti o n f o r

S te e l

S tu d s

S D

-0

S h o p

D ra w in g s

G M e ta ls a n d

S ta n d a rd

M e ta l

A rt ic le s

.2

G S h o p F a b ri c a te d

M e ta l It e m s

S D

-0

P ro d u c t

D a ta

G M is c e lla n e o u s M e ta ls a n d

S ta n d a rd

M e ta l A rt ic le s

.2

G S h o p F a b ri c a te d

M e ta l It e m s

S U

B M

IT

T

A L

R E

G

IS

T E

R C

O N

T R

A C

T N

O

T

IT

L E

A N

D L

O C

A T

IO

N

C O

N T

R A

C T

O R

C O

N T

R A

C T

O R

S

C H

E D

U L

E D

A T

E S

C O

N T

R A

C T

O R

A C

T

IO

N A

P P

R O

V

IN

G A

U T

H O

R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

T

IO

N

IT

E

M S

U B

M

IT

T E

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

T E

R

IA

L N

E E

D E

D B

Y

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

D A

T E

F W

D T

O A

P P

R A

U T

H

D A

T E

R C

D F

R O

M C

O N

T R

D A

T E

F W

D T

O O

T H

E R

R E

V

IE

W E

R

D A

T E

R C

D F

R O

M O

T H

R E

V

IE

W E

R

A C T I O N C O D E

D A

T E

O F

A C

T

IO

N

M A

IL

E

D T

O C

O N

T R

D A

T E

R C

D F

R M

A P

P R

A U

T H

R E

M A

R K

S

(a

(b

(c

(d

(e

(f

(g

(h

(i

(j

(k

(l

(m

(n

(o

(p

(q

(r

F H

UW

LI

WK

D W

WK

H D E R Y H V X E P

LW

WH

G

LW

H P V K D Y H E H H Q

UH

Y

LH

Z H G

LQ

G H

WD

LO

D Q G D

UH

F R

UU

H F W D Q G

LQ

V

WU

LF

W F R Q

IR

UP

D Q F H Z

LW

K

WK

H

F R Q

WU

D F W G

UD

Z

LQ

J V D Q G V S H F

LI

LF

D

WL

R Q V H F H S W D V R

WK

H U Z

LV

H

V

WD

WH

G

,6 ,6

,7

,6 ,6 ,7

,7

,2 R Y H U R Q O\

R Q H V H F

WL

R Q Z

LW

K

H D F K

WU

D Q V P

LW

WD

O�

,7 ,2

LV

W E ,W H P

R

,7 ,1 ,3

�5 H D G

LQ

V

WU

X F

WL

R Q V R Q

WK

H

UH

Y H

UV

H V

LG

H S

UL

R U

WR

LQ

LW

LD

WL

Q J

WK

LV

IR

UP

,2 ,1 ,7

�7 K

LV

V H F

WL

R Q Z

LO

O E H

LQ

LW

LD

WH

G E

WK

H F R Q

WU

D F

WR

U�

,7

,7 ,1 ,7

,2 ,2

,7

D

,3 ,2 ,7 ,7

�7 S H V L] H P R G H O Q X P E H U� H

WF

E

,1

�6 H H

LQ

V

WU

X F

WL

R Q Q R

F

G

H

,1

I�

J

,2

�6 H H

LQ

V

WU

X F

WL

R Q

R

K

L�

�5

�3

UR

S R Q H Q W�

,7 ,2 ,6

,6

,7 ,6

,2

,1 ,2

H F

WL

R Q Z

LO

O E H

LQ

LW

LD

WH

G E

WK

H R Q

WU

D F

WR

U

LQ

WK

H

UH

T X

LU

H G Q X P E H U R I F R S

LH

V

D F K

WU

D Q V P

LW

WD

O V K D

OO

E H Q X P E H

UH

G F R Q V H F X

WL

Y H O\

LQ

WK

H V S D F H S

UR

Y

LG

H G

IR

U

UD

Q V P

LW

WD

O R K

LV

Q X P E H U�

LQ

D G G

LW

LR

Q

WR

WK

H F R Q

WU

D F W Q X P E H U� Z

LO

O

IR

UP

D V H

UL

D O

Q X P E H U

IR

U

LG

H Q

WL

I\

LQ

J H D F K V X E P

LW

WD

O�

R U Q H Z

V X E P

LW

WD

OV

R U

UH

V X E P

LW

WD

OV

P D

UN

WK

H D S S

UR

S

UL

D

WH

E R R Q

UH

V X E P

LW

WD

OV

