W912P518B0003_TSpecs_AM1Pages.pdf

PDF 1 MB Posted

Attached to
Center Hill Spillway Gate Machinery and Trunnion Pin
Solicitation number
W912P518B0003
Issued by

About this file

TSpecs

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Spi l l way Gat es Rehabi l i t at i on Cent er Hi l l Dam W912P518B0003 Amendment 0001 DeKal b Count y, Tennessee

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 GENERAL

1. 1. 1 SCOPE OF WORK

1. 1. 1. 1 Package A

1. 1. 1. 2 Package B

1. 2 REFERENCES

1. 3 SUBMI TTALS

1. 4 WARRANTY

1. 5 WORKI NG HOURS

1. 5. 1 Feder al Hol i days

1. 6 CONSTRUCTI ON SEQUENCI NG

1. 6. 1 Spi l l way Feeder Out ages

1. 6. 2 Spi l l way Gat e Machi ner y Out ages

1. 6. 3 Wat er Management Coor di nat i on

1. 6. 4 Rai s i ng Wat er El evat i ons

1. 6. 5 Sequence of Wor k f or El ect r i cal Rehab

1. 7 OCCUPANCY OF PREMI SES

1. 8 PERMI TS AND LI CENSES

1. 9 SAFETY REQUI REMENTS

1. 10 NON- COMPLI ANCE OF SAFETY AND SECURI TY REQUI REMENTS

1. 11 PROTECTI ON OF EXI STI NG WORK AND DAMAGE REPORTS

1. 12 CONTRACTOR' S STAGI NG AREA

1. 13 SAFE CLEARANCE PROCEDURES

1. 14 DAI LY CLEANUP AND DI SPOSAL

1. 15 STORAGE OF EQUI PMENT AND MATERI ALS

1. 16 WORK COORDI NATI ON

1. 17 ENVI RONMENTAL PROTECTI ON

1. 18 EVALUATI ON OF CONTRACTOR PERFORMANCE

1. 19 COORDI NATI ON CONFERENCES

1. 20 PARTNERI NG

1. 21 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

1. 22 MEASUREMENT AND PAYMENT

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 TRAFFI C PROVI SI ONS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 00 00 Page 1

SECTI ON 01 00 00

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 GENERAL

Thi s sect i on compr i ses an expl anat i on of t he gener al cont r act r equi r ement s needed t o accompl i sh t he wor k. Thi s sect i on i s not i nt ended t o be al l encompassi ng i n t he descr i pt i ons. Al l wor k speci f i ed her ei n shal l be accompl i shed i n accor dance wi t h t he pr ocedur es pr escr i bed i n t he speci f i cat i ons and cont r act dr awi ngs.

1. 1. 1 SCOPE OF WORK

a. The wor ds " t ai nt er gat es" and " spi l l way gat es" ar e r ef er r ed t o t he same equi pment .

b. Speci f i cat i ons i n Di v i s i on 01 appl y t o bot h Package A and Package B as speci f i ed i n par agr aphs bel ow.

c. Techni cal speci f i cat i ons ( Di v i s i on 02 and above) : Not es, submi t t al s, r equi r ement s, i nf or mat i on, et c. cont ai ned i n t hose speci f i cat i ons desi gnat ed as Package A ( suf f i x 01) ar e appl i cabl e t o onl y t he wor k f ound i n Package A.

d. Techni cal speci f i cat i ons ( Di v i s i on 02 and above) : Not es, submi t t al s, r equi r ement s, i nf or mat i on, et c. cont ai ned i n t hose speci f i cat i on desi gnat ed as Package B ( suf f i x 02) ar e appl i cabl e t o onl y t he wor k f ound i n Package B.

1. 1. 1. 1 Package A

The f ol l owi ng wor k i s r equi r ed at Cent er Hi l l Dam f or Package A:

a. Gat e No. 7: Repl ace t r unni on pi n, t r unni on keeper pl at e, t r unni on t hr ust washer and t r unni on base on t he power house si de. Modi f y t r unni on pi n bushi ngs. I nspect t r unni on pi n and bushi ng of t he r emai ni ng si de of gat e No. 7 . See Sect i on 05 50 17. 01 MECHANI CAL FABRI CATI ONS FOR PACKAGE A f or det ai l ed scope.

b. Repl ace t ai nt er gat e J- seal s and ot her mi scel l aneous i t ems f or al l ei ght ( 8) t ai nt er gat es. See Sect i on 35 20 16. 01 TAI NTER GATE RUBBER SEALS FOR PACKAGE A f or det ai l ed scope.

c. I nst al l new met al l adder s at al l ni ne ( 9) gat e pi er s. See Sect i on 05 51 33. 01 METAL LADDERS FOR PACKAGE A f or det ai l ed scope.

1. 1. 1. 2 Package B

The f ol l owi ng wor k i s r equi r ed at Cent er Hi l l Dam f or Package B:

a. Repl ace spi l l way gat e f eeder s. See Sect i on 26 05 01. 02 SPI LLWAY FEEDER AND LI GHTI NG REPLACEMENTS FOR PACKAGE B f or det ai l ed scope.

SECTI ON 01 00 00 Page 2

b. Repl ace spi l l way gat e machi ner y l i ght i ng. See Sect i on 26 05 01. 02 SPI LLWAY FEEDER AND LI GHTI NG REPLACEMENTS FOR PACKAGE B f or det ai l ed scope.

c. Repl ace spi l l way gat e cont r ol panel s. See Sect i on 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B f or det ai l ed scope.

d. Repl ace spi l l way gat e br akes, gear mot or s, shaf t s, and coupl i ngs. See Sect i on 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B f or det ai l ed scope.

e. Repl ace t r avel i ng nut l i mi t swi t ch. See Sect i on 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B f or det ai l ed scope.

f . Recondi t i on equi pment . See Sect i on 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B f or det ai l ed scope.

g. Lead pai nt r emoval and pai nt i ng. See Sect i on 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B f or det ai l ed scope.

h. Repl ace washdown pump. See Sect i on 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B f or det ai l ed scope.

i . Asbest os Abat ement : Per f or m asbest os abat ement as speci f i ed i n Sect i on

02 82 14. 02 ASBESTOS ABATEMENT WORK FOR PACKAGE B.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

ER 385- 1- 31 ( 2009) The Cont r ol of Hazar dous Ener gy

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Spi l l way Feeder Out ages; G

Spi l l way Gat e Machi ner y Out ages; G

Sequence Of Wor k For El ect r i cal Equi pment ; G, ECD- E

1. 4 WARRANTY

The Cont r act or shal l pr ovi de t he Gover nment a one year war r ant y f r om t he dat e of f i nal accept ance by t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) , and compl y wi t h appl i cabl e war r ant y r equi r ement s of Sect i on 01 78 00 CLOSEOUT SUBMI TTALS. The one year war r ant y per i od shal l st ar t af t er each

SECTI ON 01 00 00 Page 3 compl et ed, i n- pl ace i t em of wor k has been t est ed i n accor dance wi t h t he t echni cal speci f i cat i ons and accept ed by t he Gover nment . The war r ant y shal l cover def ect i ve mat er i al s, desi gn and wor kmanshi p. I n i nst ances wher e t he mat er i al or equi pment manuf act ur er ' s adver t i sed mi ni mum war r ant y i s i n excess of one year , i t shal l r emai n i n f or ce f or i t s f ul l per i od.

