CEN_Access_Ladders_Specs_Section_05_51_33_-_2018-02-16.pdf
PDF 610 KB Posted
- Attached to
- CEN Trunnion Seal & Pin Replacement
- Solicitation number
- W912P5-18-S-0002
About this file
Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_-_CEN_Pin_and_J-seal__2018-01-25.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CEN Trunnion Pin, J-seals, and Access Ladders BCOES Review
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 51 33
METAL LADDERS
PART 1 GENERAL
1.1 SCOPE OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 CERTIFICATES
1.5 QUALIFICATION OF WELDERS
1.6 DELIVERY, STORAGE, AND PROTECTION
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Structural Carbon Steel
2.1.2 Structural Tubing
2.1.3 Steel Pipe
2.1.4 Fittings for Steel Pipe
2.2 FABRICATION FINISHES
2.2.1 Galvanizing
2.2.2 Galvanize
2.2.3 Repair of Zinc-Coated Surfaces
2.3 LADDERS
2.3.1 Ladder Cages
2.3.2 Ladder Safety Devices
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
3.2 WORKMANSHIP
3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS
3.4 WELDING
3.5 FINISHES
3.5.1 Dissimilar Materials
3.5.2 Field Preparation
3.5.3 Environmental Conditions
3.6 LADDERS
3.7 Concrete Cutting
-- End of Section Table of Contents --
SECTION 05 51 33 Page 1 Feb 16, 2018
ACCESS LA
DDERS O
NLY
SECTION 05 51 33
METAL LADDERS
PART 1 GENERAL
1.1 SCOPE OF WORK
The Contractor shall provide the necessary plant, labor, materials, equipment, and transportation for a complete design and satisfactory installation of the required metal ladder and ladder assembly including cages, Platforms and personal fall arrest system as specified herein and as shown in the drawings. Also cutting existing concrete parappet wall to get access to the ladder.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN LADDER INSTITUTE (ALI)
ALI A14.3 (2008) Standard for Fixed Ladders and Safety Requirements
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2015) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A153/A153M (2016) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
ASTM A47/A47M (1999; R 2014) Standard Specification for Ferritic Malleable Iron Castings
ASTM A500/A500M (2013) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
SECTION 05 51 33 Page 2 Feb 16, 2018
ACCESS LA
ASTM A653/A653M (2015; E 2016) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A780/A780M (2009; R 2015) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A924/A924M (2017a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM D1187/D1187M (1997; E 2011; R 2011) Asphalt-Base Emulsions for Use as Protective Coatings for Metal
MASTER PAINTERS INSTITUTE (MPI)
MPI 79 (Oct 2009) Alkyd Anti-Corrosive Metal Primer
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.27 Fixed Ladders
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Ladders, Platforms, Cages; G Installation Drawings, design computations and Plans shall be developed and stamped by a Professional Engineer (PE).
Concrete Cutting Plan; G Submit concrete cutting plan including the location, method of cutting.
SD-03 Product Data
Ladders; G
Ladder Safety Devices; G Including Personal Fall Arrest System.
SD-07 Certificates
Fabricator Certification for Ladder Assembly; G
1.4 CERTIFICATES
Provide fabricator certification for ladder assembly stating that the ladder and associated components have been fabricated according to the
SECTION 05 51 33 Page 3 Feb 16, 2018
ACCESS LA
requirements of current 29 CFR 1910.27 and ANSI.
1.5 QUALIFICATION OF WELDERS
Qualify welders in accordance with AWS D1.1/D1.1M. Use procedures, materials, and equipment of the type required for the work.
1.6 DELIVERY, STORAGE, AND PROTECTION
Protect from corrosion, deformation, and other types of damage. Store items in an enclosed area free from contact with soil and weather. Remove and replace damaged items with new items.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Structural Carbon Steel
ASTM A36/A36M.
2.1.2 Structural Tubing
ASTM A500/A500M.
2.1.3 Steel Pipe
ASTM A53/A53M, Type E or S, Grade B.
2.1.4 Fittings for Steel Pipe
Standard malleable iron fittings ASTM A47/A47M.