LQ

V H

UW

WU

D Q V P

LW

WD

O Q X P E H U R I

OD

V W V X E P

LV

V

LR

Q D V

Z H

OO

D V

WK

H Q H Z

V X E P

LW

WD

O Q X P E H U�

K H ,W H P

R Z

LO

O E H

WK

H V D P H ,W H P

R D V

LQ

G

LF

D

WH

G R Q

�5

IR

U H D F K H Q

WU

R Q

WK

LV

IR

UP

X E P

LW

WD

OV

UH

T X

LU

LQ

J H S H G

LW

LR

X V K D Q G

OL

Q J Z

LO

O E H V X E P

LW

WH

G R Q D V H S D

UD

WH

IR

UP

H S D

UD

WH

WU

D Q V P

LW

WD

O

IR

UP

Z

LO

O E H X V H G

IR

U V X E P

LW

WD

OV

X Q G H U V H S D

UD

WH

V H F

WL

R Q V R I

WK

H V S H F

LI

LF

D

WL

R Q V

F K H F N V K D

OO

E H S

OD

F H G

LQ

WK

H D

UL

D

WL

R Q F R

OX

P Q Z K H Q D V X E P

LW

WD

O

LV

Q R W

LQ

D F F R

UG

D Q F H Z

LW

K

WK

H S

OD

Q V D Q G V S H F

LI

LF

D

WL

R Q V D

OV

R D Z

UL

WW

H Q V

WD

WH

P H Q W

WR

WK

D W H

II

H F W

V K D

OO

E H

LQ

F

OX

G H G

LQ

WK

H V S D F H S

UR

Y

LG

H G

IR

U H P D

UN

V

R

UP

LV

V H

OI

�W

UD

Q V P

LW

WD

O�

OH

WW

H U R I

WU

D Q V P

LW

WD

O

LV

Q R W

UH

T X

LU

H G

K H Q D V D P S

OH

R I P D

WH

UL

D O R U D Q X

ID

F

WX

UH

U

V H

UW

LI

LF

D

WH

R I R P S

OL

D Q F H

LV

WU

D Q V P

LW

WH

G

LQ

G

LF

D

WH

D P S

OH

R U H

UW

LI

LF

D

WH

LQ

F R

OX

P Q F H F

WL

R Q

�6

UP

R

US

V R I Q J

LQ

H H

UV

D S S

UR

Y

LQ

J D X

WK

R

UL

W\

Z

LO

O D V V

LJ

Q D F

WL

R Q F R G H V D V

LQ

G

LF

D

WH

G E H

OR

Z

LQ

V S D F H S

UR

Y

LG

H G

LQ

H F

WL

R Q F R

OX

P Q L

WR

H D F K

LW

H P

V X E P

LW

WH

G ,Q

D G G

LW

LR

Q

WK

H Z

LO

O H Q V X

UH

H Q F

OR

V X

UH

V D

UH

LQ

G

LF

D

WH

G D Q G D

WW

D F K H G

WR

WK

H

IR

UP

S

UL

R U

WR

UH

WX

UQ

WR

WK

H F R Q

WU

D F

WR

U�

K H R Q

WU

D F

WR

U Z

LO

O D V V

LJ

Q D F

WL

R Q F R G H V D V

LQ

G

LF

D

WH

G E H

OR

Z

LQ

H F

WL

R Q F R

OX

P Q J

WR

H D F K

LW

H P

V X E P

LW

WH

G

,1 ,2 ,9 ,7 ,7

S S

UR

Y H G D V V X E P

LW

WH

G

S S

UR

Y H G H F H S W D V Q R

WH

G R Q G

UD

Z

LQ

J V

S S

UR

Y H G H F H S W D V Q R

WH

G R Q G

UD

Z

LQ

J V

H

IH

U

WR

D

WW

D F K H G V K H H W

UH

V X E P

LV

V

LR

Q

UH

T X

LU

H G

LO

O E H

UH

WX

UQ

H G E V H S D

UD

WH

F R

UU

H V S R Q G H Q F H

S S

UR

Y D O R I

LW

H P V G R H V Q R W

UH

OL

H Y H

WK

H F R Q

WU

D F

WR

U

IU

R P

F R P S O\

LQ

J Z

LW

K D

OO

WK

H

UH

T X

LU

H P H Q

WV

R I

WK

H F R Q

WU

D F W S

OD

Q V D Q G V S H F

LI

LF

D

WL

R Q V

�5 H Y H

UV

H R I R

UP

�5

LV

D S S

UR

Y H G �6 H H D

WW

D F K H G

H F H

LS

W D F N Q R Z

OH

G J H G

H F H

LS

W D F N Q R Z

OH

G J H G G R H V Q R W F R P S O\

D V Q R

WH

G Z

LW

K F R Q

WU

D F W

UH

T X

LU

H P H Q

WV

WK

H U �6