Upon r ecei pt of not i ce f r om t he Cont r act i ng Of f i cer of f ai l ur e of any of t he mat er i al or equi pment dur i ng t he war r ant y per i od, t he Cont r act or shal l pr ompt l y f ur ni sh and i nst al l new r epl acement par t s at no addi t i onal cost t o t he Gover nment .

1. 5 WORKI NG HOURS

Nor mal wor ki ng hour s shal l be Monday t hr ough Thur sday 6: 30 AM t o 5: 00 PM CST. Wor k shal l be schedul ed ar ound f eder al hol i days. Any except i ons must be appr oved by t he COR. Cont r act or ' s r equest s t o change wor k hour s shal l be submi t t ed at l east 14 cal endar days i n advance of need.

1. 5. 1 Feder al Hol i days

Do not schedul e wor k on Feder al hol i days.

a. 2018 Feder al Hol i day Schedul e ( r emai ni ng hol i days)

Dat e Hol i day Monday, Sept ember 3 Labor Day Monday, Oct ober 8 Col umbus Day Monday, November 12* Vet er ans Day Thur sday, November 22 Thanksgi v i ng Day Tuesday, December 25 Chr i st mas Day

* November 11, 2018 ( t he l egal Feder al hol i day f or Vet er ans Day) , f al l s on a Sunday. Monday, November 12, wi l l be t r eat ed as a Feder al hol i day.

b. 2019 Feder al Hol i day Schedul e

Dat e Hol i day Tuesday, Januar y 1 New Year ' s Day Monday, Januar y 21 Bi r t hday of Mar t i n Lut her Ki ng, Jr .

Monday, Febr uar y 18* * Washi ngt on' s Bi r t hday Monday, May 27 Memor i al Day Thur sday, Jul y 4 I ndependence Day Monday, Sept ember 2 Labor Day Monday, Oct ober 14 Col umbus Day Monday, November 11 Vet er ans Day Thur sday, November 28 Thanksgi v i ng Day Wednesday, December 25 Chr i st mas Day

* * Thi s hol i day i s desi gnat ed as " Washi ngt on' s Bi r t hday" i n sect i on 6103( a) of t i t l e 5 of t he Uni t ed St at es Code, whi ch i s t he l aw t hat speci f i es hol i days f or Feder al empl oyees. Though ot her i nst i t ut i ons such as st at e and l ocal gover nment s and pr i vat e busi nesses may use ot her names, i t i s our pol i cy t o al ways r ef er t o hol i days by t he names desi gnat ed i n t he l aw.

1. 6 CONSTRUCTI ON SEQUENCI NG

The wor k speci f i ed under t hi s cont r act wi l l r equi r e ext ended out ages of t he spi l l way gat e machi ner y f or t he Cent er Hi l l Pr oj ect . These out ages shal l be mi ni mi zed as much as pr act i cabl e by t he Cont r act or t o mai nt ai n

SECTI ON 01 00 00 Page 4

Spillway Gates Rehabilitation Center Hill Dam W912P518B0003 Amendment 0001 DeKalb County, Tennessee safe operation of the Center Hill Project. All requests for feeder outages and gate machinery outages shall be made in advance to the Contractor Officers' Representative and Water Management staff. All outages shall be shown on the project schedules as shown in Section 01 32 01 - PROJECT SCHEDULE. The following restrictions shall apply to all construction activities:

1.6.1 Spillway Feeder Outages

The spillway feeder replacemnt shall be completed by 01 June 2019. The methodolgy of feeder replacment shall ensure continutity of power to the gates except for the instances when terminating the feeders. This outage shall be minimized. Provide 7 calendar day notice for any feeder outage.

In the event the spillway gates are without power for longer than 24hrs the contractor shall notify the COR and provide the capability to supply temporary power to the gate(s). Outages shall not exceed more than 24 hrs per week without temporary power service in place.

1.6.2 Spillway Gate Machinery Outages

Unless otherwise approved by the COR, individual spillway gates shall only be removed from service between 15 June and 10 November. Unless otherwise approved by the Contracting Officer's Representative (COR), only one spillway gate shall be taken out of service for the machinery rehab until successful performance by the Contractor has been proven and approved by the Contracting Officer's Representative. After successful performance is proven and approved, the Contractor may request outages for up to three gates simultaneously and shall not proceed without an approval by the government. The Contractor shall provide a two week notice to the Government in writing prior to any spillway gate closures.

Contractor shall be allowed to perform work on the maximum of three (3) gates at once as long as water is not on gates or in a spill event. The trunnion pin gate (No. 7) counts as one of the down gates until it's fixed.

1.6.3 Water Management Coordination

Based on historical operations of the project, the time windows between the dates of 15 June and 10 November provide the contractor with the best chance for uninterrupted work due to high lake levels; however, hydrologic conditions are unpredictable and the contractor must be ready to adapt to changing conditions rapidly and should be prepared for work interruptions.

Due to the serious consequences resulting from water being on the gate, it is necessary to communicate with Water Management staff before work begins and throughout the replacement process. A contact phone number and email of the contractor performing the J-seal replacement, gate machinery replacement and gate number 7 pin replacement must be provided to Water Management so the contractor may be reached at any time of day and on any day of the week if Water Management staff are expecting pool levels to rise and are concerned about the risk to the gate. Once initially called, the contractor must close the gate(s) within no more than 4 hours so that there is no danger of lake levels damaging the gate(s).

Contact information for Water Management staff include:

Hydraulic Engineer: Randy Kerr office phone: 615-736-5633 mobile phone: 615-450-4045

SECTION 01 00 00 Page 5

Spillway Gates Rehabilitation Center Hill Dam W912P518B0003 Amendment 0001 DeKalb County, Tennessee email: Randall.Z.Kerr@usace.army.mil, Hydraulic Engineer: Robert Dillingham office phone: 615-736-7936 mobile phone: 615-450-4026 email: Robert.S.Dillingham@usace.army.mil, and

Water Management Section Chief: Anthony Rodino office phone: 615-736-5675 mobile phone: 615-476-3023 email: Anthony.Rodino@usace.army.mil.

1.6.4 Raising Water Elevations

The Government intends to raise water to the normal operating level on 01 July 2019. For reference of the normal operating level, see attachment 1

- Center Hill (CEN) Maximum, Median & Minimum Midnight Pool Elevations of Section 01 95 00 FORMS AND ATTACHMENTS.

1.6.5 Sequence of Work for Electrical Rehab

Contractor shall complete the design, fabrication, and installation of the electrical feeders, remote operation cabinets and diesel generator connection/disconnect by 01 June 2019. Remainder of electrical equipment may be completed before or after 01 June 2019 in accordance with other outage restrictions found in these specifications. Submit sequence of work for the electrical equipment for approval.

1.7 OCCUPANCY OF PREMISES

Center Hill Dam will be operating during performance of the work under this Contract.

Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches and roadways.