2.2 FABRICATION FINISHES
2.2.1 Galvanizing
Hot-dip galvanize items specified to be zinc-coated, after fabrication where practicable. Galvanizing: ASTM A123/A123M, ASTM A153/A153M, ASTM A653/A653M or ASTM A924/A924M, G90, as applicable.
2.2.2 Galvanize
Anchor bolts, washers, and parts or devices necessary for proper installation, unless indicated otherwise.
2.2.3 Repair of Zinc-Coated Surfaces
Repair damaged surfaces with galvanizing repair method and paint conforming to ASTM A780/A780M or by application of stick or thick paste material specifically designed for repair of galvanizing, as approved by Contracting Officer. Clean areas to be repaired and remove slag from welds. Heat surfaces to which stick or paste material is applied, with a torch to a temperature sufficient to melt the metallics in stick or paste; spread molten material uniformly over surfaces to be coated and wipe off excess material.
SECTION 05 51 33 Page 4 Feb 16, 2018
ACCESS LA
2.3 LADDERS
Fabricate vertical ladders conforming to current 29 CFR 1910.27 and ANSI, and Section 5 of ALI A14.3. Use 2 1/2 by 3/8 inch steel flats for stringers and 3/4 inch diameter steel rods for rungs. Rungs must not be less than 20 inches wide, spaced one foot apart, plug welded or shouldered and headed into stringers. Install ladders so that the distance from the rungs to the finished wall surface will not be less than 7 inches. Provide heavy clip angles bolted to the stringer and drilled for not less than two 5 /8 inch diameter expansion bolts as indicated. Provide intermediate clip angles not over 36 inches on centers. The top rung of the ladder must be level with the top of the access level, parapet or landing served by the ladder except for hatches or wells. Extend the side rails of through or side step ladders 42 inches above the access level. Provide ladder access protective swing gates at the top of access/egress level. The drawings must indicate ladder locations and details of critical dimensions and materials.
2.3.1 Ladder Cages
Conform to 29 CFR 1910.27. Fabricate 2 by 1/4 inch horizontal bands and 1 1/2 by 3/16 inch vertical bars. Provide attachments for fastening bands to the side rails of ladders or directly to the structure. Provide and fasten vertical bars on the inside of the horizontal bands. Extend cages not less than 27 inches or more than 28 inches from the centerline of the rungs, excluding the flare at the bottom of the cage, and not less than 27 inches in width. Clear the inside of the cage of projections.
2.3.2 Ladder Safety Devices
Conform to 29 CFR 1910.27 and Section 7 of ALI A14.3. Install ladder safety devices on ladders over 20 feet long or more. The ladder safety systems must meet the design requirement of the ladders which they serve.
The ladder safety system must be capable of sustaining a static load of 1,000 pounds.
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
Install items at locations indicated, according to manufacturer's instructions. Verify all measurements and take all field measurements necessary before fabrication. Provide Exposed fastenings of compatible materials, generally matching in color and finish, and harmonize with the material to which fastenings are applied. Include materials and parts necessary to complete each item, even though such work is not definitely shown or specified. Poor matching of holes for fasteners will be cause for rejection. Conceal fastenings where practicable. Thickness of metal and details of assembly and supports must provide strength and stiffness.
Formed joints exposed to the weather to exclude water. Items listed below require additional procedures.
3.2 WORKMANSHIP
Metalwork must be well formed to shape and size, with sharp lines and angles and true curves. Drilling and punching must produce clean true lines and surfaces. Continuously weld along the entire area of contact.
Do not tack weld exposed connections of work in place. Grid smooth exposed welds. Provide smooth finish on exposed surfaces of work in place, unless
SECTION 05 51 33 Page 5 Feb 16, 2018
ACCESS LA
otherwise approved. Where tight fits are required, mill joints. Cope or miter corner joints, well formed, and in true alignment. Install in accordance with manufacturer's installation instructions and approved drawings, cuts, and details.
3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS
Provide adhesive stainless steel threaded rod Series 300 anchorage where necessary for fastening metal items securely in place. Include for anchorage not otherwise specified or indicated slotted inserts, adhesive anchors,and powder-actuated fasteners, when approved for concrete; machine bolts, carriage bolts and powder-actuated threaded studs for steel.