S H F

LI

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 35 50

PROJECT SI TE SECURI TY AND AT/ OPSEC PROCEDURES

PART 1 GENERAL

1. 1 GENERAL

1. 2 REFERENCES

1. 3 ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES

1. 4 ELECTRONI C MEDI A PROVI DED BY THE CONTRACTOR

1. 5 CONDUCT OF CONTRACTOR EMPLOYEES

1. 6 RELEASE OF SENSI TI VE I NFORMATI ON

1. 7 VEHI CLES

1. 7. 1 Par ki ng of Vehi c l es

1. 8 DAMAGE OR LOSS OF CONTRACTOR' S SUPPLI ES AND PROPERTY

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

SECTI ON 01 35 50 Page 1

SECTION 01 35 50

PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES

PART 1 GENERAL

1.1 GENERAL

The entire Project area is not open to the public. Depending upon the level of security threat, some Project areas may or may not be open to the Contractor and Contractor employees. Guidance and forms for project site security requirements are available on the Nashville District Public Website:

http://www.lrn.usace.army.mil/BusinessWithUs/ContractSecurityRequirements.aspx

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY (DA)

Army Directive 2014-05 (2014) Policy and Implementation Procedures for Commnon Access Card Credentialing and Installation Access for Uncleared Contractors

DA AR 190-13 (2011) The Army Physical Security Program

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.3 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

All Contractor and associated sub-contractor employees shall comply with all applicable project and local security policies and procedures (provided by the district representative). The Contractor must also provide all information required for background checks to meet installation/facility access requirements to be accomplished by the District Security Management Office. Contractor workforce must comply with all personal identity verification requirements (FAR Clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index ( NCIC-III ) and Terrorist Screening Database (TSDB) ( Army Directive 2014-05 / DA AR 190-13 ), applicable installation, facility and area commander installation/facility access and

SECTION 01 35 50 Page 2 l ocal secur i t y pol i c i es and pr ocedur es ( pr ovi ded by gover nment r epr esent at i ve, as NCI C and TSDB ar e avai l abl e) , or , at OCONUS l ocat i ons, i n accor dance wi t h st at us of f or ces agr eement s and ot her t heat er regulations.

Backgr ound I nvest i gat i on Requi r ement s: Si nce t he i nf or mat i on pr ovi ded t hat del i ver y wi l l be out si de of r est r i ct ed ar eas wher e vet t ed empl oyees wi l l t ake possessi on, t her e ar e no i nvest i gat i on r equi r ement s at t hi s t i me. Coor di nat i on shoul d be made wi t h Di st r i ct Secur i t y Of f i ce per sonnel i f t her e ar e any changes t o t he pr ocedur es.