1.8 PERMITS AND LICENSES

The Contractor shall, at his/her own expense, obtain any licenses, permits or bonding required to perform the contract. The Contractor shall comply with current federal, state, and local laws and regulations and shall comply with any subsequent changes.

1.9 SAFETY REQUIREMENTS

The Contractor shall comply with all applicable provisions of EM 385-1-1 Safety and Health Requirements Manual and Section 01 35 26 GOVERNMENTAL

SAFETY REQUIREMENTS.

1.10 NON-COMPLIANCE OF SAFETY AND SECURITY REQUIREMENTS

If the Contractor fails or refuses to promptly comply with the safety and security requirements, the COR may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stoppage shall be made subject to claim for extension of time or for excess costs or damages to the Contractor. The Contractor will not be paid for work not performed as a result of the stop order. Work shall not resume until the Contractor provides evidence to

SECTION 01 00 00 Page 6 t he COR t hat he/ she has compl i ed or wi l l compl y wi t h appr opr i at e saf et y and secur i t y r egul at i ons.

1. 11 PROTECTI ON OF EXI STI NG WORK AND DAMAGE REPORTS

I n al l i nst ances when Gover nment pr oper t y and/ or equi pment i s damaged by t he Cont r act or ' s empl oyees or any cont r act empl oyees, t he Cont r act or shal l i mmedi at el y suspend al l wor k, and not i f y t he COR. A f ul l wr i t t en r epor t of t he i nci dent i ncl udi ng t he ext ent of damage shal l be submi t t ed t o t he COR f or eval uat i on wi t hi n t wo wor kdays of occur r ence. The Cont r act or shal l wai t f or a Not i f i cat i on t o Pr oceed f r om t he COR bef or e r esumi ng any wor k act i v i t i es.

1. 12 CONTRACTOR' S STAGI NG AREA

The Cont r act or wi l l be assi gned an ar ea near t he j obsi t e f or use as a st agi ng ar ea. Pr ospect i ve ar eas wi l l be shown dur i ng t he pr e- bi d s i t e v i s i t or upon r equest of t he Cont r act i ng Of f i cer . The bui l di ng of st r uct ur es, t he er ect i on of t ent s or ot her f or ms of pr ot ect i on wi l l be per mi t t ed onl y at such pl aces as t he Gover nment shal l appr ove, and t he sani t ar y condi t i ons of t he gr ounds i n or about such st r uct ur es shal l at al l t i mes be mai nt ai ned i n a sat i sf act or y manner . Tempor ar y Cont r act or f aci l i t i es pr ovi ded dur i ng s i t e oper at i ons shal l be r emoved pr i or t o f i nal accept ance f r om t he Gover nment . As a mi ni mum t he ar ea shal l be l ef t l ooki ng " br oom cl ean" and at l east as c l ean as bef or e t he st r uct ur e placement.

1. 13 SAFE CLEARANCE PROCEDURES

Pr oj ect per sonnel use A Saf e Cl ear ance Syst em, as st at ed i n ER 385- 1- 31 and amended by t he Nashvi l l e Di st r i ct t o ensur e cont i nui t y of ser vi ce and saf et y t o per sonnel and equi pment . Any wor k per f or med whi ch r equi r es t aki ng t he Pr oj ect ' s oper at i ng equi pment out of ser vi ce wi l l be done onl y af t er a f or mal c l ear ance i s obt ai ned by t he Cont r act i ng Of f i cer wi t h 48- hour mi ni mum not i ce. Cont r act or per sonnel shal l not v i ol at e c l ear ance. Any vi ol at i on of Saf e Cl ear ance Pr ocedur es wi l l be gr ounds f or r emoval of t he of f ender ( s) . Copi es of t he Nashvi l l e Di st r i ct Saf e Cl ear ance Pr ocedur e wi l l be suppl i ed t o t he Cont r act or upon r equest .

1. 14 DAI LY CLEANUP AND DI SPOSAL

Wor k ar eas shal l be kept r easonabl y neat on a dai l y basi s. Debr i s r esul t i ng f r om t he wor k, such as empt y pai nt cans, packi ng cases, scr ap l umber , oi l and gr ease spi l l s , and ot her debr i s shal l be col l ect ed, r emoved, and di sposed of of f - s i t e t o an appr oved f aci l i t y at l east once per week. Gover nment t r ash cans, dump boxes and ot her cont ai ner s shal l not be used. Li qui d wast e shal l not be di sposed of i n exi st i ng dr ai ns.

1. 15 STORAGE OF EQUI PMENT AND MATERI ALS

St or age of equi pment and mat er i al s wi l l be per mi t t ed onl y i n desi gnat ed st agi ng ar eas.

1. 16 WORK COORDI NATI ON

The Gover nment wi l l l i mi t i nt er f er ence wi t h t he Cont r act or ' s wor k t o t he maxi mum r easonabl e ext ent and t he Gover nment and Cont r act or shal l coor di nat e as necessar y. Cont r act or shal l al so need t o coor di nat e hi s or her wor k wi t h ot her cont r act or s t o avoi d conf l i c t s and t o mai nt ai n

SECTI ON 01 00 00 Page 7 equi pment access and ser vi ceabi l i t y . Ther e wi l l be sever al ot her maj or cont r act s under const r uct i on dur i ng t he cont r act dur at i on f or t hi s cont r act . The ot her pr oj ect s i ncl ude t he Cent er Hi l l Auxi l i ar y Dam Rei nf or ci ng Ber m and Lef t Ri m St abi l i zat i on, Cent er Hi l l Si t e Rest or at i on, and t he Cent er Hi l l Uni t s 1- 3 Rehabi l i t at i on. Al l t hr ee of t hese pr oj ect s r equi r e ext ensi ve use of Hi ghway 96 whi ch r uns acr oss t he t op of t he dam.

The wor k f or t hi s pr oj ect shal l not negat i vel y i mpact any oper at i ons f or t he above pr oj ect s, unl ess ot her wi se al l owed i n wr i t i ng by t he Cont r act i ng Of f i cer . To hel p avoi d conf l i c t s, t he Cont r act or shal l pr ovi de cont act i nf or mat i on f or var i ous on- si t e per sonnel whi l e al so schedul i ng act i v i t i es t o avoi d oper at i onal conf l i c t s wi t h ot her cont r act s. Addi t i onal l y, t he Gover nment wi l l shar e per t i nent i nf or mat i on r el at ed t o const r uct i on schedul es on t he above ment i oned cont r act s t o assi st t hi s Cont r act or wi t h schedul i ng act i v i t i es.

1. 17 ENVI RONMENTAL PROTECTI ON

The Cont r act or shal l compl y wi t h t he cont r act r equi r ement s st at ed i n Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS. Cont r act or shal l mai nt ai n al l wor k wi t hi n and out si de t he pr oj ect boundar i es f r ee f r om envi r onment al pol l ut i on t hat woul d be i n v i ol at i on of any f eder al , st at e, l ocal r egul at i ons or per mi t s.

1. 18 EVALUATI ON OF CONTRACTOR PERFORMANCE

The Cont r act or ' s per f or mance wi l l be eval uat ed i n accor dance wi t h FAR Par t

42. 15 i n t he ar eas of qual i t y, schedul e, cost cont r ol , management , ut i l i zat i on of smal l busi nesses, and r egul at or y compl i ance at mi ni mum.