Provide non-ferrous attachments for non-ferrous metal. Make exposed fastenings of compatible materials, generally matching in color and finish, to which fastenings are applied. Conceal fastenings where practicable.
3.4 WELDING
Perform welding, welding inspection, and corrective welding, in accordance with AWS D1.1/D1.1M. Use continuous welds on all exposed connections.
Grind visible welds smooth in the finished installation.
3.5 FINISHES
3.5.1 Dissimilar Materials
Where dissimilar metals are in contact, protect surfaces with a coat conforming to MPI 79 to prevent galvanic or corrosive action. Where aluminum is in contact with concrete, plaster, mortar, masonry, wood, or absorptive materials subject to wetting, protect with ASTM D1187/D1187M, asphalt-base emulsion.
3.5.2 Field Preparation
Remove rust preventive coating just prior to field erection, using a remover approved by the rust preventive manufacturer. Surfaces, when assembled, must be free of rust, grease, dirt and other foreign matter.
3.5.3 Environmental Conditions
Do not clean or paint surface when damp or exposed to foggy or rainy weather, when metallic surface temperature is less than 5 degrees F above the dew point of the surrounding air, or when surface temperature is below 45 degrees F or over 95 degrees F, unless approved by the Contracting Officer.
3.6 LADDERS
Secure to the adjacent construction with the clip angles attached to the stringer. Secure to concrete with not less than two 5/8 inch diameter adhesive threaded bolts. Install intermediate clip angles not over 36 inches on center. Install brackets as required for securing of ladders welded or bolted to structural steel or built into the concrete. Ends of ladders must not rest upon floor.
3.7 Concrete Cutting
Saw cut the existing concrete to prevent uncontrolled cracking and spalling in the adjacent concrete. Cutting shall be smooth to prevent raveling of
SECTION 05 51 33 Page 6 Feb 16, 2018
ACCESS LA
the edges of the saw cut. Cut surface shall be no more than +/- 1/4" differentof the existing surface elevation. Use concrete sawing machines that are adequate in number and power, and with sufficient replacement blades to complete the sawing at the required rate. Cut joints to true alignment. Remove sludge and cutting debris.
-- End of Section --
SECTION 05 51 33 Page 7 Feb 16, 2018
ACCESS LA
SU
BM
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
PA
G
ES
C
EN
T ru nn io n Pi n, J
-s ea ls , a nd A cc es s La dd er s
SD
-0
Sh op D ra w in gs
G La dd er s, P la tfo rm s, C ag es G
C on cr et e C ut tin g Pl an
SD
-0
Pr od uc t D at a
2.
G La dd er s 2.
3.
G La dd er
S af et y
D ev ic es
SD
-0
C er tif ic at es 1.
G
Fa br ic at or C er tif ic at io n fo r L ad de r As se m bl y
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
| PROJECT TABLE OF CONTENTS |
| DIVISION 05 - METALS |
| METAL LADDERS |
| 05 51 33 - METAL LADDERS |
| PART 1 GENERAL |
| 1.1 SCOPE OF WORK |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 CERTIFICATES |
| 1.5 QUALIFICATION OF WELDERS |
| 1.6 DELIVERY, STORAGE, AND PROTECTION |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Structural Carbon Steel |
| 2.1.2 Structural Tubing |
| 2.1.3 Steel Pipe |
| 2.1.4 Fittings for Steel Pipe |
| 2.2 FABRICATION FINISHES |
| 2.2.1 Galvanizing |
| 2.2.2 Galvanize |
| 2.2.3 Repair of Zinc-Coated Surfaces |
| 2.3 LADDERS |
| 2.3.1 Ladder Cages |
| 2.3.2 Ladder Safety Devices |
| PART 3 EXECUTION |
| 3.1 GENERAL INSTALLATION REQUIREMENTS |
| 3.2 WORKMANSHIP |
| 3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS |
| 3.4 WELDING |
| 3.5 FINISHES |
| 3.5.1 Dissimilar Materials |
| 3.5.2 Field Preparation |
| 3.5.3 Environmental Conditions |
| 3.6 LADDERS |
| 3.7 Concrete Cutting |
File details come from the government source that posted it.