1. 4 ELECTRONI C MEDI A PROVI DED BY THE CONTRACTOR

The Cont r act or shal l ensur e al l medi a, el ect r oni c f i l es, et c. , i t pr ovi des t o t he Gover nment shal l be f r ee of v i r uses, Tr oj an hor ses, bot s, wor ms, mal war e, def ect s, or any ot her har mf ul i t em of a dest r uct i ve nat ur e.

1. 5 CONDUCT OF CONTRACTOR EMPLOYEES

Meet t he r equi r ement s of EM 385- 1- 1, Sect i on 01. C Physi cal Qual i f i cat i ons of Empl oyees, i n pr ovi di ng on- si t e empl oyees. Al l Cont r act or empl oyees and subcont r act or s shal l conduct t hemsel ves i n a pr oper manner at al l t i mes. No al cohol i c or i nt oxi cat i ng bever ages or subst ances or i l l egal dr ugs or cont r ol l ed subst ances not pr escr i bed by a physi c i an shal l be possessed, consumed, and no cont r act or empl oyee shal l be under t he i nf l uence of any such unaut hor i zed subst ance whi l e on Gover nment pr oper t y.

The Cont r act or shal l r emove f r om t he si t e any i ndi v i dual whose cont i nued empl oyment i s deemed by t he appoi nt ed r ecei v i ng agent t o be cont r ar y t o t he publ i c i nt er est or i nconsi st ent wi t h t he best i nt er est s of t he U. S.

Ar my Cor ps of Engi neer s.

The Cont r act i ng Of f i cer or t he appoi nt ed r ecei v i ng agent wi l l r equi r e t he Cont r act or t o i mmedi at el y r emove f r om t he wor k s i t e anyone who i s i ncompet ent or who endanger s per sons or pr oper t y or whose physi cal or ment al condi t i on i s such t hat i t woul d i mpai r t he empl oyee' s abi l i t y t o sat i sf act or i l y per f or m t he wor k. Not i f i cat i on t o t he Cont r act or wi l l be made i n wr i t i ng i f t i me and ci r cumst ances per mi t . Ot her wi se, not i f i cat i on wi l l be ver bal and wi l l be conf i r med i n wr i t i ng as soon as possi bl e. No such r emoval , however , wi l l r educe t he Cont r act or ' s obl i gat i on t o per f or m al l wor k r equi r ed under t hi s cont r act and i mmedi at e r epl acement shal l be made as r equi r ed.

1. 6 RELEASE OF SENSI TI VE I NFORMATI ON

The Cont r act or shal l not make avai l abl e t o t he news medi a or publ i c l y di scl ose any dat a gener at ed or r evi ewed under t hi s Cont r act . Any i nqui r y r ecei ved by t he Cont r act or f or i nf or mat i on concer ni ng wor k per f or med under t hi s Cont r act shal l be r ef er r ed t o t he Gover nment f or eval uat i on under t he Fr eedom of I nf or mat i on Act of 1975, Publ i c Law 93- 502, 5 U. S. C. , Sect i on

552. The det er mi nat i on of whet her r ecor ds wi l l be r el eased wi l l r emai n wi t h t he Gover nment . The Cont r act or shal l assi st t he COR i n compi l i ng i nf or mat i on or r ecor ds f or submi ssi on upon r equest by t he gover nment .

Repor t s and dat a gener at ed under t hi s Cont r act shal l become t he pr oper t y of t he Gover nment and di st r i but i on t o any ot her sour ce by t he Cont r act or , unl ess aut hor i zed i s pr ohi bi t ed.

SECTI ON 01 35 50 Page 3

1. 7 VEHICLES

1. 7. 1 Par ki ng of Vehi c l es

Par ki ng of pr i vat e and Cont r act or vehi c l es shal l be r est r i ct ed t o t he ar eas desi gnat ed by t he Gover nment . Vehi c l es shal l be par ked no cl oser t han 30 f eet f r om occupi ed bui l di ngs.