The eval uat i on wi l l i ncl ude a wr i t t en nar r at i ve and r at i ng of ei t her except i onal , ver y good, sat i sf act or y, mar gi nal , or unsat i sf act or y f or each. The f or mat f or t he eval uat i on i s at t ached at t he end of Sect i on

01 95 00 FORMS AND ATTACHMENTS.

The Cont r act or ' s r evi ew of t he eval uat i on shal l be compl et ed el ect r oni cal l y at t he CPARS, http://www.cpars.gov . Thi s websi t e al so i ncl udes gui dance and t he user ' s manual .

Upon cont r act awar d, t he Cont r act or shal l pr ovi de t he Cont r act i ng Of f i cer wi t h t he name and e- mai l addr ess of t he Cont r act or ' s Repr esent at i ve t o be r egi st er ed i nt o t he syst em. Fol l owi ng i ni t i al compl et i on by t he Gover nment , t he Cont r act or wi l l have si xt y ( 60) cal endar days t o r evi ew, comment , and r et ur n t he eval uat i on.

1. 19 COORDI NATI ON CONFERENCES

Rout i ne coor di nat i on conf er ences wi l l be schedul ed by t he Cont r act i ng Of f i cer t hr oughout t he l i f e of t hi s cont r act . Coor di nat i on conf er ences wi l l be hel d t o di scuss cont r act admi ni st r at i on, Cont r act or qual i t y cont r ol , phasi ng, schedul i ng, and ot her aspect s r el at i ng t o t hi s const r uct i on. The Cor ps of Engi neer s and t he Cont r act or wi l l be r epr esent ed at each of t hese meet i ngs. Coor di nat i on conf er ences wi l l be schedul ed t o occur when not i f i ed by t he Cont r act i ng Of f i cer .

1. 20 PARTNERING

I n or der t o most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment ur ges t he Cont r act or t o j oi n t he Gover nment i n est abl i shi ng a cohesi ve and pr of essi onal pr oj ect management t eam. Thr ough t hi s " par t ner i ng" r el at i onshi p bot h ent i t i es woul d st r i ve t o dr aw on t he st r engt hs of each

SECTI ON 01 00 00 Page 8 or gani zat i on f or t he ul t i mat e goal of assur i ng t hat t he pr oj ect ' s i nt ended r esul t s ar e achi eved, wi t hi n budget and on schedul e. Thi s endeavor seeks an envi r onment t hat nur t ur es t eam bui l di ng, cooper at i on and t r ust bet ween t he Gover nment and t he Cont r act or . The par t ner i ng r el at i onshi p woul d be bi l at er al i n make- up, and par t i c i pat i on wi l l be t ot al l y vol unt ar y.

At t he di scr et i on of each ent i t y, a j oi nt pr oj ect management t eam " par t ner i ng" conf er ence wi l l be schedul ed. The conf er ence wi l l be at t ended by mul t i pl e of f i cer s f r om each or gani zat i on r epr esent i ng management and t he key j obsi t e st af f of each ent i t y. An appoi nt ed i ndi v i dual woul d chai r t he conf er ence and t he Cont r act or wi l l be r esponsi bl e t o est abl i sh i t s agenda and di st r i but e mi nut es of t he meet i ng. A pr of essi onal f aci l i t at or accept abl e t o bot h par t i es woul d l ead t he par t i c i pant s of t he sessi on, t hr ough t he st eps of t eam bui l di ng and t he f or mat i on of a pr obl em sol v i ng mechani sm wi t hi n t he gr oup. The conf er ence dur at i on woul d be no mor e t han one cal endar day. Locat i on and accommodat i ons f or t he conf er ence woul d be agr eed upon by bot h ent i t i es.

Al l cost s i n connect i on wi t h r ent ed f aci l i t i es and t he f aci l i t at or woul d be shar ed equal l y by t he Gover nment and t he Cont r act or . Each or gani zat i on woul d pay ot her cost s of i t s r espect i ve empl oyees at t endi ng t he conference.

Addi t i onal par t ner i ng sessi ons woul d be hel d i nt er mi t t ent l y.

I mpl ement at i on of t he par t ner i ng concept and phi l osophy woul d be an on- goi ng pr ocess.

1. 21 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13 EQUAL OPPORTUNI TY FOR VETERANS, FAR Cl ause 52. 222- 35 EQUAL OPPORTUNI TY FOR VETERANS, FAR Cl ause 52. 222- 37 EMPLOYMENT REPORTS ON VETERANS, DFARS

222. 13 SPECI AL DI SABLED AND VI ETNAM ERA VETERANS, and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act .

Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:

a. U. S. Depar t ment of Labor Vet er ans empl oyment : www.vets.gov/

b. Feder al vet er an empl oyment i nf or mat i on: www.fedshirevets.gov/index.aspx

c. Vet er ans’ Empl oyment and Tr ai ni ng Ser vi ce ( VETS) :

http://www.dol.gov/vets/

d. Vet er ans Oppor t uni t y t o Wor k ( VOW) Pr ogr am: http://benefits.va.gov/vow/

e. U. S. Ar my War r i or Tr ansi t i on Command Empl oyment I ndex:

http://www.wct.army.mil/modules/employers/index.html f . Hi r i ng Our Her oes i ni t i at i ve:

www.uschamberfoundation.org/hiring-our-heroes

g. Gui de t o Hi r i ng Vet er ans:

https:://obamawhitehouse.archives.gov/sites/default/files/docs/white_house_business_council

SECTI ON 01 00 00 Page 9

- gui de_t o_hi r i ng_vet er ans_0. pdf

1. 22 MEASUREMENT AND PAYMENT

No separ at e payment wi l l be made f or t he wor k cover ed under t hi s sect i on, except as ot her wi se pr ovi ded. The cost s t her eof shal l be i ncl uded i n t he i t em t o whi ch t he wor k per t ai ns. Payment f or t he wor k r equi r ed under t hi s cont r act wi l l made as l i s t ed i n t he bi ddi ng schedul e and as descr i bed i n Sect i on 01 22 00 MEASUREMENT AND PAYMENT.

PART 2 PRODUCTS

NOT USED.

PART 3 EXECUTI ON

3. 1 TRAFFI C PROVI SI ONS

For det ai l s on Tr af f i c Cont r ol , See Sect i on 01 55 26 TRAFFI C CONTROL.

- - End of Sect i on - -

SECTI ON 01 00 00 Page 10

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 PAYMENT I TEMS

1. 1. 1 Base Cont r act Payment I t ems

1. 1. 1. 1 Mobi l i zat i on and Demobi l i zat i on

1. 1. 1. 1. 1 Payment

1. 1. 1. 1. 2 Uni t of Measur ement

1. 1. 1. 2 Per f or mance and Payment Bonds

1. 1. 1. 2. 1 Payment

1. 1. 1. 2. 2 Uni t of Measur e

1. 1. 1. 3 Demol i t i on

1. 1. 1. 3. 1 Payment

1. 1. 1. 3. 2 Uni t of Measur e

1. 1. 1. 4 El ect r i cal Feeder s and Li ght i ng

1. 1. 1. 4. 1 Payment

1. 1. 1. 4. 2 Uni t of Measur e

1. 1. 1. 5 Spi l l way Gat e Cont r ol Panel s

1. 1. 1. 5. 1 Payment

1. 1. 1. 5. 2 Uni t of Measur e

1. 1. 1. 6 Asbest os Abat ement Wor k

1. 1. 1. 6. 1 Payment

1. 1. 1. 6. 2 Uni t of Measur e

1. 1. 1. 7 Br akes, Gear mot or s, Shaf t s, and Coupl i ngs

1. 1. 1. 7. 1 Payment

1. 1. 1. 7. 2 Uni t of Measur e

1. 1. 1. 8 Recondi t i oni ng Equi pment

1. 1. 1. 8. 1 Payment

1. 1. 1. 8. 2 Uni t of Measur e

1. 1. 1. 9 Pi n Repl acement - Gat e No. 7

1. 1. 1. 9. 1 Payment

1. 1. 1. 9. 2 Uni t of Measur e

1. 1. 1. 10 J- Seal and Har dwar e Repl acement - Gat es No. 1- 3 & 6- 8

1. 1. 1. 10. 1 Payment

1. 1. 1. 10. 2 Uni t of Measur e

1. 1. 1. 11 Tr af f i c Cont r ol

1. 1. 1. 11. 1 Payment

1. 1. 1. 11. 2 Uni t of Measur e

1. 1. 2 Opt i on 1 - Payment I t ems

1. 1. 2. 1 Per f or mance and Payment Bonds

1. 1. 2. 1. 1 Payment

1. 1. 2. 1. 2 Uni t of Measur e

1. 1. 2. 2 Tai nt er Gat e: Lead Pai nt Removal and Pai nt i ng - Hydr aul i c

Structures

1. 1. 2. 2. 1 Payment

1. 1. 2. 2. 2 Uni t of Measur e

1. 1. 2. 3 Tr af f i c Cont r ol

SECTI ON 01 22 00 Page 1

1. 1. 2. 3. 1 Payment

1. 1. 2. 3. 2 Uni t of Measur e

1. 1. 3 Opt i on 2 - Payment I t ems

1. 1. 3. 1 Per f or mance and Payment Bonds

1. 1. 3. 1. 1 Payment

1. 1. 3. 1. 2 Uni t of Measur e

1. 1. 3. 2 Li mi t Swi t ches

1. 1. 3. 2. 1 Payment

1. 1. 3. 2. 2 Measur ement

1. 1. 3. 2. 3 Uni t of Measur e

1. 1. 3. 3 Tr af f i c Cont r ol

1. 1. 3. 3. 1 Payment

1. 1. 3. 3. 2 Uni t of Measur e

1. 1. 4 Opt i on 3 - Payment I t ems

1. 1. 4. 1 Per f or mance and Payment Bonds

1. 1. 4. 1. 1 Payment

1. 1. 4. 1. 2 Uni t of Measur e

1. 1. 4. 2 Remot e Oper at i on Cabi net s

1. 1. 4. 2. 1 Payment

1. 1. 4. 2. 2 Measur ement

1. 1. 4. 2. 3 Uni t of Measur e

1. 1. 4. 3 Tr af f i c Cont r ol

1. 1. 4. 3. 1 Payment

1. 1. 4. 3. 2 Uni t of Measur e

1. 1. 5 Opt i on 4 - Payment I t ems

1. 1. 5. 1 Per f or mance and Payment Bonds

1. 1. 5. 1. 1 Payment

1. 1. 5. 1. 2 Uni t of Measur e

1. 1. 5. 2 Pump and Accessor i es

1. 1. 5. 2. 1 Payment

1. 1. 5. 2. 2 Uni t of Measur e

1. 1. 5. 3 Tr af f i c Cont r ol

1. 1. 5. 3. 1 Payment

1. 1. 5. 3. 2 Uni t of Measur e

1. 1. 6 Opt i on 5 Payment I t ems

1. 1. 6. 1 Per f or mance and Payment Bonds

1. 1. 6. 1. 1 Payment

1. 1. 6. 1. 2 Uni t of Measur e

1. 1. 6. 2 J- Seal and Har dwar e Repl acement - Gat e No. 4

1. 1. 6. 2. 1 Payment

1. 1. 6. 2. 2 Uni t of Measur e

1. 1. 6. 3 Tr af f i c Cont r ol

1. 1. 6. 3. 1 Payment

1. 1. 6. 3. 2 Uni t of Measur e

1. 1. 7 Opt i on 6 Payment I t ems

1. 1. 7. 1 Per f or mance and Payment Bonds

1. 1. 7. 1. 1 Payment

1. 1. 7. 1. 2 Uni t of Measur e

1. 1. 7. 2 J- Seal and Har dwar e Repl acement - Gat e No. 5

1. 1. 7. 2. 1 Payment

1. 1. 7. 2. 2 Uni t of Measur e

1. 1. 7. 3 Tr af f i c Cont r ol

1. 1. 7. 3. 1 Payment

1. 1. 7. 3. 2 Uni t of Measur e

1. 1. 8 Opt i on 7 Payment I t ems

1. 1. 8. 1 Per f or mance and Payment Bonds

1. 1. 8. 1. 1 Payment

1. 1. 8. 1. 2 Uni t of Measur e

1. 1. 8. 2 Met al Ladder - Pi er s 7 - 9

SECTI ON 01 22 00 Page 2

1. 1. 8. 2. 1 Payment

1. 1. 8. 2. 2 Uni t of Measur e

1. 1. 8. 3 Tr af f i c Cont r ol

1. 1. 8. 3. 1 Payment

1. 1. 8. 3. 2 Uni t of Measur e

1. 1. 9 Opt i on 8 Payment I t ems

1. 1. 9. 1 Per f or mance and Payment Bonds

1. 1. 9. 1. 1 Payment

1. 1. 9. 1. 2 Uni t of Measur e

1. 1. 9. 2 Met al Ladder - Pi er s 1 - 3

1. 1. 9. 2. 1 Payment

1. 1. 9. 2. 2 Uni t of Measur e

1. 1. 9. 3 Tr af f i c Cont r ol

1. 1. 9. 3. 1 Payment

1. 1. 9. 3. 2 Uni t of Measur e

1. 1. 10 Opt i on 9 Payment I t ems

1. 1. 10. 1 Per f or mance and Payment Bonds

1. 1. 10. 1. 1 Payment

1. 1. 10. 1. 2 Uni t of Measur e

1. 1. 10. 2 Met al Ladder - Pi er s 4 - 6

1. 1. 10. 2. 1 Payment

1. 1. 10. 2. 2 Uni t of Measur e

1. 1. 10. 3 Tr af f i c Cont r ol

1. 1. 10. 3. 1 Payment

1. 1. 10. 3. 2 Uni t of Measur e

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

SECTI ON 01 22 00 Page 3

SECTI ON 01 22 00

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 PAYMENT I TEMS

Payment i t ems f or t he wor k r equi r ed under t hi s cont r act ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. I t cover s t he cost t o r ehab t he Cent er Hi l l ( CEN) spi l l way gat e machi ner y f or al l 8 gat es, r epl ace t he CEN t r unni on pi n at spi l l way gat e No. 7, r epl ace J- seal f or al l gat es, and add met al l adder s f or al l pi er s. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar payment i t em, shal l be i ncl uded i n t he l i s t ed i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. Payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, equi pment , t ool s, suppl i es, and i nci dent al s necessar y t o compl et e t he wor k, and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 1. 1 Base Cont r act Payment I t ems

1. 1. 1. 1 Mobi l i zat i on and Demobi l i zat i on

1. 1. 1. 1. 1 Payment

a. Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on of al l of t he Cont r act or ' s pl ant and equi pment , as def i ned i n Cont r act Cl ause 252. 236- 7004 PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON. Payment wi l l be made at t he s i ngl e j ob pay i t em f or " Mobi l i zat i on and Demobi l i zat i on" .