1. 8 DAMAGE OR LOSS OF CONTRACTOR' S SUPPLI ES AND PROPERTY

The Cont r act or i s r esponsi bl e f or t aki ng t he act i on necessar y t o pr ot ect Cont r act or suppl i es, mat er i al s and equi pment , and t he per sonal pr oper t y of Cont r act or empl oyees f r om l oss, damage or t hef t . The Gover nment assumes no r esponsi bi l i t y f or t hef t , damage, et c. , of t he above. Al l i nci dent s of t hef t ( or suspect ed t hef t ) of cont r act or mat er i al s, suppl i es, or equi pment f r om pr oj ect l ands shal l be r epor t ed t o t he COR.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on - -

SECTI ON 01 35 50 Page 4

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 42 00

SOURCES FOR REFERENCE PUBLI CATI ONS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 ORDERI NG I NFORMATI ON

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 42 00 Page 1

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS

PART 1 GENERAL

1.1 REFERENCES

Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.

1.2 ORDERING INFORMATION

The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided.

AMERICAN WELDING SOCIETY (AWS)

13301 NW 47 Ave Miami, FL 33054

Ph: 888-WELDING, 305-824-1177, 305-826-6192 Fax: 305-826-6195 E-mail: customer.service@awspubs.com Internet: http://www.aws.org

ASME INTERNATIONAL (ASME)

Two Park Avenue, M/S 10E New York, NY 10016-5990 Ph: 800-843-2763 Fax: 973-882-1717 E-mail: customercare@asme.org Internet: http://www.asme.org

ASTM INTERNATIONAL (ASTM)

100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 877-909-2786 Internet: http://www.astm.org

U.S. ARMY (DA)

U.S. Army Publishing Directorate Ph: 703-614-3634 Internet: http://www.apd.army.mil

SECTION 01 42 00 Page 2

U.S. ARMY CORPS OF ENGINEERS (USACE)

CRD-C DOCUMENTS available on Internet:

http://www.wbdg.org/ccb/browse_cat.php?c=68 Order Other Documents from:

USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.publications.usace.army.mil/ or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

Not used

-- End of Section --

SECTION 01 42 00 Page 3

NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)

800 Roosevelt Road, Bldg C, Suite 312 Glen Ellyn, IL 60137 Ph: 630-942-65 91 Fax: 630-790-3095 E-mail: wlewis7@cox.net (Wes Lewis,technical consultant) Internet: http://www.naamm.org