1. 60 per cent of t he s i ngl e j ob pr i ce wi l l be pai d upon compl et i on of t he Cont r act or ' s mobi l i zat i on at t he wor k s i t e.

2. The r emai ni ng 40 per cent wi l l be pai d upon compl et i on of demobilization.

b. The Cont r act i ng Of f i cer may r equi r e t he Cont r act or t o f ur ni sh cost dat a t o j ust i f y t hi s por t i on of t he bi d i f t he Cont r act i ng Of f i cer bel i eves t hat t he per cent ages i n par agr aphs ( a. ) ( 1. ) and ( 2. ) of t hi s sect i on do not bear a r easonabl e r el at i on t o t he cost of t he wor k i n t hi s cont r act .

1. 1. 1. 1. 2 Uni t of Measur ement

Uni t of measur e: Job.

1. 1. 1. 2 Per f or mance and Payment Bonds

1. 1. 1. 2. 1 Payment

Payment wi l l be made f or Per f or mance and Payment Bonds t hat ar e r equi r ed

SECTI ON 01 22 00 Page 4 as par t of t hi s cont r act i n accor dance wi t h Cont r act Cl ause 52. 232- 5 PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS. Payment f or t he pr emi ums f or per f or mance and payment bonds wi l l be made at t he cont r act pr i ce per Job f or " Per f or mance and Payment Bonds. " The Gover nment wi l l pay t he act ual cost of accept abl e per f or mance and payment bonds or t he Cont r act or ' s bi d pr i ce, whi chever i s l ess. Payment s made under t hi s pr ovi s i on shal l not exceed t he amount i ncl uded f or " Per f or mance and Payment Bonds, " whi ch payment shal l t ake i nt o consi der at i on any di scount s or r ebat es t o t he Cont r act or f r om t he Sur et y. The Cont r act or i s advi sed t hat t he pay i t em " Per f or mance and Payment Bonds" i s onl y f or t he cost of bonds. Ot her cost s shoul d be al l ocat ed t o t he appr opr i at e payment i t ems.

The Cont r act or shal l pr ovi de evi dence of payment ( pai d i nvoi ce) f r om t he bondi ng company or agency. I f t he act ual cost of t he bonds i s l ess t han t he payment i t em amount , t he cont r act wi l l be modi f i ed t o adj ust t he payment i t em accor di ngl y. Adj ust ment ( s) t o t he l i ne i t em wi l l al so be made f or any r evi s i ons t o t he act ual bond cost s associ at ed wi t h cont r act changes.

1. 1. 1. 2. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 1. 3 Demolition

1. 1. 1. 3. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h " demol i t i on" , whi ch i ncl udes al l mat er i al s, equi pment , and l abor r equi r ed t o demol i sh t he exi st i ng equi pment i n accor dance wi t h Sect i on 02 41 00. 02 DEMOLI TI ON FOR PACKAGE B. Thi s payment i t em onl y i ncl udes demol i t i on f or equi pment under package B f or t he base cont r act . Demol i t i on f or equi pment under t he opt i ons shal l be cover ed under t he cor r espondi ng payment i t em. For payment of asbest os abat ement , see par agr aph " Asbest os Abat ement Wor k. "

Lead pai nt r emoval and di sposal of demol i shed equi pment under t he base cont r act shal l be i nci dent al t o t hi s payment . The equi pment i ncl udes, but not l i mi t ed t o, spi l l way ( t ai nt er ) gat e cont r ol panel s, br akes, gear mot or s ( mot or , wor m gear , and base) , di al i ndi cat or , and coupl i ngs. For ot her equi pment of package B, see opt i on 1 payment i t ems.

Sect i on 02 41 00. 01 DEMOLI TI ON FOR PACKAGE A: Demol i t i on f or gat e number 7 t r unni on pi n r epl acement shal l be cover ed under payment i t em " Pi n Repl acement - Gat e No. 7" . Demol i t i on f or J- seal s r epl acement shal l be cover ed under payment i t ems " J- seal and Har dwar e Repl acement - Gat es 1- 3 & 6- 8" , " J- seal and Har dwar e Repl acement - Gat e 4" , and " J- seal and Har dwar e Repl acement - Gat e 5" . Demol i t i on f or met al l adder s shal l be cover ed under payment i t ems " Met al Ladder s - Pi er s 7- 9" , " Met al Ladder s - Pi er s 1- 3" and " Met al Ladder s - Pi er s 4- 6" .

1. 1. 1. 3. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 1. 4 El ect r i cal Feeder s and Li ght i ng

1. 1. 1. 4. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h " El ect r i cal Feeder s and Li ght i ng" , whi ch i ncl udes al l mat er i al s, equi pment , and l abor r equi r ed t o

SECTI ON 01 22 00 Page 5 i nst al l t he el ect r i cal f eeder s and l i ght i ng i n accor dance wi t h Sect i on

26 05 01. 02 SPI LLWAY GATE FEEDER AND LI GHTI NG REPLACEMENTS FOR PACKAGE B.

Asbest os abat ement , l ead pai nt r emoval ( i f needed) shal l be i nci dent al t o t hi s payment .

1. 1. 1. 4. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 1. 5 Spi l l way Gat e Cont r ol Panel s

1. 1. 1. 5. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h " Spi l l way Gat e Cont r ol Panel s" , whi ch i ncl udes al l mat er i al s, equi pment , and l abor r equi r ed t o f ur ni sh and i nst al l t he spi l l way gat e cont r ol panel s i n accor dance wi t h Sect i on 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B of t he speci f i cat i ons. Mat er i al s i ncl ude, but not l i mi t t o, el ect r i cal condui t s, el ect r i cal cabl es, spi l l way gat e cont r ol panel s, mot or st ar t er , cont r ol t r ansf or mer , t r ansf or mer f or condensat e heat er s, f usi ng, r el ays and t er mi nal s. Asbest os abat ement ( i f needed) , l ead pai nt r emoval ( i f needed) of t he exi st i ng spi l l way gat e cont r ol panel s, and new manuf act ur er ' s pai nt i ng shal l be i nci dent al t o t hi s payment .

1. 1. 1. 5. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 1. 6 Asbest os Abat ement Wor k

Asbest os abat ement wor k shal l be as speci f i ed i n Sect i on 02 82 14. 02 ASBESTOS ABATEMENT WORK FOR PACKAGE B. For t he pur poses of t hi s cont r act , i t i s assumed t hat al l wi r i ng i nsi de cont r ol cabi net s cont ai ns asbest os.

1. 1. 1. 6. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h " Asbest os Abat ement Wor k, " whi ch i ncl udes f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , and l abor r equi r ed t o r emove al l asbest os cont ai ni ng mat er i al s. Thi s wi l l i ncl ude consi der at i on f or al l cost s associ at ed wi t h bul k sampl i ng, t est i ng, submi t t al pr epar at i on, asbest os wor k mobi l i zat i on and demobi l i zat i on, di sposal of ACM, and ser vi ces of cer t i f i ed asbest os abat ement and ai r moni t or i ng per sonnel .

1. 1. 1. 6. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 1. 7 Br akes, Gear mot or s, Shaf t s, and Coupl i ngs

1. 1. 1. 7. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h " Br akes, Gear mot or s, Shaf t s, and Coupl i ngs" , whi ch i ncl udes al l mat er i al s, equi pment , and l abor r equi r ed t o f ur ni sh and i nst al l t he br akes, gear mot or s, shaf t s, and coupl i ngs i n accor dance wi t h Sect i ons 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B and 05 50 15. 02 - METAL FABRI CATI ONS FOR PACKAGE 5 of t he speci f i cat i ons. Asbest os abat ement ( i f needed) , l ead pai nt r emoval ( i f needed) of t he exi st i ng br akes, gear mot or s, shaf t s and

SECTI ON 01 22 00 Page 6 coupl i ngs shal l be i nci dent al t o t hi s payment . New pai nt i ng f or new br akes, gear mot or s, shaf t s and coupl i ngs i n accor dance t o Sect i on

09 97 02. 02 PAI NTI NG: HYDRAULI C STRUCTURES FOR TAI NTER GATE MACHI NERY FOR

PACKAGE B shal l be i nci dent al t o t hi s payment .

Br akes: Mat er i al s i ncl udes condui t s and el ect r i cal cabl es t o i nst al l br akes. Modi f y i ng t he exi st i ng br ake bases, r emovi ng exi st i ng br akes, br ake encl osi ng cases, el ect r i cal cabl es and el ect r i cal condui t s shal l be i nci dent al t o t hi s payment . New shaf t at t he br ake and t wo new f l exi bl e coupl i ngs at t he end of t he shaf t shal l be i nci dent al t o t hi s payment .

Gear mot or s: Mat er i al s i ncl udes condui t s, el ect r i cal cabl es, mot or s, wor m gear s, and gear mot or bases. Modi f y i ng t he exi st i ng di al i ndi cat or shal l be i nci dent al t o t hi s payment .

1. 1. 1. 7. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 1. 8 Recondi t i oni ng Equi pment

Recondi t i oni ng equi pment shal l be pr ovi ded as speci f i ed i n Sect i on

35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B.

1. 1. 1. 8. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h " Recondi t i oni ng Equi pment " , whi ch i ncl udes f ul l compensat i on f or c l eani ng, i nspect i on, gr ease, oi l and i nspect i on r epor t s f or open gear s, encl osed gear s, shaf t bear i ngs and shaf t coupl i ngs i n accor dance wi t h Sect i on 35 20 20. 02 ELECTRI CAL

EQUI PMENT FOR GATE HOI ST FOR PACKAGE B.

1. 1. 1. 8. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 1. 9 Pi n Repl acement - Gat e No. 7

1. 1. 1. 9. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h t he r epl acement of t r unni on pi n f or gat e No. 7, as speci f i ed i n Sect i ons 05 50 15. 01 CI VI L WORKS FABRI CATI ONS FOR PACKAGE A and 05 50 17. 01 MECHANI CAL FABRI CATI ON FOR PACKAGE A, and as shown i n t he cont r act dr awi ngs. Payment wi l l be made at t he cont r act pr i ce per Job f or " Pi n Repl acement - Gat e No. 7" . Pi n keeper pl at e, scr ews, gat e suppor t / br aci ng, ( exi st i ng) pi n r emoval , f abr i cat i ng ( r epl acement ) t r unni on pi n, machi ni ng t r unni on pi n bushi ngs, pi n i nst al l at i on, shaf t c l amps, pi n and bushi ng i nspect i on and ot her r equi r ed mi scel l aneous i t ems f or pi n r epl acement shal l be i nci dent al t o t hi s payment.

a. Domol i t i on, l ead pai nt r emoval and new pai nt i ng f or pi n r epl acement ar e i nci dent al t o t hi s payment . For det ai l s, see Sect i on 02 41 00. 01 DEMOLI TI ON FOR PACKAGE A, Sect i on Sect i on 02 83 33. 01 REMOVAL/ CONTROL AND DI SPOSAL OF PAI NT WI TH LEAD FOR PACKAGE A and Sect i on 09 97 02. 01

PAI NTI NG: HYDRAULI C STRUCTURES FOR PACKAGE A.

SECTI ON 01 22 00 Page 7

1. 1. 1. 9. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 1. 10 J- Seal and Har dwar e Repl acement - Gat es No. 1- 3 & 6- 8

1. 1. 1. 10. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h t he r epl acement of J- seal f or Gat es No. 1- 3 & 6- 8, as speci f i ed i n Sect i ons 35 20 16. 01 TAI NTER GATE RUBBER SEALS FOR PACKAGE A and 05 50 15. 01 CI VI L WORKS FABRI CATI ON FOR PACKAGE A and as shown i n t he cont r act dr awi ngs. Payment wi l l be made at t he cont r act pr i ce per Job f or " J- Seal and Har dwar e Repl acement - Gat es No. 1- 3 & 6- 8" . Bol t s, scr ews, nut s, ( exi st i ng) J- seal r emoval , gasket s and ot her r equi r ed mi scel l aneous i t ems f or J- seal r epl acement shal l be i nci dent al t o t hi s payment .

a. Domol i t i on, l ead pai nt r emoval and new pai nt i ng f or J- seal and har dwar e r epl acement ar e i nci dent al t o t hi s payment . For det ai l s, see Sect i on 02 41 00. 01 DEMOLI TI ON FOR PACKAGE A, Sect i on 02 83 33. 01 REMOVAL/ CONTROL AND DI SPOSAL OF PAI NT WI TH LEAD FOR PACKAGE A and Sect i on 09 97 02. 01 PAI NTI NG: HYDRAULI C STRUCTURES FOR PACKAGE A.

1. 1. 1. 10. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 1. 11 Tr af f i c Cont r ol

1. 1. 1. 11. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h pr ovi di ng base cont r act t r af f i c cont r ol as speci f i ed i n Sect i on 01 00 00 GENERAL REQUI REMENT.

Payment wi l l be made at t he cont r act pr i ce per Job f or " Tr af f i c Cont r ol " .