SECTI ON TABLE OF CONTENTS

DI VI SI ON 05 - METALS

SECTI ON 05 50 14

STRUCTURAL METAL FABRI CATI ONS

PART 1 GENERAL

1. 1 SCOPE

1. 2 REFERENCES

1. 3 SUBMI TTALS

1. 4 QUALI TY ASSURANCE

1. 4. 1 Det ai l Dr awi ngs

1. 4. 2 Wel di ng Qual i f i cat i ons

PART 2 PRODUCTS

2. 1 FABRI CATI ON

2. 1. 1 St r uct ur al Fabr i cat i on

2. 1. 1. 1 Di mensi onal Tol er ances f or St r uct ur al Wor k

2. 1. 1. 2 St r uct ur al St eel Fabr i cat i on

2. 1. 2 Wel di ng

2. 1. 2. 1 Wel di ng of St r uct ur al St eel

2. 1. 2. 1. 1 Wel di ng Pr ocedur es f or St r uct ur al St eel

2. 1. 2. 1. 2 Wel di ng Pr ocess

2. 1. 2. 1. 3 Wel di ng Techni que

2. 1. 2. 1. 3. 1 Fi l l er Met al

2. 1. 2. 1. 3. 2 Pr eheat and I nt er pass Temper at ur e

2. 1. 2. 1. 3. 3 St r ess- Rel i ef Heat Tr eat ment

2. 1. 2. 1. 4 Wor kmanshi p

2. 1. 2. 1. 4. 1 Pr epar at i on of Base Met al

2. 1. 2. 1. 4. 2 Tempor ar y Wel ds

2. 1. 2. 1. 4. 3 Tack Wel ds

2. 1. 3 Pat t er ns

2. 1. 4 Machi ne Wor k

2. 1. 4. 1 Fi ni shed Sur f aces

2. 1. 4. 2 Unf i ni shed Sur f aces

2. 1. 4. 3 Pi n Hol es

2. 1. 5 Mi scel l aneous Pr ovi s i ons

2. 1. 5. 1 Met al l i c Coat i ngs

2. 1. 5. 2 Cl eani ng of Cor r osi on- Resi st i ng St eel

2. 1. 6 Shop Assembl y

2. 2 TESTS, I NSPECTI ONS, AND VERI FI CATI ONS

2. 2. 1 Nondest r uct i ve Test i ng

2. 2. 2 Test s of Machi ner y and St r uct ur al Uni t s

2. 2. 3 I nspect i on of St r uct ur al St eel Wel di ng

2. 2. 3. 1 Vi sual Exami nat i on

2. 2. 3. 2 Nondest r uct i ve Test i ng

2. 2. 3. 2. 1 Test i ng Agency

2. 2. 3. 2. 2 Exami nat i on Pr ocedur es

2. 2. 3. 2. 2. 1 Ul t r asoni c Test i ng

2. 2. 3. 2. 2. 2 Magnet i c Par t i c l e I nspect i on

SECTI ON 05 50 14 Page 1

2. 2. 3. 2. 2. 3 Dye Penet r ant I nspect i on

2. 2. 3. 2. 3 Accept abi l i t y of Wel ds

2. 2. 3. 2. 4 Wel ds t o be Subj ect t o Nondest r uct i ve Test i ng

2. 2. 3. 3 Test Coupons

2. 2. 3. 4 Suppl ement al Exami nat i on

2. 2. 4 St r uct ur al St eel Wel di ng Repai r s

PART 3 EXECUTI ON

3. 1 I NSTALLATI ON

3. 1. 1 Al i gnment and Set t i ng

3. 2 TESTS

3. 2. 1 Wor kmanshi p

3. 2. 2 Pr oduct i on Wel di ng

3. 3 PROTECTI ON OF FI NI SHED WORK

3. 3. 1 Machi ned Sur f aces

SECTI ON 05 50 14 Page 2

SECTION 05 50 14

STRUCTURAL METAL FABRICATIONS

PART 1 GENERAL

1.1 SCOPE

This section of the specification provides reference to standards and requirements pretaining to the structural steel fabrications of this contract. This work consists of replacing the existing grating at the Barkley Lock project with new fabricated steel grating. The new grating panels shall be fabricated to include lifting points according to the these specification and contract drawings. All grating panels shall be hot-dip galvanized.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel

AWS D1.2/D1.2M (2014) Structural Welding Code - Aluminum

ASME INTERNATIONAL (ASME)

ASME B4.1 (1967; R 2009) Preferred Limits and Fits for Cylindrical Parts

ASME B46.1 (2009) Surface Texture, Surface Roughness, Waviness and Lay

ASTM INTERNATIONAL (ASTM)

ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A380/A380M (2017) Standard Practice for Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems

ASTM A514/A514M (2014) Standard Specification for High-Yield-Strength, Quenched and Tempered Alloy Steel Plate, Suitable for Welding

ASTM A780/A780M (2009; R 2015) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

SECTION 05 50 14 Page 3

ASTM E165/ E165M ( 2012) St andar d Pr act i ce f or Li qui d Penet r ant Exami nat i on f or Gener al I ndust r y

ASTM E709 ( 2015) St andar d Gui de f or Magnet i c Par t i c l e Exami nat i on

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

Det ai l Dr awi ngs; G Wel di ng of St r uct ur al St eel St r uct ur al St eel Wel di ng Repai r s

SD- 03 Pr oduct Dat a

Fi l l er Met al Lubricant

SD- 06 Test Repor t s

Test s, I nspect i ons, and Ver i f i cat i ons

SD- 07 Cer t i f i cat es

Wel di ng Qual i f i cat i ons Appl i cat i on Qual i f i cat i on f or St eel St uds; G

1. 4 QUALI TY ASSURANCE

1. 4. 1 Det ai l Dr awi ngs

Submi t det ai l dr awi ngs f or met al wor k and machi ne wor k, pr i or t o f abr i cat i on, i ncl ude wi t hi n t…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.