1. 1. 1. 11. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 2 Opt i on 1 - Payment I t ems

1. 1. 2. 1 Per f or mance and Payment Bonds

1. 1. 2. 1. 1 Payment

Payment wi l l be made f or t he per f or mance and payment bonds t hat ar e r equi r ed as par t of Opt i on 1 of t hi s cont r act . The Gover nment wi l l pay t he act ual cost of accept abl e per f or mance and payment bonds or t he Cont r act or ' s bi d pr i ce, whi chever i s l ess. The Cont r act or shal l pr ovi de evi dence of payment ( pai d i nvoi ce) f r om t he bondi ng company or agency. I f t he act ual cost of t he bonds i s l ess t han t he l i ne i t em amount , t he cont r act wi l l be modi f i ed t o adj ust t he l i ne i t em accor di ngl y.

Adj ust ment ( s) t o t he l i ne i t em wi l l al so be made f or any r evi s i ons t o t he act ual bond cost s associ at ed wi t h cont r act changes.

1. 1. 2. 1. 2 Uni t of Measur e

Uni t of measur e: Job.

SECTI ON 01 22 00 Page 8

1. 1. 2. 2 Tai nt er Gat e: Lead Pai nt Removal and Pai nt i ng - Hydr aul i c Structures

1. 1. 2. 2. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h " Tai nt er Gat e: Lead Pai nt Removal and Pai nt i ng - Hydr aul i c St r uct ur e" , whi ch i ncl udes al l mat er i al s, equi pment , and l abor r equi r ed t o per f or m t he wor k i n accor dance Sect i ons

02 83 33. 02 REMOVAL/ CONTROL AND DI SPOSAL OF PAI NT WI TH LEAD FOR PACKAGE B

and 09 97 02. 02 PAI NTI NG: HYDRAULI C STRUCTURES FOR PACKAGE B.

a. Lead pai nt r emoval and di sposal shal l be per f or med on al l r emai ni ng equi pment t hat was not cover ed under payment par agr aph f or " Demol i t i on" . The equi pment i ncl udes, but not l i mi t ed t o, t ai nt er gat e machi ner y bases, gear housi ngs, chai n guar ds, l i mi t swi t ches, l i mi t swi t ch suppor t s, l i mi t swi t ch r educt i on assembl i es, hanger s, coupl i ngs, et c.

b. New pai nt i ng shal l be per f or med on al l r emai ni ng equi pment / machi ner y t hat was not cover ed under t he base cont r act . The equi pment i ncl udes, but not l i mi t ed t o, t ai nt er gat e machi ner y bases, machi ner y f r ames, gear housi ngs, chai n guar ds, l i mi t swi t ches, l i mi t swi t ch suppor t s, l i mi t swi t ch r educt i on assembl i es, hanger s, coupl i ngs, et c.

c. Lead pai nt r emoval , di sposal and new pai nt f or ( t r unni on) pi n r epl acement , J- seal / har dwar e r epl acement and access l adder s ar e not cover ed under t hi s payment . For det ai l s, see payment i t ems f or pi n r epl acement - Gat e No. 7, J- seal and har dwar e r epl acement , and met al ladders.

1. 1. 2. 2. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 2. 3 Tr af f i c Cont r ol

1. 1. 2. 3. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h pr ovi di ng Opt i on 5 t r af f i c cont r ol as speci f i ed i n Sect i on 01 00 00 GENERAL REQUI REMENT. Payment wi l l be made at t he cont r act pr i ce per Job f or " Tr af f i c Cont r ol " .

1. 1. 2. 3. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 3 Opt i on 2 - Payment I t ems

Pr ovi de l i mi t swi t ches and met al wor k f or l i mi t swi t ch bases i n accor dance wi t h Sect i on 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B and Sect i on 05 50 15. 02 CI VI L WORKS FABRI CATI ONS FOR PACKAGE B.

1. 1. 3. 1 Per f or mance and Payment Bonds

1. 1. 3. 1. 1 Payment

Payment wi l l be made f or t he per f or mance and payment bonds t hat ar e r equi r ed as par t of Opt i on 2 of t hi s cont r act . The Gover nment wi l l pay t he act ual cost of accept abl e per f or mance and payment bonds or t he

SECTI ON 01 22 00 Page 9

Cont r act or ' s bi d pr i ce, whi chever i s l ess. The Cont r act or shal l pr ovi de evi dence of payment ( pai d i nvoi ce) f r om t he bondi ng company or agency. I f t he act ual cost of t he bonds i s l ess t han t he l i ne i t em amount , t he cont r act wi l l be modi f i ed t o adj ust t he l i ne i t em accor di ngl y.

Adj ust ment ( s) t o t he l i ne i t em wi l l al so be made f or any r evi s i ons t o t he act ual bond cost s associ at ed wi t h cont r act changes.

1. 1. 3. 1. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 3. 2 Li mi t Swi t ches

1. 1. 3. 2. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h " Li mi t Swi t ches" , whi ch i ncl udes al l mat er i al s, equi pment , and l abor r equi r ed t o per f or m t he wor k i n accor dance Sect i on 35 20 20. 02 ELECTRI CAL EQUI PMENT FOR GATE HOI ST FOR PACKAGE B and Sect i on 05 50 15. 02 CI VI L WORKS FABRI CATI ONS FOR PACKAGE B.

Mat er i al s i ncl udes al l el ect r i cal condui t s and el ect r i cal cabl es t o i nst al l t he l i mi t swi t ches. Removi ng exi st i ng l i mi t swi t ches, el ect r i cal cabl es and el ect r i cal condui t s shal l be i nci dent al t o t hi s payment .

Pai nt i ng, l i mi t swi t ch bases, har dwar e, coupl i ngs t hat connect s t o t he l i mi t swi t ch i nput shaf t shal l be i nci dent al t o t hi s payment .

Removal of exi st i ng l ead pai nt shal l be i nci dent al t o t hi s payment .

1. 1. 3. 2. 2 Measurement

Measur ement wi l l be based on t he number of l i mi t swi t ch set s, at each gat e, sat i sf act or i l y f ur ni shed and i nst al l ed as r equi r ed under t hi s contract.

1. 1. 3. 2. 3 Uni t of Measur e

Uni t of measur e: Each ( EA) .

1. 1. 3. 3 Tr af f i c Cont r ol

1. 1. 3. 3. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h pr ovi di ng Opt i on 2 t r af f i c cont r ol as speci f i ed i n Sect i on 01 00 00 GENERAL REQUI REMENT. Payment wi l l be made at t he cont r act pr i ce per Job f or " Tr af f i c Cont r ol " .

1. 1. 3. 3. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 4 Opt i on 3 - Payment I t ems

Pr ovi de gat e r emot e cont r ol i n accor dance wi t h Sect i on 26 05 01. 02 TAI NTER

FEEDER AND LI GHTI NG REPLACEMENT FOR PACKAGE B.

1. 1. 4. 1 Per f or mance and Payment Bonds

1. 1. 4. 1. 1 Payment

Payment wi l l be made f or t he per f or mance and payment bonds t hat ar e

SECTI ON 01 22 00 Page 10 r equi r ed as par t of Opt i on 3 of t hi s cont r act . The Gover nment wi l l pay t he act ual cost of accept abl e per f or mance and payment bonds or t he Cont r act or ' s bi d pr i ce, whi chever i s l ess.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.